DEPARTMENT OF THE NAVY

HRMC (NMD)

SPECIFICATIONS FOR WORK TO BE ACCOMPLISHED

SPECIFICATION NUMBER:

INCLUDES ALL CHANGES THROUGH 3/6/2019

INDEX

ITEMS THAT ARE STRUCK OUT IN THIS INDEX DO NOT APPLY TO THIS CONTRACT.

CATEGORY I. FY-20 STANDARD ITEMS APPLICABLE TO THIS JOB ORDER WITHOUT FURTHER REFERENCE.

ITEM_NO. TITLE CHANGE DATE CHANGE

009-01 General Criteria; accomplish 10/01/2018 Original

009-02 Environmental Compliance Report for Material Usage; accomplish 04/30/2018 Original

009-03 Toxic and Hazardous Substance; control 10/01/2017 Original

009-04 Quality Management System; provide 10/01/2018 Original

009-06 Maintaining Protection and Cleanliness from Non-Radioactive Operations;

accomplish

08/31/2018 Original

009-07 Confined Space Entry, Certification, Fire Prevention and Housekeeping;

accomplish

10/01/2018 Original

009-08 Shipboard Fire Protection and Fire Prevention; accomplish 08/31/2018 Original

009-10 Asbestos-Containing Material (ACM); control 04/30/2018 Original

009-18 Mine Warfare Ships Magnetic Material; control 04/30/2018 Original

009-19 Provisioning Technical Documentation (PTD); provide 10/01/2018 Original

009-20 Government Property; control 10/01/2017 Original

009-21 Logistics and Technical Data; provide 10/01/2018 Original

009-23 Interference; remove and install 10/01/2018 Original

009-24 Authorization, Control, Isolation, Blanking, Tagging, and Cleanliness;

accomplish

10/01/2018 Original

009-34 Fire Protection of Unmanned Vessel at Contractor Facility; accomplish 10/01/2018 Original

009-39 Technical Manual Contract Requirement (TMCR) for a New Technical Manual for Commercial Equipment/Component; accomplish

10/01/2018 Original

009-40 Contractor Crane, Multi-Purpose Machine and Material Handling Equipment at a Naval Facility; provide

10/01/2018 Original

009-60 Schedule and Associated Reports for Availabilities Over 9 Weeks in Duration;

provide and manage

10/01/2018 Original

009-61 Shipboard Use of Fluorocarbons; control 07/18/2014 Original

009-67 Integrated Total Ship Testing; manage 04/30/2018 Original

009-69 Heavy Weather/Mooring Plan; provide 04/30/2018 Original

009-70 Confined Space Entry, Certification, Fire Protection, Fire Prevention and Housekeeping for Unmanned Vessels; accomplish

10/01/2018 Original

009-72 Physical Security at a Private Contractor Facility; accomplish 08/31/2018 Original

009-73 Shipboard Electrical/Electronic Cable Procedure; inspect, test, install, remove, and repair

10/01/2018 Original

009-74 Occupational, Safety and Health Plan; accomplish 10/01/2018 Original

009-80 Ship Facilities; maintain 11/18/2016 Original

009-81 Compartment Closeout; accomplish 08/31/2018 Original

009-82 Installation of Equal Component Vice Specified Component; report 03/26/2018 Original

009-84 Threaded Fastener Requirements; accomplish 10/01/2018 Original

009-93 Emergency Planning and Community Right-to-Know Act (EPCRA) and Pollution Prevention Act (PPA) Information; provide

03/06/2018 Original

009-99 Ship Departure Report; provide 07/18/2014 Original

009-100 Ship's Stability; maintain 03/06/2018 Original

ITEM_NO. TITLE CHANGE DATE CHANGE

009-101 Ship Transit and Berthing; accomplish 03/26/2018 Original

009-106 Work Authorization Form Coordinator (WAFCOR); provide 10/01/2017 Original

009-109 Non-SUBSAFE Work on SUBSAFE-Certified Vessel; accomplish 10/01/2017 Original

009-110 Non-Nuclear Work on a Nuclear Vessel; accomplish 11/18/2016 Original

009-111 Schedule and Associated Reports for Availabilities 9 Weeks or Less in Duration; provide and manage

04/30/2018 Original

009-117 Combat Systems, Light-Off Suport; provide 08/31/2018 Original

009-118 CG Deck Loading; accomplish 07/18/2014 Original

009-120 Fact Finding and Critique of Unplanned Event; manage 03/06/2018 Original

009-122 Temporary Padeye; install and remove 10/01/2018 Original

CHANGE DATETITLEITEM NO.

CATEGORY II. FY-20 STANDARD ITEMS WHICH MAY BE INVOKED IN THE WORK ITEMS OF THIS JOB ORDER

CHANGE

009-90 Technical Representative; provide 03/26/2018 Original

ITEM NO. TITLE

No. One and No. 2 CO2 Scrubber Maintenance; accomplish515-11-001

No. One and No. 2 CO & H2 Burner Maintenance; accomplish515-11-002

SHIP: ITEM NO: 515-11-001

COAR: 28 PCN: EA01-7909

EA01-7908

CMP: NONE

PLANNER:

1 of 2 ITEM NO: 515-11-001

1. SCOPE:

1.1 Title: No. One and No. 2 CO2 Scrubber Maintenance; accomplish

1.2 Location of Work:

1.2.1 Auxiliary Machine Room (AMR)

1.3 Identification:

1.3.1 Quantity: (2 EA) Carbon Dioxide Removal Plant, Mark III-B units; Mfr:

2. REFERENCES:

2.1 Standard Items, FY-20

2.2 S9515-AK-MMO-020 Rev 2, Carbon Dioxide Removal Plant Mark III-B Units Aboard 688 and 21 Class Submarines

2.3 Recommended Scrubber / Burner Repairs

3. REQUIREMENTS:

3.1 Accomplish the requirements of 009-90 of 2.1.

3.1.1 Provide the services of a qualified on-site representative to inspect, maintain and repair the equipment listed in 1.3, located in 1.2, in accordance with the requirements of 2.2 and using 2.3 and Original Equipment Manufacturer's (OEM) proprietary drawings and specifications for guidance.

3.2 Accomplish the removal of existing, overhaul, and reinstallation of following components associated with the equipment listed in 1.3, in accordance with the requirements of 2.2 and using 2.3 for guidance.

- Pump and 3hp Motor Unit

- 5hp Motor and New Pulleys

- Boilers Both Units

- Control Panels

- Heater Box Both Units

3.3 Accomplish the removal of existing, and installation of new components associated with the equipment listed in 1.3, in accordance with the requirements of 2.2 and using 2.3 for guidance. The following components shall be replaced with new:

- Resistance Temperature Detectors (RTDs)

- Sound Mounts on Compressor Bed Plate

- Heat Exchangers Both Units

- Level Control Sensors / Cables Both Units

- Level Sight Glasses

- Broken Grounding Straps

2 of 2 ITEM NO: 515-11-001

- Absorber Packing

- CO2 Flow Meters

(Q)(G) "OPERATIONAL TEST"

3.4 Accomplish an operational test of the equipment listed in 1.3, located in 1.2 and in accordance with the requirements of 2.2.

3.4.1 Allowable system fluid leaks: None. All system fluid leaks resulting from the requirements of 3.1 through 3.3 shall be corrected by the contractor.

3.4.2 Submit one legible copy, in approved transferrable media, of a report certifying satisfactory work completion of this specification to the SUPERVISOR within 5 days of completion.

3.5 All reports with no time specific submission requirement, shall be submitted to the SUPERVISOR within 30 days of work completion.

4. NOTES:

4.1 Known Source for qualified Technical Representative:

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

1. None.

SHIP: ITEM NO: 515-11-002

COAR: 28 PCN: EA01-7915

EA01-7914

CMP: NONE

PLANNER:

1 of 2 ITEM NO: 515-11-002

1. SCOPE:

1.1 Title: No. One and No. 2 CO & H2 Burner Maintenance; accomplish

1.2 Location of Work:

1.2.1 Auxiliary Machine Room (AMR)

1.3 Identification:

1.3.1 Quantity: (2 EA) CO & H2 Burner, Mark V, Size 650 CFM; Mfr:

2. REFERENCES:

2.1 Standard Items, FY-20

2.2 S9515-AS-MMM-010 Rev 6, CO & H2 Burner Mark IV-E Size 500 CFM

2.3 Recommended Scrubber / Burner Repairs

3. REQUIREMENTS:

3.1 Accomplish the requirements of 009-90 of 2.1.

3.1.1 Provide the services of a qualified on-site representative to inspect, maintain and repair the equipment listed in 1.3, located in 1.2, in accordance with the requirements of 2.2 and using 2.3 and Original Equipment Manufacturer's (OEM) proprietary drawings and specifications for guidance.

3.2 Accomplish the removal of existing, overhaul, and reinstallation of following components associated with the equipment listed in 1.3, in accordance with the requirements of 2.2 and using 2.3 for guidance.

- Control Panels

- Fan Motor / Balance Wheel on Unit No. One

- Remove No. 2 Motor for Preservation

3.3 Accomplish the removal of existing, and installation of new components associated with the equipment listed in 1.3, in accordance with the requirements of 2.2 and using 2.3 for guidance. The following components shall be replaced with new:

- Bypass Duct on Unit No.2

(Q)(G) "OPERATIONAL TEST"

3.4 Accomplish an operational test of the equipment listed in 1.3, located in 1.2 and in accordance with the requirements of 2.2.

3.4.1 Allowable system fluid leaks: None. All system fluid leaks resulting from the requirements of 3.1 through 3.3 shall be corrected by the contractor.

3.4.2 Submit one legible copy, in approved transferrable media, of a report certifying satisfactory work completion of this specification

2 of 2 ITEM NO: 515-11-002 to the SUPERVISOR within 5 days of completion.

3.5 All reports with no time specific submission requirement, shall be submitted to the SUPERVISOR within 30 days of work completion.

4. NOTES:

4.1 Known Source for qualified Technical Representative:

5. GOVERNMENT FURNISHED MATERIAL(GFM):

5.1 LLTM:

1. None.

5.2 PUSH MATERIAL:

1. None.

5.3 KITTED MATERIAL:

1. None.