N3904024Q2872 RFQ.pdf

PDF 749 KB Posted

Attached to
Rental of One (1) 3T Forklift
Solicitation number
N3904024Q2872
Issued by

About this file

This document is a Request for Quotation (RFQ) for the rental of one (1) 6K# counterbalance pneumatic forklift at the Naval Shipyard in Groton, CT. The required period of performance is 5 weeks with an optional 2-week extension. The RFQ provides detailed specifications and requirements for the forklift, including capacity, dimensions, power type, and safety features. It outlines the rental terms, delivery and inspection process, maintenance and repair responsibilities, and applicable federal clauses. Vendors are required to submit a technical proposal demonstrating compliance with the specifications, as well as pricing information. Award will be made to the vendor who is technically acceptable and can provide the forklift in the soonest timeframe. Past performance will also be evaluated using the Contractor Performance Assessment Reporting System (CPARS). The due date for quotations is August 26, 2024.

View the file

Other files

File Type Posted
N3904024Q2872 Attachment 1 OPSEC redacted.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

REQUEST FOR QUOTATION

N3904024Q2872

N39040-17-T-

THIS IS NOT AN ORDER

PLEASE PROVIDE DELIVERED PRICES, AVAILABILITY, AND PRICE SOURCE WITH QUOTE

All quotes should include this form filled out in its entirety (highlighted yellow fields are required). Please indicate Mobilization time in DAYS

REFERENCE # N3904024Q0172 DUE DATE: 08/26/2024 11:00 AM ET

From: Portsmouth Naval Shipyard Your company info:

kyle.j.wilkinson4.civ@us.navy.mil Name:

Contracting, Code 410 POC:

Kittery, ME 03904 (P) PHONE: 207-438-2940 Email:

Cage Code:

BUSINESS SIZE (circle one): SMALL LARGE PAYMENT TERMS ______%______DAYS

MOBILIZATION TIME: _________ARO PRICES DERIVED FROM (CHECK ONE)

F.O.B. DESTINATION, Y____N____ ___COMMERCIAL PRICE LIST DATED

IF NO, SHIPPING COST__________. ___INTERNAL PRICE LIST DATED

___OTHER ( PLEASE EXPLAIN )

Please indicate your preferred payment method by checking one of the options below. Payment options available are WAWF and GCPC: Government Commercial Purchase Card (up to $100,000). Please ensure that you register for WAWF (www.wawftraining.com) GCPC_____ WAWF (Wide Area Workflow) _____

*Please note that purchase card orders are not paid up front. Once material is received, a Government cardholder may be contacted for purchase card information.

_X__ If checked, to be awarded on an “All or None” basis, and CPARS evaluation procedures apply.

YOUR SIGNATURE___________________________________DATE________________________

ITEM DESCRIPTION QTY Unit Price Total

0001 Rental and Maintenance of One (1) 6K# Counterbalance Pneumatic Forklift In Accordance with Statement of Work

5 Weeks

0002 Freight associated with Rental of One (1) 6K# Counterbalance Pneumatic Forklift

1 Job

1001 Option to Extend CLIN 0001

2 Weeks

N39040-17-T-

Period of Performance:

o Base: 09/19/2024-10/23/2024 o Option 1: 10/24/2024-11/06/2024

Place of performance is: NLON Groton, CT For evaluation purposes, please provide any applicable procedures and technical information. If no information is provided, your quotation may be determined to be unresponsive.

Award may be made on the basis of adherence to the schedule and/or soonest mobilization.

Please provide published commercial labor rates and breakdown of total prices, if applicable, for Price Justification purposes.

See Below for Detailed Statement of Work and Applicable Clauses.

METHOD OF PROPOSAL SUBMISSION:

Offers shall be emailed. All responsible sources may submit a quote which shall be considered by the agency.

System for Award Management (SAM): Vendors must be registered in the SAM database to be considered for award. Registration is free and can be completed on-line at http://www.sam.gov/.

All quotes should include this form filled out in its entirety (highlighted yellow fields are required).

N39040-17-T-

MATERIAL HANDLING EQUIPMENT RENTAL STATEMENT OF WORK

Requirements:

Machine capacities listed in Table-1 are approximate, actual required capacity range is noted in the Unit Specifications Table(s).

Bid submittals will include the make and model of the machine(s) being quoted and the actual dimensions of any specification item that includes a required measurement. Table-2 will be returned with the bid submittal indicating yes or no in the checklist for compliance with each noted specification. In the event that no bidder is able to fully meet the specifications in Table-2 without requiring the exceptions listed, the unit that best meets the operational needs of the Government will be selected.

Table-1

Unit Specifications: Unit 1

Comply

Description Yes No

•Capacity/type: 5.5K#-8K# capacity @ 24” L.C., counterbalanced forklift

•Minimum lift height: 96”

•Max outside turning radius: 96”

•Pallet Forks: MAX Width: 5”, MAX thickness: 2”, Length: 42”

•Power type: Internal Combustion, Diesel

•Shall be no older than 5 years

•Pneumatic, solid pneumatic, or foam filled tires

•Enclosed cab with defrost blower and air conditioning

•Windshield wipers front and rear

•EXCEPTION: Unit will have a rain canopy and an air circulating fan for the operator. This exception will only be considered if no bidder is able to meet this specification without need for exception(s).

•The carriage will be equipped with side-shift.

•Hydraulic fork positioners

•EXCEPTION: Manual forks will only be considered if no bidder is able to meet this specification without need for exception(s).

Unit Number Machine type Quantity

Unit 1 6K# Counterbalance, Pneumatic, IC Forklift 1

N39040-17-T-

•Light package to include front and rear working lights.

•Will be equipped with audible backup alarm •Will have manufacturer’s capacity data plate containing safe working load and maximum reach height at a minimum.

•Operator controls shall be properly and clearly marked

•An operator’s manual will be in the machine

Unit Make and Model: __________________________________________________

Table-2

General Service Terms:

Rentals will include unlimited usage hours within the contracted period of performance.

Delivery and pick-up of the equipment at the address noted above is the responsibility of the contractor.

The contractor shall provide alternate forks specified by the Government, on request, up to one time per machine during the period of performance, at no charge to the Government.

Alternate forks will also be provided with an appropriate updated Capacity Data Plate if required.

Equipment shall be fully functional and in safe operating condition. It will be in compliance with any and all applicable laws governing internal combustion material handling equipment and its operation in the State and/or jurisdiction where the rental will be used. All units for use in California will have a CARB EIN clearly visible on each machine.

The contractor shall notify the Contracting Officer’s Representative (COR) or Technical Point of Contact a minimum of 48 hours prior to delivery of units. Delivery will occur on or before the required start date noted in the period of performance. Initial delivery will take place during normal first shift hours. The vendor should account for potential delays at the pass-office and security when planning the delivery. For the purposes of this contract, normal first shift hours will be considered week-days that are not federal holidays, between the hours of 07:00am and 02:00pm.

An inspection of each forklift shall be performed by a shipyard licensed operator using a PNSY provided MHE Inspection Sheet on delivery. Any machines not meeting the requirements of this statement of work, or having defects or damage that negatively affect the operation of the machine will be refused.

If there are deminimis defects or damage found that are determined to be superficial in nature and that do not affect the operation of the machine, they will be noted on the inspection form.

The Vendor’s representative will sign the PNSY inspection form or attest in writing that the damage was pre-existing and does not affect the operation of the machine. This will be completed before the unit is accepted by the Government.

N39040-17-T-

The rental period does not begin until the government has accepted the forklift.

To be allowed onto a Government Shipyard, personnel must be US citizens and in possession of appropriate personal identification. Proof of US citizenship may be necessary and can be required for access to the drydock. Allowable documentation of US citizenship is an official government issued Certificate of Birth or Naturalization (w/ raised seal & not a photocopy) or a US passport.

Vehicular access requires a non-expired driver’s license and appropriate vehicle identification or registration. The transport vehicle must have the company’s name / logo prominently displayed.

To be allowed onto a Government Shipyard, personnel must be US citizens and in possession of appropriate personal identification. Proof of US citizenship may be necessary and can be required for access to the drydock. Allowable documentation of US citizenship is an official government issued Certificate of Birth or Naturalization (w/ raised seal & not a photocopy) or a US passport.

Vehicular access requires a non-expired personal Driver’s License and appropriate vehicle identification or registration. The transport vehicle must have the company’s name / logo prominently displayed.

Any cellular phones or other electronic devices required for use within security islands, or other areas where photography or recording is prohibited, shall not have any cameras or electronic video recording sensors.

Work Site Operational Safety Environment – contractors and non- PNS Government

Agencies (NPGAs) shall be responsible to read and understand the requirements of OSHECM Chapter 250 and can see an electronic copy of OSHECM Chapter 250 (latest revision) by using the following web site:

http://www.navsea.navy.mil/shipyards/norfolk/Shared%20Documents/Chapter%20250.pdf.

The Contractor shall provide and require their personnel to wear personal protection equipment (PPE) (e.g., hearing protection, eye protection, gloves, steel-toed shoes or boots, aprons, masks, face shields, reflective vests, safety harnesses for fall protection in accordance with OSHA CFR 1926 (construction) and CFR 1915 (shipyard) standards. The Contractor is required to follow all appropriate lockout/tag out requirements as specified by OSHECM Chapter 250 and CFR 1915.89. Contractor shall conform to all applicable safety and occupational health standards published in the Federal Register or any other Occupational Safety and Health Administration (OSHA) Public Laws and ensure employees observe safety, traffic control, and fire prevention requirements in effect at the site.

To gain access to the drydock environs, personnel must be escorted and possess / wear their own personal safety gear.

N39040-17-T-

The contractor shall be responsible for all materials and labor for preventative maintenance and repairs not arising out of abuse or negligence by the Government. The government shall be responsible for daily fluid level checks; however, the contractor shall be responsible for adding fluids to the equipment to ensure the loss of fluid is not due to a more serious mechanical issue.

All service shall be provided within eight (8) hours of notification to the contractor. In the event the equipment cannot be returned to service within the twenty-four (24) hour period, a comparable replacement shall be provided by the contractor within twenty-four (24) hours of the initial deficiency notification at no charge to the Government.

The Contractor shall validate all completed repairs by either signing the appropriate PNSY provided MHE Inspection Sheet, or by providing a completed repair order.

If breakdowns become frequent, the equipment will be removed from the shipyard and replaced with a more reliable unit in accordance with the unit specifications outlined herein upon request by the Government.

Any routine preventative maintenance will be completed during normal first-shift hours unless alternative arrangements are made ahead of time.

During routine maintenance, or emergency breakdown repairs, the Contractor shall provide liquid spill protection to the ground surface. All spills shall be contained and cleaned up prior to leaving the site. If a spill is caused by a broken or leaking liquid line or some other system on the Contractor’s equipment, the Installation Fire Department will be alerted to contain the spill until the Contractor can make the necessary repairs. Applicable emergency contact numbers will be obtained by the Contractor from the local pass office prior to commencement of any work.

It shall be the responsibility of the Contractor to reimburse the Government for containing the spill. If at the determination of the Government, leaks are unacceptably frequent, the unit will be swapped out for a different unit meeting the same specification.

The Contractor is responsible for disposal of any fluids or hazardous material generated as a result of maintenance, spills, or leaks.

***End Statement of Work***

N39040-17-T-

CLAUSES:

Responsibility and Inspection: unless otherwise specified in the order, the supplier is responsible for the performance of all inspection requirements and quality control. The following FAR provisions and clauses are applicable to this procurement:

52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements 52.204-2 Security Requirements 52.204-7 System for Award Management 52.204-8 Annual Representations and Certifications 52.204-12 Unique Entity Identifier Maintenance 52.204-13 System for Award Management Maintenance 52.204-16 Commercial and Government Entity Code Reporting 52.204-17 Ownership or Control of Offeror 52.204-18 Commercial and Government Entity Code Maintenance 52.204-19 Incorporation by Reference of Representations and Certifications 52.204-20 Predecessor of Offeror 52.204-21 Basic Safeguarding of Covered Contractor Information Systems 52.204-22 Alternative Line Item Proposal

52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities

52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment

52.204-25 Prohibition of Contracting for Certain Telecomunications and Video Surveillance Services or Equipment

52.204-26 Covered Telecommunications Equipment or Services--Representation 52.204-27 Prohibition on a ByteDance Covered Application 52.209-2 Prohibition on Contracting with Inverted Domestic Corporations—Representation 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations

52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law

52.211-14 Notice of Priority Rating for National Defense, Emergency Preparedness, and Energy Program Use 52.211-15 Defense Priority and Allocation Requirements 52.211-16 Variation in Quantity 52.211-17 Delivery of Excess Quantities 52.212-4 Contract Terms and Conditions—Commercial Products and Commercial Services

52.212-5 Contract Terms and Conditions Required To Implement Statutes or Executive Orders— Commercial Products and Commercial Services

52.217-5 Evaluation of Options 52.217-9 Option to Extend the Term of the Contract 52.219-1 Small Business Program Representations 52.219-6 Notice of Total Small Business Set-Aside 52.219-28 Post-Award Small Business Program Rerepresentation 52.222-1 Notice to the Government of Labor Disputes 52.222-3 Convict Labor 52.222-19 Child Labor—Cooperation with Authorities and Remedies 52.222-21 Prohibition of Segregated Facilities 52.222-22 Previous Contracts and Compliance Reports 52.222-25 Affirmative Action Compliance 52.222-26 Equal Opportunity 52.222-50 Combating Trafficking in Persons

N39040-17-T-

52.223-5 Pollution Prevention & Right-To-Know Information 52.223-22 Public Disclosure of Greenhouse Gas Emissions and Reduction Goals—Representation 52.225-13 Restrictions on Certain Foreign Purchases

52.225-25 Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions Relating to Iran—Representation and Certifications

52.226-7 Drug-Free Workplace 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving 52.232-1 Payments 52.232-33 Payment by Electronic Funds Transfer—System for Award Management 52.232-36 Payment by Third Party 52.232-39 Unenforceability of Unauthorized Obligations 52.232-40 Providing Accelerated Payments to Small Business Subcontractors 52.233-1 Disputes 52.233-3 Protest after Award 52.233-4 Applicable Law for Breach of Contract Claim 52.242-15 Stop-Work Order 52.242-17 Government Delay of Work 52.246-15 Certificate of Conformance 52.247-34 F.o.b. Destination 52.252-1 Solicitation Provisions Incorporated by Reference 52.252-2 Clauses Incorporated by Reference 52.252-5 Authorized Deviations in Provisions 52.252-6 Authorized Deviations in Clauses

Additional DFARS contract terms and conditions applicable to this procurement are:

252.203-7000 Requirements Relating to Compensation of Former DoD Officials 252.203-7002 Requirement to Inform Employees of Whistleblower Rights 252.203-7003 Agency Office of the Inspector General 252.203-7005 Representation Relating to Compensation of Former DoD Officials 252.204-7003 Control of Government Personnel Work Product 252.204-7006 Billing Instructions 252.204-7014 Limitations on the Use or Disclosure of Information by Litigation Support Contractors 252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support 252.204-7016 Covered Defense Telecommunications Equipment or Services--Representation

252.204-7017 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services-- Representation

252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services 252.204-7024 Notice on the use of the Supplier Performance Risk System 252.215-7013 Supplies and Services Provided by Nontraditional Defense Contractors 252.217-7028 Over and Above Work 252.223-7008 Prohibition of Hexavalent Chromium 252.225-7012 Preference for Certain Domestic Commodities 252.225-7031 Secondary Arab Boycott of Israel 252.225-7048 Export-Controlled Items 252.231-7000 Supplemental Cost Principles 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports 252.232-7006 Wide Area WorkFlow Payment Instructions 252.232-7010 Levies on Contract Payments 252.236-7002 Obstruction of Navigable Waterways 252.237-7010 Prohibition on Interrogation of Detainees by Contractor Personnel 252.243-7001 Pricing of Contract Modifications

N39040-17-T-

252.244-7001 Contractor Purchasing System Administration--Basic

252.247-7023 ADDITIONAL DEFINITIONS--BASIC (NAVSEA) (OCT 2018)

C-202-H001 Use of navy support contractors for official contract files (navsea) (oct 2018) C-204-H001 Approval by the government (navsea) (jan 2019) C-211-H018 Contractor proposal navsea) (oct 201 C-215-H002 Exclusion of mercury (navsea) (mar 2019) C-223-H003 Restrictions on use of yellow material (navsea) (oct 2018) C-223-N002 Permits and responsibilities (navsea) (dec 2018) C-247-H001 Marking of reports (navsea) (oct 2018) D-211-H002 Packaging of supplies--basic (navsea) (dec 2020) D-247-H002 Inspection and test records (navsea) (jan 2019) E-246-H022 Certificate of compliance (navsea) (oct 2018) E-246-W002 Partial deliveries (navsea) (oct 2018 F-211-W001 Payment instructions (navsea) (feb 2024) G-232-H002 Government purchase card method of pay (navsea) (jun 2023) G-232-H004 Supplemental instructions regarding invoicing (navsea) (jan 2019) G-232-H005 Government contract administration points-of-contact and responsibilities (navsea) (oct 2023) G-242-H001 Hours of operation and holiday schedule (navsea) (jul 2021) G-242-H002 Notification of use of navy support contractor for official contract files (navsea) (apr 2019) L-204-H003 F.o.b. evaluation criteria (navsea) (dec 2018 M-247-H001 F.o.b. evaluation criteria (navsea) (dec 2018)

52.212-1 Instructions to Offerors--Commercial Items

I. GENERAL

In addition to FAR 52.212-1, “Instructions to Offerors – Commercial Items” and any other instructions contained elsewhere in this solicitation, the following information is provided:

Objections to any of the terms and conditions of the RFQ will constitute a deficiency which will make the offer unacceptable.

IMPORTANT NOTES:

(1) Vendors shall respond to all requirements of the solicitation document. Vendors are cautioned not to alter the solicitation.

(2) Initial quotes and any modifications thereto are to be submitted to the Contracting Office on or before the closing dated time cited elsewhere in this Request for Quote.

(3) Responses should be submitted via email only

(4) Please review all specifications carefully.

II. CONTENT OF QUOTE

RFQ pricing and information pages completed by the vendor.

Technical Submission to include:

o Submission of technical information demonstrating compliance with the specifications, including, but not limited to:

Technical submission shall include the Manufacturer Name and Model Number of the specific unit(s) being proposed. The Government will only evaluate those specifically identified unit(s).

Brochures pertaining to the pieces of equipment being quoted, to include, but not limited to: pictures of the equipment, and technical specifications of the equipment including model/series unit demonstrating compliance with the PWS and specifications. These should be readily identified by the item ID number.

N39040-17-T-

The details of any/all exceptions taken to the specification.

The completion and submission of the above items will constitute a quote and will be considered the vendor’s unconditional assent to the terms and conditions of this solicitation and any attachments and/or exhibits hereto. An objection to any of the terms and conditions of the solicitation will constitute a deficiency which will make the offer unacceptable. Potential contractors will be screened for contractor responsibility in accordance with

FAR Subpart 9.1.

52.212-2, Evaluation - Commercial Items is applicable to this procurement.

The Government will award a contract resulting from this solicitation to the responsible vendor whose quote conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The contract will be awarded to the vendor with the Lowest Price Technically Acceptable. Quotes will be revaluated based on the following criteria:

-Technical Acceptability (Must meet specifications and document capabilities) -Must meet specifications and document capabilities.

-Adherence to schedule and soonest Mobilization.

-Price (Lowest Price Technically Acceptable, after adherence to other factors)

- Past Performance (Vendors will be reviewed using CPARS/FAPPIIS for past performance)

Vendors will be required to submit a quote that will be evaluated in accordance with the specifications provided in the solicitation, FAR 52.212-1 Instruction to Offerors. Failure to include pricing for all line items shall be cause for rejection of the quote for all line items.

Technical:

Please provide documentation demonstrating your capabilities in fulfilling the SOW.

Technical Evaluation Ratings Rating Description Acceptable Submission clearly meets the minimum requirements of the solicitation Unacceptable Submission does not clearly meet the minimum requirements of the solicitation

If the technical submittal is determined “Unacceptable”, it renders the entire quote technically unacceptable.

Technical submissions that do not meet the minimum requirements will be rated as “Unacceptable” and will no longer be considered for further competition or award.

Schedule:

Please confirm availability for requested period of performance. If your company is unavailable for the requested period, please provide earliest available start. Please provide your best and fastest schedule. Award may be made to the vendor who can provide the soonest execution.

Price:

The Price will be evaluated as Lowest Price Technically Acceptable, however, the Contracting Officer reserves the right to award based on ability to meet the required schedule.

******* END OF REQUEST FOR QUOTE *******

File details come from the government source that posted it. Updated .