This is a Performance Work Statement (PWS) for the inspection and opening of AS-39 turbines for the Department of the Navy Military Sealift Command. The PWS outlines the technical and administrative requirements for Original Equipment Manufacturer (OEM) services related to AS-39 turbine maintenance and inspection activities. The work encompasses comprehensive opening, inspection, and assessment procedures to ensure turbine operability and compliance with naval specifications. The statement establishes performance standards, quality assurance requirements, and documentation protocols that the contractor must follow throughout the inspection process, including detailed reporting of findings and condition assessments of turbine components.

The PWS specifies contractor responsibilities for executing inspections in accordance with OEM technical manuals and Navy-approved procedures, including preparation of inspection reports with photographic documentation and recommendations for repair or replacement of identified defects. The contractor must maintain compliance with all applicable naval safety standards and quality control measures throughout the work scope, with particular emphasis on detailed component-level analysis and accurate technical documentation to support maintenance and operational decision-making by Military Sealift Command personnel.

View the file

Other files

File Type Posted
N3220527Q7045 Other than Full and Open.pdf PDF
Solicitation - N3220527Q7045.pdf PDF
15-4341.txt TXT text file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USS LAND and USS CABLE

( AS 39 Class )

PROPULSION/GENERATION MACHINERY
CONTRACT NO. N00000-00-X-0000
ITEM NO. XXXX
CATEGORY "A"
2026-08-06
AS-39 TURBINES OPEN AND INSPECT
Pete DeSimone

1. ABSTRACT

1.1. This item describes the requirements to open and inspect the HP Turbine, LP turbine, and SSTGs for refurbishment consideration as future AS Class spares.

2. REFERENCES/ENCLOSURES

2.1. References:

2.1.1. Technical Manual 0341-LP-138-3000, Main Propulsion Steam Turbines and Gears

2.1.2. NAVSEA Tech Manual 0961-LP-071-014, Ship Service Generator

2.2. Enclosures:

2.2.1. Photos of Units

3. ITEM LOCATION/DESCRIPTION

3.1. Location/Quantity

3.1.1. Quantity: One (1) Main Propulsion HP Turbine Assembly

3.1.2. Quantity: One (1) Main Propulsion LP Turbine Assembly

3.1.3. Quantity: Four (4) SSTG Turbine Assemblies

3.2. Item Description/Manufacturer’s Data:

3.2.1. HP Turbine Description (QTY 1)

APL:051150034
Serial Number:654259
Mfr:SIEMENS DEMAG DELAVAL
Mfr Dwg:H2729ASSYH2730
Type:HIM
EQUIP SPEC:MILT17600
Design Speed:6,126 RPM
No. Stages:9
Operating Steam Pressure:600 PSIG
Operating Steam Temperature850 Deg F
Weight of HP Rotor:1,855 lbs
Bearing Span:66-1/2”
Rotor LOA:78-1/2”
Maximum Rotor Diameter:23.455”
Weight of Upper Casing Half:5,650 lbs

3.2.2. LP Turbine Description (QTY 1)

APL:051150035
Mfr:SIEMENS DEMAG DELAVAL
Mfr Dwg:H2729 & H2731
Type:HIM
EQUIP SPEC:MILT17600
Design Speed:5,322 RPM
No. Stages:6 Single Flow & 2 Astern
Operating Steam Pressure:600 PSIG
Operating Steam Temperature850 Deg F
Weight of LP Rotor:5,650 lbs
Bearing Span:76”
Rotor LOA:90-1/4”
Maximum Rotor Diameter:45-1/2”
Weight of Upper Casing Half:8,400 lbs

3.2.3 SSTG Turbine Description (QTY 4)

Mfr: DeLaval
Type: GJ
Speed: 8929 RPM
Steam Pressure: 570 PSIG
Steam Temperature: 850 Deg F.
Exhaust Pressure: 4 HgA
Overspeed Trip Speed: 9,825-10,000 RPM
Nr Turbine Rotor Wheels: 8 Rows
Bearing Span: 51-1/4”
Rotor Dimension: Approx 26” Dia. x 72” L
Rotor Weight: 1,003 lbs
Turbine Upper Case with Diaphragms Weight: 2,245 lbs

4. GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None

5. NOTES:

5.1. MSC REP is Peter DeSimone, 757-434-2772, peter.c.desimone2.civ@us.navy.mil

6. QUALITY ASSURANCE REQUIREMENTS: None additional.

7. STATEMENT OF WORK

7.1. The contractor shall provide crane and rigging support to transfer the turbines between government transportation and the contractor’s shop.

7.2. Turbine Assemblies listed in paragraph 3.0 (HP, LP, and SSTGs):

7.2.1. Disassemble the turbines to remove the rotors and diaphragms for inspection. Conduct inspection of the rotors and diaphragms and provide a CFR outlining the results of the inspection and a recommendation if the equipment can be serviced to fit-for-service condition. For bidding purposes assume the inspections shall include fly ash blast, wet MP NDT and close visual inspection of the rotors and diaphragms.

7.2.2. Remove and inspect SSTG Reduction Gears and provide recommendation for servicing to return to a fit-for-service condition.

7.2.3. Recommend any additional candidate parts for inspection and candidate refurbishment to include the nozzle block. Additional parts will be considered as a Change Order.

7.2.4. Dispose of remaining turbine parts (e.g. casings, coolers, frames, etc)

7.2.5. Refurbishment of components will be addressed by a Change Order or a separate Purchase Order.

7.3. Generators:

7.3.1 Remove the generators from each SSTG and crate for Government pick up.

7.3.2 Government will pick up generators within 14 calendar days of notice.

7.3.3 Provide crate cube and weights for each of the generator crates. Label each crate as follows:

Requisition No. (To be provided by MSCREP) Generator, Ships Service Turbine Quantity 1 Gross weight and container volume (cube)

7.3.4 Provide crane and rigging to load crate on Government transport.

7.4. Manufacturer’s Representative:

7.4.1. Contractor shall provide the on-site services of the OEM or an MSC N7 approved non-OEM to complete all work on the turbines. The OEM and MSC N7 approved turbine companies are listed below.

Curtis Wright 1101 Cavalier Blvd Chesapeake, Virginia 23323 POC: Bryan Murphy Phone: (757) 592-0973 E-mail: bryan.murphy@siemensgovt.com MI-Tech Inc.

6685 Jet Park Road North Charleston, SC 29406 POC: Bill Totten Phone: (843) 553-2743 E-mail: bill@mi-tech.net PJ Schwalbenberg & Associates Inc 26 Spear Mill Road Cushing, Maine 04563 POC: Pete Schwalbenberg Phone: (207) 354-0700 E-mail: office@turbinesandgears.comTurboGen

8. GENERAL REQUIREMENTS – None Additional.

Enclosure 2.1 – Main Engine High Pressure Turbine

Enclosure 2.2 – Main Engine Low Pressure Turbine

SSTG

0286 - 9 image1.jpeg image2.jpeg image3.jpeg image4.jpeg image5.jpeg image6.jpeg

File details come from the government source that posted it. Updated .