N3904025Q4405 Q and A as of 8.5.2025.pdf

PDF 101 KB Posted

Attached to
DLA Upright Rack Repair and Installation; Q & A as of 8/5/2025 Attached.
Solicitation number
N3904025Q4405
Issued by

About this file

This document is a Questions and Answers (Q&A) file for Solicitation N3904025Q4405 for DLA Upright Rack Repair and Installation at the Portsmouth Naval Shipyard. The Q&A provides detailed specifications about a single upright rack requiring repair, including dimensional details such as 40" depth, 5.5"x4" leg dimensions, and 25" of front post damage. The upright is a rolled form type with a 13' x 6" frame face size, and a 30" repair kit is recommended.

Key administrative requirements include all contractor personnel being US citizens, submitting a visit request, and bringing two forms of ID including a Real ID. The solicitation has been granted an extension, with the new submission deadline set for 8/8/2025 by 1PM EST. Potential bidders are directed to view a repair kit photo on Damotech.com and can schedule a site visit. Security protocols emphasize the need for proper identification and advance appointment with the Pass and ID office.

View the file

Other files

File Type Posted
N3904025Q4405 Request for Quote Updated 8.18.2025.pdf PDF
N3904025Q4405 Request for Quote.pdf PDF
N3904025q4405 RFQ.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Solicitation N3904025Q4405

DLA Upright Rack Repair and Installation

Question and Answers as of 8/4/2025

Q1. How many uprights need repair?

A1: One upright

Q2. Is a site visit possible?

A2. Yes

Q3. How deep is the upright?

A3. 40”

Q4. What is the leg dimension

A4. 5.5”x 4”

Q5. Is the rear post or cross member damaged?

A5. No

Q6. Is just the front post damaged?

A6. Yes

Q7. How high does the damage go?

A7. 25”

Q8. What Clearance will the team need if awarded the job?

A8. All personnel assigned by the contractor must be US citizens. The contractor is required to submit a visit request.

Q9. What can be done to minimize delays in security?

A9. Have two forms of ID including a Real ID and set up an appointment with Pass and

ID office.

Q10. What is the frame face size?

A10. 13’ x 6”

Q11. Can a photo of the punch type be provided?

A11. Photo of the repair kit suggested can be seen online at Damotech.com

Q12. Is the upright structural or rolled form?

A12. rolled

Q13. Height of repair kit needed?

A13. 30”

Q14. Can an extension be granted for submissions?

A14. Yes, The new date for submission will be 8/8/2025 by 1PM est

File details come from the government source that posted it. Updated .