N32253-22-Q-0065.pdf
PDF 1 MB Posted
- Attached to
- Muratec M5000 CNC Plasma Punch Press Relocation Federal contract opportunity
- Solicitation number
- N32253-22-Q-0065
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| APPENDIX_III_Contractor_CIA_CNIA_NWA_SECREQS_Jun2019.pdf | ||
| APPENDIX_II_ENVIRONMENTAL_FOR_KTRS_ON_SHIP_PROJECTS_10Oct2019.pdf | ||
| APPENDIX_IV_PHNSYIMF_OPSEC_Contract_Requirements_21Mar2022.pdf | ||
| APPENDIX_V_Fillable_Hot_Work_Permit.pdf | ||
| APPENDIX_I_SAFETY_AND_HEALTH_WORK_PRACTICES_ PHNSYIMF_8July2021.pdf | ||
| APPENDIX_VI_NAVFAC_P-307_Mgt_of_Weight_Handling_Equipment_Jun2016.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SEE ADDENDUM
(No Collect Calls)
N3225322Q0065 06-Jul-2022
b. TELEPHONE NUMBER
808-473-8000, EXT 5193
8. OFFER DUE DATE/LOCAL TIME
03:00 PM 20 Jul 2022
5. SOLICITATION NUMBER 6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA ARE
26. TOTAL AWARD AMOUNT (For Gov t. Use Only )
23.
CODE 10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
N322539. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
STEPHANIE M LEAL
2. CONTRACT NO. 3. AWARD/EFFECTIVE DATE 4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER
30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA
0 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA ARE ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
. YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:SET ASIDE:UNRESTRICTED ORX
SMALL BUSINESS
17a.CONTRACTOR/ CODE FACILITY
OFFEROR CODE
PHNSY & IMF
667 SAFEGUARD ST., STE. 100
JBPHH HI 96860-5033
18a. PAYMENT WILL BE MADE BY CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A
13b. RATING
CODE15. DELIVER TO CODE N32253 16. ADMINISTERED BY
12. DISCOUNT TERMS11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ IFB RFPX
PEARL HARBOR NAVAL SHIPYARD & IMF
SEE PERFORMANCE WORK STATEMENT
667 SAFEGUARD STREET
PEARL HARBOR HI 96860-5033
TEL: FAX:
FAX:
TEL: 808-473-8000 SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$8,000,000
NAICS:
811310
X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICESITEM NO. QUANTITY UNIT UNIT PRICE AMOUNT
24.22.21.19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF32
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________
32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f . TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINALPARTIALCOMPLETE
36. PAYMENT35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER 39. S/R VOUCHER NUMBER 40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT
41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE
42a. RECEIVED BY (Print)
42b. RECEIVED AT (Location)
42c. DATE REC'D (YY/MM/DD) 42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY UNIT
22. 23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
N3225322Q0065
Section SF 1449 - CONTINUATION SHEET
ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
CLIN
Number
1 Job
Plasma Punch
FFP
Disassemble, transport, install above ground foundation kit, reassemble, and recalibrate a Muratec M5000 CNC Plasma Punch Press to full operational condition.
FOB: Destination
PSC CD: N034
NET AMT
PWS
PERFORMANCE WORK STATEMENT
(PWS)
Muratec M5000 CNC Plasma Punch Press Relocation for Pearl Harbor Naval Shipyard & Intermediate Maintenance Facility
(PHNSY & IMF)
1.0 BACKGROUND
1.1 The primary mission of Pearl Harbor Naval Shipyard & Intermediate Maintenance Facility (PHNSY & IMF) is to deliver regional maintenance, at the depot and intermediate levels, to keep the surface ships and submarines of our nation's navy "Fit to Fight." As Hawaii’s regional maintenance center, PHNSY & IMF’s capabilities include excellence in overhauling, repairing, converting, alteration, refurbishing, and the decommissioning of Navy vessels.
2.0 OBJECTIVE & SCOPE
2.1 PHNSY & IMF seeks a contractor to disassemble, transport, install above ground foundation kit, reassemble to full operational condition and recalibrate the M5000 CNC Plasma Punch Press located in Building 72.
2.2 Disassembly phase shall be performed in accordance with the Original Equipment Manufacturer (OEM) specifications.
2.3 Transportation phase shall be the task of relocating the machinery from outside of the Controlled Industrial Area (CIA) at Building 72 (origin), to inside the CIA at Building 155 (destination).
2.4 Installation phase shall be the task of installing the Muratec Foundation Kit (part number 781742-2-
00) in accordance to OEM specifications at Building 155 in the Government specified location.
2.5 Reassembly phase shall be the task of reassembling the transported Muratec M5000 CNC Plasma Punch Press in accordance with OEM specifications to full operational conditions. The Muratec M5000 CNC Plasma Punch Press must be reassembled on the Muratec Foundation Kit. Recalibration of the Muratec M5000 CNC Plasma Punch Press shall be included as part of the reassembly phase.
2.6 The desired result of this service is to help the sheet metal shop move a mission critical piece of equipment into their new designated shop area inside the CIA. This equipment disassembly, transporting, installation of the foundation kit, reassembly and recalibration effort is above and beyond the current resource capacity of PHNYS & IMF’s production shops.
3.0 PERFORMANCE REQUIREMENTS
3.1 The contractor shall provide one individual as a Project Manager who is responsible for the planning, scheduling, and managing the execution of work concerning all aspects of this contract.
The Project Manager shall coordinate with Code 980 for physical security requirements and traffic management.
3.1.1 Prior to commencing work, the contractor shall meet in conference with the Government Technical Point of Contact (TPOC), Contracting Officer’s Representative (COR) and necessary support personnel to discuss and develop mutual understandings relative to environmental, safety, schedule, security, and waste management. The contractor shall obtain all necessary permits, approvals and licenses necessary for the transportation of material on highway/roads and the disposal/recycling of scrap materials.
3.1.2 Environmental Protection Plan. The contractor shall present an Environmental Protection Plan (EPP) as part of the contractor’s proposal and bid submittal. The M5000 CNC Plasma Punch Press and its components may contain hazardous materials such as lead paint, asbestos in the electrical insulation and oil/fluids in the gear boxes. Testing for such materials and proper control of hazardous materials is required. Attachments - Appendix I and Appendix II outline the various elements that shall be addressed, including but not limited to nuisance dust control and other steps to be taken to minimize or prevent damage to adjoining structures, minimizing interruptions to on- going PHNSY & IMF operations and injury to personnel working in the vicinity. Once accepted by the Government, the EPP shall become an integral part of the requirements of this PWS.
3.1.3 Plan of Action. A preliminary Plan of Action (POA) plan must be submitted prior to commencing. This plan will highlight disassembly, transportation, installation of the foundation kit, reassembly, and recalibration plans for the M5000 CNC Plasma Punch Press and all of its associated components under the specification of the contract period of performance. The POA shall be submitted in a PDF format within ten (10) business days after the contract is awarded. The POA will be reviewed and approved by the Government.
3.1.4 Safety Plan. The contractor shall provide a Safety Plan covering all aspects of safety for this project. The contractor shall comply with Original Equipment Manufacturer (OEM) requirements and all work performed shall be in accordance with applicable Federal and State of Hawaii Occupational Safety and Health Administration (OSHA) requirements. The contractor must comply with the shipyard safety requirements. See Attachments - Appendix I.
3.1.5 Hot Work Checklist and Permit. All hot work must comply with NFPA 51B Standard for Fire Prevention during Welding, Cutting and other Hot Work. The contractor shall submit a
Hot Work Checklist and Permit to Shop 17 Permit Authorized Individual, no later than seven
(7) working days prior to hot work being performed. See Attachments - Appendix V.
3.1.6 Contractor Mobile Crane Entry Package. The contractor will complete a Contractor Mobile Crane Entry Package and submit it to NAVFAC Hawaii and Code 740 AP for approval at least one (1) month prior to the start of work. See Attachments - Appendix VI.
3.1.6.a The Contractor Mobile Crane Entry Package shall include as a minimum, lifting configurations center of gravity of the lifted load, laydown area, and overhead interference.
3.1.6.b Lifting and lowering any component shall be considered a critical lift and shall comply with the shipyard requirements. Rigging by choking or sweeping using synthetic products, is not allowed unless approved by the shipyard. Tilting of lifted or suspended load during installation/removal when it is necessary shall only be performed using a chain-fall, ratchet hoists or similar equipment, and only done in a controlled manner following shipyard approval.
3.1.6.c The contractor shall provide all material handling and lifting equipment, rigging support services, and other support equipment (such as cranes, forklifts, Bobcats, man-lifts, etc.) necessary for continuous support and shall provide qualified personnel to operate it. The Contractor Mobile Crane Entry Package must be approved by the Government prior to the start of work.
3.2 Remove all equipment, all associated peripherals (pumps, motors, tanks, machinery control cabinets, machine control hardware, etc.), and all utility infrastructure (pipe, conduit, cable, wiring, electrical cabinets, transformers, etc.) between the equipment and its primary isolation or disconnect.
Note: PHNSY & IMF will de-energize and disconnect machine from the primary isolation/disconnect point prior to start of work.
• All conduit and piping shall be capped at the isolation or disconnect point as applicable.
• Removal of leveling compound (grout) during the equipment disassembly process may be required to break the equipment free from its foundation.
3.2.1 The contractor shall ensure that the removal/dismantle site of Building 72 is cleaned of all debris and the ground surface is free of hazards, including tripping hazards, pot-holes and or other uneven conditions resulting from the removal/dismantle phase of work.
3.3 The contractor shall safely transport all parts of the Muratec M5000 CNC Plasma Punch Press from Building 72 (outside the CIA) to Building 155 (inside the CIA) in adherence to prior approved Plan of Action and Safety Plan.
3.4 The contractor shall install the above ground foundation kit (Muratec Part Number 781742-2-00) at Building 155 in the Government specified location in accordance with Original Equipment Manufacturer (OEM) specifications prior to the reassembly and recalibration phase.
3.4.1 Vendor shall be responsible for providing foundation kit (Muratec PN 781742-2-00), installation of kit and all associated hardware to complete the installation.
3.4.2 After completion of installation, final drawings depicting configuration shall be provided to Code 980 POC. Format of delivered documents will be determined by the Government.
3.5 The contractor shall layout and reassemble the Muratec M5000 CNC Plasma Punch Press in accordance with Original Equipment Manufacturer (OEM) specifications. The Muratec M5000 CNC Plasma Punch Press must be reassembled on the Muratec Foundation Kit. Muratec safety mats shall be installed around the machine and secured with adhesive.
3.6 The contractor shall provide a completely operational system(s) capable of meeting the following requirements:
3.6.1 Responsibility for Test
a.) The contractor shall be responsible for all materials and tools required to perform all tests herein.
b) The Government TPOC and COR will be notified in writing, three (3) days prior to all tests and inspections being performed, and reserves the right to witness any test and inspections deemed necessary to assure performance requirements of this PWS are met.
3.6.2 Operational Test. The machine shall be operated at no load for not less than four hours.
Proper operation of all controls, motors, adjusting mechanisms, and accessories shall be verified during this test cycle. If a malfunction occurs during this test cycle, the test shall be restarted each time until a full four (4) hour test cycle is completed without a malfunction.
Three (3) failures without completion of the test cycle shall be considered cause for rejection of the system. For the purpose of this test, a “failure” is defined as any equipment malfunction which requires remedial action to restore the system to full operation in accordance with this specification.
3.6.3 Audible Noise Test. Two (2) random measurements shall be taken at the operator’s work areas. The first taken at the controller/computer cabinet and the other at the emergency stop button located in front of the turret on the end of the material loading bed. For each measurement, the microphone shall be located on a straight line which is perpendicular to the surface/corner being measured and at a height corresponding to the point of the highest noise level emitted from the surface/corner at the herein specified location or distance from the equipment. Each sample shall be 100 dB (A scale) or less.
3.6.4 Performance Accuracy Test. The machine shall be operated under Computer Numerical Control (CNC) in each mode of operation to test the machine’s response to command data.
During performance testing the control functions and machine response to commands for slide motions, turret indexing, feed rate changes and auxiliary functions shall be checked. The safety limit stops shall be checked by attempting to exceed the limits of travel by the work holders.
No-punch safety zones shall be checked by attempting to punch within the zone.
3.6.5 Performance and Alignment Tests. The machine shall be operated in a manner suitable to properly demonstrate and verify the successful operation of the machine and all of its component parts, relative to the design, construction and performance criteria using programs provided by the owning shop as listed below in sections 3.6.5.a thru 3.6.5.h.
Proper punch press operation and accuracy shall be verified by punching the parts listed below:
3.6.5.a Fifteen (15) 0.25” diameter holes horizontally across a 2’ x 2’ steel sheet metal of 0.063” starting at 1.25” from edge of sheet in the X direction and 6” in the Y direction.
Holes shall be spaced 1.5” apart. A second row of fifteen (15) holes shall be punched in a staggered pattern starting at X of 2” and Y of 6.75” and holes shall be spaced 1.5” apart. This pattern shall be repeated three (3) times in the Y direction. Distance between holes shall be measured with accuracy of all hole positions at +/- 0.005”.
3.6.5.b Five (5) retainer pieces on 0.125” brass sheet metal
3.6.5.c Five (5) 5” blanks on 0.125” brass sheet metal
A nesting test shall be performed by fabrication of the parts listed below utilizing both the plasma cutting and punching functions. All pieces shall be fabricated per government provided program and sample.
3.6.5.d Five (5) round blanks on 0.25” aluminum sheet metal
3.6.5.e Five (5) round flanges on 0.125” aluminum sheet metal
3.6.5.f Five (5) brush holders on 0.063” stainless steel sheet metal
3.6.5.g Five (5) louvers on 0.050” stainless steel sheet metal
3.6.5.h Five (5) prop guards on 0.050” galvanized steel sheet metal
3.6.6 Final Report. The contractor shall provide a final report to Code 987, and the Sheet Metal Shop (x17) documenting all test results from the tests performed in sections 3.6.2 thru 3.6.5 (all).
3.7 The equipment shall be examined by the Government to determine compliance with the requirements of this Performance Work Statement.
4.0 SERVICE DELIVERY SUMMARY
Performance Requirement PWS Paragraph Performance Threshold
1. Participate in required pre-work coordination meeting with the Government representatives.
Paragraph 3.1.1 100% delivery and compliance.
2. Provide Environmental Protection Plan (EPP) and follow accordingly in all operations associated with this PWS
Paragraph 3.1.2 100% delivery and compliance.
3. Provide Plan of Action (POA) Paragraph 3.1.3 100% delivery and compliance.
4. Provide Safety Plan Paragraph 3.1.4 100% delivery and compliance.
5. Provide Hot Work Checklist and Permit as applicable.
Paragraph 3.1.5 100% delivery and compliance.
6. Provide Contractor Crane Entry Package to NAVFAC and Code 980
Paragraph 3.1.6 100% delivery and compliance.
7. Disassemble Plasma Punch Press from Building 72 and return work site to clean and orderly state.
Paragraph 3.2 (all) 100% delivery and compliance.
8. Transport Plasma Punch Press and all associated materials to Building 155.
Paragraph 3.3 100% delivery and compliance.
9. Install Above Ground Foundation Kit (part number 781742-2-00) at Building 155.
Paragraph 3.4 (all) 100% delivery and compliance.
10. Reassemble Plasma Punch Press at Building 155.
Paragraph 3.5 100% delivery and compliance.
11. Recalibrate Plasma Punch Press to full operational status.
Paragraph 3.6 (all) 100% delivery and compliance.
5.0 GOVERNMENT PROVIDED SERVICES
5.1 All utilities required to power the Muratec M5000 CNC Plasma Punch Press at Building 155 will be installed by PHNSY & IMF prior to reassembly and recalibration.
6.0 GOVERNMENT FURNISHED PROPERTY
6.1 None.
7.0 QUALITY CONTROL PLAN
7.1 The contractor shall develop a Quality Control Plan (QCP) and maintain an effective quality control program to ensure services are performed in accordance with this PWS. The contractor shall develop and implement procedures to identify, prevent, and ensure non-recurrence of defective services. The contractor's QCP is the means by which the contractor assures that work complies with the requirement of the contract. This QCP shall be in effect from the first day of the contract being awarded.
7.2 The contractor shall maintain records of reviews and actions taken per the QCP, and shall make such records available to the Government upon request.
7.3 Periodic Progress Meetings: The contractor agrees to attend any progress meetings during the contract period of performance. The Government TPOC and other government personnel, as appropriate, may meet periodically with the contractor to review the contractor’s performance. At these meetings the TPOC will apprise the contractor of how the Government views the contractor’s performance and the contractor will notify the Government of problems, if any, being experienced. Appropriate action shall be taken to resolve outstanding issues. These meetings shall be at no additional cost to the Government.
8.0 CONTRACTOR QUALIFICATIONS
8.1 The contractor shall comply with Safety and Health work practices specified in section. See Attachments - Appendix I.
8.2 The contractor shall comply with environmental guidelines specified in section 7. See
Attachments - Appendix II.
8.3 The contractor shall pass a background check to gain access onto the base. The contractor will coordinate with the Technical Point of contact (TPOC) or Contracting Officer’s Representative (COR) to obtain a gate pass at building 3455 Pass Office. It is not unusual for the pass process to take an hour or more. The contractor shall be a U.S. citizen and pass a security background check. Only those individuals with favorable investigations shall be utilized on this contract. Prior to the start of work, the contractor shall provide the COR full name of all personnel working on this contract; social security number; date of birth, place of birth and citizenship. The contractor’s employees must be a U.S. citizen and registered with the Defense Biometric Identification System (DBIDS). The contractor personnel shall have a valid Driver’s license, and a vehicle pass for base access. The contractor will submit the Base access request to Joint Base Pearl Harbor Hickam Security.
8.4 The contractor performing services shall be required to comply with all PHNSY & IMF rules, regulations, and training that is applicable to conduct, safety, security, and procedures governing site entry and exit.
9.0 SECURITY REQUIREMENTS
9.1 In accordance with current DoD and Homeland Security Requirements, performance of all work under this contract is restricted to U.S. citizens and U.S. nationals only. After contract award, the contractor shall provide to the TPOC and/or COR on company letterhead a request for access of all personnel working on this contract and include the following information: full name, Social Security number, date of birth, and citizenship. The contractor shall state that the information has been verified, filed, and available for examination by the Government upon request.
9.2 Contractor personnel must meet the requirements for an unescorted entry, GREEN badge, to PHNSY & IMF areas. Four weeks prior to the visit, the contractor, sub-contractors and suppliers, shall complete applicable items on Part 1 of the Contractor Visit Request (VR) form (PH-SYD 5512/28) and submit it to the Government Contracting Agency (GCA) or COR for completion of Part 2. The GCA/COR will forward the VR and DD 254, as applicable, to the Shipyard & IMF Sponsor for completion of Part 3, no later than three weeks prior to the visit. The Shipyard & IMF Sponsor will submit the VR to Pass and Identification Office (Pass & ID), no later than two week prior to the visit.
The VR must include the type of U.S. citizenship. Entry into the CIA, CNIA, NWA, or OSA may be authorized under one of the following conditions:
9.3 For unescorted access to the CIA: Contractor must show proof of U.S. citizenship before a GREEN badge can be issued. The contractor shall follow the applicable requirements listed below in Attachments -Appendix III and brief their personnel to ensure compliance. Non-compliance with applicable items in Attachments - Appendix III is a material violation of the contract. Should contractor personnel receive or suspect they have learned of unauthorized sensitive information, they shall identify and immediately report suspicions to the Government. This contract does not require access to Nuclear Work spaces.
9.4 Contractor employees shall clearly identify themselves as a contractor (i.e. company shirt, badge, company identification) in a visible location on the front of exterior clothing, above the waist, (except when safety or health reasons prevent such placement). Identification badges shall be worn at all times when performing work. The contractor performing services shall be required to comply with all PHNSY & IMF rules, regulations, and training that is applicable to conduct, safety, security, and procedures governing site entry and exit. Contractor personnel will be escorted when working in sensitive areas, as required. The TPOC will make arrangements to provide escort service if required.
10.0 OPERATIONS SECURITY (OPSEC)
10.1 The contractor shall comply will Operational Security (OPSEC) requirements specified in Attachments - Appendix IV.
10.2 Upon contract award, if determined by the OPSEC Program Manager (OPSEC PM), the contractor must submit an OPSEC Plan to be approved by the Government prior to the start of work. The OPSEC Plan must be submitted via encrypted email, through the approved Department of Defense Safe (DoD) Secure Access File Exchange (SAFE) at https://safe.apps.mil.
10.3 It is the responsibility of all contractor personnel (prime and sub) to avoid inadvertent disclosure of unclassified or classified information during the period of this contract.
10.4 During the period of this contract, contractor personnel may be exposed to, use, or produce, U.S.
Government CI and observable indicators which may lead to the discovery of CI. PHNSY & IMF CI will not be distributed to unauthorized third parties, including foreign government or companies under Foreign Ownership, Control or Influence (FOCI). The contractor shall protect all CI in a manner appropriate to the nature of the information.
10.5 U.S. Government CI shall not be publicized in corporate wide newsletters, trade magazines, displays, internet page or public websites. All transmission to personal email accounts (AOL, Yahoo, Gmail, Hotmail, Comcast, etc.,) and posting on social media websites (Facebook, Instagram, Twitter, LinkedIn, etc.,) are strictly prohibited. Media requests related to this project shall be directed to PHNSY & IMF Public Release Authority.
10.6 The contractor and its personnel should realize that disclosure or compromise of CI to unauthorized persons, whether willfully or through gross negligence, carelessness, or indiscretion, may warrant action to remove the individual assigned or to terminate the awarded contract. Furthermore, such conduct may be cause for criminal prosecution and imposition of criminal and civil penalties.
10.7 The contractor shall protect Controlled Unclassified Information (CUI) at all times. CUI consist of but is not limited to unclassified information requiring safe guarding and dissemination controls, consistent with applicable law, regulation, or government-wide policy. Any attempt by unauthorized third parties to solicit, obtain, photograph or record incidents of loss or compromise of CUI or other pertinent sensitive information related to this contract shall be immediately reported to the organization’s Command Security Manager and the COR.
11.0 CONTRACTOR PERSONNEL
11.1 The contractor shall comply with Public Law 105-270, Section 5(2A)(A), which states that contractors will not perform inherently governmental functions. Section 5(2)(A) of this Public Law defines the term “inherently governmental function” as “a function that is so intimately related to the public interest as to require performance by Federal Government employees.” Per Section 5(2)(B), inherently governmental functions include management of government programs requiring value judgements, conduct of foreign relations, selection of program priorities, and the direction of intelligence and counter-intelligence operations. Per Section 5(2)(C), inherent governmental functions DO NOT include,
(i) gathering information for or providing advice, opinions, recommendations, or ideas to Federal Government officials; or (ii) any function that is primarily ministerial and internal in nature.”
11.2 Contractor personnel shall not establish an employee-employer relationship with government personnel under this contract.
11.3 The contractor shall not provide personal services.
11.4 Contractor personnel shall make clear to all individuals they engage with that they are contractor employees and not government employees. When participating and introducing themselves during official events wherein government, non-government, or foreign personnel are present, contractor personnel shall identify themselves as employees of the contractor. Contractor personnel must be clearly identified (i.e. company shirt, pin, visible company ID, etc.) in a visible location as to who their employer is.
11.5 Contractor personnel shall not manage, supervise or task government employees or military personnel. Contractor personnel may not make any commitment to non-DOD personnel, including a foreign official, which commits the expenditure of U.S. government resources.
11.6 Facilities may close due to local or national emergencies, administrative closings, or other government directed facility closings. Contractor access to government facilities during closures is not permitted.
12.0 PLACE OF PERFORMANCE
12.1 The place of performance shall be on-site at PHNSY & IMF Building 72 outside the Controlled Industrial Area and at Building 155 inside the Controlled Industrial Area.
13.0 HOURS OF OPERATION
13.1 First shift working hours are from 0630 to 1500 hours, daily Monday through Friday, excluding Holidays.
13.2 Second shift working hours are from 1430 to 2300 hours, daily Monday through Friday, excluding Holidays.
13.3 Second shift working hours may be performed with concurrence from government TPOC and COR.
The contractor shall submit a request in writing no later than one (1) week prior to scheduling work on second shift hours.
13.4 If the Federal holiday falls on a Saturday, the holiday is observed on the preceding Friday. If the Federal holiday falls on a Sunday, the holiday is observed on the following Monday.
DELIVERY INFORMATION
CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /
CAGE
0001 POP 01-SEP-2022 TO
31-AUG-2023
N/A PEARL HARBOR NAVAL SHIPYARD &
IMF
SEE PERFORMANCE WORK STATEMENT
667 SAFEGUARD STREET
PEARL HARBOR HI 96860-5033
FOB: Destination
N32253
INSPECTION AND ACCEPTANCE TERMS
Supplies/services will be inspected/accepted at:
CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY
0001 Destination Government Destination Government
CLAUSES INCORPORATED BY REFERENCE
52.204-7 System for Award Management OCT 2018 52.204-8 Annual Representations and Certifications MAY 2022 52.204-9 Personal Identity Verification of Contractor Personnel JAN 2011 52.204-13 System for Award Management Maintenance OCT 2018 52.204-16 Commercial and Government Entity Code Reporting AUG 2020 52.204-18 Commercial and Government Entity Code Maintenance AUG 2020 52.204-19 Incorporation by Reference of Representations and
Certifications.
DEC 2014
52.204-21 Basic Safeguarding of Covered Contractor Information Systems
NOV 2021
52.204-22 Alternative Line Item Proposal JAN 2017 52.204-24 Representation Regarding Certain Telecommunications and
Video Surveillance Services or Equipment
NOV 2021
52.209-11 Representation by Corporations Regarding Delinquent Tax Liability or a Felony Conviction under any Federal Law
FEB 2016
52.212-1 Instructions to Offerors--Commercial Products and Commercial Services
NOV 2021
52.212-3 Offeror Representations and Certifications--Commercial Products and Commercial Services
MAY 2022
52.212-4 Contract Terms and Conditions--Commercial Products and Commercial Services
NOV 2021
52.215-8 Order of Precedence--Uniform Contract Format OCT 1997 52.222-29 Notification Of Visa Denial APR 2015 52.223-6 Drug-Free Workplace MAY 2001 52.232-39 Unenforceability of Unauthorized Obligations JUN 2013 52.232-40 Providing Accelerated Payments to Small Business
Subcontractors
NOV 2021
52.233-1 Disputes MAY 2014 52.242-15 Stop-Work Order AUG 1989 52.243-1 Alt I Changes--Fixed Price (Aug 1987) - Alternate I APR 1984 252.201-7000 Contracting Officer's Representative DEC 1991 252.203-7000 Requirements Relating to Compensation of Former DoD
Officials
SEP 2011
252.203-7002 Requirement to Inform Employees of Whistleblower Rights SEP 2013 252.203-7005 Representation Relating to Compensation of Former DoD
Officials
NOV 2011
252.204-7003 Control Of Government Personnel Work Product APR 1992 252.204-7007 Alternate A, Annual Representations and Certifications MAY 2021
252.204-7008 Compliance With Safeguarding Covered Defense Information Controls
OCT 2016
252.204-7009 Limitations on the Use or Disclosure of Third-Party Contractor Reported Cyber Incident Information
OCT 2016
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting
DEC 2019
252.204-7015 Notice of Authorized Disclosure of Information for Litigation Support
MAY 2016
252.204-7017 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services -- Representation
MAY 2021
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services
JAN 2021
252.204-7019 Notice of NIST SP 800-171 DoD Assessment Requirements MAR 2022 252.204-7020 NIST SP 800-171 DoD Assessment Requirements MAR 2022 252.215-7013 Supplies and Services Provided by Nontraditional Defense
Contractors.
JAN 2018
252.225-7048 Export-Controlled Items JUN 2013 252.232-7003 Electronic Submission of Payment Requests and Receiving
Reports
DEC 2018
252.232-7010 Levies on Contract Payments DEC 2006 252.232-7017 Accelerating Payments to Small Business Subcontractors--
Prohibition on Fees and Consideration
APR 2020
252.243-7001 Pricing Of Contract Modifications DEC 1991 252.244-7000 Subcontracts for Commercial Items JAN 2021 252.247-7023 Transportation of Supplies by Sea FEB 2019
ADDENDUM TO FAR 52.212-1
Quotation submittal is at the firm or individual’s discretion and no monetary compensation of any kind shall be made if deemed an unsuccessful offeror.
All firms or individuals responding must be registered with the System for Award Management (SAM) (https://www.sam.gov) by the award date.
Written offers should be submitted in accordance with the CLIN structure. If unable to meet the Period of Performance as identified in the solicitation, please provide soonest availability.
The CLIN structure is for (1) one base year as follows:
CLIN 0001
The contractor shall disassemble, transport, install above ground foundation kit, reassemble, and recalibrate a Muratec M5000 CNC Plasma Punch Press to full operational condition.
Work shall be performed in accordance to Performance Work Statement (PWS) and the contractor shall present an Environmental Protection Plan, preliminary Plan of Action, and Safety Plan with written offer.
All quotation submissions need to include completion of FAR 52.212-3, 52.204-24 and 52.204-26.
(End of provision)
CLAUSES INCORPORATED BY FULL TEXT
52.212-2 EVALUATION--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (NOV 2021)
(a) The Government will award a contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. The following factors shall be used to evaluate offers:
(i) Technical capability of the item offered to meet the Government requirement.
(ii) Price
Award will be made on the basis of the lowest evaluated price of proposals meeting or exceeding the acceptability standards for non-cost factor of technical capability.
(b) Options. The Government will evaluate offers for award purposes by adding the total price for all options to the total price for the basic requirement. The Government may determine that an offer is unacceptable if the option prices are significantly unbalanced. Evaluation of options shall not obligate the Government to exercise the option(s).
(c) A written notice of award or acceptance of an offer, mailed or otherwise furnished to the successful offeror within the time for acceptance specified in the offer, shall result in a binding contract without further action by either party. Before the offer's specified expiration time, the Government may accept an offer (or part of an offer), whether or not there are negotiations after its receipt, unless a written notice of withdrawal is received before award.
(End of provision)
ADDENDUM TO FAR 52.212-2
1. EVALUATION
a. Basis for Contract Award
This evaluation is conducted in accordance with (IAW) Federal Acquisition Regulation (FAR) 13, Simplified Acquisition Procedures, as supplemented by the Defense Federal Acquisition Regulation Supplement (DFARS) and the Navy Marine Corps Acquisition Regulation Supplement (NMCARS). These regulations are available electronically at the Federal Acquisition Regulation website, https://www.acquisition.gov/. A contract may be awarded to the contractor who is deemed responsible IAW FAR 9.1, whose technical approach is deemed acceptable IAW the solicitation, and whose price is determined fair and reasonable.
b. Solicitation Requirements, Terms and Conditions
Contractors are required to meet all solicitation requirements, such as terms and conditions, representations and certifications, and technical requirements, in addition to those identified as factors. Failure to comply with the terms and conditions of the solicitation may result in the contractor being ineligible for award. Contractors must clearly identify any exception to the solicitation terms and conditions and must provide complete supporting rationale. The Government reserves the right to determine any such exceptions unacceptable.
TABLE 1- TECHNICAL RATINGS
RATING DESCRIPTION
Acceptable Quote meets the requirements of the solicitation and clearly demonstrates thorough knowledge and understanding of, and approach to, accomplishing each paragraph listed in the PWS.
Unacceptable Quote does not meets the requirements of the solicitation or does not clearly demonstrate thorough knowledge and understanding of, and approach to, accomplishing each paragraph listed in the PWS.
CLAUSES INCORPORATED BY FULL TEXT
52.212-5 CONTRACT TERMS AND CONDITIONS REQUIRED TO IMPLEMENT STATUTES OR
EXECUTIVE ORDERS--COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES (MAY 2022)
(a) The Contractor shall comply with the following Federal Acquisition Regulation (FAR) clauses, which are incorporated in this contract by reference, to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services:
(1) 52.203-19, Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements (JAN 2017) (section 743 of Division E, Title VII, of the Consolidated and Further Continuing Appropriations Act, 2015 (Pub. L.
113-235) and its successor provisions in subsequent appropriations acts (and as extended in continuing resolutions)).
(2) 52.204-23, Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab and Other Covered Entities (NOV 2021) (Section 1634 of Pub. L. 115-91).
(3) 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment. (NOV 2021) (Section 889(a)(1)(A) of Pub. L. 115-232).
(4) 52.209-10, Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015).
(5) 52.233-3, Protest After Award (AUG 1996) (31 U.S.C. 3553).
(6) 52.233-4, Applicable Law for Breach of Contract Claim (OCT 2004) (Public Laws 108-77 and 108-78 (19 U.S.C. 3805 note)).
(b) The Contractor shall comply with the FAR clauses in this paragraph (b) that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services: [Contracting Officer check as appropriate.]
___ (1) 52.203-6, Restrictions on Subcontractor Sales to the Government (JUN 2020), with Alternate I (NOV 2021) (41 U.S.C. 4704 and 10 U.S.C. 2402).
___ (2) 52.203-13, Contractor Code of Business Ethics and Conduct (NOV 2021) (41 U.S.C. 3509).
___ (3) 52.203-15, Whistleblower Protections under the American Recovery and Reinvestment Act of 2009 (JUN 2010) (Section 1553 of Pub. L. 111-5). (Applies to contracts funded by the American Recovery and Reinvestment Act of 2009.)
X (4) 52.204-10, Reporting Executive Compensation and First-Tier Subcontract Awards (JUN 2020) (Pub. L.
109-282) (31 U.S.C. 6101 note).
___ (5) [Reserved]
___ (6) 52.204-14, Service Contract Reporting Requirements (Oct 2016) (Pub. L. 111-117, section 743 of Div. C).
___ (7) 52.204-15, Service Contract Reporting Requirements for Indefinite-Delivery Contracts (Oct 2016) (Pub.
L. 111-117, section 743 of Div. C).
___ (8) 52.209-6, Protecting the Government's Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment. (NOV 2021) (31 U.S.C. 6101 note).
___ (9) 52.209-9, Updates of Publicly Available Information Regarding Responsibility Matters (OCT 2018) (41 U.S.C. 2313).
____ (10) [Reserved]
____ (11) 52.219-3, Notice of HUBZone Set-Aside or Sole-Source Award (SEP 2021) (15 U.S.C. 657a).
____ (12) 52.219-4, Notice of Price Evaluation Preference for HUBZone Small Business Concerns (SEP 2021) (if the offeror elects to waive the preference, it shall so indicate in its offer) (15 U.S.C. 657a).
____ (13) [Reserved]
____ (14)(i) 52.219-6, Notice of Total Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).
____ (ii) Alternate I (MAR 2020) of 52.219-6.
____ (15)(i) 52.219-7, Notice of Partial Small Business Set-Aside (NOV 2020) (15 U.S.C. 644).
____ (ii) Alternate I (MAR 2020) of 52.219-7.
____ (16) 52.219-8, Utilization of Small Business Concerns (OCT 2018) (15 U.S.C. 637(d)(2) and (3)).
____ (17)(i) 52.219-9, Small Business Subcontracting Plan (NOV 2021) (15 U.S.C. 637(d)(4)).
____ (ii) Alternate I (NOV 2016) of 52.219-9.
____ (iii) Alternate II (NOV 2016) of 52.219-9.
____ (iv) Alternate III (JUN 2020) of 52.219-9.
____ (v) Alternate IV (SEP 2021) of 52.219-9.
____ (18) (i) 52.219-13, Notice of Set-Aside of Orders (MAR 2020) (15 U.S.C. 644(r)).
____ (ii) Alternate I (MAR 2020) of 52.219-13.
____ (19) 52.219-14, Limitations on Subcontracting (SEP 2021) (15 U.S.C. 657s).
____ (20) 52.219-16, Liquidated Damages—Subcontracting Plan (SEP 2021) (15 U.S.C. 637(d)(4)(F)(i)).
____ (21) 52.219-27, Notice of Service-Disabled Veteran-Owned Small Business Set-Aside (SEP 2021) (15 U.S.C.
657f).
X (22) (i) 52.219-28, Post-Award Small Business Program Rerepresentation (SEP 2021) (15 U.S.C. 632(a)(2)).
____ (ii) Alternate I (MAR 2020) of 52.219-28.
____ (23) 52.219-29, Notice of Set-Aside for, or Sole-Source Award to, Economically Disadvantaged Women- Owned Small Business Concerns (SEP 2021) (15 U.S.C. 637(m)).
____ (24) 52.219-30, Notice of Set-Aside for, or Sole-Source Award to, Women-Owned Small Business Concerns Eligible Under the Women-Owned Small Business Program (SEP 2021) (15 U.S.C. 637(m)).
____ (25) 52.219-32, Orders Issued Directly Under Small Business Reserves (MAR 2020) (15 U.S.C. 644(r)).
____ (26) 52.219-33, Nonmanufacturer Rule (SEP 2021) (15 U.S.C. 657s).
X (27) 52.222-3, Convict Labor (JUN 2003) (E.O. 11755).
____(28) 52.222-19, Child Labor--Cooperation with Authorities and Remedies (JAN 2022) (E.O. 13126).
X (29) 52.222-21, Prohibition of Segregated Facilities (APR 2015).
X (30)(i) 52.222-26, Equal Opportunity (SEPT 2016) (E.O. 11246).
____ (ii) Alternate I (FEB 1999) of 52.222-26.
X (31)(i) 52.222-35, Equal Opportunity for Veterans (JUN 2020) (38 U.S.C. 4212).
____ (ii) Alternate I (JUL 2014) of 52.222-35.
X (32)(i) 52.222-36, Equal Opportunity for Workers with Disabilities (JUN 2020) (29 U.S.C. 793).
____ (ii) Alternate I (JUL 2014) of 52.222-36.
X (33) 52.222-37, Employment Reports on Veterans (JUN 2020) (38 U.S.C. 4212).
____ (34) 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (DEC 2010) (E.O.
13496).
X (35)(i) 52.222-50, Combating Trafficking in Persons (NOV 2021) (22 U.S.C. chapter 78 and E.O. 13627).
____ (ii) Alternate I (MAR 2015) of 52.222-50 (22 U.S.C. chapter 78 and E.O. 13627).
X (36) 52.222-54, Employment Eligibility Verification (MAY 2022). (E. O. 12989). (Not applicable to the acquisition of commercially available off-the-shelf items or certain other types of commercial products or commercial services as prescribed in FAR 22.1803.)
____ (37)(i) 52.223-9, Estimate of Percentage of Recovered Material Content for EPA–Designated Items (MAY 2008) (42 U.S.C. 6962(c)(3)(A)(ii)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
____ (ii) Alternate I (MAY 2008) of 52.223-9 (42 U.S.C. 6962(i)(2)(C)). (Not applicable to the acquisition of commercially available off-the-shelf items.)
X (38) 52.223-11, Ozone-Depleting Substances and High Global Warming Potential Hydrofluorocarbons (JUN 2016) (E.O. 13693).
____ (39) 52.223-12, Maintenance, Service, Repair, or Disposal of Refrigeration Equipment and Air Conditioners
(JUN 2016) (E.O. 13693).
____ (40) (i) 52.223-13, Acquisition of EPEAT® Registered Imaging Equipment (JUN 2014) (E.O.s 13423 and 13514).
____ (ii) Alternate I (OCT 2015) of 52.223-13.
____ (41)(i) 52.223-14, Acquisition of EPEAT® Registered Televisions (JUN 2014) (E.O.s 13423 and 13514).
____ (ii) Alternate I (JUN 2014) of 52.223-14.
____ (42) 52.223-15, Energy Efficiency in Energy-Consuming Products (MAY 2020) (42 U.S.C. 8259b).
____ (43)(i) 52.223-16, Acquisition of EPEAT®-Registered Personal Computer Products (OCT 2015) (E.O.s 13423 and 13514).
____ (ii) Alternate I (JUN 2014) of 52.223-16.
X (44) 52.223-18, Encouraging Contractor Policies to Ban Text Messaging While Driving (JUN 2020) (E.O.
13513).
____ (45) 52.223-20, Aerosols (JUN 2016) (E.O. 13693).
____ (46) 52.223-21, Foams (JUN 2016) (E.O. 13693).
X (47)(i) 52.224-3, Privacy Training (JAN 2017) (5 U.S.C. 552a).
____ (ii) Alternate I (JAN 2017) of 52.224-3.
____ (48) 52.225-1, Buy American--Supplies (NOV 2021) (41 U.S.C. chapter 83).
____ (49) (i) 52.225-3, Buy American--Free Trade Agreements--Israeli Trade Act (NOV 2021) (41 U.S.C. chapter 83, 19 U.S.C. 3301 note, 19 U.S.C. 2112 note, 19 U.S.C. 3805 note, 19 U.S.C. 4001 note, Pub. L. 103-182, 108-77, 108-78, 108-286, 108-302, 109-53, 109-169, 109-283, 110-138, 112-41, 112-42, and 112-43.
____ (ii) Alternate I (JAN 2021) of 52.225-3.
____ (iii) Alternate II (JAN 2021) of 52.225-3.
____ (iv) Alternate III (JAN 2021) of 52.225-3.
____ (50) 52.225-5, Trade Agreements (OCT 2019) 19 U.S.C. 2501, et seq., 19 U.S.C. 3301 note).
X (51) 52.225-13, Restrictions on Certain Foreign Purchases (FEB 2021) (E.O.'s, proclamations, and statutes administered by the Office of Foreign Assets Control of the Department of the Treasury).
____ (52) 52.225-26, Contractors Performing Private Security Functions Outside the United States (OCT 2016) (Section 862, as amended, of the National Defense Authorization Act for Fiscal Year 2008; 10 U.S.C. 2302 Note).
____ (53) 52.226-4, Notice of Disaster or Emergency Area Set-Aside (NOV 2007) (42 U.S.C. 5150
____ (54) 52.226-5, Restrictions on Subcontracting Outside Disaster or Emergency Area (NOV 2007) (42 U.S.C.
5150).
____ (55) 52.229-12, Tax on Certain Foreign Procurements (FEB 2021).
____ (56) 52.232-29, Terms for Financing of Purchases of Commercial Products and Commercial Services (NOV 2021) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).
____ (57) 52.232-30, Installment Payments for Commercial Products and Commercial Services (NOV 2021) (41 U.S.C. 4505, 10 U.S.C. 2307(f)).
X (58) 52.232-33, Payment by Electronic Funds Transfer—System for Award Management (OCT 2018) (31 U.S.C. 3332).
____ (59) 52.232-34, Payment by Electronic Funds Transfer—Other than System for Award Management (JUL 2013) (31 U.S.C. 3332).
____ (60) 52.232-36, Payment by Third Party (MAY 2014) (31 U.S.C. 3332).
____ (61) 52.239-1, Privacy or Security Safeguards (AUG 1996) (5 U.S.C. 552a).
____ (62) 52.242-5, Payments to Small Business Subcontractors (JAN 2017)(15 U.S.C. 637(d)(13)).
____ (63)(i) 52.247-64, Preference for Privately Owned U.S.-Flag Commercial Vessels (NOV 2021) (46 U.S.C.
55305 and 10 U.S.C. 2631).
____ (ii) Alternate I (APR 2003) of 52.247-64.
____ (iii) Alternate II (NOV 2021) of 52.247-64.
(c) The Contractor shall comply with the FAR clauses in this paragraph (c), applicable to commercial services, that the Contracting Officer has indicated as being incorporated in this contract by reference to implement provisions of law or Executive orders applicable to acquisitions of commercial products and commercial services: [Contracting Officer check as appropriate.]
X (1) 52.222-41, Service Contract Labor Standards (AUG 2018) (41 U.S.C. chapter 67).
X (2) 52.222-42, Statement of Equivalent Rates for Federal Hires (MAY 2014) (29 U.S.C. 206 and 41 U.S.C.
chapter 67).
_____ (3) 52.222-43, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (Multiple Year and Option Contracts) (AUG 2018) (29 U.S.C. 206 and 41 U.S.C. chapter 67).
_____ (4) 52.222-44, Fair Labor Standards Act and Service Contract Labor Standards--Price Adjustment (MAY 2014) (29 U.S.C 206 and 41 U.S.C. chapter 67).
_____ (5) 52.222-51, Exemption from Application of the Service Contract Labor Standards to Contracts for Maintenance, Calibration, or Repair of Certain Equipment--Requirements (MAY 2014) (41 U.S.C. chapter 67).
_____ (6) 52.222-53, Exemption from Application of the Service Contract Labor Standards to Contracts for Certain Services--Requirements (MAY 2014) (41 U.S.C. chapter 67).
X (7) 52.222-55, Minimum Wages for Contractor Workers Under Executive Order 14026 (JAN 2022) (E.O.
13658).
X (8) 52.222-62, Paid Sick Leave Under Executive Order 13706 (JAN 2022) (E.O. 13706).
_____ (9) 52.226-6, Promoting Excess Food Donation to Nonprofit Organizations (JUN 2020) (42 U.S.C. 1792).
(d) Comptroller General Examination of Record. The Contractor shall comply with the provisions of this paragraph
(d) if this contract was awarded using other than sealed bid, is in excess of the simplified acquisition threshold, as defined in FAR 2.101, on the date of award of this contract, and does not contain the clause at 52.215-2, Audit and Records--Negotiation.
(1) The Comptroller General of the United States, or an authorized representative of the Comptroller General, shall have access to and right to examine any of the Contractor's directly pertinent records involving transactions related to this contract.
(2) The Contractor shall make available at its offices at all reasonable times the records, materials, and other evidence for examination, audit, or reproduction, until 3 years after final payment under this contract or for any shorter period specified in FAR Subpart 4.7, Contractor Records Retention, of the other…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .