REQUEST FOR QUOTATION **REV 6/8/2020**

N3904020Q0205 (See Pg 2-4 for changes) N39040-17-T-

THIS IS NOT AN ORDER

PLEASE PROVIDE DELIVERED PRICES, AVAILABILITY, AND PRICE SOURCE WITH QUOTE

REFERENCE # 20RC00414

DUE DATE: 6/16/2020 4:00 PM EST

From: Portsmouth Naval Shipyard Your company info:

emily.bateman@navy.mil Name:

Contracting, Code 410.1

POC:

Portsmouth, NH 03801-2590 (P)

PHONE: 207-438-6819

(F)

FAX: (207) 438-4193

Cage Code:

BUSINESS SIZE: SMALL LARGE

PAYMENT TERMS ______%______DAYS

MOBILIZATION TIME: _________ARO

PRICES DERIVED FROM ( CHECK ONE )

F.O.B. DESTINATION, Y____N____

___COMMERCIAL PRICE LIST DATED

IF NO, SHIPPING COST__________.

___INTERNAL PRICE LIST DATED

___OTHER ( PLEASE EXPLAIN )

Please indicate your preferred payment method by checking one of the options below. Payment options available are WAWF and GCPC: Government Commercial Purchase Card (up to $100,000). Please ensure that you register for WAWF (www.wawftraining.com) GCPC_____ WAWF (Wide Area Workflow) _____ *Please note that purchase card orders are not paid up front. Once material is received, a Government cardholder may be contacted for purchase card information.

_X__ If checked, to be awarded on an “All or None” basis, and PPIRS evaluation procedures apply.

YOUR SIGNATURE___________________________________DATE________________________

ITEM

DESCRIPTION

QTY

Total Towing of Caisson 3 from PNSY to BHNP

1 JO

Delivery Tow to occur on or around 7/8/2020.

Tow to be in accordance with the Statement of Work (SOW).

Option: Towing of Caisson 3 from BHNP to PNSY

1 JO

Return Tow estimated to occur 12/1/20-2/1/21.

(if exercised, schedule would be coordinated by both parties).

Tow to be in accordance with the Statement of Work (SOW).

· Place of performance is:

· Start: Portsmouth Naval Shipyard, Kittery, ME.

· End: Boston Historical National Park, Charlestown, MA.

· Towing Plan, in accordance with the SOW, shall be submitted with quotation.

· For evaluation purposes, please provide the towing plan, and any applicable procedures and technical information. If no information is provided, your quotation may be determined to be unresponsive.

· PPIRS/CPARS information will be utilized to evaluate Past Performance.

· Award may be made on the basis of adherence to the schedule and/or soonest mobilization.

· Please provide published commercial labor rates and breakdown of total prices, if applicable, for Price Justification purposes.

· See Below for Detailed Statement of Work and Applicable Clauses.

Amendment 6/3/2020:

This amendment 01 issued to:

(1) Add Attachment 2 Caisson Drawings

Amendment 6/8/2020:

This amendment 02 issued to:

(1) Provide answers to Questions 1-10, below;

(2) Add information regarding a Site Visit 6/11 (Answer 1);

(3) Add Attachments 3 & 4 required for Site Visit (Answer 1);

(4) update the Wage Determination (Answer 3);

(5) Extend the solicitation closing date from 6/10/2020 at 4pm EST, to 6/16/2020 at 4pm EST.

Q1- Can we visit PNSY to see the caisson in person ahead of submitting our quote? We feel to be accurate and safe with our tow plan that an in person viewing of the caisson is needed.

A1 –There are 2 drawings of the caisson attached to the solicitation page, to assist with the tow plan. Additionally, the customer has decided that we can accommodate a site visit, in order to achieve more accurate tow plans.

The site visit will be held on Thursday 6/11, at 10 am. Please allow up to 2 hours to get through Security at Pass & ID. NO CAMERAS are allowed, including personal mobile devices.

In order to do this, we need some information from you by Noon time (12pm EST) tomorrow 6/9, so we can process the request through Security.

Attendance is limited to ONE person per company, due to all of the current health protocols.

Security requires:

(1) a Visitors request (for the individual) , and

(2) a DBIDs Request (for the company).

(1) PNS will complete the Visitor request; which requires the following information (Please provided on company letterhead):

-Company information (Name, address, Company POC, phone, email)

-ONE Visiting Individual’s Name : Last, First, Middle Initial

-Country of Citizenship (must be US citizen)

-State of Residence

-(individual must bring 2 forms of photo ID to gain SY access)

(2) the DBIDs Form 5500 (Att 3) must be filled out and sent back (Send to emily.bateman@navy.mil, Sponsor information [escort] will be filled in by PNS).

The DBIDs Form 5512 (Att 4) must be completed, but cannot be submitted electronically, and must be HAND CARRIED to the Pass Office on the date of the site visit.

As a result of the addition of a site visit, and to allow additional time to prepare the tow plan, the solicitation closing date will be extended from 6/10/2020 at 4pm EST, to 6/16/2020 at 4pm EST.

Q2- The solicitation notes that we need to submit 52.212-3 and its ALT I with our quote. We do not see these documents included in the solicitation. Can you please provide?

A2 – If you are registered in SAM (must have a Cage Code), the 52.212-3 information should be available there, and does not need to be submitted separately. Registration in SAM is required to

Q3- Please clarify whether the wage rates included with the solicitation are required to be paid at all times the tug is underway, including when the tug is underway without the caisson, or only when the tug has the caisson under tow. This is the first time we have had or heard of a project where Davis Bacon wage rates are to be paid for a coastal tow.

A3 – The wage rates would be applicable to performance under the contract; we do not currently have information clarifying whether or not it would still be applicable before pick up or after the caisson would be dropped off. You would need to verify with the Department of Labor.

Following clarification regarding the SOW, the Wage Determination has been updated:

-Wage Determination for deep sea vessels is removed:

“20Q0205 Attachment 1” to RFQ: Wage Determination 2019-0288, Rev 4, dated 2/12/2020

-Wage Determination for tug boats and other coastal vessles is added:

“20Q0205 Attachment 1 REV” to RFQ: Wage Determination 2015-0213, Rev 17, dated 4/20/2020

Q4- Are there any requirements for the towing contractor to have a third party marine surveyor complete a condition survey of the caisson before/after the tow or for a third party marine surveyor to complete a trip and tow survey ahead of the tow? If so, would the same surveys need to be completed for the return tow if exercised?

A4 – Please see the Statement of Work; A third party marine surveyor is not required.

Q5- Will there be an on-site pre-tow conference before each tow where the towing contractor and tug captain will need to be in attendance? If there is a requirement for a trip and tow survey, will the surveyor also need to attend a pre-tow conference if one is held?

A5 – Please see the Statement of Work, paragraph B.; pre-tow conference and surveyor are not required.

Q6- Please confirm all necessary dock lines for securing the caisson at the point of destination will be furnished by the government.

A6 – Confirmed.

Q7- Are there any specific tow restrictions such as maximum sea state, maximum tow speed or daylight only towing that the towing contractor will need to adhere to?

A7 – Please see the Statement of Work, paragraph B., specifically item 2.

Q8 - Will there be any specific security inspections or requirements that the tug and/or tug crew will need to complete ahead of or upon arrival at either the PNSY or BHNP?

A8 – PNS will re-locate the caisson outside of the port security barrier week of the scheduled tow. The contractor will not be allowed to depart their vessel to land without DBIDS contractor badging. Security may elect to perform a vessel inspection. Contractor will be required to stay on the tow vessel with the exception of placing gear on the caisson. Escorts will be provided if required.

Q9- Are there going to be any requirements for sign-offs or inspections of the tow by the Government once the tug arrives onsite and is setup to tow but prior to departing? If so, how long should we allot for inspection once the tug is ready to tow?

A9 – C984 will perform a site inspection just prior to the scheduled tow, Contractor should provide adequate notice of intended itinerary. No signatures required.

Q10- Do we need to have an established WAWF account prior to submission of our quote or can that be established at a later date if our quote is accepted?

A10 – Available payment options are WAWF or Government Purchase Card; there is no requirement for having an active WAWF account at the time of quotation submission, however, the Government is not responsible for payment delays that are the result of any delays in invoice submission due to delays in account creation. If your company does not currently have a WAWF account, the Government Purchase Card may be the more reasonable payment method selection.

******end 6/8/2020 amendment******

STATEMENT OF WORK:

Towing of Caisson #3 from PNSY, Kittery, ME to BHNP, Charlestown, MA

A. SCOPE:

1. Vessel(s) Required:

A U.S. or foreign flag ocean tug

2. Cargo Description:

One (1) PNSY Dry Dock 3 Caisson.

Length: 80’ 10 3/4”

Beam: 15’

Displacement: 563LT (Long Tons)

Draft: 26’

3. Port(s)/Place(s) of Departure:

Portsmouth Naval Shipyard, Kittery, Maine (PNS)

4. Laytime:

1 days

5. Port(s)/Place(s) of Destination:

Boston Historical National Park, Charlestown, Massachusetts (BHNP)

6. Period of Performance

Delivery to Destination on or around 08JUL20

Return to Portsmouth Naval Shipyard between 01DEC20-01FEB21

B. SUMMARY OF OPERATIONS:

1. The cargo shall be picked up at its’ pier (Berth 6 or similar proximity) location Portsmouth Naval Shipyard and delivered to the cargo’s designated pier location at Charlestown Naval Shipyard (Boston Historical National Park). Contractor shall coordinate all arrangements for arriving and departing ports with the appropriate authorities. Assist tugs, if required, are the responsibility of the Contractor. Contractor is responsible for line handlers on the tug and cargo as required. Return voyage from designated pier location at Charlestown Naval Shipyard (Boston Historical National Park) to a location at Portsmouth Naval Shipyard designated by port operations. Weather may potentially impact the safety of the tow, and therefore the government is flexible given the unpredictability of the weather.

2. The Contractor shall supply all the necessary material, equipment, hardware and lines for a safe tow, including the towing bridle and emergency towing lines, dewatering equipment as applicable. Contractor shall also supply operational navigation lights and day shapes IAW the COLREGS Rules of the Road, as applicable.

3. Perform Detailed Technical evaluation and oversight as necessary, to ensure the tug and cargo (Caisson 3) are prepared and rigged for tow.

4. Contractor shall provide a Towing Plan to be submitted with quotation and approved prior to award. Towing Plan should at minimum include: tug range, condition of the tug, required certificates of tug and tug Master, description all towing material, equipment, hardware and lines to be use with certificates as required, towing procedures, emergency towing procedures, towing schedule, towing route, foul weather plan, cargo(caisson) flooding plan during tow to include dewatering plan during tow.

****End of SOW****

CLAUSES:

Responsibility and Inspection: unless otherwise specified in the order, the supplier is responsible for the performance of all inspection requirements and quality control. The following FAR provisions and clauses are applicable to this procurement:

52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements

52.204-2 Security Requirements

52.204-7 System for Award Management

52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards

52.204-13 System for Award Management Maintenance

52.204-16 Commercial and Government Entity Code Reporting

52.204-17 Ownership or Control of Offeror

52.204-18 Commercial and Government Entity Code Maintenance

52.204-19 Incorporation by Reference of Representations and Certifications.

52.204-20 Predecessor of Offeror

52.204-21 Basic Safeguarding of Covered Contractor Information Systems

52.204-22 Alternative Line Item Proposal

52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky 52.204-24 Representation Regarding Certain Telecommunications and Video Surveillance Services or Equipment 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance 52.209-2 Prohibition on Contracting with Inverted Domestic Corporations--Representation

52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations

52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction

52.211-14 Notice Of Priority Rating For National Defense, Emergency Preparedness, and Energy Program Use

52.211-15 Defense Priority And Allocation Requirements

52.212-1 Instructions to Offerors--Commercial Items

52.212-2 Evaluation - Commercial Item

52.212-3 Offeror Representations and Certifications--Commercial Items

52.212-4 Contract Terms and Conditions--Commercial Items

52.217-5 Evaluation of Options

52.217-7 Option for Increased Quantity-Separately Priced Line Item.

52.217-9 Option to Extend the Term of the Contract

52.219-1 Alt Small Business Program Representations

52.219-6 Notice of Total Small Business Set-Aside

52.219-28 Post-Award Small Business Program Representation

52.222-3 Convict Labor

52.222-21 Prohibition Of Segregated Facilities

52.222-26 Equal Opportunity

52.222-36 Equal Opportunity for Workers with Disabilities

52.222-41 Service Contract Labor Standards

Wage Determination for deep sea vessels is removed:

“20Q0205 Attachment 1” to RFQ: Wage Determination 2019-0288, Rev 4, dated 2/12/2020

Wage Determination for tug boats and other coastal vessles is added:

“20Q0205 Attachment 1 REV” to RFQ: Wage Determination 2015-0213, Rev 17, dated 4/20/2020

52.222-42 Statement Of Equivalent Rates For Federal Hires

52.222-44, Fair Labor Standards Act and Service Contract Labor Standards

52.222-50 Combating Trafficking in Persons

52.222-55 Minimum Wages Under Executive Order 13658

52.223-11 Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons.

52.223-18 Encouraging Contractor Policies To Ban Text Messaging While Driving

52.223-22 Public Disclosure of Greenhouse Gas Emissions and Reduction Goals -- Representation.

52.225-13 Restrictions on Certain Foreign Purchases

52.225-25 Prohibition on Contracting with Entities Engaging in Certain Activities or Transactions

52.232-18 Availability of Funds 52.232-33 Payment by Electronic Funds Transfer--System for Award Management

52.232-36 Payment by Third Party

52.232-39 Unenforceability of Unauthorized Obligations

52.232-40 Providing Accelerated Payments to Small Business Subcontractors

52.233-3 Protest After Award

52.233-4 Applicable Law for Breach of Contract Claim

52.237-2 Protection Of Government Buildings, Equipment, And Vegetation

52.242-15 Stop-Work Order

52.243-1 Alt I Changes-Fixed-Price 52.247-34 F.O.B. Destination

52.252-1 Solicitation Provisions Incorporated By Reference

52.252-2 Clauses Incorporated By Reference

52.252-6 Authorized Deviations in Clauses

C-211-H001 ACCESS TO THE VESSEL(S) (NAVSEA) (OCT 2018)

C-211-H018 APPROVAL BY THE GOVERNMENT (NAVSEA) (JAN 2019)

C-228-H001 INDEMNIFICATION FOR ACCESS TO VESSEL (NAVSEA) (DEC 2018)

C-204-H001 USE OF NAVY SUPPORT CONTRACTORS FOR OFFICIAL CONTRACT FILES (OCT 2018)

C-223-H003 EXCLUSION OF MERCURY (NAVSEA) (MAR 2019)

C-223-H004 MANAGEMENT AND DISPOSAL OF HAZARDOUS WASTE (NAVSEA) (MAR 2019)

C-237-H001 ENTERPRISE-WIDE CONTRACTOR MANPOWER REPORTING APPLICATION (OCT 2018)

C-247-H001 PERMITS AND RESPONSIBILITIES (NAVSEA) (DEC 2018)

D-247-H002 PACKAGING OF SUPPLIES—BASIC (NAVSEA) (OCT 2018)

E-246-H016 INSPECTION AND ACCEPTANCE OF F.O.B. DESTINATION DELIVERIES (OCT 2018)

G-242-H001 GOVERNMENT CONTRACT ADMINISTRATION POINTS-OF-CONTACT AND RESPONSIBILITIES (NAVSEA) (OCT 2018)

G-232-H002 PAYMENT INSTRUCTIONS AND CONTRACT TYPE SUMMARY FOR PAYMENT OFFICE (NAVSEA) (JUN 2018)

G-232-H004 GOVERNMENT PURCHASE CARD METHOD OF PAY (NAVSEA) (OCT 2018)

G-232-H005 SUPPLEMENTAL INSTRUCTIONS REGARDING INVOICING (NAVSEA) (JAN 2019)

G-242-H002 HOURS OF OPERATION AND HOLIDAY SCHEDULE (NAVSEA) (OCT 2018)

Quoters shall include a completed copy of 52.212-3 and its ALT I with quotes. All clauses shall be incorporated by reference in the order. Additional DFARS contract terms and conditions applicable to this procurement are:

252.203-7000 Requirements Relating to Compensation of Former DoD Officials

252.203-7002 Requirement to Inform Employees of Whistleblower Rights

252.203-7005 Representation Relating to Compensation of Former DoD Officials

252.204-7003 Control Of Government Personnel Work Product

252.204-7006 Billing Instructions

252.204-7008 Compliance With Safeguarding Covered Defense Information Controls

252.204-7009 Limitations on the Use or Disclosure of Third-Party Contractor Reported Cyber Incident

252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting

252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support

252.213-7000 Notice to Prospective Suppliers on Use of Past Performance Information Retrieval System

252.215-7013 Supplies and Services Provided by Nontraditional Defense Contractors.

252.223-7008 Prohibition of Hexavalent Chromium

252.225-7031 Secondary Arab Boycott of Israel.

252.225-7048 Export-Controlled Items

252.231-7000 Supplemental Cost Principles.

252.232-7003 Electronic Submission of Payment Requests and Receiving Reports

252.232-7006 Wide Area WorkFlow Payment Instructions

252.232-7010 Levies on Contract Payments

252.237-7010 Prohibition on Interrogation of Detainees by Contractor Personnel

252.243-7001 Pricing of Contract Modifications.

252.244-7000 Subcontracts for Commercial Items

252.247-7023 Transportation of Supplies by Sea

Also applicable: Government Furnished Property:

52.245-1 Government Property

52.245-9 Use And Charges

52.247-55 F.O.B. Point For Delivery Of Government-Furnished Property

252.211-7007 Reporting of Government-Furnished Property

252.245-7001 Tagging, Labeling, and Marking of Government-Furnished Property

252.245-7002 Reporting Loss of Government Property

252.245-7003 Contractor Property Management System Administration

252.245-7004 Reporting, Reutilization, and Disposal

52.212-2, Evaluation - Commercial Items is applicable to this procurement.

The Government will award a contract resulting from this solicitation to the responsible vendor whose quote conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The contract will be awarded to the vendor with the Lowest Price Technically Acceptable. Quotes will be evaluated based on the following criteria:

- Technical Acceptability (Must meet specifications and document capabilities)

- Adherence to Schedule (Award may be made based on delivery and ability to meet the requested schedule)

- Price (Lowest Price Technically Acceptable, after adherence to other factors)

Vendors will be required to submit a quote that will be evaluated in accordance with the specifications provided in the solicitation, FAR 52.212-1 Instruction to Offerors. Failure to include pricing for all line items may be cause for rejection of the quote for all line items.

Technical:

Please provide documentation demonstrating your capabilities in fulfilling the SOW.

Technical Evaluation Ratings

Rating
Description
Acceptable
Submission clearly meets the minimum requirements of the solicitation
Unacceptable
Submission does not clearly meet the minimum requirements of the solicitation

If the technical submittal is determined “Unacceptable”, it renders the entire quote technically unacceptable. Technical submissions that do not meet the minimum requirements will be rated as “Unacceptable” and will no longer be considered for further competition or award.

Schedule:

Please confirm availability for requested period of performance. If your company is unavailable for the requested period, please provide earliest available start. Please provide your best and fastest schedule. Award may be made to the vendor who can provide the soonest execution.

Price:

The Price will be evaluated as Lowest Price Technically Acceptable, however, the Contracting Officer reserves the right to award based on ability to meet the required schedule.

Please Provide FOB Destination Pricing