Att1_SOW_(WARTSILLA_SEALS)_FINAL_N3904018T0016_Redacted.pdf
PDF 62 KB Posted
- Solicitation number
- N3904018T0016
About this file
Attachment 1: Statement of Work
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work (SOW) for Shaft Seal Work onboard
1. Introduction
1.1. Scope/Brief description of the project
Observe Portsmouth Naval Shipyard (PNS) employees as they replace shaft seals in order to provide consultation and prevent potential problems and liability.
1.2. Place of Performance
Portsmouth Naval Shipyard, , main shaft seal assembly.
1.3. Estimated Period of Performance for the following CLINs/TGIs:
CLIN0001: ‐
CLIN0002: ‐
CLIN0003: ‐
CLIN0004: ‐
CLIN0005: ‐
Note: One day prior and one day after the PoP is assumed for travel. At the beginning of the PoP for CLIN0001, one additional day preceding the work is needed for security badging and training
(6010 Bells and Whistles) on‐site.
1.4. References
1.4.1 SUBSAFE Memorandum of Agreement
1.4.2 NAVSEA 0924‐062‐0010 Rev C, CHG‐5, Submarine Safety (SUBSAFE) Requirements
Manual
2. Contractor Requirements
2.1. On award of this contract, meet with Portsmouth Naval Shipyard (PNS) Code 200S (SUBSAFE
Program Office) to review and sign a Memorandum of Agreement (MOA). Reference 1.4.1 shall be signed by all parties prior to start of this Work Item in accordance with Reference 1.4.2.
2.2. This Statement of Work contains SUBSAFE work as defined by Reference 1.4.2. SUBSAFE work may not be outsourced to a non‐NAVSEANOTE 5000 activity without prior PNS Code 200S and
NAVSEA approval.
2.3. SUBSAFE interference removed and reinstalled under this Work Item requires Reentry Controls
(REC) in accordance with Reference 1.4.2.
Statement of Work (SOW) for Shaft Seal Work onboard
2.4. The contractor is present as a technical consultant to observe and advise as the seals are replaced to prevent potential problems and liability, specifically during the following TGIs:
*2.4.1. .
2.4.2.
2.4.3.
2.4.4. .
2.4.5. .
2.4.6.
3. Qualifications (as required per contract)
4. Base Access/Security Requirements
4.1. ‐ Contractor facility must possess a minimum of a CONFIDENTIAL Facility Security Clearance (FCL); and all contractor employees performing work under this contract must possess, at a minimum, a U.S. Department of Defense final‐adjudicated CONFIDENTIAL Personal Security Clearance (PCL) prior to being assigned classified work at Portsmouth Naval Shipyard (PNSY).
4.2. ‐ The contractor is responsible for providing documentation of U.S. citizenship and security clearance verification for all employees prior to being assigned work at PNSY. The contractor shall submit visit requests via the Joint Personnel Adjudication System (JPAS) to SMO 39040.
Visit requests submitted by other means will not be accepted without Facility Security Officer signed verification as to the level of security clearance granted to each employee on the visit request.
4.3. ‐ Contractors should have Defense Biometric Identification System (DBIDS) credentials for access to Portsmouth Naval Shipyard.
5. Applicable Documents
5.1. TGIs as listed in part 2 above, Contractor Requirements, which include installation instructions.
File details come from the government source that posted it. Updated .