This document is a draft Statement of Work (SOW) for the repair of the Ship's Service Turbine Generators (SSTG) on board a Virginia-class submarine. The Department of the Navy, Naval Sea Systems Command is conducting market research through this sources sought notice to identify eligible contractors capable of providing technical services to the Pearl Harbor Naval Shipyard and Intermediate Maintenance Facility (PHNSY & IMF) for this requirement.
The SOW outlines the scope of work, including disassembly, inspection, repair, and testing of the SSTG equipment. Key tasks include replacement of the Turbine High Pressure (THP) Radial Rotor, THP bearing Inboard Thrust Stator, and accomplishment of a specific SHIPALT. The contractor must also provide technical assistance during catcher bearing removal and reinstallation, as well as perform micro-balancing, static tuning, and dynamic tuning of the SSTG. The applicable NAICS code is 336611 - Ship Building and Repairing, and the PSC code is J020 - Maintenance, Repair, and Rebuilding of Equipment-Ship and Marine Equipment. Interested parties are instructed to submit a capability statement addressing their ability to perform these services.
View the file
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
DEPARTMENT OF THE NAVY
HRMC (NMD)
SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED
SPECIFICATION NUMBER: HRMC-512-24
INCLUDES ALL CHANGES THROUGH 5/1/2024
INDEX
SHIP: HRMC-512-24
ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.
CATEGORY I. FY-24 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.
ITEM NO. TITLE CHANGE DATE CHANGE
009-01 General Criteria; accomplish 09/27/2022 Original
009 02 Environmental Compliance Report for Material Usage; accomplish 09/27/2022 Original
009-03 Toxic and Hazardous Substance; control 09/27/2022 Original
009-04 Quality Management System; provide 09/27/2022 Original
009 05 Temporary Access; accomplish 09/27/2022 Original
009 06 Maintaining Protection and Cleanliness from Non Radioactive Operations;
accomplish
09/27/2022 Original
009 07 Confined Space Entry, and Certification; accomplish 09/27/2022 Original
009 08 Shipboard Fire Protection and Fire Prevention; accomplish 02/28/2023 CH 1
009 10 Asbestos Containing Material (ACM); control 09/27/2022 Original
009 18 Mine Warfare Ships Magnetic Material; control 09/29/2022 Original
009-19 Provisioning Technical Documentation (PTD); provide 09/27/2022 Original
009 20 Government Property; control 09/27/2022 Original
009 21 Logistics and Technical Data; provide 09/27/2022 Original
009-23 Interference; remove and install 09/29/2022 Original
009-24 Authorization, Control, Isolation, Blanking, Tagging, and Cleanliness; accomplish 09/27/2022 Original
009 34 Fire Protection of Unmanned Vessel at Contractor Facility; accomplish 09/27/2022 Original
009 39 Technical Manual Contract Requirement (TMCR) for a New Technical Manual for
Commercial Equipment/Component; accomplish
09/27/2022 Original
009 40 Contractor Crane, Multi Purpose Machine and Material Handling Equipment at a
Naval Facility; provide
09/27/2022 Original
009 60 Schedule and Associated Reports for CNO Availabilities; provide and manage 09/30/2022 Original
009 61 Shipboard Use of Fluorocarbons; control 09/27/2022 Original
009 67 Integrated Total Ship Testing; manage 09/27/2022 Original
009 69 Heavy Weather/Mooring Plan; provide 09/27/2022 Original
009 70 Confined Space Entry, Certification, Fire Protection, Fire Prevention and
Housekeeping for Unmanned Vessels; accomplish
09/27/2022 Original
009 72 Physical Security at a Private Contractor Facility; accomplish 09/30/2022 Original
009-73 Shipboard Electrical/Electronic Cable Procedure; inspect, test, install, remove, and repair
09/30/2022 Original
009-74 Occupational, Safety and Health Plan; accomplish 09/30/2022 Original
009 80 Ship Facilities; maintain 09/27/2022 Original
009 81 Compartment Closeout; accomplish 09/30/2022 Original
009-82 Installation of Equal Component Vice Specified Component; report 09/27/2022 Original
009-84 Threaded Fastener Requirements; accomplish 09/30/2022 Original
009 88 Collection, Holding and Transfer (CHT) and Motor Gasoline (MOGAS) Tanks, Spaces, and Piping, including Sewage or MOGAS Contaminated Tanks, Spaces, and Piping; certify
09/27/2022 Original
009 93 Emergency Planning and Community Right to Know Act (EPCRA) and Pollution
Prevention Act (PPA) Information; provide
09/27/2022 Original
009 99 Ship Departure Report; provide 09/27/2022 Original
ITEM NO. TITLE CHANGE DATE CHANGE
009 100 Ship's Stability; maintain 09/30/2022 Original
009 101 Ship Transit and Berthing; accomplish 09/27/2022 Original
009 106 Work Authorization Form Coordinator (WAFCOR); provide 09/27/2022 Original
009-109 Non-SUBSAFE Work on SUBSAFE-Certified Vessel; accomplish 09/27/2022 Original
009-110 Non-Nuclear Work on a Nuclear Vessel; accomplish 09/27/2022 Original
009 111 Schedule and Associated Reports for non CNO Availabilities; provide and manage
09/30/2022 Original
009 117 Combat Systems, Light Off Suport; provide 09/30/2022 Original
009 118 CG Deck Loading; accomplish 09/27/2022 Original
009-120 Fact Finding and Critique of Unplanned Event; manage 09/30/2022 Original
009 122 Temporary Padeye; install and remove 09/30/2022 Original
009 125 Boats Less Than 65 Feet Long; accomplish 10/25/2022 Original
099-01PH Waste Generated on Government Property, including Satellite Accumulation area (SAA), Managing and Disposing of Hazardous Waste (HW) and non-HW;
accomplish
01/20/2023 Original
099 02PH Dry Dock Requirement; accomplish 01/20/2023 Original
099-03PH Additional Environmental Requirements; accomplish 01/20/2023 Original
099-04PH Industrial Wastewater/Oily Wastewater Disposal; accomplish 01/20/2023 Original
099 007PH Radiological Fallout Controls; accomplish 07/13/2023 CH 3
099-08PH Safety of Ship Requirement; provide 11/03/2023 CH-6
099 40PH Additional Requirements for Contractor Cranes, Multi Purpose machine, and
Material Handling Equipment at Joint Base Pearl Harbor Hawaii; accomplish
01/17/2023 Original
099 69PH Pier Laydown for Pearl Harbor Naval Shipyard & IMF (PHNSY & IMF)
Availability; accomplish
10/20/2023 CH 4
CATEGORY II. FY-24 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB ORDER.
TITLE CHANGE DATEITEM NO. CHANGE
009-90 Technical Representative; provide 09/27/2022 Original
ITEM NO. TITLE
Hazardous Waste Produced on Naval Vessels; control077-00-001
No. One and No. 2 Ships Service Turbine Generator (SSTG); repair311-10-001
SHIP: ITEM NO: 077-00-001
COAR: 26 PCN: EAMC-L004
CMP: NONE
PLANNER:
SSP: HRMC-512-24 1 of 5 ITEM NO: 077-00-001
1. SCOPE:
1.1 Title: Hazardous Waste Produced on Naval Vessels; control
1.2 Location of Work:
1.2.1 Throughout the Ship
1.3 Identification:
1.3.1 Not Applicable
2. REFERENCES:
2.1 Resource Conservation and Recovery Act (RCRA)
2.2 Federal Hazardous Materials Transportation Act, 49 U.S.C. 5103
2.3 Applicable Hazardous Waste Manifest Form
2.4 10 U.S.C. 7311
3. REQUIREMENTS:
3.1 Manage and dispose of all hazardous waste listed in 3.5 in accordance with 2.1 and 2.2.
3.1.1 When a Navy generator number is required by this Work Item, submit the original of 2.3 to the SUPERVISOR for assignment of Environmental Protection Agency (EPA) or delegated state environmental agency identification number.
3.1.2 Manage and transport for Navy disposal, Navy-generated
hazardous waste listed in 3.5 in accordance with 2.1 and 2.2, as designated by the SUPERVISOR.
3.1.3 Submit one legible copy of 2.3 signed by the owner or operator of the disposal facility to the SUPERVISOR within 48 hours of receipt from owner or operator of disposal facility.
3.2 Complete documentation required by 2.1 and 2.2, using EPA or delegated state environmental agency identification number in accordance with 2.4.
3.2.1 Documentation related to hazardous waste generated solely by the physical actions of contractor personnel (termed Contractor- Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law.
Regardless of the presence of other material in or on the shipboard systems or structure which may have qualified a waste stream as hazardous, where the contractor performs work on a system or structure using materials (whether or not the use of such materials was specified by the Navy) which by themselves would cause the waste from such work to be a hazardous waste, documentation related to such waste shall only bear a generator number issued to the contractor.
3.2.2 Documentation related to hazardous waste generated by the combined physical actions of Navy and contractor personnel (termed Co-Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law and shall also cite in the remarks block a generator identification number
SHIP:
SSP: HRMC-512-24 2 of 5 ITEM NO: 077-00-001 issued to the Navy pursuant to applicable law. When the contractor merely drains a system and such drainage creates hazardous waste or the contractor performs work on system or structure using materials which by themselves would not cause the waste from such work to be hazardous waste but such work nonetheless creates a hazardous waste, documentation related to such waste shall bear a generator identification number issued to the contractor and shall also cite in the remarks block a generator identification number issued to the Navy. The contractor shall sign the generator certification on the Uniform Hazardous Waste Manifest whenever use of the manifest is required for disposal. The contractor shall obtain SUPERVISOR's concurrence with the categorization of the wastes as co-generated before completion of the manifest. Manifests prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.
3.3 If the contractor, while performing work at a Government facility, cannot obtain a separate generator identification number from the state in which the availability will be performed, the contractor shall notify the SUPERVISOR within three business days of receipt of written notification by the state. After obtaining approval of the SUPERVISOR, the contractor shall use the Navy site generator identification number and insert in the remarks block the contractor generator identification number issued for the site where his main facilities are located.
3.4 If, for availabilities at a contractor-owned or controlled facility, the Navy cannot obtain a separate generator identification number for use at a contractor facility, the Navy shall notify the contractor within three business days of receipt of notification by the state. The contractor shall dispose of hazardous waste in accordance with 2.1, 2.2, and 2.3.
3.5 Hazardous waste, as identified in 2.1, expected to be produced during performance of this Job Order:
AMOUNT
TYPE NAVY CO-GENERATED CONTRACTOR
Acid Solutions (may include _____ ____________ __________ spent sulfamic, citric, chromic, nitric, sulfuric, hydrochloric, etc.)
Ethylene Glycol (Antifreeze) _____ ____________ __________
Sodium Hydroxide _____ ____________ __________
Cleaning Solvents _____ ____________ __________
Sodium Phosphates (Tri, Bi, _____ ____________ __________ or Mono)
Fluorocarbons _____ ____________ __________
Morpholine _____ ____________ __________
Sodium Chromates _____ ____________ __________
Hydrazine _____ ____________ __________
SSP: HRMC-512-24 3 of 5 ITEM NO: 077-00-001
Methyl Ethyl Ketone _____ ____________ __________
Spent Abrasive Blast Material _____ ____________ __________
(contaminated with a known hazardous waste)
Trichloroethane _____ ____________ __________
Miscellaneous Chemicals _____ ____________ __________
(Rust Preventative)
Miscellaneous Chemicals _____ ____________ __________
(Corrosive)
Miscellaneous Chemicals _____ ____________ __________
(TCLP Toxic)
Miscellaneous Chemicals _____ ____________ __________
(Reactive)
Oil (Synthetic) _____ ____________ __________
Paints (Enamel, Latex, _____ ____________ __________
Epoxy, thinners, oil based, rubber paint, non-skid, lacquer, remover, varnishes)
Paints (May include lead, _____ ____________ __________ cadmium, or chrome)
Paint Strippers (phenols, _____ ____________ __________ lead, chromium)
Sludges (Contaminated with _____ ____________ __ a known hazardous waste)
Wool Felt (contaminated _____ ____________ __________ with chromium and PCB's)
Lube/Fuel Oil Soaked Rags _____ ____________ __________
Paint/Flakes (Pressure Washing _____ ____________ __________
Ext Hull Surfaces)
Fuel Oil(Residual) _____ ____________ __________
Bilge Water _____ ____________ __________
Oil/Water _____ ____________ __________
AFFF/Water _____ ____________ __________
MEK Contaminated Rags _____ ____________ __________
Metal Dust / Debris _____ ____________ __________
3.5.1 Provide zero dollars for managing and disposing of all
hazardous waste listed in 3.5. Total cost greater or less than above dollar amount will be the subject of an equitable adjustment.
SSP: HRMC-512-24 4 of 5 ITEM NO: 077-00-001
3.6 Submit one legible copy, in approved transferrable media of a report identifying type, amount, and disposal cost of waste listed in 3.5 that was removed during the performance of this Job Order to the SUPERVISOR.
3.6.1 The report shall include analysis or other method used to identify the waste and state whether each listed waste was hazardous (with generator assignment), non-hazardous, or did not exist.
3.6.1.1 Chemical analysis shall be accomplished by laboratories with state or EPA approved quality assurance programs.
3.6.2 The contractor shall make an effort to minimize hazardous waste generation by reducing the volume or toxicity by neutralizing, recycling, or otherwise removing it from the requirements of Subtitle C of 2.1 and include a description of such efforts in the report.
3.7 Nothing contained in this Work Item shall relieve the contractor from complying with applicable federal, state, and local laws, codes, ordinances, and regulations, including the obtaining of licenses and permits in connection with hazardous waste handling and disposal in the performance of this contract.
4. NOTES:
4.1 The waste listed in 3.5 is based on the best information available at the time of preparation of the solicitation. Hazardous waste generated during the actual performance of the work may vary in type or amount from waste listed in 3.5 which may result in renegotiation for credit or increase pursuant to Paragraph (b) of 2.4. The contractor is expected to use best management practice to identify and dispose of all hazardous waste. Some of the substances listed in 3.5 may be neutralized, recycled, or otherwise removed from the requirements of Subtitle C of 2.1. Inclusion of these substances in the waste listed in
3.5 does not preclude the contractor from taking action consistent with
2.1 to reduce or eliminate the hazardous constituents of any waste required to be disposed of under the contract in accordance with 2.2.
Processes that add hazardous constituents to the bilges may require that bilge water be disposed of as a hazardous waste.
4.1.1 The types and amounts of wastes listed in 3.5 are estimates of waste to be disposed of under this contract as required by 2.4. They are not estimates of the amount of the work involved in generating that waste. The work requirements of each individual Work Item specify the actual work to be accomplished.
4.2 Hazardous wastes are determined by one or more of the following methods:
4.2.1 Chemical analysis which shows that the material
characteristics of ignitability, corrosivity, reactivity, and/or toxicity (Toxicity Characteristic Leachate Procedure - TCLP) exceed the limits for that material in 40 CFR 261.20 Subpart C.
4.2.2 Reference to a Material Safety Data Sheet (MSDS), or
4.2.3 Applying knowledge of the hazardous characteristics of the waste in light of the materials or the process used.
4.3 Asbestos, bilge water, oil/water including sludge, debris and other contaminants, sludge which includes solids and sludge from ballast tanks, CHT tanks, voids, oily waste tanks, fuel ballast tanks, fuel oil tanks, skegs (West coast), PCB's (Maryland), etc., apply only in those states
SSP: HRMC-512-24 5 of 5 ITEM NO: 077-00-001 listing them as hazardous waste. When an availability is to be performed in a state where these items are hazardous waste, an estimate of the amount to be generated shall be included in 3.5.
5. GOVERNMENT FURNISHED MATERIAL (GFM):
5.1 LLTM:
1. None.
5.2 PUSH MATERIAL:
1. None.
5.3 KITTED MATERIAL:
1. None.
SHIP: ITEM NO: 311-10-001
COAR: 26 PCN: EA01-L077
EA01-L076
CMP: NONE
PLANNER:
SSP: HRMC-512-24 1 of 3 ITEM NO: 311-10-001
1. SCOPE:
1.1 Title: No. One and No. 2 Ships Service Turbine Generator (SSTG);
repair
1.2 Location of Work:
1.2.1 Engine Room
1.3 Identification:
1.3.1 Quantity: (One EA), No. One, SSTG, Mfr: Northrop Grumman
1.3.2 Quantity: (One EA), No. 2, SSTG, Mfr: Northrop Grumman
2. REFERENCES:
2.1 Standard Items, FY-24
2.2 S9311-DE-MMO-010, Turbine Generator Set Technical Manual
2.3 6511E72, Steam Turbine Generator Assembly
2.4 SHIPALT 4950D, SSTG Mag Bearing Axial Sensor and Wirewell Mod
2.5 S9G-N3B-TG-2.1, TG SETS, GDEB Test Procedure
2.6 1TS-3835 Rev D, VACL SSTG Field Service THR Tuning Procedure
2.7 Security Requirement, Work Item Addendum
3. REQUIREMENTS:
3.1 Accomplish the requirements of 009-90 of 2.1, for the disassembly, inspection, and repair of the equipment listed in 1.3 and located in 1.2.
See Note 4.1.
3.1.1 Provide the services of a qualified Original Equipment
Manufacturer's (OEM) representative to disassemble, clean free of corrosion, and inspect, the Turbine High Pressure (THP) bearing assembly, THP Radial Rotor, Thrust Rotor, inboard and outboard Thrust Stator Assembly of the equipment listed in 1.3, for signs of overheating or defects, in accordance with the requirements of 2.2 through 2.4, 2.7 and OEM's proprietary drawings and specifications.
Record the inspection results.
3.1.1.1 Submit one legible copy, in approved transferrable
media, of a report listing results of the requirements of 3.1.1 to the SUPERVISOR.
3.2 Provide 30 days of technical assistance to PHNSY in support of catcher bearing removal and reinstallation for the equipment listed in
1.3 and located in 1.2. Catcher bearing removal and reinstallation will be accomplished by PHNSY personnel.
3.3 Accomplish repairs to equipment listed in 1.3, located in 1.2, in accordance with the requirements of 2.2 through 2.4, 2.7 and OEM's proprietary drawings and specifications.
3.3.1 Remove existing and replace with new THP Radial Rotor for the
SSP: HRMC-512-24 2 of 3 ITEM NO: 311-10-001 equipment listed in 1.3, located in 1.2 and in accordance with the requirements of 2.2 and 2.3.
3.3.1.1 Accomplish installation, grinding and machining to final finish, the THP Radial Rotor and Sensor target area in accordance with the requirements of 2.2 and 2.3. Record final dimensional readings.
3.3.2 Remove existing and replace with new THP bearing Inboard Thrust Stator for the equipment listed in 1.3, located in 1.2, and in accordance with the requirements of 2.2, 2.3 and OEM's proprietary drawings and specifications.
3.3.3 Accomplish SHIPALT 4950D for equipment listed in 1.3, located in 1.2, in accordance with the requirements of 2.4 and OEM's proprietary drawings and specifications.
3.3.4 Machine to final size, install and fit housings and liners for the equipment listed in 1.3, located in 1.2, in accordance with the requirements of 2.2, 2.3 and OEM's proprietary drawings and specifications.
3.3.4.1 Route housings and liners via AIR FREIGHT to OEM
facility for finish machining to suit unit-specific measurements.
See Note 4.2 and 4.4.
3.3.4.2 Return newly machined housings and liners via AIR
FREIGHT to PHNSY. See Note 4.3.
3.3.5 Submit one legible copy, in approved transferrable media, of a report listing results of the requirements of 3.3 to the SUPERVISOR.
3.4 Accomplish SSTG micro-balancing of the equipment listed in 1.3, located in 1.2, in accordance with the requirements of 2.5 through 2.7 and OEM's proprietary procedures and specifications. Record the results.
3.5 Accomplish SSTG Static Tuning of the equipment listed in 1.3, located in 1.2, in accordance with the requirements of 2.5 through 2.7 and OEM's proprietary procedures and specifications. Record the results.
3.5.1 Submit one legible copy, in approved transferrable media, of a report listing results of the requirements of 3.5 to the SUPERVISOR.
3.6 Accomplish SSTG Dynamic Tuning of the equipment listed in 1.3, located in 1.2, in accordance with the requirements of 2.5 through 2.7 and OEM's proprietary procedures and specifications. Record the results.
See Note 4.5.
3.6.1 Submit one legible copy, in approved transferrable media, of a report listing results of the requirements of 3.6 to the SUPERVISOR.
3.7 Provide certification that all work has been completed, in accordance with the requirements of 2.2 through 2.7 and OEM's proprietary drawings, procedures and specifications.
3.7.1 Submit one legible copy, in approved transferrable media, of a report listing results of the requirements of 3.7 to the SUPERVISOR.
4. NOTES:
4.1 Known source for OEM qualified Technical Representative:
NORTHROP GRUMMAN MARINE SYSTEMS
401 E HENDY AVE