N3904025Q2956 Combined Synopsis.docx
DOCX document 57 KB Posted
- Attached to
- Rental of One (1) 400 LPAC
- Solicitation number
- N3904025Q2956
About this file
This is a Combined Synopsis/Solicitation (RFQ N3904025Q2956) issued by Portsmouth Naval Shipyard for the rental of one VRLA 400 Low Pressure Air Compressor (LPAC) and associated equipment. The rental period is from March 25, 2025 to April 21, 2025, with an option period from April 22, 2025 to May 5, 2025, with place of performance at NOB, Norfolk, VA. This is a total small business set-aside under NAICS code 532490 with a size standard of $40 million.
The requirement includes the rental of a 100 HP electric-powered LPAC (400 CFM), 500-gallon air receiving tank, 400 CFM desiccant air dryer, air hoses, and distribution manifold. Key technical specifications include 100% oil-free air capability, 115 PSIG regulated pressure, remote emergency stop functionality, and outdoor operation capability in temperatures from -10°F to 110°F. The contractor must provide equipment start-up, commissioning services, preventative maintenance, training, and 24/7 repair service with 12-hour response time. Quotes are due by March 7, 2025 at 11:00 AM EST, with award to be made on a Lowest Price Technically Acceptable basis. The POC is Gordon Roberts III at gordon.j.roberts1@navy.mil.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Attachment 1- Enclosure 2 PNSY OPSEC Contract Requirements 25-032.pdf | ||
| N3904025Q2956 Combined Synopsis.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
REQUEST FOR QUOTATION
N3904025Q2956
COMBINED SYNOPSIS/SOLICITATION NOTICE:
Requirement Title: Rental of one (1) VRLA 400 LPAC Solicitation Number: N3904025Q2956 Response Deadline: 03/07/2025 @1100 EST POC: Gordon Roberts III (gordon.j.roberts1@navy.mil) ; 207-451-7119 Portsmouth Naval Shipyard, Kittery, ME
GENERAL INFORMATION:
1. This is a combined synopsis/solicitation for commercial products or commercial services prepared in accordance with the format in subpart 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; proposals are being requested and a written solicitation will not be issued Paper copies of this solicitation will not be available. This combined synopsis/solicitation SHALL be posted on SAM.gov.
2. This solicitation documents and incorporates provisions and clauses in effect through FAC 2025-03 and DFARS Change Notice 2025-0117. It is the responsibility of the contractor to be familiar with the applicable clauses and provisions. The clauses may be accessed in full text at these addresses:
https://www.acquisition.gov/browse/index/far and http://www.acq.osd.mil/dpap/dars/change_notices.html.
3. This solicitation is being issues as a(n): Request For Quotation (RFQ)
4. This acquisition is for: Total Small Business Set Aside
5. North American Industry Classification System Code (NAICS): 532490 “Other Commercial and Industrial Machinery and Equipment Rental and Leasing”
6. The size standard is: 40 Millions of Dollars
REQUIREMENT INFORMATION:
The Portsmouth Naval Shipyard requests responses from sources capable of providing the following: Rental of One (1) VRLA 400 LPAC
· Period of Performance: 03/25/2025 – 04/21/2025
· Option Period of Performance: 04/22/2025 – 05/05/2025
· Place of Performance: NOB, Norfolk, VA
METHOD OF PROPOSAL SUBMISSION:
Offers shall be emailed. All responsible sources may submit a quote which shall be considered by the agency.
System for Award Management (SAM): Vendors must be registered in the SAM database to be considered for award. Registration is free and can be completed on-line at http://www.sam.gov/.
All quotes shall include a completed technical specification sheet upon proposal.
THIS IS NOT AN ORDER
PLEASE PROVIDE DELIVERED PRICES, AVAILABILITY, AND PRICE SOURCE WITH QUOTE
REFERENCE # N3904025Q2956 DUE DATE: 03/10/2025 11:00 AM ET
| From: Portsmouth Naval Shipyard | Your company info: |
| Gordon.j.roberts1@navy.mil | Name: |
| Contracting, Code 410.2 | POC: |
| Kittery, ME 03904 | (P) |
| PHONE: 207-451-7119 | Email: |
| Cage Code: |
BUSINESS SIZE (circle one): SMALL LARGE PAYMENT TERMS ______%______DAYS
| MOBILIZATION TIME: _________ARO | PRICES DERIVED FROM (CHECK ONE) |
| F.O.B. DESTINATION, Y____N____ | ___COMMERCIAL PRICE LIST DATED |
| IF NO, SHIPPING COST__________. | ___INTERNAL PRICE LIST DATED |
| ___OTHER ( PLEASE EXPLAIN ) |
Please indicate your preferred payment method by checking one of the options below. Payment options available are WAWF and GCPC: Government Commercial Purchase Card (up to $100,000). Please ensure that you register for WAWF (www.wawftraining.com) GCPC_____ WAWF (Wide Area Workflow) _____
*Please note that purchase card orders are not paid up front. Once material is received, a Government cardholder may be contacted for purchase card information.
_X__ If checked, to be awarded on an “All or None” basis, and CPARS evaluation procedures apply.
YOUR SIGNATURE___________________________________DATE________________________
| ITEM |
| DESCRIPTION |
| QTY |
| Unit Price |
| Total |
| 0001 |
| Rental of One (1) VRLA 400 LPAC |
**In accordance with the Statement of Work** 4 Weeks
| 0002 |
| Freight |
**All shipping costs associated with Line Item 0001** 1 Job
| 1001 |
| Option to Extend: |
Rental of One (1) VRLA 400 LPAC **In accordance with the Statement of Work** 2 Weeks
Total:
· Period of Performance: 03/25/2025 – 04/21/2025
· Option Period of Performance: 04/22/2025 – 05/05/2025
· Place of performance is: NOB, Norfolk, VA
· For evaluation purposes, please provide any applicable procedures and technical information. If no information is provided, your quotation may be determined to be unresponsive.
· Award may be made on the basis of adherence to the schedule and/or soonest mobilization.
· Please provide published commercial labor rates and breakdown of total prices, if applicable, for Price Justification purposes.
· See Below for Detailed Statement of Work and Applicable Clauses.
ALL OFFERS SHALL INCLUDE THIS FORM FILLED OUT IN ITS ENTIRETY (HIGHLIGHTED YELLOW FIELDS ARE REQUIRED).
STATEMENT OF WORK
1. SCOPE
1.1. Portsmouth Naval Shipyard (PNSY) is seeking to lease one electric powered Low Pressure Air Compressor (LPAC). The applications are for establishing a Tool Air system. The compressed air system will have a dedicated compressor with controls, pressure regulator, storage tank, air dryer, distribution manifold, and compressed air hoses. The minimum allowable requirements for the system is detailed in the Statement of Work (SOW) below. The compressor plant shall be designed for outdoor use and will be subjected to inclement weather year round. The vendor shall be responsible for supplying all fittings and adaptors required to make all equipment, manifold, & hose connections. The vendor shall be responsible for setting up the compressors & support equipment and also provide equipment startup and commissioning, as requested by PNSY. The application for the compressed air systems is located at NOB Norfolk, VA.
2. APPLICABLE DOCUMENTS
2.1. Issues of Publications - The following documents in effect on the date of this requested proposal is a part of this specification to the extent applicable, or as specified herein. Within the specification, they shall be referred to by their basic designation only.
2.1.1. Government Furnished
2.1.1.1. N/A
2.1.2. Nongovernment Furnished
2.1.2.1. CGA G-7.1-2018: Commodity Specification for Air, Seventh Edition
2.1.2.2. ISO 8573-1:2001
2.1.2.3. OSHA 29 CFR 1910.169, Compressed Gas and Compressed Air Equipment, Air Receivers
2.2. Order of precedence - In the event of conflict between the text of this specification and that of the references cited above, the text of this specification shall take precedence. Nothing in this specification, however, shall supersede applicable laws or regulations unless a specific exemption has been obtained.
3. REQUIREMENTS
3.1. Component List
3.1.1. 100 HP LPAC Required components.
| PIECE NO. |
| QTY. |
| NAME OF PART |
| PARA NO. |
| CP-01 |
| 1 |
| 100 HP LPAC (400 CFM) |
| 3.2 |
| CP-02 |
| 1 |
| 500 Gal Air Receiving Tank |
| 3.6 |
| CP-03 |
| 1 |
| 400 CFM Desiccant Air Dryer |
| 3.7 |
| CP-04 |
| 250 FT |
| 3 IN Air Hose |
| 3.8 |
| CP-05 |
| 1 |
| Manifold |
| 3.9 |
| CP-06 |
| 200 FT |
| Electrical Power Cable |
| 3.4 |
3.2. 100 HP Electric LPAC Requirements
3.2.1. Nominal Compressed air flow rate: 400 SCFM.
3.2.2. Maximum system pressure: 125 PSIG.
3.2.3. Regulated delivered Air Pressure Set point: 115 PSIG.
3.2.4. Compressor shall be designed to deliver 100% Oil Free air capable of meeting the requirements as defined in section(s) 2.1.2.1 thru 2.1.2.4. Oil Flooded compressors are not acceptable.
3.2.5. Compressor connection: 3 Inch. Compressor must be supplied with Male/Female SPUD Fitting(s) as required for connection to downstream drying/filtering equipment.
3.2.6. Compressor shall be a fully packaged Air-Cooled unit including intercooler/after cooler to maintain a package maximum discharge compressed air temperature of 100F under all ambient conditions in order to protect downstream drying/filtering equipment.
3.2.7. Compressor shall enclosed in a weatherproof enclosure suitable for outdoor operation with an ambient operating temperature range of -10°F to 110°F without the need for additional shelter/protection.
3.2.8. All opening/connections/flanges are to be cleaned and capped.
3.2.9. Compressor shall be UL listed.
3.2.10. All vendor supplied equipment shall be capable of operating in below freezing temperatures and include freeze protection measures on components that are prone to freezing if local temperatures could drop below freezing(e.g. condensate line, water separators, and drains)
3.2.11. LPAC must be pre-wired for and compatible with a Remote Emergency Stop (E-stop) Switch. This will enable the LPAC to be shut down in response to an emergency condition where air needs to be secured. The Contractor shall route all E-stops switch & control wiring to a central location designated by the government where the LPAC equipment can be secured.
3.2.11.1. The E-stop cable distance to be routed is estimated at 500 Ft, however, the Contractor shall be prepared to provide & route up to 1500 FT of wire to accommodate complex routing paths, cable routing around obstacles, service brows, electrical service chases, etc.
3.2.11.2. E-stop switch shall be equipped with protective Plexiglas or acrylic style clear cover to prevent inadvertent activation.
3.2.11.3. E-stop cabling must utilize heavy-duty industrial cable for use in flexible, portable, and extra-hard usage applications (type SO cable or equivalent).
3.3. 100 HP LPAC Physical Dimension
3.3.1. Maximum Allowable Footprint (L x W) Inches: 90 X 54
3.3.2. Maximum Allowable Weight (lbs): N/A
3.4. 100 HP LPAC Electrical Requirements:
3.4.1. Operating Voltage: 460 VAC 3 Phase 60 Hz
3.4.2. Maximum Starting Amperage: 400A
3.4.3. Maximum Operating Amperage (FLA): 200A
3.4.4. All onboard low voltage controls must have integral transformer to provide necessary voltage stepdown. Compressor must operate from one 460VAC circuit.
3.4.5. The Compressor shall be equipped with electrical power cable, 200 FT in length.
3.4.6. The power cable wire gauge must be sized properly to minimize voltage drop over 200 Ft and handle full load run amperage as well as start-up in rush current.
3.4.7. Power cable shall be delivered with fabricated, watertight, camlok connections. (Ex. Duraline, Leviton)
3.5. 100 HP LPAC Operating and Safety Controls:
3.5.1. Compressor shall cycle using control logic based on maintaining system pressure.
3.5.2. Compressor and any pressure vessels within the package must be fitted with appropriate safety relief valve(s).
3.5.3. Pressure relief set point shall not exceed the working pressure rating of any component in line with the compressed air system (125 PSI).
3.5.4. Alarm(s)/controls to maintain compressor operable and all compressed air quality requirements as defined in this statement of work.
3.5.5. The Tooling Air Compressor shall be equipped with Remote Emergency Stop Switch (E-stop) as defined in paragraph 3.2.11. of this statement of work
3.6. 500 Gallon Compressed Air Receiver Tank Requirements:
3.6.1. 500 Gallon, ASME rated Pressure Vessel
3.6.2. Minimum working pressure rating: 150 PSIG
3.6.3. Pressure Relief valve and tank drain meeting the pressure requirements to protect the supplied air receiver and compressed air system.
3.6.4. Tank maintenance & construction shall meet all requirements in accordance with Section 2.1.2.3
3.6.5. Tank shall be equipped with lashing/ tie down points and base mount bolt pattern to enable the tank to be properly secured.
3.6.6. 3 IN connections: SPUD Fittings, M & F
3.6.7. Air Receiving tank shall be 100% free of any oily residue and shall be suitable to support and meet all requirements defined in section 2.1.2.
3.7. Desiccant Dryer Requirements:
3.7.1. Nominal Inlet Flow rate: 400 SCFM
3.7.2. Compressed air outlet flow Dew Point: -40°F PDP under full load of the supplied air compressor.
3.7.3. Ambient Operating Temperature range: -10°F to 110°F
3.7.4. Maximum Allowable Footprint (L x W) Inches: 92 X 42
3.7.5. Maximum Allowable Weight (lbs.): N/A
3.7.6. Nominal Rated Working Pressure (PSIG): 150
3.7.7. Inlet / Outlet Connections: 3IN NPT
3.7.7.1. Note: If the air dryer is manufactured with 2 IN NPT connections, adaptors shall be required to enable 3 IN SPUD connections for hose connections.
3.7.7.2. NPT to 3 IN SPUD adaptors.
3.7.8. Dryer shall be equipped with particulate and oil removal pre-filters c/w automatic condensate drains and a one micron dust after filter.
3.7.9. The desiccant dryer shall consume no more than 18% of the LPA input volume for purging to a –40°F dew Point.
3.7.10. The Desiccant dryer shall operate from one circuit rated at: 120 VAC, single phase, 20 Amp, 60Hz.
3.7.11. Dryer shall be UL listed.
3.8. Equipment Air Hose Connection & Distribution Hose Requirements:
3.8.1. The contractor shall, on delivery, make all 3 IN hose connections between compressor, dryer, and air receiver, and all hose connections must have safety cables (Safety Restraint Devices) installed to prevent hose whip in case of accidental separation of coupling or clamp device. The Vendor shall provide the necessary length to make all connections.
3.8.2. The Vendor shall provide 3 IN, non-collapsible, pneumatic rubber hose- 50 FT. hose length per sections. Connections shall be industry standard MxF SPUD connections.
3.8.3. All compressed air hose and fittings shall have a minimum working pressure of 150 PSI.
3.8.4. The Vendor shall provide all necessary interconnecting hose, elbows, & hardware.
3.9. Compressed Air Distribution Manifolds:
3.9.1. The compressed air system will require a distribution manifold to supply air to various tooling equipment from the receiving air tank.
3.9.1.1. Manifold Input: The distribution manifold shall be supplied from the receiving air tank via a 3 inch inlet hose equipped with SPUD connections.
3.9.1.2. Manifold 3 Inch Flow Through Output: The distribution manifold shall be equipped with one 3 IN outlet connection to enable 3 Inch hoses sections to “flow through” each given manifold, enabling several manifolds to be “daisy chained” in series to a single 3 IN pneumatic distribution line.
3.9.1.3. 3 IN manifold Input and 3 IN manifold output shall be configured as a matched set of MxF SPUD connections.
3.9.1.4. Manifold Branch Outputs: The distribution manifold shall contain a minimum of four (4) output connections, 1 1/4-IN pneumatic SPUD connections. Each output shall have an isolation valve so each branch lines may be individually isolated.
3.10. Equipment Start-up/ Commissioning Services
3.10.1. Contractor must provide start-up and commissioning services to prepare the equipment to be placed into service. This includes but is not limited to the following:
3.10.1.1. Energizing low pressure compressed air equipment
3.10.1.2. Pressurizing the system
3.10.1.3. Performing leak check of all contractor made connections
3.10.1.4. Adjusting setpoint(s) to meet the requirements of this Statement of Work
3.10.1.5. Verifying satisfactory operation of all drains installed on equipment
3.10.1.6. Troubleshooting/adjudicating any alarm conditions present on start-up (See 6.4)
3.10.1.7. Training Government operators in equipment function, control and alarm(s)/indications.
4. NOTES:
4.1. Construction: Except as noted for a particular machine type, units shall be a single integrated framed structure manufactured as a complete entity to include all devices, accessories, and fittings necessary to perform the function for which it was designed. Each unit shall be capable of continuous, year-round, outdoor, unmanned operation even at minimal loading while exposed from inclement to extremely harsh weather (e.g. deep snow, strong & gusty winds, and/or heavy rain) and varied ambient conditions (–10 to +110°F & 0 to 100% RH). Machines shall meet State and federal requirements for its type such as the National Electrical Code (NEC) for electrical devices / components and the American Society of Mechanical Engineers (ASME) for pressurized vessels / components. Machines shall be modular in design so as to act as a stand-alone unit; compact so as to fit in the tight confines of a drydock; portable so as to be transported by forklift and then lifted by crane; and ruggedly constructed so as to endure a marine industrial environment. Machines shall be newly manufactured / completely refurbished and factory tested within ten (10) years.
4.2. Supplemental Equipment: For the protection and cleanliness of the machinery components, all connection points shall be shipped with plug/cap fittings.
4.3. Electrical: Electrical components shall conform to a NEMA standard (NEMA 3) that allows for unsheltered outdoor use of the unit. Each machine shall require only one type / source of electrical power (460 VAC +5% / three-phase / 60 hertz). The type of electrical power required (voltage & amperage) must be clearly indicated on the outside of the equipment, readily detected, and collocated with all other electrical information. The Vendor shall provide the Project Temporary Services Zone Manager with the following details: (i) electrical power type (amperage & voltage); (ii) type of electrical connectors (for three phase, specify whether or not equivalent to Duraline 4M20); (iii) breaker type/size or recommended capacity for the electrical source; and (iv) whether the machine is furnished with over-current protection.
4.4. Lifting & Handling:
4.4.1. N/A
4.5. Machinery / Equipment Tagging and Markings: All piping inlet(s) / outlet(s) must be clearly marked. Machinery and itemized equipment require tagging to show Project Number / Technical Specification Identification (ID) Number
4.6. Vendor Identification Of Itemized And Ancillary Equipment: The Contractor shall uniquely tag and permanently mark all of its ancillary and itemized equipment / hardware (e.g. manifolds, hose assemblies, pipe fittings, duct adapters, ducting, etc.) so as to differentiate from that owned by either the Shipyard or other Vendors.
4.7. Dead Front Control Panel or External Controller: Access to basic machinery controls, such as a Dead Front Control Panel or External Controller, shall be such that there is non-exposure to energized "live" electrical circuits or other components regardless of voltage, to include control circuitry, by "a person on the operating side of the equipment".
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1. N/A
6. RESPONSIBILITITES
6.1. Government
6.1.1. Equipment Technical Evaluation: C230 Engineering
6.1.2. Receipt Inspection: COR, TPOC & Zone Manager (ZM)
6.1.3. Schedule equipment delivery & returns: COR, TPOC & ZM
6.1.4. Schedule equipment service, repair, and training: COR, TPOC & Project Zone Manager.
6.2. Contractor
6.2.1. Any and all required State approved safety features (i.e. safety pressure relief valves, low water cutout, over pressure protection) installed with applicable State certification.
6.2.2. The contractor shall maintain a stringent maintenance program and be responsible for all preventative maintenance, except for daily check of liquid levels. The contractor shall provide oil, filters, coolant, and lubricant for engine and compressor operation during the rental period.
6.2.3. The contractor shall provide repair service within twelve (12) hours after notification by the Contracting Officer or his/her representative. In the event the machine cannot be returned to service within twenty-four (24) hours of notification, the Contractor shall deliver a replacement at no extra charge to the Government.
6.2.4. The contractor shall provide equipment start-up, and on site commissioning per SOW 3.10.
6.2.5. The contractor shall be responsible for equipment failure not arising out of abuse or negligence by the government.
6.2.6. There shall be no changes unless authorized by the Contracting Officer.
6.2.7. The Contractor shall provide technical support to PNSY project personnel as required.
6.2.8. The Contractor shall provide all deliverables specified in section 6.5.
6.3. Maintenance
6.3.1. Surveillance Checks. The Government will conduct daily surveillance checks of the equipment, which is limited to a visual inspection verifying no alarm conditions or obvious deficiencies are present (Ex. Abnormal Noises, Vibrations, leaks). Except for daily surveillance checks, the Contractor is responsible for all equipment preventative maintenance, weekly inspections and repairs for the duration of the lease. The Contractor shall coordinate with the COR and TPOC, in writing, to schedule preventative maintenance and weekly inspections.
6.3.2. Preventative Maintenance & Weekly Inspections. The Contractor shall perform Preventative Maintenance and Weekly Inspections of the equipment during the contract. The Contractor shall provide a Preventative Maintenance (PM) plan with schedules which are equipment specific and include a list of actions for both weekly inspections and PM. At a minimum, the list of actions shall meet all requirements recommended by the Original Equipment Manufacturer (OEM). If a list of actions is not available from or recommended by the OEM, the Contractor shall develop a list of actions and perform these services in accordance with the SOW. Weekly inspections shall be performed by a qualified service technician provided by the Contractor and shall consist of checking all functional operating parameters of each individual piece of equipment including, but is not limited to: verifying correct equipment set-up, performance and operation, checking for diagnostic or trouble codes. The PM plan actions list for each piece of equipment shall include a comprehensive list of the components to be serviced as well as identifying the service frequency (e.g., all consumables to be replaced, bearing grease points, belt replacement / tensioning, filter changes, refrigerant charge, oil changes, other lubrication, coolant refills, liquid top-offs, etc.) The Contractor shall prepare and submit a technical field report that identifies what was included in the weekly inspection, the results of the inspection, and which PM plan actions were performed, what system, equipment or component was serviced, when the PM was performed and next scheduled PM date. Copies of all reports shall be delivered to the COR and TPOC upon completion of the service.
6.3.3. Repairs. The Contractor shall provide a qualified service technician to repair all equipment deficiencies and malfunctions and return the system to an operable condition. The response time for the repair or replacement of deficient equipment shall meet the requirements defined in section 6.2.
6.4. Training. The Contractor is responsible for and shall provide training sessions to Shipyard Personnel on the operation and setup of all equipment. Training shall be available throughout the duration of the lease to accommodate equipment swap out and seasonal equipment operation.
6.5. Deliverables. The Contractor shall deliver the following information, electronically to the COR and TPOC, and in hard copy when the equipment is delivered to the Government:
6.5.1. Technical Instructions (TIs) such as Operations & Maintenance Manuals, Operating Instructions, Controls Manual, and/or Mechanical/Electrical Manual with Schematics; Note, all Technical Instructions shall be located in a water proof case affixed to each machine.
6.5.2. Points of contact with telephone numbers for requesting emergency repairs 24 hours 7 days a week
6.5.3. Preventative Maintenance Schedules. (See section 6.3)
6.5.4. Equipment Data Sheet (EDS)
7. DELIVERY / ACCEPTANCE / RETURN.
7.1. Delivery. Except as noted below in paragraph 7.3, the Contractor shall deliver machinery that is fully-charged, fully-assembled, ready-to-use, in a first-class-operating condition and functions as intended. The machinery with its support equipment shall be delivered to the site on or prior to the request date. The Contractor shall confirm the date and time of delivery prior to each delivery with the COR and TPOC, if appointed. The Government can provide forklift services for removing machinery from Contractor’s transport during work hours. The Contractor shall provide the COR and TPOC with an itemized list of all equipment delivered at the time of delivery.
7.2. Acceptance - Upon satisfactory completion of inspection and test of the equipment, the authorized Government Representative (Portsmouth Naval Shipyard, Code 990 Equipment Manager) will sign and forward the acceptance document(s) to Code 420 COR for completion. Unloading of equipment from Vendor’s transport does not signify acceptance.
7.3. Security - To be allowed onto a government Shipyard, personnel must be US citizens and in possession of appropriate personal identification. Proof of US citizenship may be necessary and can be required for access to the drydock. Allowable documentation of US citizenship is an official government issued Certificate of Birth or Naturalization (w/ raised seal & not a photocopy) or a valid US passport. Vehicular access requires a non-expired personal Driver’s License and appropriate vehicle identification or registration. The transport vehicle must have the company’s name / logo prominently displayed. To gain access to the drydock environs, authorization must be given by the Security Department, personnel must be escorted and possess / wear their own personal safety gear.
7.4. Receipt Inspection Criteria- Equipment must meet all criteria defined in this specification.
7.5. Final Acceptance. Upon satisfactory completion of inspection and test of the equipment, the authorized Government Representative (Portsmouth Naval Shipyard Code 990 Equipment Manager or Project Temporary Service Zone Manager) will sign and forward the acceptance document(s) to the POC as designated on the Contract and/or the COR for completion. Unloading of equipment from Contractor’s transport does not signify acceptance.
7.6. Return. The Government will provide a temporary storage location convenient for Contractor pick-up. The Government will notify the Contractor as well as the Contracting Office as to when the rental Item has been released and is available for pick-up. The last day of the rental period shall be the next normal workday after the Contractor has been so notified. The Contractor shall be responsible for shipping. The Government can provide forklift services during work hours for placing the equipment onto the Contractor’s transport.
8. ATTACHMENTS
8.1. N/A
| SOW |
| REQUIREMENT |
| COMPLIANCE WITH SOW. |
(See Instructions Below)
EXCEPTIONS TO SOW.
(See Instructions Below)
Equipment
3.2-3.4
100HP LPAC
100% Oil free air
Air pressure set point: 115PSIG
Remote E-Stop provided and connected
Air cooled
Compressor connection:3-IN
Max. starting amps: 400A
Max. operating amps: 200A
Operate from one 460VAC circuit
Suitable for outdoor operation
Dimensions
Freeze protection
UL listed
3.4
Electrical Power Cable
200ft in length
Camlok connections
Capable of supporting amperage
| 3.5 |
| Operating and Safety Controls |
3.6
500 Gallon Air Receiving Tank
ASME rated
Pressure relief valve
Air receiver connection:3-IN
Min. working pressure rating: 150 PSIG
3.7
Desiccant Air Dryer
Flow rate: 400SCFM
Air dryer connection:3-IN
-40°F pressure dew point
120 VAC, single phase, 20A
Rated working pressure: 150PSIG
Suitable for outdoor use
Dimensions
UL listed
3.8
3-IN Air Hose
250-FT total length
50-FT sections
SPUD Connections
Min. Working pressure:150PSI
Safety restraint devices
3.9
Manifold
3-IN inlet
3-IN outlet
Min. (4) 1.25-IN Connections
Isolation valves on each output
Services
| 3.10 |
| Equipment Start-up and Commissioning Services |
| 6.3 |
| Preventative Maintenance |
| 6.4 |
| Training |
| 6.5 |
| Deliverables |
INSTRUCTIONS
1. COMPLIANCE WITH SOW.
(i) Use YES or NO to identify if equipment and services comply with all SOW requirements.
(ii) Ensure answers are consistent with any brochures, specification sheets or other descriptive literature provided in your quote.
2. EXCEPTIONS TO SOW.
(i) Identify any exceptions to the SOW. Note: answers are required for any NO in prior column.
(ii) Explain reason for exception.
ENGINEERING APPROVAL
TECH POC: _ _______
REVIEWER: _________
APPROVAL: _________
CLAUSES:
CLAUSES:
Responsibility and Inspection: unless otherwise specified in the order, the supplier is responsible for the performance of all inspection requirements and quality control. The following FAR provisions and clauses are applicable to this procurement:
| 52.203-18 |
| Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements—Representation |
| 52.204-2 |
| Security Requirements |
| 52.204-7 |
| Disclosure of Information |
| 52.204-8 |
| Annual Representations and Certifications |
| 52.204-10 |
| Reporting Executive Compensation and First-Tier Subcontract Awards |
| 52.204-13 |
| System for Award Management Maintenance |
| 52.204-16 |
| Commercial and Government Entity Code Reporting |
| 52.204-17 |
| Ownership or Control of Offeror |
| 52.204-18 |
| Commercial and Government Entity Code Maintenance |
| 52.204-19 |
| Incorporation by Reference of Representations and Certifications |
| 52.204-20 |
| Predecessor of Offeror |
| 52.204-21 |
| Basic Safeguarding of Covered Contractor Information Systems |
| 52.204-22 |
| Alternative Line Item Proposal |
| 52.204-23 |
| Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities |
| 52.204-24 |
| Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment |
| 52.204-25 |
| Prohibition of Contracting for Certain Telecommunications and Video Surveillance Services or Equipment |
| 52.204-26 |
| Covered Telecommunications Equipment or Services--Representation |
| 52.209-2 |
| Prohibition on Contracting with Inverted Domestic Corporations—Representation |
| 52.209-6 |
| Protecting the Government’s Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment |
| 52.209-10 |
| Prohibition on Contracting with Inverted Domestic Corporations |
| 52.209-11 |
| Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law |
| 52.211-16 |
| Variation in Quantity |
| 52.211-17 |
| Delivery of Excess Quantities |
| 52.212-1 |
| Instructions to Offerors—Commercial Products and Commercial Services |
| 52.212-2 |
| Evaluation—Commercial Products and Commercial Services |
| 52.212-4 |
| Contract Terms and Conditions—Commercial Products and Commercial Services |
| 52.212-5 |
| Contract Terms and Conditions Required To Implement Statutes or Executive Orders—Commercial Products and Commercial Services |
| 52.215-1 |
| Instructions to Offerors—Competitive Acquisition |
| 52.215-6 |
| Place of Performance |
| 52.217-5 |
| Evaluation of Options |
| 52.217-9 |
| Option to Extend the Term of the Contract |
| 52.219-1 |
| Small Business Program Representations |
| 52.219-6 |
| Notice of Total Small Business Set-Aside |
| 52.219-28 |
| Post-Award Small Business Program Representation |
| 52.222-3 |
| Convict Labor |
| 52.222-19 |
| Child Labor—Cooperation with Authorities and Remedies |
| 52.222-21 |
| Prohibition of Segregated Facilities |
| 52.222-22 |
| Previous Contracts and Compliance Reports |
| 52.222-23 |
| Notice of Requirement for Affirmative Action to Ensure Equal Employment Opportunity for Construction |
| 52.222-26 |
| Equal Opportunity |
| 52.222-50 |
| Combating Trafficking in Persons |
| 52.223-5 |
| Pollution Prevention & Right-To-Know Information |
| 52.225-13 |
| Restrictions on Certain Foreign Purchases |
| 52.225-25 |
| Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran—Representation and Certifications |
| 52.226-7 |
| Drug-Free Workplace |
| 52.226-8 |
| Encouraging Contractor Policies to Ban Text Messaging While Driving |
| 52.232-33 |
| Payment by Electronic Funds Transfer—System for Award Management |
| 52.232-36 |
| Payment by Third Party |
| 52.232-39 |
| Unenforceability of Unauthorized Obligations |
| 52.232-40 |
| Providing Accelerated Payments to Small Business Subcontractors |
| 52.233-1 |
| Disputes |
| 52.233-3 |
| Protest after Award |
| 52.233-4 |
| Applicable Law for Breach of Contract Claim |
| 52.237-2 |
| Protection of Government Buildings, Equipment, and Vegetation |
| 52.244-6 |
| Subcontracts for Commercial Products and Commercial Services |
| 52.246-4 |
| Inspection of Services—Fixed-Price |
| 52.247-34 |
| F.o.b. Destination |
| 52.252-2 |
| Clauses Incorporated by Reference |
| 52.252-5 |
| Deviations in Provisions |
| 52.252-6 |
| Authorized Deviations in Clauses |
Additional DFARS contract terms and conditions applicable to this procurement are:
| 252.203-7000 |
| Requirements Relating to Compensation of Former DoD Officials |
| 252.203-7002 |
| Requirement to Inform Employees of Whistleblower Rights |
| 252.203-7005 |
| Representation Relating to Compensation of Former DoD Officials |
| 252.204-7003 |
| Control of Government Personnel Work Product |
| 252.204-7008 |
| Compliance with Safeguarding Covered Defense Information Controls |
| 252.204-7009 |
| Limitations on the Use or Disclosure of Third-Party Contractor Reported Cyber Incident Information |
| 252.204-7012 |
| Safeguarding Covered Defense Information and Cyber Incident Reporting |
| 252.204-7015 |
| Notice of Authorized Disclosure of Information for Litigation Support |
| 252.204-7016 |
| Covered Defense Telecommunications Equipment or Services--Representation |
| 252.204-7017 |
| Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services--Representation |
| 252.204-7018 |
| Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services |
| 252.204-7019 |
| Notice of NIST SP 800-171 DoD Assessment Requirements |
| 252.204-7020 |
| NIST SP 800-171 DoD Assessment Requirements |
| 252.204-7024 |
| Notice on the use of the Supplier Performance Risk System |
| 252.215-7010 |
| Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data--Basic |
| 252.215-7012 |
| Requirements for Submission of Proposals via Electronic Media |
| 252.215-7013 |
| Supplies and Services Provided by Nontraditional Defense Contractors |
| 252.223-7004 |
| Drug-Free Work Force |
| 252.223-7008 |
| Prohibition of Hexavalent Chromium |
| 252.225-7012 |
| Preference for Certain Domestic Commodities |
| 252.225-7031 |
| Secondary Arab Boycott of Israel |
| 252.225-7048 |
| Export-Controlled Items |
| 252.232-7003 |
| Electronic Submission of Payment Requests and Receiving Reports |
| 252.232-7006 |
| Wide Area WorkFlow Payment Instructions |
| 252.232-7010 |
| Levies on Contract Payments |
| 252.237-7010 |
| Prohibition on Interrogation of Detainees by Contractor Personnel |
| 252.243-7001 |
| Pricing of Contract Modifications |
| 252.244-7000 |
| Subcontracts for Commercial Products or Commercial Services |
| 252.247-7023 |
| Transportation of Supplies by Sea--Basic |
C-202-H001 ADDITIONAL DEFINITIONS--BASIC (NAVSEA) (OCT 2018)
C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (OCT 2018)
C-211-H018 APPROVAL BY THE GOVERNMENT (NAVSEA) (JAN 2019)
C-223-H003 EXCLUSION OF MERCURY (NAVSEA) (MAR 2019)
C-223-H004 MANAGEMENT AND DISPOSAL OF HAZARDOUS WASTE (NAVSEA) (MAR 2019)
C-223-N002 RESTRICTIONS ON USE OF YELLOW MATERIAL (NAVSEA) (OCT 2018)
C-247-H001 PERMITS AND RESPONSIBILITIES (NAVSEA) (DEC 2018)
D-247-H002 PACKAGING OF SUPPLIES—BASIC (NAVSEA) (OCT 2018)
D-247-W001 PROHIBITED PACKINGS MATERIALS (NAVSEA) (OCT 2018)
E-246-H016 INSPECTION AND ACCEPTANCE OF F.O.B. DESTINATION DELIVERIES (OCT 2018)
G-232-H002 PAYMENT INSTRUCTIONS AND CONTRACT TYPE SUMMARY FOR PAYMENT OFFICE (NAVSEA) (JUN 2018)
G-232-H004 GOVERNMENT PURCHASE CARD METHOD OF PAY (NAVSEA) (OCT 2018)
G-232-H005 SUPPLEMENTAL INSTRUCTIONS REGARDING INVOICING (NAVSEA) (JAN 2019)
G-242-H001 GOVERNMENT CONTRACT ADMINISTRATION POINTS-OF-CONTACT AND RESPONSIBILITIES (NAVSEA) (OCT 2018)
G-242-H002 HOURS OF OPERATION AND HOLIDAY SCHEDULE (NAVSEA) (OCT 2018)
H-209-H003 REQUIRED DISCLOSURE OF ORGANIZATIONAL CONFLICT OF INTEREST (NAVSEA) (NOV 2022)
H-223-N001 INFORMATION ON EXPOSURE TO HAZARDOUS MATERIAL (NAVSEA) (JAN 2019)
52.212-1 Instructions to Offerors--Commercial Items
I. GENERAL
In addition to FAR 52.212-1, “Instructions to Offerors – Commercial Items” and any other instructions contained elsewhere in this solicitation, the following information is provided:
Objections to any of the terms and conditions of the RFQ will constitute a deficiency which will make the offer unacceptable.
IMPORTANT NOTES:
(1) Vendors shall respond to all requirements of the solicitation document. Vendors are cautioned not to alter the solicitation.
(2) Initial quotes and any modifications thereto are to be submitted to the Contracting Office on or before the closing dated time cited elsewhere in this Request for Quote.
(3) Responses should be submitted via email only
(4) Please review all specifications carefully.
II. CONTENT OF QUOTE
· RFQ pricing and information pages completed by the vendor.
· Technical Submission to include:
· Submission of technical information demonstrating compliance with the specifications, including, but not limited to:
· Technical submission shall include the Manufacturer Name and Model Number of the specific unit(s) being proposed. The Government will only evaluate those specifically identified unit(s).
· Brochures pertaining to the pieces of equipment being quoted, to include, but not limited to: pictures of the equipment, and technical specifications of the equipment including model/series unit demonstrating compliance with the PWS and specifications. These should be readily identified by the item ID number.
· The details of any/all exceptions taken to the specification.
The completion and submission of the above items will constitute a quote and will be considered the vendor’s unconditional assent to the terms and conditions of this solicitation and any attachments and/or exhibits hereto. An objection to any of the terms and conditions of the solicitation will constitute a deficiency which will make the offer unacceptable. Potential contractors will be screened for contractor responsibility in accordance with FAR Subpart 9.1.
52.212-2, Evaluation - Commercial Items is applicable to this procurement.
The Government will award a contract resulting from this solicitation to the responsible vendor whose quote conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The contract will be awarded to the vendor with the Lowest Price Technically Acceptable. Quotes will be evaluated based on the following criteria:
- Technical Acceptability (Must meet specifications and document capabilities)
- Adherence to Schedule (Award may be made based on delivery and ability to meet the requested schedule)
- Price (Lowest Price Technically Acceptable, after adherence to other factors)
Vendors will be required to submit a quote that will be evaluated in accordance with the specifications provided in the solicitation, FAR 52.212-1 Instruction to Offerors. Failure to include pricing for all line items shall be cause for rejection of the quote for all line items.
Technical:
Please provide documentation demonstrating your capabilities in fulfilling the SOW.
Technical Evaluation Ratings
| Rating |
| Description |
| Acceptable |
| Submission clearly meets the minimum requirements of the solicitation |
| Unacceptable |
| Submission does not clearly meet the minimum requirements of the solicitation |
If the technical submittal is determined “Unacceptable”, it renders the entire quote technically unacceptable. Technical submissions that do not meet the minimum requirements will be rated as “Unacceptable” and will no longer be considered for further competition or award.
Schedule:
Please confirm availability for requested period of performance. If your company is unavailable for the requested period, please provide earliest available start. Please provide your best and fastest schedule. Award may be made to the vendor who can provide the soonest execution.
Price:
The Price will be evaluated as Lowest Price Technically Acceptable, however, the Contracting Officer reserves the right to award based on ability to meet the required schedule.
(END OF COMBINED SYNOPSIS/SOLICITATION)
File details come from the government source that posted it. Updated .