SOW-982-17-008
STATEMENT OF WORK
Removal of Modular Building within B96 SCOPE: This Statement of Work covers the removal of a modular building located with Building 96 at Portsmouth Naval Shipyard, Kittery ME.
BACKGROUND:
A modular building was designed by Portafab Corporation in 2013 and installed within the rear of Building 96. Building 96 is located within the Controlled Industrial Area (CIA) at Portsmouth Naval Shipyard (PNS).
The modular building consists of two 25’ square, 10’ high areas. One area is supporting a second 25’ square enclosed structure for a 20’ height. The second area has an opening through the ceiling to a deck area with railings.
The entire assembly is fully equipped with electrical service per NFPA 70, and including addition industrial use 230V disconnects. The enclosed areas are equipped with a standard fire protection system.
There are personnel doors, as well as a manual overhead 8’ door. There is also a single stairway leading up to the second deck.
REQUIREMENTS:
The Shipyard shall remove all utility (air, water, fire) connections from the structure.
The Contractor shall remove the identified structure from the building. At the discretion of the Contractor, the modular building’s material components removed shall either be disposed of by the Contractor, or saved for reuse by the Contractor. The structure is identified on Attachment (1). Attachment (1) Drawing AD-102 Notes 4 through 9 are applicable, and Drawing AD-301 Notes 1 through 4 area applicable.
The Contractor shall use care to not damage the floor more than necessary. Attachment (1) Drawing AD-102 Note 4 indicates that the Contractor shall repair the floor. This repair shall include cutting all bolts flush.
The Contractor shall use all required OSHA and the industry standards to remove, and dispose of the material.
The Contractor is limited to the facility space as described in the drawings in Attachment (1).
The Contractor shall supply all lifting and handling equipment required.
DELIVERABLES:
The Contractor shall provide the items required per 29 CFR Per 96, and are not limited to the items listed below.
Demolition Plan – To include a safety plan, fall protection plan, and means and methods.
GENERAL:
0. OWNERSHIP OF DELIVERABLES: Portsmouth Naval Shipyard shall retain ownership of all deliverables produced by the Contractor.
0. HOURS OF WORK: The place of performance is Building 96 at Portsmouth Naval Shipyard, Kittery, ME. All work shall be accomplished during normal working hours of the PNSY, Kittery, ME, 7:00 AM until 3:00 PM, Monday through Friday. The Contractor shall provide 48-hour notice to request permission from the Contracting Officer for work on Saturday, Sunday and Holidays. The work must be coordinated with the Contracting Officer as it will impact a production environment. The dates may be changed based on needs of Portsmouth Naval Shipyard.
0. SECURITY: No person not known to be a United States citizen of good standing and repute shall be eligible for access to Portsmouth Naval Shipyard and adjacent areas. Proof of citizenship may be required. Every person shall be required to submit information to be able to acquire a Contractor’s badge for the duration of the work.
0. CLEAN UP: Refuse shall be removed from the job daily and disposed of properly at locations off of the Navy property at the Contractor’s expense. The Government reserves the right to salvage any and all materials at the discretion of the Contracting Officer.
0. WORK SITE OPERATIONAL SAFETY ENVIRONMENT: The work area may be ~20 to 30 feet up on the equipment. The area has railings for fall protection. All required precautions shall be taken.
0. HAZARD ENERGY CONTROL: The Contractor shall be responsible for filling out Reference (a) before the work is started. This form and any associated documentation will be furnished upon request.
0. INSPECTION: Inspection shall be done during and at the completion of the contract. Contact the Contracting Officer when work is complete and ready for inspection. The Contractor must provide at least two days advance notice to the Government representative of requested inspection time for any inspection desired with the Contractor on the site and schedule such inspection to commence at or before 2:00 PM Monday through Friday. Any work deemed unsatisfactory by the Contracting Officer shall be redone until acceptable at no additional cost to the Government
0. FALL PROTECTION: The Contractor shall follow OSHA 1926.501 (Fall Protection) and 1915.159 (Personal Fall Arrest Systems) for fall protection.
0. OIL SPILLS: Any release of oil to the environment, regardless of the quantity, is considered a spill. For both incidental and emergency spills, always contact Central Dispatch at extension 2333.
8. Promptly correct visible discharges that result in a loss of oil from the container, including but not limited to seams, gaskets, piping, pumps, valves, rivets, and bolts.
8. Contractors will quickly clean up all spills and discharges of oil to the environment, provided:
· There are sufficient personnel at the scene that can respond to the spill or discharge;
· Sufficient personnel can respond with proper Personal Protective Equipment;
· Personnel responding have knowledge of the hazards involved;
· Personnel responding have the means to respond to the spill or discharge; and
· Report spill to Central Dispatch at extension 2333 once spill is cleaned up.
8. If Contractors are not able to clean up the spill, they shall report the spill immediately to Central Dispatch at extension 2333. Provide Central Dispatch with the following information on the spill or discharge:
· Location;
· Type of material;
· Cause;
· Damages or injuries;
· Estimated quantity;
· Discovery date and time; and
· Possible affected media (i.e., water, soil, sewer, etc.)
REFERENCES:
a) Hazardous Energy Document Contractor Compliance Certification Document
b) 29 CFR Part 1926
ATTACHMENTS:
1) SOW-3054-Attachment1.PDF, drawings of described area
FIGURES:
NA