N3904026Q5424 Exhibit A.docx

DOCX document 22 KB Posted

Attached to
100 STUDS, CONTINUOUS THREAD (PNSY) Federal contract opportunity
Solicitation number
N3904026Q5424
Issued by
Department of the Navy Naval Sea Systems Command

About this file

This is an Exhibit A document containing the Contract Data Requirements List (CDRL) and certification requirements for a federal procurement of 100 continuous thread studs (part number referenced as PNSY). The document specifies that two Certificates of Compliance must be submitted with each shipment of material—one referencing specification MIL-DTL-1222 and another referencing specification QQ-N-286. Both certificates must be submitted one-time with the material delivery and distributed via mail without requiring DD Form 250 documentation.

The Certificate of Compliance requirements mandate that a quality assurance official sign and date the certification, attesting that all items furnished are in full compliance with contract requirements. The certificate must include material identification details such as lot number, batch, part number, contract number, order number, item number, National Stock Number (NSN), manufacturer's part number, serial number, drawing reference, and manufacturer's lot/heat numbers. All required inspection and test reports referenced in the DD Form 1423 attachment must accompany the signed statement to ensure traceability to each contract item and verify that the actual attributes of furnished items meet all contract specifications.

View the file

Other files for this federal contract opportunity

Other files attached to 100 STUDS, CONTINUOUS THREAD (PNSY), newest first.
File Type Posted
N3904026Q5424 Combined Synopsis Solicitation.docx DOCX document
N3904026Q5424 Attachment 1 - TCs.docx DOCX document

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACT __________________

PRINTED 7 MARCH 2025 PAGE _______

ATTACHMENT 1 TO EXHIBIT A (DD FORM 1423)

SYSTEM/ITEM: STUDCATEGORY ____________
ITEM NO0001CONTRACTOR
01SEQ NOA001AA
02DATA DESCCERTIFICATE OF COMPLIANCE
03SUBTITLEMIL-DTL-1222
04DID NUMBERPER ATTACHMENT 1 TO EXHIBIT A
05CONTRACT REFPARA. C.3.1
06TECH OFFICE2310.3
07DD 250 REQDD
08APP CODE
09IAC INPUT
10FREQUENCYO-TIME
11AS OF DATE
12DATE 1ST SUBMWITH MATERIAL
13DATE SUB SUBM
14DISTRIBUTION410__/0 VIA MAIL (N0 DD 250 REQD)
15TOTAL__
16REMARKS

SEQ. NO. A001

PREPARED BY ________________________________________________DATE__________________
APPROVED BY ________________________________________________DATE__________________
DD FORM 1423

CONTRACT __________________

PRINTED 7 MARCH 2025 PAGE _______

EXHIBIT A

(ADP DD FORM 1423 (MECHANIZED EQUIVALENT) PER DAR CLAUSE 16-815)

CONTRACT DATA REQUIREMENTS LIST

SYSTEM/ITEM: STUDCATEGORY ____________
ITEM NO0001CONTRACTOR
01SEQ NOA001AB
02DATA DESCCERTIFICATE OF COMPLIANCE
03SUBTITLEQQ-N-286
04DID NUMBERPER ATTACHMENT 1 TO EXHIBIT A
05CONTRACT REFPARA. C.3.2
06TECH OFFICE2320.3
07DD 250 REQDD
08APP CODE
09IAC INPUT
10FREQUENCYO-TIME
11AS OF DATE
12DATE 1ST SUBMWITH MATERIAL
13DATE SUB SUBM
14DISTRIBUTION410__/0 VIA MAIL (N0 DD 250 REQD)
15TOTAL__
16REMARKS

SEQ. NO. A001

PREPARED BY ________________________________________________DATE__________________
APPROVED BY ________________________________________________DATE__________________
DD FORM 1423

CONTRACT/SOLICITATION ________________________________________________________________ ITEM ___________________________________________ (DATE FOR ITEM) ___________________

REQUIRED CERTIFICATION

A. CERTIFICATION SHALL BE SUPPLIED WITH EACH SHIPMENT OF MATERIAL. CERTIFICATION (CERTIFICATE OF COMPLIANCE) SHALL BE SUPPLIED AS OUTLINED IN PARAGRAPH B. THE VENDOR IS LIABLE FOR CONDUCTING ALL TESTS, ANALYSES, INSPECTIONS, AND EXAMINATIONS, ETC., AS SPECIFIED BY THE CONTRACT AND SPECIFICATIONS WHETHER CERTIFICATIONS ARE REQUIRED OR NOT.

CERTIFICATE OF COMPLIANCE (PROVIDE THE FOLLOWING VERBATIM STATEMENT OR COMPLETE THE OPTIONAL FORM AT THE END OF THIS PART)

"I ATTEST ALL ITEMS FURNISHED ON THIS CONTRACT ARE IN FULL COMPLIANCE WITH ALL CONTRACT REQUIREMENTS".

B. CERTIFICATION SHALL BE SUPPLIED PER THE FOLLOWING INSTRUCTIONS:

1. THE CERTIFICATION OF COMPLIANCE SHALL CONTAIN THE SIGNATURE AND TITLE OF THE VENDOR OFFICIAL DESIGNATED RESPONSIBLE FOR QUALITY ASSURANCE.

2. THE MATERIAL IDENTIFICATION (E.G. LOT, BATCH, PART #, ETC.) SHALL BE INCLUDED ON THE CERTIFICATE OF COMPLIANCE.

CERTIFICATE OF COMPLIANCE

COMPANY NAME

MATERIAL IDENTIFICATION (COMPLETE APPLICABLE ITEMS)

CONTRACT NO. ______________ ORDER NO. ________________ ITEM NO. ____________________ NATIONAL/LOCAL STOCK NO. NSN/LSN ____________________________________________________ MANUFACTURER’S PART NO. _____________________________________________________________ MANUFACTURER’S SERIAL NO. ___________________________________________________________ DRAWING AND PIECE NO. _________________________________________________________________

MANUFACTURER’S LOT/HEAT NOS. AS MARKED ON THE MATERIAL _________________________

ALL INSPECTIONS AND TEST REPORTS REQUIRED BY ATTACHMENT I TO EXHIBIT A (DD FORM 1423) FOR TRACEABILITY TO EACH CONTRACT ITEM MUST ACCOMPANY THIS SIGNED STATEMENT:

THE INSPECTION AND TEST REPORTS (AS APPLICABLE) PROVIDED REPRESENT THE ACTUAL ATTRIBUTES OF THE ITEMS FURNISHED ON THIS CONTRACT AND INDICATE FULL COMPLIANCE WITH ALL CONTRACT REQUIREMENTS. I ATTEST ALL ITEMS FURNISHED ON THIS CONTRACT ARE IN FULL COMPLIANCE WITH ALL CONTRACT REQUIREMENTS.

SIGNATURE ___________________________________________________DATE _______________
QUALITY ASSURANCE OFFICIAL