This is a Request for Proposals (RFP) issued by Military Sealift Command (MSC) Norfolk for vessel towing services under FAR Part 12 simplified procedures. The solicitation number is N3220527R6016, issued on 30 October 2026, with proposals due by Friday, 06 November 2026 at 1100 Eastern Time. MSC seeks up to two U.S. Flag, Jones Act, ocean-going certified tugs capable of towing two separate decommissioned naval vessels in a single voyage: ex-FORT WORTH (LCS-3) with a displacement of 3,500 long tons and ex-LAKE ERIE (CG-70) with a displacement of 9,600 long tons. Both vessels are located at Naval Station San Diego, California, with ex-FORT WORTH to be delivered to INACTSHIPS Bremerton, Washington and ex-LAKE ERIE to be delivered to INACTSHIPS Pearl Harbor, Hawaii.
The contract will be firm-fixed-price with a layday commencing 14 December 2026. Four days of laytime are allowed in total for the entire mission, shared across both tows regardless of whether one or two tugs are used. Offerors must provide tugs with sufficient bollard pull to tow each assigned ship at a minimum speed of six knots for five-knot speed of advance in Beaufort 5 conditions, with calculations provided for each tug-and-tow combination. Tugs must be built on or after 1970 or provide evidence of complete rebuild and repowering after 1970, be fully bunkered, and have sufficient fuel and stores capacity to complete the tow. Required deliverables include a comprehensive towing package prepared by the contractor, services of an Independent Marine Surveyor included in the lump-sum price, tow bridle and hardware, emergency tow lines, and twice-daily position reports in port and four times daily at sea. This acquisition is set-aside as a Total Small Business Set-Aside under NAICS Code 483111. Payment will be made by ERP DFAS-CL through the Wide Area Work Flow system with electronic invoice submission required.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Shipyard Data Sheet.xlsx | XLSX spreadsheet | |
| TUGCON 2026 (02-26).pdf | ||
| 2015-0213 Rev. 42.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
30 October 2026
This is the Military Sealift Command Norfolk, Strategic Sealift Program Support Office
SOURCES SOUGHT NOTICES, RFP’S, AMENDMENTS AND CONTRACT AWARDS
WILL BE POSTED TO THE SAM.GOV WEBSITE (ONLY) UNTIL FURTHER NOTICE.
HTTPS://SAM.GOV
PROFORMA DOCUMENTS WILL BE MADE AVAILABLE UPON REQUEST.
Subj: RFP N3220527R6016
Ref: (a) SF 1449
(b) MSC TUGCON 2026 (02-26)
This acquisition is a FAR part 12 acquisition being conducted under FAR 12.201-1 Simplified procedures. Only FAR Part 12 procedures will be used to solicit and evaluate offerors. Per FAR 52.216-1, the Government contemplates award of a firm-fixed-price contract resulting from this solicitation.
MSC Strategic Sealift Program Support Office, N103A, requests proposals for vessel(s) capable of meeting the transportation requirements described below. The paragraph numbers below apply to the box layout of references (a) and (b), which are incorporated herein by reference (available on the MSC web site at https://www.msc.usff.navy.mil, under “Business “Opportunities”, select “Contracts”, then “Proforma”, or upon request), and shall be the charter form of any contract resulting from this solicitation. By submission of a proposal, the owner/offeror confirms agreement with all terms and conditions of this solicitation and the charter form, unless otherwise identified therein.
NOTES:
1. IN ACCORDANCE WITH MSC TUGCON PROFORMA, PART VIII (A)(11), A VALID
SUBMISSION CONSISTS OF AT LEAST A SHIP NAME, A PRICE, AND A SIGNATURE;
WITHOUT THESE THREE AT A MINIMUM, YOUR SUBMISSION WILL NOT BE
CONSIDERED FOR EVALUATION AND AWARD.
2. DUE TO INCREASED E-MAIL SECURITY, IT MAY TAKE LONGER FOR E-MAILS TO BE
RECEIVED IN THE APPROPRIATE IN-BOX, ESPECIALLY WHEN AN E-MAIL IS HOSTED IN
A FOREIGN COUNTRY; SOME E-MAILS ARE DELAYED IN EXCESS OF HOURS. OFFERORS
ARE ENCOURAGED TO SUBMIT OFFERS AS SOON AS POSSIBLE. NO JPEG FILES.
3. OFFERORS ARE REMINDED THAT EXPIRED OFFERS WILL BE EXCLUDED FROM THE
COMPETITION UPON EXPIRATION AND WILL NOT BE AVAILABLE FOR SUBSEQUENT
REVIVAL OR RENEWAL UNLESS THE EXPIRATION OCCURS DURING A PERIOD WHERE
FINAL PROPOSAL REVISIONS ARE BEING ACTIVELY SOUGHT.
4. THIS IS A SPOT CHARTER; AS SUCH, ALL PROFORMA SECTIONS THAT ADDRESS
EXTENDED TERM CHARTERS ARE NOT APPLICABLE.
https://sam.gov/ https://www.msc.usff.navy.mil/
A. STANDARD FORM 1449 BOXES
I. Standard Form 1449 Boxes
2. Contract No.: Will be provided upon award
5. Solicitation No.: N3220527R6016
6. Solicitation Issue Date: 30 October 2026
7. For Solicitation Information: Email David Anaya at david.c.anaya.civ@us.navy.mil or 564-226-8419
8. Offer Due Date: Friday, 06 November 2026, at 1100 Eastern Time
9. Issued By: Military Sealift Command Norfolk, 471 East C Street, Bldg. SP-64, Naval Station Norfolk, Norfolk, VA 23511-2419 (Code: N32205)
10. This Acquisition is: Total Small Business Set-Aside; NAICS Code: 483111
14. Method of Solicitation: RFP 18a. Payment will be made by: ERP DFAS-CL (Pay DoDAAC N50082). Submit electronic invoices IAW Part VI(6) DFARS 252.232-7006 Wide Area Work Flow Payment Instructions 18b. Submit invoices to: See Part VI(C)(7) MSC Wide Area Work Flow (WAWF) Instructions 27a. Solicitation incorporates by full text FAR 52.212-1, 52.212-4 and tailored as indicated and appropriate.
PART I - TUGCON BOXES:
1. Tug Required:
Up to two U.S. Flag, Jones Act, Ocean-Going Certified Tug(s) capable of towing ex-FORT WORTH (LCS-3) and ex-LAKE ERIE (CG-70) “IAW the U.S. Navy Tow Manual (SL740- AA-MAN-010).” The requirement is for one voyage consisting of two separate tows.
2. Description of the Tows:
• TOW 1: EX-FORT WORTH (LCS-3)
o Displacement – 3,500 LT o Length – 387.6’ o Beam – 57.7’ o Max Draft – 14’ 1”
• TOW 2: EX-LAKE ERIE (CG-70)
o Displacement – 9,600 LT o Length – 567’ o Beam – 55’ o Max Draft – 36’
3. Port/Place of Departure: Both vessels are located at Naval Station San Diego, CA
4. Laytime: Four (4) days of laytime are allowed in total for the entire mission, shared across both tows regardless of whether one or two tugs are used. The allowance may be allocated between the tows as needed.
5. Port/Place of Destination: Ex-FORT WORTH (LCS-3) will be delivered to INACTSHIPS
Bremerton, WA and ex-LAKE ERIE (CG-70) will be delivered to INACTSHIPS Pearl Harbor, HI mailto:david.c.anaya.civ@us.navy.mil
6. Layday(s): Commencing/Cancelling: 14 December 2026 (Four (4) days of laytime are allowed in total for the entire mission, shared across both tows regardless of whether one or two tugs are used. The allowance may be allocated between the tows as needed.)
7. Terms/Conditions/Attachments added, deleted or modified:
Add: special requirements:
A. The vessel(s)/tug(s) shall either be built on or after 1970 or if built prior to 1970, contractor must submit evidence issued or endorsed by the USCG, ABS, or another USCG-recognized classification society sufficient to establish the date and scope of the rebuild that the tug(s) was(were) fully rebuilt and repowered after 1970.
B. Bollard pull: Each offered tug shall have sufficient bollard pull to tow its assigned ship at a minimum tow speed of six (6) knots for five (5) knot SOA in Beaufort 5 conditions. If one tug is offered for both tows, it shall meet this requirement for each ship separately.
Maximum tow speed shall be calculated IAW the U.S. Navy Tow Manual. Each tug shall tow only one ship at a time. Contractors shall provide the calculations used to determine appropriate bollard pull for each proposed tug-and-tow combination.
C. Tug(s) shall be fully bunkered for the voyage.
D. Tug(s) shall have sufficient fuel and stores capacity to complete the tow without stops for fuel or supplies. Fuel stops and resupply are authorized if one singular tow vessel is being utilized for both tows.
E. Internet and satellite phone capability.
F. U.S. Navy Towing Manual (SL740-AA-MAN-10) will be used and complied with for this requirement. The link for download is:
https://www.navsea.navy.mil/Home/SUPSALV/00C2-Salvage/Salvage-Publications/
G. There will be a pre-tow conference at Naval Station San Diego, CA prior to towing each vessel. The time of this meeting will be mutually agreed upon by MSC and contractor but should occur not later than 24 hours before tow. Required attendees include tug Captain/contractor representative, MSC representative(s), a representative from each towed vessel and the IMS.
H. Contractor shall obtain the services of an Independent Marine Surveyor (IMS). This service should be included in the offer’s lump-sum price. The IMS is an independent third party to act as a mediator between the Navy and the contractor to provide independent analysis of the operations and to assist in settling disagreements. The IMS selected should be proposed by the towing contractor and agreed to by the MSC technical representative. IMS duties shall include the following, but are not limited to:
1. Perform detailed technical evaluation and oversight as necessary, to ensure the tug(s) and both towed vessels (LCS-3 and CG-70) are prepared and rigged for tow IAW the U.S. Navy Towing Manual, as applicable.
Technical evaluations shall include a review of the following, but not limited to:
https://www.navsea.navy.mil/Home/SUPSALV/00C2-Salvage/Salvage-Publications/
• Contractor prepared tow package.
• Pre-tow checklist to include items such as verifying the condition of the LCS-3 and CG-70 as being seaworthy of the tow.
• Material condition of the tug(s) and LCS-3 and CG-70.
• Preparations of the tug(s) and LCS-3 and CG-70.
• Inspection of all material, equipment, hardware, lines, and required certificates.
• Completed U.S. Navy Towing Manual Appendix H.
• Issue a towing certificate when the tug(s) and LCS-3 and CG-70 are safely rigged for tow.
I. Contractor must provide tow bridle and hardware, emergency tow lines, flooding alarms, navigation lights and day shapes IAW the COLREGS Rules Of The Road and nondestructive testing (NDT) of vessel deck fittings. This must be provided for both towed vessels.
J. Contractor must prepare and submit a comprehensive towing package for review and approval prior to commencement of tow. This package includes, but is not limited to:
1. A completed Appendix H from the U.S. Navy Towing Manual with associated detail
2. Steady state tow line tension calculations over the spectrum of anticipated weather conditions along the tow route
3. Speeds of advance (SOA)
4. Weather conditions and limits
5. A sketch of the tow configuration which identifies all components in the tow rig from the tow machine on the tug(s) to the pad eyes on tow (this includes tow wire, connecting shackles, chain inspections, and pad eye NDT (non-destructive testing) inspection paperwork.
6. Documentation of pedigree, testing, or stamping for the individual jewelry components to assist in identifying the weakest link and to facilitate forensic analysis in the event of a failure and tracking of failure trends.
7. Tug(s) specifications to include hull and tow machinery certifications, bollard pull, tow wire certifications, and the Master’s towing endorsement.
8. Route planning and identification of ports of refuge including associated restrictions for entry as stated by the Captain of the Port.
9. The completed tow package must be sent to NAVSEA and MSC representatives for approval prior to tow.
K. Lump-sum price shall include a total of four (4) days of laytime for the entire mission, shared across both tows regardless of whether one or two tugs are used. The allowance may be allocated between the tows as needed.”
L. Position reports. Position reports shall be issued by electronic mail: vessel shall provide position/status reports in port twice daily at 0000z and 1200z and at-sea four times daily at 0000z, 0600z, 1200z, and 1800z. Additionally, position/status reports shall be sent upon departure and arrival, and at other times requested by the applicable MSC area command for force protection reasons. Reports shall be sent to the email addresses that will be provided after the contract award.
M. Contractor shall provide name and complete description/characteristics of the tow vessel(s) including Certificate of Inspection (COI), Certificate of Documentation (COD) or classification society equivalent, photos, and all deliverables as per MSC PROFORMA
TUGCON 2026 (02-26).
N. Contractor shall include a transit plan in the offer that will detail the transit from Naval Base San Diego, CA to INACTSHIPS Bremerton, WA and INACTSHIPS Pearl Harbor, HI for each tow. Details shall include route planning and identification of ports of refuge including associated restrictions for entry as stated by the captain of the port.
O. Acknowledgement: Owner/Offeror shall do the following:
1. Owner/ Offeror shall submit a warranty that the Owner/ Offeror acknowledges and will meet all requirements of the solicitation and corresponding proforma.
2. Owner/Offeror submit items: 7B, 7M and 7N.
3. Owner/Offeror’s warranty validates acknowledgment of items: 1-6 and 7A-7L.
http://www.acquisition.gov/far/index.html http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html
REPLACE PART IV WITH THE FOLLOWING:
PART IV. ADDITIONAL FAR AND DFARS CLAUSES; add/amend the following:
Amend: (b) FAR 52.203-13, Contract Code of Business Ethics and Conduct (Nov 2021) –
CHECKED
Amend: (b) FAR 52.204-14, Service Contract Reporting Requirements (Oct 2016) – CHECKED
Add: (b) FAR 52.203-17, Contract Employee Whistleblower Rights (Nov 2023) – CHECKED
Amend; (b) FAR 52.217-8, Option to Extend Services (Nov 1999) to read as follows:
The Government may require continued performance of any services within the limits and at the rates specified in the contract. These rates may be adjusted only as a result of revisions to prevailing labor rates provided by the Secretary of Labor. The option provision may be exercised more than once, but the total extension of performance hereunder shall not exceed 6 months. The Contracting Officer may exercise the option by written notice to the Contractor any time prior to redelivery of the Vessel.
Amend: (b) FAR 52.219-6 Notice of Total Small Business Set-Aside (Nov 2020) - CHECKED
Amend: (b) FAR 52.219-8, Utilization of Small Business Concerns (Jan 2025) - CHECKED
Amend: (b) FAR 52.219-14, Limitations on Subcontracting (Oct 2022) – CHECKED
Amend: (b) FAR 52.219-28, Postaward Small Business Program Rerepresentation (Jan 2025) -
CHECKED
Amend: (b) FAR 52.222-3, Convict Labor (Jun 2003) - CHECKED http://www.acquisition.gov/far/index.html http://www.acq.osd.mil/dpap/dars/dfarspgi/current/index.html
Add: (b) FAR 52.222-21, Prohibition of Segregated Facilities (Apr 2015) – CHECKED
Amend: (b) FAR 52.222-35, Equal Opportunity for Veterans (Jun 2020) - CHECKED
Amend: (b) FAR 52.222-36, Equal Opportunity for Workers with Disabilities (Jun 2020) -
CHECKED
Amend: (b) FAR 52.222-37, Employment Reports on Veterans (Jun 2020) - CHECKED
Amend: (b) FAR 52.222-40, Notification of Employee Rights Under the National Labor Relations Act (Dec 2010) – CHECKED
Amend: (b) FAR 52.222-41, Service Contract Labor Standards (Aug 2018) - CHECKED
Amend: (b) FAR 52.222-42, Statement of Equivalent Rates for Federal Hires (May 2014) to read as follows:
In compliance with the Service Contract Labor Standards statute and the regulations of the Secretary of Labor ( 29 CFR Part 4), this clause identifies the classes of service employees expected to be employed under the contract and states the wages and fringe benefits payable to each if they were employed by the contracting agency subject to the provisions of 5 U.S.C.5341 or 5 332.
This Statement is for Information Only: It is not a Wage Determination Employee Class Non-Mech Daily Mech Daily Daily
Master $440.74 $497.88 Chief Engineer $395.30
Chief Mate $267.24 $294.00 2nd Mate $238.01 $261.86 3rd Mate $208.82 $229.71
1st Asnt Engineer $272.16 2nd Asnt Engineer $241.27 3rd Asnt Engineer $206.23
Able Seaman $161.98 Ordinary Seaman $122.86
(End of clause)
Amend: (b) FAR 52.222-62, Paid Sick Leave Under Executive Order 13706 (Jan 2022) –
Add: (b) FAR 52.222-90, Addressing DEI Discrimination by Federal Contractors - CHECKED
Amend: (b) FAR 52.225-13, Restrictions on Certain Foreign Purchases (Feb 2021) - CHECKED
Amend: (b) FAR 52.240-1, Prohibition on Unmanned Aircraft Systems Manufactured or Assembled by American Security Drone Act-Covered Foreign Entities (Nov 2024) - CHECKED
Add: (b) 52.240-91, Security Prohibitions and Exclusions - CHECKED http://uscode.house.gov/view.xhtml?req=granuleid:USC-prelim-title5-section5341&num=0&edition=prelim
Add: (b) 52.240-93, Basic Safeguarding of Covered Contractor Information Systems -
Add: (b) 52.244-6 Subcontracts for Commercial Products and Commercial Services - CHECKED
Add: (c) DFARS 252.225-7005 Identification of Expenditures in the United States – CHECKED
PART VI(c) DFARS 252.232-7006 Wide Area Work Flow Payment Instructions
VI(c) DFARS 252.232-7006 Wide Area Work Flow Payment Instructions
VI(c)(f)(1)(ii)(A) Not Applicable
VI(c)(f)(1)(ii)(B) Invoice 2-in-1 VI(c)(f)(3): Document routing: The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
A. Routing Data Table:
Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC N50082 Issue By DoDAAC N32205 Admin DoDAAC N32205 Inspect By DoDAAC N62387 Ship To Code N62387 Ship From Code Leave Blank Mark For Code Leave Blank Service Approver (DoDAAC) N62387 Service Acceptor (DoDAAC) N62387 Accept at Other DoDAAC Leave Blank LPO DoDAAC N62387 DCAA Auditor DoDAAC Leave Blank Other DoDAAC(s) Leave Blank
PART V. ADDITIONAL FAR AND DFARS PROVISIONS; add/amend the following:
Add: (c) DFARS 252.225-7059 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region-Representation (JUN 2023) – CHECKED
Amend: (b) DFARS 252.247-7026, Evaluation Preference for Use of Domestic Shipyards — Applicable to Acquisition of Carriage by Vessel for DoD Cargo in the Coastwise or Noncontiguous Trade (Oct 2024) - CHECKED
PART VII. ATTACHMENTS – TUG CONTRACT; add the following:
(b) U.S. Department of Labor Wage Determination, 2015-0213, Rev. 42
(c) Shipyard Data Information Spreadsheet; As outlined in relevant Parts V, VIII, and IX below, submission of an offer requires the submission of relevant shipyard data information for all Jones Act vessels owned or controlled by the offeror.
PART VIII. INSTRUCTIONS TO OFFERORS; add/amend the following:
AMEND PART VIII(m) to read: Evidence of USCG Certificate of Inspection (COI), Certificate of Documentation (COD), and ABS Class, as applicable.
AMEND PART VIII(n) to read: Vessel specification sheet to include pictures of the vessel.
ADD PART VIII(o) to read: FAR 52.219-14 Limitations on Subcontract Compliance. Offerors shall provide what estimated percentage of work/award will be completed/paid to subcontractors for this solicitation if any. If offeror plans to subcontract work for this solicitation, offerors shall provide whether the subcontractor is a small or large business for all subcontractors that will be completing work for this solicitation.
PART IX. FAR 52.212-2 EVALUATION; AMEND THE FOLLOWING:
AMEND PART IX(a)(3) to read as follows:
In selecting the lowest price, technically acceptable offer, the following factors will be considered, taking into account domestic shipyard usage:
1. Technical
2. Price
Add PART IX(d) to read as follows:
Solicitation Compliance. The offeror’s proposal will be reviewed for compliance with the submission requirements outlined in Part VIII(a)(12). Failure to provide any of those submission requirements may result in a proposal being not eligible for award.
THIS CONCLUDES THE CHANGES TO PART I, TUGCON BOX 7
(TERMS/CONDITIONS/ATTACHMENTS ADDED, DELETED OR MODIFIED).
Signed: CHRISTOPHER TOMLIN, Contracting Officer, MSC, N103A https://www.acquisition.gov/content/52212-2-evaluation-commercial-items
| Add: special requirements: |
| Add PART IX(d) to read as follows: |
| Solicitation Compliance. The offeror’s proposal will be reviewed for compliance with the submission requirements outlined in Part VIII(a)(12). Failure to provide any of those submission requirements may result in a proposal being not eligible for aw... |
File details come from the government source that posted it. Updated .