SHIP: NAVSTA PEARL HARBOR HI (CNIC ITEM NO: 077-11-001

62813)

COAR: £§. PCN: HSB8-L033

HSB7-L032

CMP:

PLANNER:

NONE

1. SCOPE:

1.1 Title: Hazardous Waste Produced on Naval Vessels; control

1.2 Location of Work:

1.2.1 Throughout the Ship

1.3 Identification:

1.3.1 Not Applicable

2 . REFERENCES:

2.1 Resource Conservation and Recovery Act (RCRA)

2.2 Federal Hazardous Materials Transportation Act, 49 U.S.C. 5103

2.3 Applicable Hazardous Waste Manifest Form

2.4 10 u.s.c. 7311

3. REQUIREMENTS:

3.1 Manage and dispose of all hazardous waste listed in 3.5 in accordance with 2.1 and 2.2.

3.1.1 When a Navy generator number is required by this Work Item, submit the original of 2.3 to the SUPERVISOR for assignment of

Environmental Protection Agency (EPA) or delegated state environmental agency identification number.

3.1.2 Manage and transport for Navy disposal, Navy-generated

hazardous waste listed in 3.5 in accordance with 2.1 and 2.2, as designated by the SUPERVISOR.

3.1.3 Submit one legible copy of 2.3 signed by the owner or operator of the disposal facility to the SUPERVISOR within 48 hours of receipt from owner or operator of disposal facility.

3.2 Complete documentation required by 2.1 and 2.2, using EPA or delegated state environmental agency identification number in accordance with 2.4.

3.2.1 Documentation related to hazardous waste generated solely by the physical actions of Ship's Force or Navy employees (termed Navy

Generated Hazardous Waste) on board the vessel shall only bear a generator identification number issued to the Navy pursuant to applicable law. The contractor shall obtain SUPERVISOR'S concurrence with the categorization of the waste as Navy-generated before completion of the manifest. The manifest prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.

3.2.2 Documentation related to hazardous waste generated solely by the physical actions of contractor personnel (termed Contractor-

SSP: HRMC-008-21 1 of 5 ITEM NO: 077-11-001

SHIP: NAVSTA PEARL HARBOR HI (CNIC 62813)

Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law.

Regardless of the presence of other material in or on the shipboard systems or structure which may have qualified a waste stream as hazardous, where the contractor performs work on a system or structure using materials (whether or not the use of such materials was specified by the Navy) which by themselves would cause the waste from such work to be a hazardous waste, documentation related to such waste shall only bear a generator number issued to the contractor.

3.2.3 Documentation related to hazardous waste generated by the combined physical actions of Navy and contractor personnel (termed

Co-Generated Hazardous Waste) shall bear a generator identification number issued to the contractor pursuant to applicable law and shall also cite in the remarks block a generator identification number issued to the Navy pursuant to applicable law. When the contractor merely drains a system and such drainage creates hazardous waste or the contractor performs work on system or structure using materials which by themselves would not cause the waste from such work to be hazardous waste but such work nonetheless creates a hazardous waste, documentation related to such waste shall bear a generator identification number issued to the contractor and shall also cite in the remarks block a generator identification number issued to the

Navy. The contractor shall sign the generator certification on the

Uniform Hazardous Waste Manifest whenever use of the manifest is required for disposal. The contractor shall obtain SUPERVISOR's concurrence with the categorization of the wastes as co-generated before completion of the manifest. Manifests prepared shall be presented to the SUPERVISOR for completion after the hazardous waste has been identified.

3.3 If the contractor, while performing work at a Government facility, cannot obtain a separate generator identification number from the state in which the availability will be performed, the contractor shall notify the SUPERVISOR within three business days of receipt of written notification by the state. After obtaining approval of the SUPERVISOR, the contractor shall use the Navy site generator identification number and insert in the remarks block the contractor generator identification number issued for the site where his main facilities are located.

3.4 If, for availabilities at a contractor-owned or controlled facility, the Navy cannot obtain a separate generator identification number for use at a contractor facility, the Navy shall notify the contractor within three business days of receipt of notification by the state. The contractor shall dispose of hazardous waste in accordance with 2.1, 2.2, and 3.2.3.

3.5 Hazardous waste, as identified in 2.1, expected to be produced during performance of this Job Order:

TYPE

Acid Solutions (may include spent sulfamic, citric, SSP: HRMC-008-21

NAVY

AMOUNT

CO-GENERATED CONTRACTOR

ITEM NO: 077-11-001

chromic, nitric, sulfuric, hydrochloric, etc.)

Ethylene Glycol (Antifreeze)

Sodium Hydroxide

Cleaning Solvents

Sodium Phosphates (Tri, Bi, or Mono)

Fluorocarbons

Morpholine

Sodium Chromates

Hydrazine

Methyl Ethyl Ketone

Spent Abrasive Blast Material

(contaminated with a known hazardous waste)

Trichloroethane

Miscellaneous Chemicals

(Rust Preventative)

Miscellaneous Chemicals

(Corrosive)

Miscellaneous Chemicals

(TCLP Toxic)

Miscellaneous Chemicals

(Reactive)

Oil (Synthetic)

Paints (Enamel, Latex, Epoxy, thinners, oil based, rubber paint, non-skid, lacquer, remover, varnishes)

Paints (May include lead, cadmium, or chrome)

Paint Strippers (phenols, lead, chromium)

Sludges (Contaminated with a known hazardous waste)

SSP: HRMC-008-21 3 of 5 ITEM NO: 077-11-001

Wool Felt (contaminated with chromium and PCB's)

Lube/Fuel Oil Soaked Rags

Paint/Flakes (Pressure Washing

Ext Hull Surfaces)

Fuel Oil(Residual)

Bilge Water

Oil/Water

AFFF/Water

MEK Contaminated Rags

3.5.1 Provide zero dollars for managing and disposing of all

hazardous waste listed in 3.5. Total cost greater or less than above dollar amount will be the subject of an equitable adjustment.

3.6 Submit one legible copy, in approved transferrable media of a report identifying type, amount, and disposal cost of waste listed in 3.5 that was removed during the performance of this Job Order to the SUPERVISOR.

3.6.1 The report shall include analysis or other method used to identify the waste and state whether each listed waste was hazardous

(with generator assignment), non-hazardous, or did not exist.

3.6.1.1 Chemical analysis shall be accomplished by laboratories with state or EPA approved quality assurance programs.

3.6.2 The contractor shall make an effort to minimize hazardous waste generation by reducing the volume or toxicity by neutralizing, recycling, or otherwise removing it from the requirements of Subtitle

C of 2.1 and include a description of such efforts in the report.

3.7 Nothing contained in this Work Item shall relieve the contractor from complying with applicable federal, state, and local laws, codes, ordinances, and regulations, including the obtaining of licenses and permits in connection with hazardous waste handling and disposal in the performance of this contract.

4. NOTES:

4.1 The waste listed in 3.5 is based on the best information available at the time of preparation of the solicitation. Hazardous waste generated during the actual performance of the work may vary in type or amount from waste listed in 3.5 which may result in renegotiation for credit or increase pursuant to Paragraph (b) of 2.4. The contractor is expected to use best management practice to identify and dispose of all hazardous waste. Some of the substances listed in 3.5 may be neutralized, recycled, or otherwise removed from the requirements of

Subtitle C of 2.1. Inclusion of these substances in the waste listed in

3.5 does not preclude the contractor from taking action consistent with

2.1 to reduce or eliminate the hazardous constituents of any waste required to be disposed of under the contract in accordance with 2.2.

Processes that add hazardous constituents to the bilges may require that bilge water be disposed of as a hazardous waste.

SSP: HRMC-008-21 4 of 5 ITEM NO: 077-11-001

4.1.1 The types and amounts of wastes listed in 3.5 are estimates of waste to be disposed of under this contract as required by 2.4. They are not estimates of the amount of the work involved in generating that waste. The work requirements of each individual Work Item specify the actual work to be accomplished.

4.2 Hazardous wastes are determined by one or more of the following methods:

4.2.1 Chemical analysis which shows that the material

characteristics of ignitability, corrosivity, reactivity, and/or toxicity (Toxicity Characteristic Leachate Procedure - TCLP) exceed the limits for that material in 40 CFR 261.20 Subpart C.

4.2.2 Reference to a Material Safety Data Sheet (MSDS), or

4.2.3 Applying knowledge of the hazardous characteristics of the waste in light of the materials or the process used.

4.3 Asbestos, bilge water, oil/water including sludge, debris and other contaminants, sludge which includes solids and sludge from ballast tanks, CHT tanks, voids, oily waste tanks, fuel ballast tanks, fuel oil tanks, skegs (West coast), PCB's (Maryland), etc., apply only in those states listing them as hazardous waste. When an availability is to be performed in a state where these items are hazardous waste, an estimate of the amount to be generated shall be included in 3.5.

5. GOVERNMENT FURNISHED MATERIAL (GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

1. None.

SSP: HRMC-008-21 5 of 5 ITEM NO: 077-11-001

SHIP:

COAR:

1. SCOPE:

NAVSTA PEARL HARBOR HI (CNIC

62813)

.£l1

ITEM NO: 311-11-001

PCN:

CMP:

PLANNER:

HSB7-L030

NONE

1.1 Title: Boat Alteration 35HS/20C, Generator Replace; accomplish

1.2 Location of Work:

1.2.1 Throughout

1.3 Identification:

1.3.1 Boat Information: 35-Foot Harbor Security (HS) Boat (HSB-7), Manufacturer: Safe Boat, Manufacturer Hull Identification Number:

EGO01648K111Z1241 APL Number: 72A120017, Hull Registry Number:

35HS1101

2 . REFERENCES:

2.1 Standard Items, (FY 22)

2.2 S9008-J4-BIB-010, Boat Information Book for 35-Foot Harbor Security

(HS) Boat, Hulls 35HS1101-35HS1102

2.3 TO300-AU-SPN-010, Fabrication, Welding and Inspection of Small Boats and Craft, Aluminum Hulls

2.4 S9086-TX-STM-010 Rev 7, Naval Ships' Technical Manual Chapter 583, Volume 1, Boats and Small Craft

2.5 300-5107858 Rev A, Standard Electrical Installation Requirements and

Nomenclature

2.6 501-5112234, 35FT Harbor Security (Safe Boat) Generator Replacement

Mechanical Modifications

2.7 311-5112235, 35FT Harbor Security (Safe Boat) Generator Replacement

Electrical Modifications

2.8 123-5112236, 35FT Harbor Security (Safe Boat) Generator Replacement

Structural Modifications

2.9 513-5112743, 35HS (Safe Boat) Ventilation Mods Incidental To

Generator Replacement- Mechanical Modifications

2.10 301-5112744, 35HS (Safe Boat) Ventilation Mods Incidental To

Generator Replacement-Electrical Modifications

2.11 35FPL-800-001 Rev C, Booklet of General Plans

2.12 35FPL-311-001 Rev A, Generator Electric Schematic

2.13 35FPL-301-001, DC Power Distribution Equipment General Arrangement

2.14 35FPL-324-001 Rev A, DC Breaker Panel Electric Schematic

2.15 35FPL-324-002 Rev A, AC Breaker Panel Electric Schematic

2.16 35FPL-324-003 Rev A, Main Breaker Panel Electric Schematic

SSP: HRMC-008-21 1 of 3 ITEM NO: 311-11-001

2.17 35FPL-324-004 Rev A, 24 voe Breaker Panel

2.18 FPB-M-555-001, Fuel System Schematic

2.19 Westerbeke Engines & Generators, Multi-Port Single Phase Marine

Gasoline Generators Operators Manual,7.5 MCGA or 5.0 MCGA 60 HZ, 6.2 MCGA or 4.2 MCGA 50 HZ

3. REQUIREMENTS:

3.1 Accomplish the requirements of boat alteration 35HS/20C on vessel listed in 1.3.1, in accordance with 2.6 through 2.10, using 2.2, 2.4,

2.11 through 2.19 as guidance.

3.1.1 Cables and wiring shall be installed in accordance with the requirements of 2.5.

3.1.2 Chip and grind surface flush and smooth in way of removals.

3.1.3 Accomplish requirements of 009-12 of 2.1, including Table 3, Column C, Lines One through 7 for structure modifications installation.

3.1.4 Accomplish updating BOATALT Label Plates in accordance with

2.6 through 2.10 General Notes.

(V) (G) "GENERATOR BREAK-IN"

3.2 Accomplish test notes T-1 and T-2 in accordance with 2.7 and 2.19

3.2.1 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing the results of the requirements of 3.2 to the SUPERVISOR.

(V) (G) "OPERATIONAL TEST"

3.3 Accomplish test notes T-1 through T-5 in accordance with 2.6 and

2.19.

3.3.1 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing the results of the requirements of 3.3 to the SUPERVISOR.

(V) (G) "PULL TEST"

3.4 Accomplish test notes T-1 through T-5 in accordance with 2.8.

3.4.1 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing the results of the requirements of 3.4 to the SUPERVISOR.

(V) (G) "OPERATIONAL TEST"

3.5 Accomplish test notes T-1 through T-4 in accordance with 2.9.

3.5.1 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing the results of the requirements of 3.5 to the SUPERVISOR.

SSP: HRMC-008-21 2 of 3 ITEM NO: 311-11-001

3.6 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

3.7 Upon completion of all new installations specified in this Work

Item, turn over all manuals, design instructions, product specification sheets, and warranty information to the SUPERVISOR.

3.7.1 Coordinate with the SUPERVISOR, to turn over all surplus and removed material associated with this work item for final disposition.

4. NOTES:

4.1 None

5. GOVERNMENT FURNISHED MATERIAL(GFM)

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

SSP: HRMC-008-21 3 of 3 ITEM NO: 311-11-001

SHIP:

COAR:

1. SCOPE:

NAVSTA PEARL HARBOR HI (CNIC

62813)

.£l1

ITEM NO: 311-11-002

PCN:

CMP:

PLANNER:

HSB8-L031

NONE

1.1 Title: Boat Alteration 35HS/20C, Generator Replace; accomplish

1.2 Location of Work:

1.2.1 Throughout

1.3 Identification:

1.3.1 Boat Information: 35-Foot Harbor Security (HS) Boat (HSB-8), Manufacturer: Safe Boat, Manufacturer Hull Identification Number:

EGO01649L111Z1242 APL Number: 72A120018, Hull Registry Number:

35HS1102

2 . REFERENCES:

2.1 Standard Items, (FY 22)

2.2 S9008-J4-BIB-010, Boat Information Book for 35-Foot Harbor Security

(HS) Boat, Hulls 35HS1101-35HS1102

2.3 TO300-AU-SPN-010, Fabrication, Welding and Inspection of Small Boats and Craft, Aluminum Hulls

2.4 S9086-TX-STM-010 Rev 7, Naval Ships' Technical Manual Chapter 583, Volume 1, Boats and Small Craft

2.5 300-5107858 Rev A, Standard Electrical Installation Requirements and

Nomenclature

2.6 501-5112234, 35FT Harbor Security (Safe Boat) Generator Replacement

Mechanical Modifications

2.7 311-5112235, 35FT Harbor Security (Safe Boat) Generator Replacement

Electrical Modifications

2.8 123-5112236, 35FT Harbor Security (Safe Boat) Generator Replacement

Structural Modifications

2.9 513-5112743, 35HS (Safe Boat) Ventilation Mods Incidental To

Generator Replacement- Mechanical Modifications

2.10 301-5112744, 35HS (Safe Boat) Ventilation Mods Incidental To

Generator Replacement-Electrical Modifications

2 .11 35FPL-800-001 Rev C, Booklet of General Plans

2.12 35FPL-311-001 Rev A, Generator Electric Schematic

2.13 35FPL-301-001, DC Power Distribution Equipment General Arrangement

2.14 35FPL-324-001 Rev A, DC Breaker Panel Electric Schematic

2.15 35FPL-324-002 Rev A, AC Breaker Panel Electric Schematic

2.16 35FPL-324-003 Rev A, Main Breaker Panel Electric Schematic

SSP: HRMC-008-21 1 of 3 ITEM NO: 311-11-002

2.17 35FPL-324-004 Rev A, 24 voe Breaker Panel

2.18 FPB-M-555-001, Fuel System Schematic

2.19 Westerbeke Engines & Generators, Multi-Port Single Phase Marine

Gasoline Generators Operators Manual,7.5 MCGA or 5.0 MCGA 60 HZ, 6.2 MCGA or 4.2 MCGA 50 HZ

3. REQUIREMENTS:

3.1 Accomplish the requirements of boat alteration 35HS/20C on vessel listed in 1.3.1, in accordance with 2.6 through 2.10, using 2.2, 2.4,

2.11 through 2.19 as guidance.

3.1.1 Cables and wiring shall be installed in accordance with the requirements of 2.5.

3.1.2 Chip and grind surface flush and smooth in way of removals.

3.1.3 Accomplish requirements of 009-12 of 2.1, including Table 3, Column C, Lines One through 7 for structure modifications installation.

3.1.4 Accomplish updating BOATALT Label Plates in accordance with

2.6 and 2.10 General Notes.

(V) (G) "GENERATOR BREAK-IN"

3.2 Accomplish test notes T-1 and T-2 in accordance with 2.7 and 2.19

3.2.1 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing the results of the requirements of 3.2 to the SUPERVISOR.

(V) (G) "OPERATIONAL TEST"

3.3 Accomplish test notes T-1 through T-5 in accordance with 2.6 and

2.19.

3.3.1 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing the results of the requirements of 3.3 to the SUPERVISOR.

(V) (G) "PULL TEST"

3.4 Accomplish test notes T-1 through T-5 in accordance with 2.8.

3.4.1 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing the results of the requirements of 3.4 to the SUPERVISOR.

(V) (G) "OPERATIONAL TEST"

3.5 Accomplish test notes T-1 through T-4 in accordance with 2.9.

3.5.1 Submit one legible copy, in hard copy or approved

transferrable media, of a report listing the results of the requirements of 3.5 to the SUPERVISOR.

SSP: HRMC-008-21 2 of 3 ITEM NO: 311-11-002

3.6 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

3.7 Upon completion of all new installations specified in this Work

Item, turn over all manuals, design instructions, product specification sheets, and warranty information to the SUPERVISOR.

3.7.1 Coordinate with the SUPERVISOR, to turn over all surplus and removed material associated with this work item for final disposition.

4. NOTES:

4.1 None

5. GOVERNMENT FURNISHED MATERIAL(GFM)

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

SSP: HRMC-008-21 3 of 3 ITEM NO: 311-11-002

SHIP: NAVSTA PEARL HARBOR HI (CNIC ITEM NO: 423-11-001

COAR: £§. PCN:

CMP:

PLANNER:

HSB7-L029

NONE

1. SCOPE:

1.1 Title: Boat Alteration 35HS/18C, Electronic Navigation System

Upgrade; accomplish

1.2 Location of Work:

1.2.1 Throughout

1.3 Identification:

1.3.1 Quantity (One EA), 35-Foot Harbor Security (HS) Boat (HSB-7), Manufacturer: Safe Boat, Manufacturer Hull Identification Number:

EGO01648K111Z1241 APL Number: 72A120017, Hull Registry Number:

35HS1101

2 . REFERENCES:

2.1 Standard Items, (FY 22)

2.2 S9008-J4-BIB-010, Boat Information Book for 35-Foot Harbor Security

(HS) Boat, Hulls 35HS1101-35HS1102

2.3 300-5107858, Standard Electrical Installation Requirements and

Nomenclature

2.4 423-5111725, 35FT Harbor Security (Safe Boat) Electronic Navigation

System Upgrade

2.5 35FPL-800-001 Rev c, Booklet of General Plans

2.6 35FPL-301-001, DC Power Distribution Equipment General Arrangement

2.7 35FPL-324-001 Rev A, DC Breaker Panel Electric Schematic

2.8 35FPL-324-002 Rev A, AC Breaker Panel Electric Schematic

2.9 35FPL-324-003 Rev A, Main Breaker Panel Electric Schematic

2.10 35FPL-324-004 Rev A, Main Breaker Panel Electric Schematic

2 .11 35FPL-150-001 Rev B, Deck House Structure

3. REQUIREMENTS:

3.1 Accomplish the requirements of boat alteration 35HS/18C on vessel listed in 1.3.1, in accordance with 2.4 and using 2.2, 2.5 through 2.11 as guidance.

3.1.1 Cables and wiring shall be installed in accordance with the requirements of 2.3.

3.1.2 System set up for interfacing equipment shall be accomplished by a certified Furuno technician and in accordance with the manufacturer's installation manual.

3.1.3 Accomplish updating BOATALT Label Plates in accordance with

2.4 General Notes.

(V) (G) "OPERATIONAL TEST"

SSP: HRMC-008-21 1 of 2 ITEM NO: 423-11-001

3.2 Conduct an operational test of new electronic in accordance with the operators manual.

3.3 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

3.4 Upon completion of all new installations specified in this Work

Item, turn over all manuals, design instructions, product specification sheets, and warranty information to the SUPERVISOR.

3.4.1 Coordinate with the SUPERVISOR, to turn over all surplus and removed material associated with this work item for final disposition.

4. NOTES:

4.1 None

5. GOVERNMENT FURNISHED MATERIAL(GFM)

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

SSP: HRMC-008-21 2 of 2 ITEM NO: 423-11-001

SHIP: NAVSTA PEARL HARBOR HI (CNIC ITEM NO: 423-11-002

COAR: £§. PCN:

CMP:

PLANNER:

HSB8-L030

NONE

1. SCOPE:

1.1 Title: Boat Alteration 35HS/18C, Electronic Navigation System

Upgrade; accomplish

1.2 Location of Work:

1.2.1 Throughout

1.3 Identification:

1.3.1 Quantity (One EA), 35-Foot Harbor Security (HS) Boat (HSB-8), Manufacturer: Safe Boat, Manufacturer Hull Identification Number:

EGO01649L111Z1242 APL Number: 72A120018, Hull Registry Number:

35HS1102

2 . REFERENCES:

2.1 Standard Items, (FY 22)

2.2 S9008-J4-BIB-010, Boat Information Book for 35-Foot Harbor Security

(HS) Boat, Hulls 35HS1101-35HS1102

2.3 300-5107858, Standard Electrical Installation Requirements and

Nomenclature

2.4 423-5111725, 35FT Harbor Security (Safe Boat) Electronic Navigation

System Upgrade

2.5 35FPL-800-001 Rev c, Booklet of General Plans

2.6 35FPL-301-001, DC Power Distribution Equipment General Arrangement

2.7 35FPL-324-001 Rev A, DC Breaker Panel Electric Schematic

2.8 35FPL-324-002 Rev A, AC Breaker Panel Electric Schematic

2.9 35FPL-324-003 Rev A, Main Breaker Panel Electric Schematic

2.10 35FPL-324-004 Rev A, Main Breaker Panel Electric Schematic

2 .11 35FPL-150-001 Rev B, Deck House Structure

3. REQUIREMENTS:

3.1 Accomplish the requirements of boat alteration 35HS/18C on vessel listed in 1.3.1, in accordance with 2.4 and using 2.2, 2.5 through 2.11 as guidance.

3.1.1 Cables and wiring shall be installed in accordance with the requirements of 2.3.

3.1.2 System set up for interfacing equipment shall be accomplished by a certified Furuno technician and in accordance with the manufacturer's installation manual.

3.1.3 Accomplish updating BOATALT Label Plates in accordance with

2.4 General Notes.

(V) (G) "OPERATIONAL TEST"

SSP: HRMC-008-21 1 of 2 ITEM NO: 423-11-002

3.2 Conduct an operational test of new electronic in accordance with the operators manual.

3.3 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

3.4 Upon completion of all new installations specified in this Work

Item, turn over all manuals, design instructions, product specification sheets, and warranty information to the SUPERVISOR.

3.4.1 Coordinate with the SUPERVISOR, to turn over all surplus and removed material associated with this work item for final disposition.

4. NOTES:

4.1 None

5. GOVERNMENT FURNISHED MATERIAL(GFM)

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

SSP: HRMC-008-21 2 of 2 ITEM NO: 423-11-002

SHIP: NAVSTA PEARL HARBOR HI (CNIC ITEM NO: 443-11-001

COAR: £§. PCN:

CMP:

PLANNER:

HSB7-L028

NONE

1. SCOPE:

1.1 Title: Boat Alteration 35HS/21C, Electro-Optical Infrared Imaging

System Replace; accomplish

1.2 Location of Work:

1.2.1 Throughout

1.3 Identification:

1.3.1 Quantity (One EA), 35-Foot Harbor Security (HS) Boat (HSB-7), Manufacturer: Safe Boat, Manufacturer Hull Identification Number:

EGO01648K111Z1241 APL Number: 72A120017, Hull Registry Number:

35HS1101

2 . REFERENCES:

2.1 Standard Items, (FY 22)

2.2 S9008-J4-BIB-010, Boat Information Book for 35-Foot Harbor Security

(HS) Boat, Hulls 35HS1101-35HS1102

2.3 300-5107858, Standard Electrical Installation Requirements and

Nomenclature

2.4 443-5112796, 35FT Harbor Security (Safe Boat) Electro-Optical

Infrared Imaging System Replacement

2.5 35FPL-800-001 Rev c, Booklet of General Plans

2.6 35FPL-301-001, DC Power Distribution Equipment General Arrangement

2.7 35FPL-324-001 Rev A, DC Breaker Panel Electric Schematic

2.8 35FPL-324-002 Rev A, AC Breaker Panel Electric Schematic

2.9 35FPL-324-003 Rev A, Main Breaker Panel Electric Schematic

2.10 35FPL-324-004 Rev A, 24 voe Breaker Panel

3. REQUIREMENTS:

3.1 Accomplish the requirements of boat alteration 35HS/21C on vessel listed in 1.3.1, in accordance with 2.4, using 2.5 through 2.10 as guidance.

3.1.1 Cables and wiring shall be installed in accordance with the requirements of 2.3.

3.1.2 Secure cables and wiring to existing cableways using cable ties.

3.1.3 Accomplish updating BOATALT Label Plates in accordance with

2.4 General Notes.

3.1.4 Upon completion of all new installations specified in this

Work Item, turn over all manuals, design instructions, product specification sheets, and warranty information to the SUPERVISOR.

SSP: HRMC-008-21 1 of 2 ITEM NO: 443-11-001

3.1.4.1 Coordinate with the SUPERVISOR, to turn over all surplus and removed material associated with this work item for final disposition.

(V) (G) "OPERATIONAL TEST"

3.2 Conduct an operational test of the electro-optical imaging system in accordance with operational manual.

3.3 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 None

5. GOVERNMENT FURNISHED MATERIAL(GFM)

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

SSP: HRMC-008-21 2 of 2 ITEM NO: 443-11-001

SHIP: NAVSTA PEARL HARBOR HI (CNIC ITEM NO: 443-11-002

COAR: £§. PCN:

CMP:

PLANNER:

HSB8-L029

NONE

1. SCOPE:

1.1 Title: Boat Alteration 35HS/21C, Electro-Optical Infrared Imaging

System Replace; accomplish

1.2 Location of Work:

1.2.1 Throughout

1.3 Identification:

1.3.1 Quantity (One EA), 35-Foot Harbor Security (HS) Boat (HSB-8), Manufacturer: Safe Boat, Manufacturer Hull Identification Number:

EGO01649L111Z1242 APL Number: 72A120018, Hull Registry Number:

35HS1102

2 . REFERENCES:

2.1 Standard Items, (FY 22)

2.2 S9008-J4-BIB-010, Boat Information Book for 35-Foot Harbor Security

(HS) Boat, Hulls 35HS1101-35HS1102

2.3 300-5107858, Standard Electrical Installation Requirements and

Nomenclature

2.4 443-5112796, 35FT Harbor Security (Safe Boat) Electro-Optical

Infrared Imaging System Replacement

2.5 35FPL-800-001 Rev c, Booklet of General Plans

2.6 35FPL-301-001, DC Power Distribution Equipment General Arrangement

2.7 35FPL-324-001 Rev A, DC Breaker Panel Electric Schematic

2.8 35FPL-324-002 Rev A, AC Breaker Panel Electric Schematic

2.9 35FPL-324-003 Rev A, Main Breaker Panel Electric Schematic

2.10 35FPL-324-004 Rev A, 24 voe Breaker Panel

3. REQUIREMENTS:

3.1 Accomplish the requirements of boat alteration 35HS/21C on vessel listed in 1.3.1, in accordance with 2.4, using 2.5 through 2.10 as guidance.

3.1.1 Cables and wiring shall be installed in accordance with the requirements of 2.3.

3.1.2 Secure cables and wiring to existing cableways using cable ties.

3.1.3 Accomplish updating BOATALT Label Plates in accordance with

2.4 General Notes.

3.1.4 Upon completion of all new installations specified in this

Work Item, turn over all manuals, design instructions, product specification sheets, and warranty information to the SUPERVISOR.

SSP: HRMC-008-21 1 of 2 ITEM NO: 443-11-002

3.1.4.1 Coordinate with the SUPERVISOR, to turn over all surplus and removed material associated with this work item for final disposition.

(V) (G) "OPERATIONAL TEST"

3.2 Conduct an operational test of the electro-optical imaging system in accordance with operational manual.

3.3 Accomplish the requirements of 009-32 of 2.1 for new and disturbed surfaces.

4. NOTES:

4.1 None

5. GOVERNMENT FURNISHED MATERIAL(GFM)

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

SSP: HRMC-008-21 2 of 2 ITEM NO: 443-11-002

SHIP: NAVSTA PEARL HARBOR HI (CNIC ITEM NO: 583-31-001

COAR: £§. PCN: HSB7-L033

HSB8-L034

CMP:

PLANNER:

NONE

1. SCOPE:

1.1 Title: Transfer of Boat and Trailer Custody; accomplish

1.2 Location of Work:

1.2.1 Contractor's Facility

1.3 Identification:

1.3.1 Quantity (One EA), 35 Foot Harbor Security (HS) Boat (HSB-7), Manufacturer: Safe Boat., Manufacturer Hull Identification Number:

EGO01648K111Z1241, APL Number: 72A120017, Hull Registry Number:

35HS1101

1.3.2 Quantity (One EA), 35 Foot Harbor Security (HS) Boat (HSB-8), Manufacturer: Safe Boat, Manufacturer Hull Identification Number:

EGO01649L111Z1242 APL Number: 72A120018, Hull Registry Number:

35HS1102

1.3.3 Quantity (One EA), HSB-7 Boat Trailer, Manufacturer: JDCI

ENTERPRISES, Model Number: SB36-18, Serial Number:

42XBK3630CB113895, USN: N9751838T

1.3.4 Quantity (One EA), HSB-8 Boat Trailer, Manufacturer: JDCI

ENTERPRISES, Model Number: SB36-18, Serial Number:

42XBK3632CB113896, USN: N9751839T

2 . REFERENCES:

2.1 Attachment (A):, Boat and Trailer Custody Form

3. REQUIREMENTS:

3.1 The CONTRACTOR shall pick up and deliver each craft via trailer to contractor's facility.

3.1.1 The CONTRACTOR shall pick up each craft and trailer listed in

1.3 within 72 hours after the awarding of contract.

3.1.2 The GOVERNMENT will provide the trailers for craft transport and the CONTRACTOR shall place the crafts on jack stands and keel blocks.

3.1.3 The CONTRACTOR shall be responsible for each craft and trailer listed in 1.3 from the time of delivery to the CONTRACTOR, to the return of the craft and trailer to the GOVERNMENT.

3.2 Upon receiving custody of each craft and trailer listed in 1.3 from the activity, complete Part A of 2.1. Submit one copy, in approved transferrable media, of 2.1 to the SUPERVISOR within 24 hours after delivery of the craft and trailer.

3.3 After returning custody of each craft and trailer listed in 1.3 to the activity, complete Part B of 2.1. Submit one copy, in approved

SSP: HRMC-008-21 1 of 2 ITEM NO: 583-31-001 transferrable media, of 2.1 to the SUPERVISOR, within 24 hours after redelivery of the craft and trailer.

3.3.1 The CONTRACTOR shall be responsible for delivery to and from boat launch ramp for all necessary sea trials to prove all work has been completed in accordance with the requirements of each Work Item within the availability.

4. NOTES:

4.1 None.

5. GOVERNMENT FURNISHED MATERIAL (GFM)

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

SSP: HRMC-008-21 2 of 2 ITEM NO: 583-31-001