N39040-15-T-0011_Quote_Sheet_FBO.doc
DOC document 47 KB Posted
- Solicitation number
- N39040-15-T-0011
About this file
N39040-15-T-0011 Quote Sheet
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N39040-15-T-0011_Combined_Synopsis_FBO.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N39040-15-T-0011
THIS IS NOT AN ORDER
PLEASE PROVIDE DELIVERED PRICES, AVAILABILITY, AND PRICE SOURCE WITH QUOTE
REFERENCE # 15RQ50010
DUE DATE: 10/14/2014 12:30 PM EST
From: Portsmouth Naval Shipyard
Your company info:
Emily.Bateman@navy.mil
TO:
Contracting Office, Code 410
ATTN:
PORTSMOUTH, NH 03801-2590
(P)
PHONE: 207-438-6819
(F)
FAX: (207) 438-4193
Cage Code:
BUSINESS SIZE: SMALL LARGE
PAYMENT TERMS ______%______DAYS
DELIVERY TIME: ____________ARO
PRICES DERIVED FROM ( CHECK ONE )
F.O.B. DESTINATION, Y____N____
___COMMERCIAL PRICE LIST DATED
IF NO, SHIPPING COST__________.
___INTERNAL PRICE LIST DATED
___OTHER ( PLEASE EXPLAIN )
Please indicate your preferred payment method by checking one of the options below. Payment options available are WAWF and GCPC: Government Commercial Purchase Card (up to $100,000). Please ensure that you register for WAWF (www.wawftraining.com) GCPC_____ WAWF (Wide Area Workflow) _____ *Please note that purchase card orders are not paid up front. Once material is received, a Government cardholder may be contacted for purchase card information.
_X__ If checked, to be awarded on an “All or None” basis, NAVSUP Provision L70011, PPIRS evaluation procedures apply.
YOUR SIGNATURE___________________________________DATE________________________
ITEM
DESCRIPTION
QTY
TOTAL
LINE ITEM 0001 Barge Delivery (PNS to NLON)
1 JO
DELIVERY NLT 10/20/14.
Towing of one (1) Navy YC (flat barge) in accordance with the below specifications.
FROM Portsmouth Naval Shipyard (PNS), Kittery ME to Submarine Base New London (NLON), Groton, CT.
LINE ITEM 0002 Barge Return (NLON to PNS)
1 JO
PICK UP NLT 05/22/14.
Towing of one (1) Navy YC (flat barge) in accordance with the below specifications.
FROM Submarine Base New London (NLON), Groton, CT to Portsmouth Naval Shipyard (PNS), Kittery, ME.
Notes on following page
NOTES:
· The barge specifications are as follows: Length 110’, Width 35’. Maximum Navigational Draft Is 8’, Actually Drafting 1’-2’. Barge Will Carry A Stable Cargo Weighing Approximately 40 Tons.
· POP: Delivery to Groton NLT 10/20/2014, and pick up NLT 5/22/2015 to be returned to Portsmouth.
· All movement of the barge must be coordinated with the point of contact (will be provided with award).
· DELIVERY: Departure from PNS any weekday (Monday – Friday, exluding holidays) from 0800-1300 within the Period of Performance (POP). Arrival at NLON any weekday (Monday – Friday, exluding holidays) from 0700-1500 within the pop.
· PICK UP: Departure from NLON any weekday (Monday – Friday, exluding holidays) from 0800-1300 within the Period of Performance. Arrival at PNS any weekday (Monday – Friday, exluding holidays) from 0700-1500 within the POP.
· Government to provide assist tugs available for departure from PNS and arrival to NLON at no cost. Weather may potentially impact the safety of the tow, and therefore the government is flexible given the unpredictability of the weather.
NMCARS 5237.102(90)
“The contractor shall report contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the [Commander, Portsmouth Naval Shipyard] via a secure data collection site. Contracted services excluded from reporting are based on Product Service Codes (PSCs). The excluded PSCs are:
(1) W, Lease/Rental of Equipment;
(2) X, Lease/Rental of Facilities;
(3) Y, Construction of Structures and Facilities;
(4) S, Utilities ONLY;
(5) V, Freight and Shipping ONLY.
The contractor is required to completely fill in all required data fields using the following web address https://doncmra.nmci.navy.mil.
Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk, linked at https://doncmra.nmci.navy.mil."
Wage Determination 2010-0205 is applicable. (updated WD will be attached to contract)
PLEASE PROVIDE FOB DESTINATION/DELIVERED PRICES
File details come from the government source that posted it. Updated .