AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83)

Prescribed by GSA

FAR (48 CFR) 53.243

The purpose of this amendment is to remove the requirement to submit the Environmental Protection Plan (EPP)w ith the quote. The EPP is still required to be submitted after aw ard.

All other terms and conditions remained unchanged.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 10

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 28-Jun-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street, County, State and Zip Code) X N3225322Q0043

X 9B. DATED (SEE ITEM 11)

04-May-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE

RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

28-Jun-2022

CODE

PEARL HARBOR NAVAL SHIPYARD & IMF

ATTN: LYNDON PALOMA

667 SAFEGUARD ST., STE. 100, CODE 410

JBPHH HI 96860-5033

N32253 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N3225322Q0043

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

The following have been modified:

ADDENDUM TO FAR 52.212-1

Quote Preparation Instructions:

The Offeror shall submit a proposal for consideration no later than the due date and time listed in this solicitation.

The Offeror shall submit their proposal in a format readable by Microsoft (MS) Word 2010, Adobe Acrobat X Pro, MS Excel 2010, and MSPower Point 2010.

All offers shall meet all the requirements set forth in the solicitation. In order to evaluate Price Reasonableness, additional cost information may be requested to supplement the Government’s evaluation.

Offerors shall submit the following with their proposal:

a. Submit a completed and signed copy of the solicitation indicating agreement to the provisions and clauses therein. Each offeror shall annotate the unit price per CLINS and the corresponding total. Additionally, offerors are to fill out the following clauses in the solicitation:

- 52.204-24

- 52.204-26

- 52.222-22

b. All offerors are to acknowledge the solicitation and any amendments. If an offeror is registered in SAM

(System for Award Management), they must acknowledge 52.212-3(b)(2).

c. Submit a written Technical Approach in accordance with the Performance Work Statement (PWS).

Describe in detail your company's approach to meeting all of the tasks required by the PWS, limit three (3) pages.

The Offeror shall submit their proposal electronically via email to the designated POCs below:

LYNDON PALOMA – lyndon.paloma@navy.mil

LYN URATANI – lyn.uratani@navy.mil

ADDENDUM TO FAR 52.212-2

ADDENDUM TO FAR 52.212-2

EVALUATION

Basis for contract award - This acquisition is being conducted under FAR Parts 12 and 13. Quotes will be evaluated using the factors identified in FAR 52.212-2, Evaluation – Commercial items and this Addendum. Award will be made utilizing a Lowest Price Technically Acceptable (LPTA) source selection method.

Specifically, the evaluation process shall proceed as follows:

mailto:lyndon.paloma@navy.mil mailto:lyn.uratani@navy.mil

First, the quotes will be ranked in order from lowest to highest based on the price. The lowest priced quotation will then be evaluated and receive a rating of Acceptable or Unacceptable based on the criteria below. In order to be rated as Acceptable, the Technical quote must meet the government's minimum requirements as described in the schedule, the 52.212-1 provision, and this 52.212-2 Addendum provision. Quotes deemed Unacceptable are those that fail to meet the Government's minimum requirements.

Past performance will then be evaluated and assigned a rating of Acceptable or Unacceptable. In order to be rated as

Acceptable, the past performance must present either a reasonable expectation that the quoter will successfully perform the required effort or that the quoter’s performance record is unknown.

If the lowest priced quoters Technical quote and past performance are rated acceptable, the government will then evaluate pricing to determine fair and reasonableness per FAR 13.106-3.

If the lowest priced quotation is evaluated to have an acceptable technical quote, acceptable past performance, and fair and reasonable prices, per FAR 13.106-3, the Government will complete a responsibility determination IAW the criteria specified in FAR 9.104-1. If found responsible, the Government may stop the evaluation process at this point as that quote represents the best value to the Government. Award shall be made to that quoter without further consideration of any other quotes.

If the lowest priced quotation is assigned an unacceptable rating (either technical or past performance), or if the price is determined not fair and reasonable or if the Quoter is found to be non-responsible, the next lowest priced quote will be evaluated. This process will continue (in ascending order) until aquoter is evaluated to have an acceptable technical rating, an acceptable past performance rating, fair and reasonable prices and the quoter is deemed responsible or until all offers have been evaluated.

The Government reserves the right to evaluate all quotes.

Factor 1: Technical Acceptability

TECHNICAL RATINGS

RATING DESCRIPTION

Acceptable Quote meets the requirements of the solicitation and clearly demonstrates thorough knowledge and understanding of, and approach to, accomplishing each paragraph listed in the PWS.

Unacceptable Quote does not meets the requirements of the solicitation and clearly demonstrates thorough knowledge and understanding of, and approach to, accomplishing each paragraph listed in the PWS.

Factor 2: Past Performance

The Government will conduct a performance risk assessment the quoter’s record of past and current performance, as well as that of its proposed subcontractors and team member as it relates to the probability of successfully performing the requirements of the solicitation. The past performance evaluation will consider the quoter's demonstrated recent (within the past three years) and relevant (similar in size and scope to the services identified in the schedule) record of performance in supplying services that meet the solicitation’s requirements. Quoter’s are advised that, in conducting the past performance assessment, the Government may use data provided in the Quoter’s proposal and data obtained from other sources.

Past performance will be rated on an “acceptable” or “unacceptable” basis.

PAST PERFORMANCE EVALUATION RATINGS

RATING DESCRIPTION

Acceptable Based on the quoter’s performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort, or the quoter’s performance record is unknown. (See note below.)

Unacceptable Based on the quoters’s performance record, the Government has no reasonable expectation that the quoter will be able to successfully perform the required effort.

Note: In the case of a quoter without a record of relevant past performance or for whom information on past performance is not available or so sparse that no meaningful past performance rating can be reasonably assigned, the quoter may not be evaluated favorably or unfavorably on past performance. Therefore, the quoter shall be determined to have unknown past performance. In the context of acceptability/unacceptability, “unknown” shall be considered “acceptable.”

Factor 3: Price

In order to be considered for award, price must be determined fair and reasonable and balanced (or if unbalanced pricing exists that it does not pose an unacceptable risk to the government) using one or more techniques set forth in

FAR 13.106-3.

The Government reserves the right to award no contract at all depending on the quality of the quotes submitted and availability of funds for the requirement. The Government intends to evaluate quotes and award a single contract without requesting or accepting revised quotes. Therefore, the quoters will be advised that their initial quote should contain the most favorable terms and reflect its best possible performance potential. The Government does reserve the right to clarify aspects of the quotes and hold discussions, if deem necessary.

(End of provision addendum)

PERFORMANCE WORK STATEMENT

PERFORMANCE WORK STATEMENT (PWS)

Shop 11 Bertsch Pinch Press Disposal for Pearl Harbor Naval Shipyard

& Intermediate Maintenance Facility (PHNSY & IMF)

1.0 BACKGROUND

1.1 The primary mission of Pearl Harbor Naval Shipyard & Intermediate Maintenance Facility (PHNSY

& IMF) is to deliver regional maintenance, at the depot and intermediate levels, to keep the surface ships and submarines of our nation's navy "Fit to Fight." As Hawaii’s regional maintenance center, PHNSY & IMF’s capabilities include excellence in overhauling, repairing, converting, alteration, refurbishing, and the decommissioning of Navy vessels.

2.0 OBJECTIVE & SCOPE

2.1 PHNSY & IMF seeks a contractor that is qualified to perform the dismantling and disposal of the

Bertsch Pinch Press. The industrial machine is located inside building 155. The schedule of the dismantling and disposal of the Bertsch Pinch Press shall be determined by the Government representative and coordinated with the contractor. The desired result of these services is to clear shop spaces to allow PHNSY & IMF to install new equipment and to use these spaces more effectively. This equipment removal effort is above and beyond the current resource capacity of

PHNSY & IMF’s production shops.

3.0 PERFORMANCE REQUIREMENTS

3.1 The contractor shall provide one individual as a Project Manager who is responsible for the planning, scheduling, and managing the execution of work concerning all aspects of this contract. The Project

Manager shall coordinate with Code 1121 for physical security requirements and traffic management.

3.2 Prior to commencing work, the contractor shall meet in conference with the Government TPOC, COR and necessary support personnel to discuss and develop mutual understandings relative to environmental, safety, schedule, security, and waste management. The contractor shall obtain all necessary permits, approvals and licenses necessary for the transportation of material on highway/roads and disposal/recycling of scrap materials.

3.3 The contractor shall present an Environmental Protection Plan (EPP) 45 days after award. See

Section 15.0 Attachments - Appendix I and Appendix II outline the various elements that shall be addressed, including testing the Bertsch Pinch Press for the presence of hazardous material, including lead and asbestos, and environmental mitigation efforts, including nuisance dust control and other steps to be taken to minimize or prevent damage to adjoining structures, on-going PHNSY & IMF operations and injury to personnel working in the vicinity. Once accepted by the Government, the

EPP shall become an integral part of the requirements of this PWS.

3.4 A preliminary Plan of Action (POA) plan must be submitted prior to commencing. This plan will highlight disassembly plans for the equipment items to be disassembled, relocated, staged, packaged, and crated under this specification during the contract period of performance. The POA shall be submitted in a PDF format within ten (10) business days after the contract is awarded. The POA will be reviewed and approved by the Government.

3.5 The contractor shall provide a Safety Plan covering all aspects of safety for this project. The safety plan shall be approved by the government prior to commencement of work. All work performed shall be in accordance with applicable Federal, State of Hawaii and OSHA requirements. Refer to Section

15.0 Attachments - Appendix I for guidance regarding safety.

3.6 All hot work must comply with NFPA 51B Standard for Fire Prevention during welding, cutting and other hot work. The contractor shall submit a Hot Work Checklist and Permit to a Shop 17 Permit

Authorized Individual no later than seven (7) working days prior to hot work being performed. See

Section 15.0 Attachments - Appendix V.

3.7 The contractor shall provide all material handling and lifting equipment, rigging support services, and other support equipment (such as cranes, forklifts, Bobcats, man-lifts, etc.) necessary for continuous support and shall provide qualified personnel to operate it. The contractor will complete and submit to NAVFAC Hawaii and Code 740 AP at least one (1) month prior to start of work a Contractor

Crane Entry Package as applicable to the POA. See Section 15.0 Attachments – Appendix VI.

3.8 The contractor shall be responsible for the dismantling and disposal of the industrial plant equipment listed below. The contractor shall have salvage rights to all the scrap material generated as a result of the dismantling of the identified equipment. Disposal of the material shall be in accordance with Federal, State and local laws and regulations. The disposal of scrap materials within PHNSY & IMF is strictly prohibited.

a. The contractor shall remove all equipment, all associated peripherals (pumps, motors, tanks, machinery control cabinets, machine control hardware, etc.) and all utility infrastructure (pipe, conduit, cable, wiring, electrical cabinets, transformers, etc.) between the equipment and its primary isolation or disconnect.

b. All conduit and piping shall be capped at the isolation or disconnect point.

c. Peripheral equipment, piping runs, and other utility infrastructure located in service trenches or underneath steel plate flooring shall be removed and disposed.

d. Removal of leveling compound (grout) during the equipment disassembly process may be required to break the equipment free from the foundation. All debris generated during the process shall be removed and disposed.

e. Steel bolts/anchors protruding from the foundation will be cut as close to the foundation as reasonably possible.

3.9 Itemized list of industrial equipment to be disposed:

Description of Equipment to be

Disposed

Physical Characteristics Equipment Specific Disassembly and Packaging Requirements

1. Manufacture: Bertsch

Description: Pinch Press

Serial Number: M-10716

Model Number: 20

Location: Building 155, Column 8-9

DOUBLE PINCH WITH HYDRAULIC

SPEED CONTROL, 22 ROLL DIAMETER,

1 1/16 X 16' CAPACITY, COLD ROLLING

CAPACITY AT 60000 PSI, 3 ADJUSTABLE

FORGINGS. ACCESSORIES INCLUDE:

TEFC MOTOR PUMP TANK HYDRAULIC

UNIT,

BED ROLLER TABLE CONSOLE TYPE

ELECT CABINET (NEMA 12) CONTROL

STATION.

Equipment Characteristics

Length / Width / Height

42 ft. x 18 ft. x 12 ft.*

Weight estimated to be at least

150,000* pounds

Pit Dimensions:

Length / Width / Height

15 ft. x 31 ft. x 4 ft.*

*Values are approximations made by the Government, and should not be assumed to be accurate.

- Equipment has been drained of fluids but there may be residual fluids in the lines.

- Power has been disconnected.

3.10 The contractor shall clear and dispose of all scrap materials and debris generated from the dismantling of the equipment in the work site. The work site shall be returned to a clean and orderly state.

4.0 SERVICE DELIVERY SUMMARY

Performance Requirement Reference Performance Threshold

1. Provide a single point of contact that will serve as the project manager.

Paragraph 3.1 100% delivery and compliance.

2. Provide an OPSEC Plan to the Government for approval by the OPSEC Program Manager.

Paragraph 10.2 100% delivery and compliance.

3. Meet in conference with the Government prior to commencing work.

Paragraph 3.2 100% delivery and compliance.

4. Follow the Environmental Protection Plan (EPP) in all operations associated with this PWS.

Paragraph 3.3 100% delivery and compliance.

5. Provide Plan of Action (POA) Paragraph 3.4 100% delivery and compliance.

6. Provide Safety Plan Paragraph 3.5 100% delivery and compliance.

7. Provide Hot Work Checklist and Permit to Code

970 Shop 17.

Paragraph 3.6 100% delivery and compliance.

8. Provide Contractor Crane Entry Package to

NAVFAC and Code 740.

Paragraph 3.7 100% delivery and compliance.

9. Completely remove and properly dispose of items listed in the PWS.

Paragraph 3.8 and

3.9

100% delivery and compliance.

10. Perform clean-up of work site. Paragraph 3.10 100% delivery and compliance.

5.0 QUALITY ASSURANCE

5.1 The contractor shall develop a Quality Control Plan (QCP) and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor's QCP is the means by which the contractor assures that work complies with the requirement of the contract.

5.2 The contractor shall maintain records of reviews and actions taken per the QCP, and shall make such records available to the Government upon request.

5.3 The contractor agrees to attend any progress meetings during the contract period of performance. The

Government TPOC and other government personnel, as appropriate, may meet periodically with the contractor to review the contractor’s performance. At these meetings the TPOC will apprise the contractor of how the Government views the contractor’s performance and the contractor will notify the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.

6.0 GOVERNMENT PROVIDED SERVICES

6.1 The Government will provide laydown space for the purpose of staging disassembled equipment, equipment components, peripherals and utility infrastructure.

7.0 CONTRACTOR QUALIFICATIONS

7.1 The contractor shall provide trained personnel fully capable of providing the deliverables requested and have the knowledge, skills, and expertise to meet the requirements specified in this PWS.

7.2 The contractor shall comply with safety and health work practices specified in Section 15.0

Attachments – Appendix I.

7.3 The contractor shall comply with environmental guidelines specified in Section 15.0 Attachments –

Appendix II.

7.4 The contractor shall establish clear organizational lines of authority and responsibility to ensure effective management. The contractor must maintain continuity between Code 980 TPOC and the

COR. The project manager shall be responsible for the performance and quality of meeting the requirements of this PWS. The project manager or alternate shall have full authority to act on behalf of the contractor on all contract matters relating to operations of this contract.

8.0 SECURITY REQUIREMENTS

8.1 Prior to the start of work, the contractor shall provide the COR (on company letterhead) a request for access to PHNSY & IMF and include the following information – full name of all personnel working on this contract; Social Security number; date of birth, place of birth, and citizenship. The contractor shall state that information has been verified and shall have supporting records on file if required for examination.

8.2 The contractor shall pass a background check to gain access into PHNSY & IMF. The contractor’s employees must be U.S. Citizens and registered with the Defense Biometric Identification System

(DBIDS). The contractor shall coordinate with the TPOC or COR to obtain a gate pass at Building

3455 Pass Office. Only those individuals with favorable investigations shall be utilized on this contract. The contractor will coordinate with building 3455 Pass Office or government designee in the completion of current form SECNAV 5512/1.

8.3 Contractor personnel must meet the requirements for a “green” unescorted badge for access to areas requiring services related to this contract. The contractor will coordinate with PHNSY Security

Office or government designee at building 207 in the completion of Visit Request for PHNSY & IMF current form PH-SYD 5512/28.

8.4 This contract does not require a security clearance level and clearance granted by the Defense

Security Service (DSS). The contractor shall comply with Security requirements specified in Section

15.0 Attachments - Appendix III.

8.5 Should contractor personnel receive or suspect they have learned classified information beyond their level of clearance, the contractor shall identify and immediately report suspicions to the COR.

9.0 OPERATIONS SECURITY (OPSEC)

9.1 The contractor shall comply will Operational Security (OPSEC) requirements specified in

Section 15.0 Attachments - Appendix IV.

9.2 Upon contract award, if determined by the OPSEC Program Manager (OPSEC PM), the contractor must submit an OPSEC Plan to be approved by the Government prior to the start of work. The OPSEC Plan must be submitted via encrypted email, through the approved

Department of Defense Safe (DoD) Secure Access File Exchange (SAFE) at https://safe.apps.mil.

9.3 It is the responsibility of all contractor personnel (prime and sub) to avoid inadvertent disclosure of unclassified or classified information during the period of this contract.

9.4 During the period of this contract, contractor personnel may be exposed to, use, or produce, U.S.

Government CI and observable indicators which may lead to the discovery of CI. PHNSY & IMF CI will not be distributed to unauthorized third parties, including foreign government or companies under

Foreign Ownership, Control or Influence (FOCI). The contractor shall protect all CI in a manner appropriate to the nature of the information.

9.5 U.S. Government CI shall not be publicized in corporate wide newsletters, trade magazines, displays, internet page or public websites. All transmission to personal email accounts (AOL, Yahoo, Gmail, Hotmail, Comcast, etc.,) and posting on social media websites (Facebook, Instagram, Twitter, LinkedIn, etc.,) are strictly prohibited. Media requests related to this project shall be directed to

PHNSY & IMF Public Release Authority.

9.6 The contractor and its personnel should realize that disclosure or compromise of CI to unauthorized persons, whether willfully or through gross negligence, carelessness, or indiscretion, may warrant action to remove the individual assigned or to terminate the awarded contract. Furthermore, such conduct may be cause for criminal prosecution and imposition of criminal and civil penalties.

9.7 The contractor shall protect Controlled Unclassified Information (CUI) at all times. CUI consist of but is not limited to unclassified information requiring safe guarding and dissemination controls, consistent with applicable law, regulation, or government-wide policy. Any attempt by unauthorized third parties to solicit, obtain, photograph or record incidents of loss or compromise of CUI or other pertinent sensitive information related to this contract shall be immediately reported to the organization’s Command Security Manager and the COR.

10.0 CONTRACTOR PERSONNEL

10.1 The contractor shall furnish sufficient personnel to perform all work specified within this performance work statement. The contractor is required to comply with Public Law 105-270, Section

5(2) (A). This law states that contractors will not perform inherently governmental functions.

Section 5(2)(A) of this Public Law defines the term “inherently governmental function” as “a function that is so intimately related to the public interest as to require performance by Federal Government employees.” Per Section 5(2) (B), inherently governmental functions include management of government programs requiring value judgments, conduct of foreign relations, selection of program priorities, and the direction of intelligence and counter-intelligence operations. Per Section 5(2) (C), inherent governmental functions DO NOT include, (i) gathering information for or providing advice, opinions, recommendations, or ideas to Federal Government officials; or (ii) any function that is primarily ministerial and internal in nature.”

10.2 Contractor personnel shall not establish an employee-employer relationship with government personnel under this contract.

10.3 The contractor shall not provide personal services.

10.4 Contractor personnel shall make clear to all individuals they engage with that they are contractor employees and not government employees. When participating and introducing themselves during official events wherein government, non-government, or foreign personnel are present, contractor personnel shall identify themselves as employees of the contractor. Contractor personnel must be clearly identified (i.e. company shirt, pin, visible company ID, etc.) in a visible location as to who their employer is.

10.5 Contractor personnel shall not manage, supervise, or task government employees or military personnel. Contractor personnel may not make any commitment to non-government personnel, including a foreign official, which commits the expenditure of U.S. government resources.

10.6 Facilities may close due to local or national emergencies, administrative closings, or other government directed facility closings. Contractor access to government facilities during closures is not permitted.

11.0 PLACE OF PERFORMANCE

11.1 The place of performance shall be on-site at PHNSY & IMF Building 155, in the Controlled

Industrial Area (CIA).

12.0 PERIOD OF PERFORMANCE

13.1 To be determine at award of the contract. The contractor shall complete the performance requirements of this contract no later than the end of the Period of Performance.

13.0 HOURS OF OPERATION

13.1 First shift working hours are from 0630 to 1500 hours, daily Monday through Friday, excluding

Holidays.

13.2 Second shift working hours are from 1430 to 2300 hours, daily Monday through Friday, excluding

Holidays.

13.3 Second shift working hours may be requested by the Government to complete contract work.

13.4 If the Federal holiday falls on a Saturday, the holiday is observed on the preceding Friday. If the

Federal holiday falls on a Sunday, the holiday is observed on the following Monday.

New Year’s Day 1st of January

Dr. Martin Luther King’s Birthday 3rd Monday in January

President’s Day 3rd Monday in February

Memorial Day 4th or 5th Monday in May

Juneteenth 3rd Saturday in June

Independence Day 4th of July

Labor Day 1st Monday in September

Columbus Day 2nd Monday in October

Veteran’s Day 11th of November

Thanksgiving Day 4th Thursday in November

Christmas Day 25th of December

14.0 ATTACHMENTS

APPENDIX I Safety and Health Work Practices PHNSY & IMF (revised May 27, 2020)

APPENDIX II Environmental Protection Guidelines for Contractors on Facilities Projects at Pearl

Harbor Naval Shipyard & Intermediate Maintenance Facility (revised October 16, 2019)

APPENDIX III Contractor Security Requirements for Pearl Harbor Naval Shipyard & IMF’s Controlled

Industrial area, Controlled Nuclear Information Areas, Nuclear Work Areas and /or other sensitive areas, (revised June 2021)

APPENDIX IV PHNSY & IMF OPSEC Contract Requirements (March 21, 2022)

APPENDIX V Hot Work Checklist and Permit

APPENDIX VI NAVFAC P-307 Management of Weight Handling Equipment (June 2016)

(End of Summary of Changes)