This is a compliance checklist document for a Statement of Work (SOW) that outlines the technical specifications and delivery requirements for a compressed air system package with three operational subsystems: breathing air, tooling air, and blasting air.

The breathing air subsystem requires two 100 HP low-pressure air compressors (LPACs) delivering 400 CFM each, one 1000-gallon air receiving tank, two 400 CFM desiccant air dryers, and associated emergency stop controls with cabling. The tooling air subsystem requires one 200 HP LPAC delivering 800 CFM, one 1000-gallon tank, one 800 CFM dryer, and E-stop controls. The blasting air subsystem requires three 400 HP LPACs delivering 1600 CFM each, three 1000-gallon tanks, three 1600 CFM dryers, three E-stop systems, and seven compressed air manifolds. All LPACs must deliver 100% oil-free air regulated to 115 PSIG with maximum discharge temperatures of 100°F, and all desiccant dryers must deliver -40°F pressure dew point air. Common requirements include UL listing, weatherproof enclosures rated for -10°F to 110°F continuous outdoor use, ASME-rated tanks with 150 PSIG minimum working pressure, Camlok J-series electrical connections at 460V/3Ph/60Hz, and E-stop compatibility with up to 1500-foot cable runs. Contractor responsibilities include providing start-up, commissioning, and training; submitting a Quality Assurance Plan; maintaining the equipment with weekly inspections; providing repair service within 12 hours with unit replacement if repairs cannot be completed within 24 hours; and supplying technical manuals, PM schedules, equipment data sheets, and 24/7 emergency repair contacts. The document is a blank compliance matrix for use in verifying contractor adherence to SOW requirements.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Category Sub- Category Requirement

SOW

Reference Compliant (Yes/No) If No Explain

Component List Breathing Air

Qty 2: 100 HP

LPAC (400 CFM)

3.1.1, PC-

01/02

Qty 1: 1000 Gal Air Receiving Tank

Qty 2: 400 CFM Desiccant Air Dryer

04/05

Qty 2: E-stop and cabling

3.1.1, PC-

07/08

Tooling Air Qty 1: 200 HP

LPAC (800 CFM)

3.1.2, PC-

Qty 1: 1000 Gal

Tank

Qty 1: 800 CFM

Dryer

Qty 1: E-Stop

3.1.2, PC-

Blasting Air

Qty 3: 400 HP

LPAC (1600

CFM)

3.1.3, PC-

14-16

Qty 3: 1000 Gal

Tank

17-19

Qty 3: 1600 CFM

Dryer

20-22

Qty 3: E-Stop

3.1.3, PC-

28-30

Ancillary

Qty 7:

Compressed Air Manifolds

3.1.3, PC-

31-37

Hoses

Various lengths of 3" and 2" Air Hose 3.1

100 HP

LPAC Performance

400 SCFM,

100% Oil Free Air 3.2

Max 125 PSIG, Regulated to 115

PSIG 3.2

Air-Cooled, max discharge temp 100°F 3.2

Electrical

460V/3Ph/60Hz, 200A FLA, 400A

Start 3.4

Camlok connections (J series) 3.4

Physical Max Footprint (LxW): 90" x 54" 3.3

Weatherproof enclosure for - 10°F to 110°F 3.2

Safety/Control UL Listed 3.2

E-stop compatible, with up to 1500ft cable 3.2.11

500 Gal Tank

ASME rated, 150 PSIG min working pressure 3.6

Vertical mounting, 3"

SPUD

connections, Oil-free 3.6

400 CFM

Dryer

Delivers -40°F PDP dew point 3.7

(LxW): 92" x 42" 3.7

120V/1Ph/20A power, UL listed 3.7

Redundant Breathing Air Package

Overall Design

System is designed for continuous, uninterrupted operation 3.2.1

Proposed system meets all functional requirements for a fully redundant breathing air package as detailed in SOW 3.2.1

200 HP

LPAC Performance

800 SCFM,

Air 3.8

Max 125 PSIG, PSIG 3.8

Electrical

400A FLA, 500A

Start 3.1 series) 3.1

Physical

Max Footprint (LxW): 106" x 66" 3.9

Safety/Control UL Listed 3.8 up to 1500ft cable 3.8.11

1000 Gal Tank

ASME rated, 150 working pressure 3.12

SPUD

connections, Oil-free 3.12

800 CFM

PDP dew point 3.13

(LxWxH): 105" x 58" x 72" 3.13 power, UL listed 3.13

400 HP

LPAC Performance

1550 SCFM,

Air 3.14

Max 150 PSIG, PSIG 3.14

Electrical

800A FLA 3.16

series) 3.16

Physical

Max Footprint (LxW): 120" x 76" 3.15

Safety/Control UL Listed 3.14 up to 1500ft cable 3.14.11

1000 Gal Tank

ASME rated, 150 working pressure 3.18

SPUD

connections 3.18

1550 CFM

PDP dew point 3.19

(LxW): 110" x 80" 3.19 power, UL listed 3.19

Common Items Manifolds

3" flow-through IN/OUT, six 1- 1/4" branch outputs 3.2

Hoses

Connections made on delivery with safety cables 3.21

Min working pressure of 150

PSI 3.21

Construction

Continuous outdoor use (-10 to +110°F), meets

NEC/ASME 4.1

New/Refurbished within 10 years 4.1

Contractor Resp.

Provide repair service within 12 hours 6.2

Replace unit if not fixed in 24 hours 6.2

Submit Quality Assurance Plan

(QAP) 6.2

Responsible for all PM and weekly inspections 6.3

Deliverables

Technical Manuals in waterproof case on each machine 6.5

24/7 emergency repair contacts 6.5

PM Schedules and Equipment Data Sheet

(EDS) 6.5

Services

Provide start-up, commissioning, and training 3.22, 6.4

Sub Category:
Compliant YesNo If No Explain311 PC 0102:
Component ListRow1:
Breathing AirRow1:
Compliant YesNo If No Explain311 PC 03:
Component ListRow2:
Breathing AirRow2:
Compliant YesNo If No Explain311 PC 0405:
Component ListRow3:
Breathing AirRow3:
Compliant YesNo If No Explain311 PC 0708:
Component ListRow4:
Compliant YesNo If No Explain312 PC 09:
Component ListRow5:
Tooling AirRow1:
Compliant YesNo If No Explain312 PC 10:
Component ListRow6:
Tooling AirRow2:
Compliant YesNo If No Explain312 PC 11:
Component ListRow7:
Tooling AirRow3:
Compliant YesNo If No Explain312 PC 13:
Component ListRow8:
Compliant YesNo If No Explain313 PC 1416:
Component ListRow9:
Blasting AirRow1:
Compliant YesNo If No Explain313 PC 1719:
Component ListRow10:
Blasting AirRow2:
Compliant YesNo If No Explain313 PC 2022:
Component ListRow11:
Blasting AirRow3:
Compliant YesNo If No Explain313 PC 2830:
Component ListRow12:
Ancillary:
Compliant YesNo If No Explain313 PC 3137:
Component ListRow13:
Hoses:
Compliant YesNo If No Explain31:
Compliant YesNo If No Explain32:
100 HP LPACRow1:
PerformanceRow1:
Compliant YesNo If No Explain32_2:
100 HP LPACRow2:
PerformanceRow2:
Compliant YesNo If No Explain32_3:
34:
ElectricalRow1:
34_2:
33:
PhysicalRow1:
32:
UL Listed:
32_2:
SafetyControlRow1:
3211:
500 Gal Tank:
36:
36_2:
37:
400 CFM DryerRow1:
37_2:
400 CFM DryerRow2:
37_3:
Overall Design:
Package:
321:
321_2:
38:
200 HP LPACRow1:
PerformanceRow1_2:
38_2:
31:
ElectricalRow1_2:
31_2:
Physical:
39:
UL Listed_2:
38_3:
SafetyControlRow1_2:
3811:
1000 Gal Tank:
Tank:
312:
312_2:
313:
800 CFM DryerRow1:
313_2:
800 CFM DryerRow2:
313_3:
314:
400 HP LPACRow1:
PerformanceRow1_3:
314_2:
400 HP LPACRow2:
316:
400 HP LPACRow3:
ElectricalRow1_3:
316_2:
400 HP LPACRow4:
Physical_2:
315:
400 HP LPACRow5:
UL Listed_3:
314_3:
400 HP LPACRow6:
SafetyControlRow1_3:
31411:
318:
1000 Gal TankRow1:
318_2:
319:
1550 CFM DryerRow1:
319_2:
1550 CFM DryerRow2:
319_3:
Manifolds:
32_3:
Common ItemsRow1:
321_3:
Common ItemsRow2:
HosesRow1:
321_4:
Common ItemsRow3:
41:
Common ItemsRow4:
ConstructionRow1:
41_2:
Common ItemsRow5:
62:
Common ItemsRow6:
Contractor RespRow1:
62_2:
Common ItemsRow7:
Contractor RespRow2:
62_3:
Common ItemsRow8:
Contractor RespRow3:
63:
Common ItemsRow9:
65:
247 emergency:
65_2:
65_3:
Services:
322 64:
Check Box1: Off
Check Box2: Off
Check Box3: Off
Check Box4: Off
Check Box5: Off
Check Box6: Off
Check Box7: Off
Check Box8: Off
Check Box9: Off
Check Box10: Off
Check Box11: Off
Check Box12: Off
Check Box13: Off
Check Box14: Off
Check Box15: Off
Check Box16: Off
Check Box17: Off
Check Box18: Off
Check Box19: Off
Check Box20: Off
Check Box21: Off
Check Box22: Off
Check Box23: Off
Check Box24: Off
Check Box25: Off
Check Box26: Off
Check Box27: Off
Check Box28: Off
Check Box29: Off
Check Box30: Off
Check Box31: Off
Check Box32: Off
Check Box33: Off
Check Box34: Off
Check Box35: Off
Check Box36: Off
Check Box37: Off
Check Box38: Off
Check Box39: Off
Check Box40: Off
Check Box41: Off
Check Box42: Off
Check Box43: Off
Check Box44: Off
Check Box45: Off
Check Box46: Off
Check Box47: Off
Check Box48: Off
Check Box49: Off
Check Box50: Off
Check Box51: Off
Check Box52: Off
Check Box53: Off
Check Box54: Off
Check Box55: Off
Check Box56: Off
Check Box57: Off
Check Box58: Off
Check Box59: Off
Check Box60: Off
Check Box61: Off
Check Box62: Off
Check Box63: Off
Check Box64: Off
Check Box65: Off
Check Box66: Off
Check Box67: Off
Text68:
Text69:
Text70:
Text71:
Text72:
Text73:
Text74:
Text75:
Text76:
Text77:
Text78:
Text79:
Text80:
Text81:
Text82:
Text83:
Text84:
Text85:
Text86:
Text87:
Text88:
Text89:
Text90:
Text91:
Text92:
Text93:
Text94:
Text95:
Text96:
Text97:
Text98:
Text99:
Text100:
Text101:
Text102:
Text103:
Text104:
Text105:
Text106:
Text107:
Text108:
Text109:
Text110:
Text111:
Text112:
Text113:
Text114:
Text115:
Text116:
Text117:
Text118:
Text119:
Text120:
Text121:
Text122:
Text123:
Text124:
Text125:
Text126:
Text127:
Text128:
Text129:
Text130:
Text131:
Text132:
Text133:
Text134:

File details come from the government source that posted it. Updated .