SS-26-067.pdf

PDF 137 KB Posted

Attached to
TUGCON; OPEN-OCEAN TOW MISSION
Solicitation number
N32205-SS-PM4-26-067
Issued by

About this file

This is a Source Sought Notification issued by Military Sealift Command (MSC) Norfolk for market research regarding towing services for the dry cargo vessel Ex-Juneau (LPD-10). MSC seeks information on the price and availability of a U.S. flag, ocean-going certified tug capable of towing the 17,326-ton, 570-foot vessel in support of Exercise Valiant Shield 26. The tug must be built in 1970 or later and possess sufficient bollard pull to tow the LPD-10 at a minimum speed of six knots in Beaufort 5 sea conditions without hull cleaning or propeller removal. The mission commences May 18, 2026, departing Pearl Harbor, Hawaii, with an intermediate stop in Guam (one week) and final destination at Marianas Island Testing and Training Surveillance Area, approximately 250 nautical miles southeast of Guam, arriving no later than sunset June 26, 2026. The tug must have fuel capacity to complete the approximately 30-day mission without refueling and maintain internet and satellite phone capability.

Interested parties must provide responses via email by 1100 hours Eastern Time on March 9, 2026, to David Anaya (David.C.Anaya.CIV@US.Navy.mil or 564-226-8419). Required information includes complete vessel description with certificates of inspection and documentation, lump-sum pricing including up to four days at the destination site and demurrage rates, itinerary and number of days required, availability confirmation, business size designation, and any comments regarding 46 CFR Chapter 1 Subchapter M towing vessel regulations. The small business size standard for this water transportation service (NAICS 483111) is 1,050 employees. Additional contractor responsibilities include obtaining an independent marine surveyor, providing tow bridles and emergency equipment, preparing a comprehensive towing package compliant with U.S. Navy Towing Manual (SL740-AA-MAN-010), providing position reports at specified intervals, facilitating personnel transfers, and maintaining standby capability within 100-200 nautical miles of the disconnect location for potential emergency reconnection.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

02 MARCH 2026

THIS IS THE MILITARY SEALIFT COMMAND NORFOLK, STRATEGIC SEALIFT

PROGRAM SUPPORT OFFICE, N103A

SOURCE SOUGHT NOTIFICATION NO. N32205-26-PM4-067

SUBJECT: DRY CARGO TUGCON; OPEN-OCEAN TOW MISSION

1. THIS IS MARKET RESEARCH CONDUCTED BY THE PM4 PROGRAM OFFICE OF

MSC. IT IS A REQUEST FOR INFORMATION ONLY, AND YOUR RESPONSE WILL

NOT BE CONSIDERED AN OFFER. THIS REQUEST FOR INFORMATION DOES NOT

COMMIT THE GOVERNMENT TO PAY ANY COSTS INCURRED IN THE

PREPARATION OR SUBMISSION TO THIS MARKET SURVEY OR TO CONTRACT FOR

SERVICES.

2. MSC REQUESTS INFORMATION ABOUT THE PRICE AND AVAILABILITY OF A U.S.

FLAG, OCEAN-GOING CERTIFIED TUG CAPABLE OF TOWING EX-JUNEAU (LPD-10)

“IAW THE U.S. NAVY TOW MANUAL (SL740-AA-MAN-010)” AND PROVIDING

SERVICES IN SUPPORT OF EXERCISE VALIANT SHIELD 26. THE REQUIREMENT IS

FOR ONE VOYAGE.

3. DESCRIPTION OF THE TOW:

• DISPLACEMENT – 17,326 LT

• LENGTH – 570’

• BEAM – 100’

• MAX DRAFT – 34’

4. PORT(S)/PLACE(S) OF DEPARTURE: PEARL HARBOR, HI

5. LAYTIME: FOUR (4) DAYS FOR THE ENTIRE MISSION.

6. PORT(S)/PLACE(S) OF DESTINATION: INTERMEDIATE STOP – GUAM (ONE WEEK);

FINAL DESTINATION - MARIANAS ISLAND TESTING AND TRAINING

SURVEILLANCE AREA, 250NM SOUTHEAST OF GUAM

7. LAYDAYS: COMMENCING/CANCELLING: 18 MAY 2026

8. TUG REQUIREMENTS:

• VESSEL/TUG SHALL BE BUILT IN 1970 OR LATER.

• BOLLARD PULL: SUFFICIENT TO TOW LPD-10 VESSEL AT A MINIMUM TOW

SPEED OF SIX (6) KNOTS FOR FIVE (5) KNOT SOA IN BEAUFORT 5

CONDITIONS WITHOUT THE NEED FOR HULL CLEANING OR PROPELLER

REMOVAL FROM EX-USS JUNEAU (LPD-10). THE HULL HAS NOT BEEN

CLEANED SINCE 2008. MAXIMUM TOW SPEED TO BE CALCULATED IAW THE

U.S. NAVY TOW MANUAL.

• INDICATE WHETHER THE TUG WOULD HAVE SUFFICIENT FUEL CAPACITY

TO COMPLETE THE TOW AND REMAIN ON STANDBY WITHOUT REFUELING

UNTIL AFTER THE SINKEX IS COMPLETE; APPROXIMATELY THIRTY (30)

DAYS. IF NOT, INDICATE HOW RE-FUELING WOULD BE ACCOMPLISHED.

• INTERNET AND SATELLITE PHONE CAPABILITY.

• U.S. NAVY TOWING MANUAL (SL740-AA-MAN-10) WILL BE USED AND

COMPLIED WITH FOR THIS REQUIREMENT. THE LINK FOR DOWNLOAD IS:

HTTP://WWW.NAVSEA.NAVY.MIL/HOME/SUPSALV/00C2-SALVAGE-

PUBLICATIONS/.

• THERE WILL BE A PRE-TOW CONFERENCE AT PEARL HARBOR, HI PRIOR TO

TOWING THE VESSEL. THE TIME OF THIS MEETING WILL BE MUTUALLY

AGREED UPON BY MSC AND CONTRACTOR BUT SHOULD OCCUR NOT

LATER THAN 24 HOURS BEFORE TOW. REQUIRED ATTENDEES INCLUDE TUG

CAPTAIN/CONTRACTOR REPRESENTATIVE, MSC REPRESENTATIVE(S), A

REPRESENTATIVE FROM THE LPD-10 VESSEL AND THE IMS.

• CONTRACTOR SHALL OBTAIN THE SERVICES OF AN INDEPENDENT MARINE

SURVEYOR (IMS). THIS SERVICE SHOULD BE INCLUDED IN THE OFFER’S

LUMP-SUM PRICE. THE IMS IS AN INDEPENDENT THIRD PARTY TO ACT AS A

MEDIATOR BETWEEN THE NAVY AND THE CONTRACTOR TO PROVIDE

INDEPENDENT ANALYSIS OF THE OPERATIONS AND TO ASSIST IN SETTLING

DISAGREEMENTS. THE IMS SELECTED SHOULD BE PROPOSED BY THE

TOWING CONTRACTOR AND AGREED TO BY THE MSC TECHNICAL

REPRESENTATIVE. IMS DUTIES SHALL INCLUDE THE FOLLOWING, BUT ARE

NOT LIMITED TO:

O PERFORM DETAILED TECHNICAL EVALUATION AND OVERSIGHT AS

NECESSARY, TO ENSURE THE TUG AND LPD-10 ARE PREPARED AND

RIGGED FOR TOW IAW THE U.S. NAVY TOWING MANUAL, AS

APPLICABLE.

TECHNICAL EVALUATIONS SHALL INCLUDE A REVIEW OF THE

FOLLOWING, BUT NOT LIMITED TO:

• CONTRACTOR PREPARED TOW PACKAGE.

• PRE-TOW CHECKLIST TO INCLUDE ITEMS SUCH AS

VERIFYING THE CONDITION OF THE LPD-10 AS BEING

SEAWORTHY OF THE TOW.

• MATERIAL CONDITION OF THE TUG AND LPD-10.

• PREPARATIONS OF THE TUG AND LPD-10.

• INSPECTION OF ALL MATERIAL, EQUIPMENT,

HARDWARE, LINES, AND REQUIRED CERTIFICATES.

• COMPLETED U.S. NAVY TOWING MANUAL APPENDIX H.

• ISSUE A TOWING CERTIFICATE WHEN THE TUG AND

LPD-10 ARE SAFELY RIGGED FOR TOW.

• CONTRACTOR MUST PROVIDE TOW BRIDLE AND HARDWARE, EMERGENCY

TOW LINES, FLOODING ALARMS, NAVIGATION LIGHTS, DAY SHAPES IAW

THE COLREGS RULES OF THE ROAD, AND NONDESTRUCTIVE TESTING (NDT)

OF VESSEL DECK FITTINGS.

• CONTRACTOR MUST PREPARE AND SUBMIT A COMPREHENSIVE TOWING

PACKAGE FOR REVIEW AND APPROVAL PRIOR TO COMMENCEMENT OF

TOW. THIS PACKAGE INCLUDES, BUT IS NOT LIMITED TO:

o A COMPLETED APPENDIX H FROM THE US NAVY TOWING MANUAL

WITH ASSOCIATED DETAIL

http://www.navsea.navy.mil/Home/SUPSALV/00C2-Salvage-Publications/ http://www.navsea.navy.mil/Home/SUPSALV/00C2-Salvage-Publications/ o STEADY STATE TOW LINE TENSION CALCULATIONS OVER THE

SPECTRUM OF ANTICIPATED WEATHER CONDITIONS ALONG THE

TOW ROUTE

o SPEEDS OF ADVANCE (SOA) o WEATHER CONDITIONS AND LIMITS o A SKETCH OF THE TOW CONFIGURATION WHICH IDENTIFIES ALL

COMPONENTS IN THE TOW RIG FROM THE TOW MACHINE ON THE

TUG TO THE PAD EYES ON TOW (THIS INCLUDES TOW WIRE,

CONNECTING SHACKLES, CHAIN INSPECTIONS, AND PAD EYE NDT

(NON-DESTRUCTIVE TESTING) INSPECTION PAPERWORK.

o DOCUMENTATION OF PEDIGREE, TESTING, OR STAMPING FOR THE

INDIVIDUAL JEWELRY COMPONENTS TO ASSIST IN IDENTIFYING

THE WEAKEST LINK AND TO FACILITATE FORENSIC ANALYSIS IN

THE EVENT OF A FAILURE, AND TRACKING OF FAILURE TRENDS.

o TUG SPECIFICATIONS TO INCLUDE HULL AND TOW MACHINERY

CERTIFICATIONS, BOLLARD PULL, TOW WIRE CERTIFICATIONS, AND

THE MASTER’S TOWING ENDORSEMENT.

o ROUTE PLANNING AND IDENTIFICATION OF PORTS OF REFUGE

INCLUDING ASSOCIATED RESTRICTIONS FOR ENTRY AS STATED BY

THE CAPTAIN OF THE PORT.

o THE COMPLETED TOW PACKAGE MUST BE SENT TO NAVSEA AND

MSC REPRESENTATIVES FOR APPROVAL PRIOR TO TOW.

• LUMP SUM AMOUNT SHALL INCLUDE UP TO FOUR (4) DAYS OF LAYTIME

• POSITION REPORTS. POSITION REPORTS SHALL BE ISSUED BY ELECTRONIC

MAIL: VESSEL SHALL PROVIDE POSITION/STATUS REPORT IN PORT TWICE

DAILY AT 0000Z AND 1200Z AND AT-SEA FOUR TIMES DAILY AT 0000Z,

0600Z, 1200Z, AND 1800Z. ADDITIONALLY, POSITION/STATUS REPORTS

SHALL BE SENT UPON DEPARTURE AND ARRIVAL, AND AT OTHER TIMES

REQUESTED BY THE APPLICABLE MSC AREA COMMAND FOR FORCE

PROTECTION REASONS. REPORTS SHALL BE SENT TO THE EMAIL

ADDRESSES THAT WILL BE PROVIDED AFTER THE CONTRACT AWARD.

• CONDUCT AN AT-SEA TRANSFER OF PERSONNEL FROM THE TOW VESSEL

TO EX-JUNEAU OR FROM U.S. NAVY OR COAST GUARD VESSEL.

• ARRIVE IVO GUAM NLT 16 JUNE. FACILITATE U.S. NAVY PERSONNEL

BOARDING AND CONDUCTING TRAINING ON THE TOWED VESSEL

APPROXIMATELY 12 NM FROM GUAM FOR UP TO 1 WEEK.

o BATTLE DAMAGE REPAIR (BDR) TRAINING o FLIGHT OPERATIONS ON AND OFF TOWED VESSEL o LIVE FIRE EXERCISES ONBOARD o POSSIBLE MOORING IN GUAM OUTER APRA HARBOR TO A MOORING

BUOY OR PIER SIDE FOR CRANE SUPPORT INSIDE US NAVAL BASE

PENDING NAVY APPROVALS.

o IF MOORING BUOY GETS AUTHORIZED IN GUAM, CONTRACTOR

NEEDS TO PROVIDE MOORING JEWELRY TO MOORING BUOYS.

• TOW TO SINKEX LOCATION APPROXIMATELY 250NM SOUTHEAST OF GUAM

AT THE CONCLUSION OF TRAINING.

• ARRIVE AT THE DESIGNATED DROP LOCATION NO LATER THAN SUNSET ON

OR ABOUT 26 JUNE 2026 FOR DISCONNECT AS DIRECTED.

• STANDBY WITHIN 100-200NM OF THE DISCONNECT LOCATION, PREPARED

TO RECONNECT THE TOW IN THE EVENT OF AN EMERGENCY AS DIRECTED.

9. INTERESTED PARTIES ARE REQUESTED TO PROVIDE THE FOLLOWING

INFORMATION:

A. NAME AND COMPLETE DESCRIPTION/CHARACTERISTICS OF THE TOW

VESSEL INCLUDING CERTIFICATE OF INSPECTION (COI), CERTIFICATE OF

DOCUMENTATION (COD) OR CLASSIFICATION SOCIETY EQUIVALENT,

PHOTOS, AND ALL DELIVERABLES AS PER MSC TUG PROFORMA (TUGCON -

SPOT) FEBRUARY 2026 (02-26).

B. LUMPSUM (INCLUDE UP TO 4 DAYS AT DESTINATION SITE FOR

CUSTOMS/DELIVERY) AND DEMURRAGE RATE.

C. ITINERARY, NUMBER OF DAYS REQUIRED TO COMPLETE THE TOW

MISSION.

D. CONFIRM AVAILABILITY FOR LAYDAY.

E. BUSINESS SIZE. IF OTHER THAN SMALL BUSINESS, PROVIDE A NARRATIVE

OF SUB-CONTRACTING POSSIBILITIES ENVISIONED, IF ANY. IF NONE,

PROVIDE AN EXPLANATION.

F. ANY OTHER PERTINENT QUESTIONS OR COMMENTS INCLUDING 46 CFR,

CHAPTER 1, SUBCHAPTER M - TOWING VESSELS.

10. THE FEDERAL ACQUISITION REGULATION 19.102 ESTABLISHES THE SMALL

BUSINESS SIZE STANDARD FOR THIS TYPE OF WATER TRANSPORTATION

SERVICE AS NAICS “483111” WITH A SMALL BUSINESS SIZE LIMITATION OF 1,050

EMPLOYEES. PLEASE INDICATE IF BUSINESS IS A SMALL BUSINESS CONCERN.

11. RESPONSES ARE REQUESTED, VIA EMAIL, PRIOR TO 1100 HOURS, EASTERN

TIME, 09 MARCH 2026. THE POINT OF CONTACT DAVID ANAYA, EMAIL

DAVID.C.ANAYA.CIV@US.NAVY.MIL, OR TEL (564) 226-8419.

SIGNED: CHRISTOPHER TOMLIN, CONTRACTING OFFICER, MSC, N103

File details come from the government source that posted it. Updated .