This document contains an errata notice and work package for repairs to a barge roof. The errata updates specifications for a roof reseal project on Barge IX-516 located at the Nuclear Power Training Unit in Charleston, South Carolina. It requires removing the existing roof coating, installing new rubber sealant to fill depressions and ensure proper drainage, and applying a new coating. Interested contractors must meet security requirements, be ISO 9000 compliant, and have a Navy Maintenance Database program and Agreement for Boat Repair. The related federal contract opportunity is solicitation N40027-20-R-0001 for repairs including the roof work on Barge IX-516 at the Nuclear Power Training Unit in Charleston. The opportunity is restricted and offers will only be accepted from holders of an Agreement for Boat Repair who meet the stated security and quality standards.

ERRATA ONE

View the file

Other files

Show all 27

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

THIS PERMANENT CHANGE UPDATES THE SPECIFICATION BID PACKAGE.

SHIP: IX-516 (RMC 22275)

SERM-016-20

ERRATA NUMBER:

SPECIFICATION NUMBER:

One

THE FOLLOWING ITEMS ARE REPLACED:

150-11-001

THE FOLLOWING ITEMS ARE CANCELED:

582-11-001

DATED: 11/4/2019 12:44:02PMPage 1 of 1

SHIP: IX-516 (RMC 22275) ITEM NO: 150-11-001 (E1)

COAR: 28 PCN: NPTU-L003

BWST FILE NO: 000-001 CMP: NONE

REVISED: 05 Apr 2019 PLANNER: See Attachment A

SSP: SERM-016-20 1 of 3 ITEM NO: 150-11-001 ERRATA NO. One

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

1. SCOPE:

1.1 Title: Re-seal Barge Roof; accomplish

1.2 Location of Work:

1.2.1 IX-516 Barge, 4th Level, Weather

1.3 Identification:

1.3.1 Quantity (18,720 SF); Sheathing, Roof, Detail One of 2.3

2. REFERENCES:

2.1 Standard Items

2.2 OSHA 1915, Maritime Requirements

2.3 150-6396670 Rev O, Details

2.4 150-6396666, Roof Secondary and Cross Section

2.5 150-6396667 Rev O, Roof Details

2.6 150-6396681, Bolt Schedule for Roof Framing

2.7 MIL-PRF-24667 Rev C, Coating DELETEDSystem, MS-880G Flexible Epoxy Nonskid Deck Coating

(E1)

3. REQUIREMENTS:

3.1 Accomplish a visual inspection of the IX-516 roof area and identify each discrepancies found. Ensure all personnel wears wear fall protection equipment during the visual inspection of the roof area in accordance with 2.2. Install and certify fall protection equipment on the roof of the IX-516 in order to support work on the IX-516 barge in accordance with 2.2 through 2.7.6. Contractor shall ensure all anchoring points of the fall protection equipment installed are tested and certified in accordance with 2.2 through 2.7 6 prior to the start of the work.

(E1)

3.1.1 Submit one (1) legible copy of, in hard copy or approved transferrable media, of a report listing the requirements of 3.1 to the SUPERVISOR

(E1)

3.1.2 Accomplish the requirements of 009-09 of 2.1 for the reseal of roof coated in 1.3.

(E1)

3.2 Remove Install existing new roof coating system and install new rubber sealant to the entire roof area. Fill depressions, low spots, irregularities, and shape for proper drainage to the entire roof area listed in 1.3 and located in 1.2, using 2.3 through 2.7.6.

(E1)

3.2.1 Accomplish an inspection of the new newly installed rubber roof sealant coating on system location-listed at location listed in.1.2. Verify all depressions, low spots, and irregularities are filled and properly shaped for drainage of the entire roof area listed in 1.3 and located in 1.2, using 2.3 through 2.7.6. Ensure

(E1)

SSP: SERM-016-20 2 of 3 ITEM NO: 150-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

there is no water standing standing.water.

3.3 Accomplish the requirements of OO9-32 of 2.1 for new and disturbed surface.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

1. None.

SSP: SERM-016-20 3 of 3 ITEM NO: 150-11-001

EXPORT CONTROLLED DATA: This document contains technical information whose export is governed by U.S.

International Traffic in Arms Regulation (ITAR). This information must not be transferred to a foreign person/entity without proper authorization of the U.S. Government. Violations may result in administrative, civil, or criminal penalties.

Attachment A

Planners

BUNTING, ANTHONY

BURGOS, LUIS

GEVARA, JOHN

PERRONE, MICHAEL

RANCK, JEFFREY

RUIZ, FREDY

File details come from the government source that posted it. Updated .