Blower_Repair_SOW.pdf

PDF 196 KB Posted

Attached to
Diesel Blower Repair Federal contract opportunity
Solicitation number
N3904020Q0022
Issued by
Department of the Navy Naval Sea Systems Command

About this file

Diesel Blower Statement of Work

View the file

Other files for this federal contract opportunity

Other files attached to Diesel Blower Repair, newest first.
File Type Posted
Sole_Source_Fairbanks_Morse_Signed_Redacted.pdf PDF

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK

FOR

CORRECTING DIESEL ENGINE DEFICIENCIES

1. BACKGROUND. The Navy Diesel Engine Inspector completed an inspection on the USS XXXXXX and the DEI documented the following maintenance actions below. Fairbanks Morse Engine (FME) the Original Equipment Manufacturer, will provide technician(s) to accomplish the repairs detailed in paragraph 2 below, and provide all required material support.

2. DESCRIPTION OF SERVICES. Fairbanks Morse Engine shall provide labor (excluding support described in paragraph 3, below), management, supervision, tools, materials, transportation, and equipment necessary to repair all identified deficiencies.

2.1 Blower alignment: FME shall remove/reinstall and realign the EDG scavenger air blower.

2.2 Blower Rotors: FME shall remove the blower rotors, the clearances are out of specification and will require repair and re-plating.

2.3 Blower Timing Gears: FME shall retime the blower gear set (7-35-67), it may require replacement.

3. GOVERNMENT FURNISHED UTILITIES AND SERVICES.

3.1 Support Services. Water, service air, and electricity required for the performance of the work covered by this contract will be furnished to FME at no additional cost. PNS shall provide and install/remove temporary support services to FME equipment as required. PNS shall provide rigging support as necessary to accomplish required repairs and inspections.

3.2 Mechanical Assistance. PNS shall provide outside machinist (shop 38) support to assist FME as needed to accomplish required repairs and inspections.

4. GENERAL INFORMATION.

4.1. Quality Control. FME is responsible for quality control of all work performed under this contract to assure the requirements of the contract are provided as specified.

4.2. Quality Assessment. FME’s performance will be checked throughout the period of performance of this contract.

4.3. Working Hours. FME shall provide sufficient management and personnel to support one 10-hour shift. Shift working hours shall be 0700-1700, six days a week (Monday through Saturday).

4.4. Work Site Cleanup. Remove and dispose of all debris/waste at the end of the workday from work site per applicable federal, state and local requirements.

File details come from the government source that posted it.