SF 440BRL NAVY DWVB SPECS.pdf
Standard Form PDF 377 KB Posted
- Attached to
- Frac Tank Oily Waste Disposal and Cleaning
- Solicitation number
- N32253-22-Q-0022
View the file
Who attaches SF 440
| Agency | Files |
|---|---|
| Department of the Navy Naval Sea Systems Command | 1 |
Other files
| File | Type | Posted |
|---|---|---|
| N32253-22-Q-0022 QA 01.04.2022.pdf | ||
| N32253-22-Q-0022.2 RFQ.pdf | ||
| N32253-22-Q-0022.1 RFQ.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1805 Howard Road Waxahachie, TX 75165 Phone (469) 517-1642 Fax (469) 517-1647
STANDARD 440 BRL CORRUGATED DOUBLE WALL V-BOTTOM
LIQUID STORAGE TANK SPECIFICATIONS
FLOOR: ¼” A36 PLATE ON INTERNAL AND EXTERNAL FLOOR, 4” SLOPED V-BOTTOM
FLOOR, FLOOR PANELS ARE BROKE ON BRAKE PRESS
Internal and External Floors will be connected together with 4” Channel
Channel is oriented longitudinal and stich welded to the outer floor and plug welded to the inner floor.
After inner floor is plug welded the welds will be ground smooth
SUBSTRUCTURE: 10” CHANNEL STRUCTURAL MEMBERS, ALL GUSSETS/CROSSMEMBERS TO BE
3/8” A36 PLATE.
WALLS: EXTERNAL 3/16” A36 PLATE, CORRUGATED PROFILE, RIBS ON 18” O.C
INTERNAL 1/4” A36 PLATE, SMOOTH PLATE
Internal and External walls will be plug welded together at each rib
¼” Spacers will be included in between inner and outer walls
ROOF: ¼” A36 PLATE, ARCH IN ROOF FOR RAIN DRAINAGE, 4” CHANNEL SUPPORTS
HANDRAILS AROUND ENTIRE PERIMETER OF TANK THAT FOLD DOWN FOR
TRANSPORT (picture for illustration only, note this is not the exact roof layout)
PIPING: (1) 4” FRONT SUCTION LINE TO FLOOR, WITH 4” BUTTERFLY VALVE
(1) 4” FRONT FILL LINE, WITH 4” BUTTERFLY VALVE
(1) 4” REAR DRAIN VALVE AT BOTTOM OF V, WITH 4” BUTTERFLY VALVE
(1) 4” FLANGE WITH BLANK ON ROOF
(2) 6” FLANGES WITH BLANKS ON ROOF
(1) 8” BLAYLOCK PRV VALVE (LL-10 MODEL) 16oz/in2 Pressure, 0.4 oz/in2 vacuum
FLOAT INDICATOR: (1) MECHANICAL FLOAT LEVEL, WITH 8” STAINLESS STEEL FLOAT BALL
FULL/EMPTY FLOAT INDICATOR ON FRONT WALL OF TANK
(1) BRL CHART IS INCLUDED ON THE FRONT OF THE TANK, ALL VERTICAL
MEASUREMENT ARE TAKEN FROM THE CENTER OF THE TANK AT THE BOTTOM
OF THE VEE
MANWAYS: (2) 22” FLAT SEAL MANWAYS, D-SHAPED BUNA GASKET ON NECK OF MANWAY
BOTH ON ROOF WITH INTERNAL LADDERS
ACCESS: 22” WIDE STAIRWAY IN FRONT, ALL STAIRS EQUIPED WITH SLIP-
RESISTANT TREADS
AXLES/TIRES: 22,500 LB AXLE WITH AIR BRAKES
11R X 22.5 RADIAL TIRES ON STEEL WHEELS
SOUTHERN FRAC LOGO MUDFLAPS
COATINGS: INTERNAL HIGH BUILD GLASSFLAKE REINFORCED EPOXY
STRATHMORE
MINIMUM THICKNESS RECOMMENDED BY STRATHMORE (12MIL)
EXTERNAL (INCLUDING BOTTOM OF TANK) – ZINC RICH EPOXY PRIMER,
URETHANE TOP COAT (GRAY
STRATHMORE
RECOMMENDED THICKNESS BY STRATHMORE (BLAST PROFILE+2MIL)
SOUTHERN FRAC STANDARDS (5-7MIL WET) (3-5MIL DRY)
BLAST: INTERIOR SSPC-SP10 Exterior – SSPC-SP6
HYDROTESTING: TANKS ARE FILLED TO CAPACITY AND CHECKED FOR LEAKS, LEAK TEST
DOCUMENTATION AVAILABLE UPON REQUEST.
AIR TEST: INTERSTITIAL CAVITY WILL BE AIR TESTED
(3) ¾” PORTS TO TEST INSTERSTITIAL SPACE
DIMENSIONS: 47’-3” LONG X 8’-6” WIDE X 10’-6” TALL
36,280LBS
INTERSTITIAL COUPLINGS: (3) ¾” COUPLINGS WITH BALL VALVES ON FRONT
(3) ¾” COUPLINGS WITH BALL VALVES ON REAR
-SIGN INCLUDED SHOWING NOT TO EXCEED 3PSI
(1) PRESSURE RELEIF VALVE ON ROOF, SET TO BLEED AIR FROM
INTERSTITIAL CAVITY AT 3PSI.
TANK TRANSPORT
ALL HANDRAILS MUST BE FOLDED DOWN PRIOR TO TRANSPORTING THE TANK. THE TANK WILL
BE OVER LEGAL TRANSPORT HEIGHT IF THE HANDRAILS ARE IN THE UP POSITION. TO LOWER
THE HANDRAILS LIFT UP AND FOLD DOWN. THERE ARE CHAIN HOBBLES FOR ROOF HANDRAILS
TO STRAP THE HANDRAILS DOWN. BRASS CLASP ARE ON THE END OF THE CHAIN AND THESE
NEED TO BE IN PLACE PRIOR TO MOVING THE TANK.
THE BRAKES ON THE TRAILER WILL BE LOCKED DOWN WHEN THE AIR IS DISCONNECTED FROM
THE TRACTOR. ON THE REAR FACE OF THE TANK THERE IS A (1/4 INCH) DRAIN PEP-COCK THAT
WHEN UNSCREWED WILL BEGIN TO BLEED THE AIR FROM THE AIR TANK RELEASING THE
BRAKES SO THAT THE UNIT CAN BE MOVED WITHOUT AIR APPLIED FROM THE TRACTOR. DO
NOT ATTEMPT TO DRAG THE TRAILER WITH THE BRAKES LOCKED. IF THE AIR IS DRAINED FROM
THE TANK THE BRAKES WILL REMAIN UNLOCKED. ONCE YOU CLOSE THE REAR PEP-COCK YOU
CAN APPLY AIR TO THE FRONT OF THE UNIT VIA THE GLADHANDS TO LOCK THE BRAKES AGAIN.
BE SURE TO CHAULK THE TIRES IN THE FINAL RESITNG POSITION OF THE TANK.
IT IS THE DRIVERS RESPONSIBILITY TO ENSURE THAT THE GLADHANDS AND 7-WAY PLUG ARE
CONNECTED PROPERLY TO THE FRAC TANK. CHECK BRAKES AND LIGHTS BEFORE MOVING THE
UNIT. FAILURE TO DO SO CAN CAUSE DAMAGE TO THE UNIT AND COULD BE A ROAD HAZARD.
WHEN UNLOADING THE UNIT, DO NOT DROP THE TANK. THIS CAN DAMAGE THE LINER AND
OTHER PORTIONS OF THE UNIT. THE TANK NEEDS TO BE LOWERED GENTLY TO THE GROUND
WITH THE OPPROPRIATE EQUIPMENT OR A WINCH ON THE TRUCK CAPABLE OF LOWERING THE
UNIT.