Questions and Answers 2.0- Sources SoughtN3220527Q7019 - Copy.pdf

PDF 104 KB Posted

Attached to
SHRED SERVICES
Solicitation number
N3220527Q7019
Issued by

About this file

This document is a Questions and Answers (Q&A) file addressing industry inquiries regarding a federal contract for document destruction services at Naval Station Norfolk. The government provided clarifications on ten substantive issues raised by potential offerors.

The contract requires monthly shredding services on the second Thursday of each month, with all destruction occurring on-site at government locations. Contractor employees must hold SECRET clearance and a Courier Card, with security requirements applying to both prime contractors and subcontractors, though the government will only contract directly with the prime. Paper shredding equipment must be listed on the NSA Evaluated Products List for SECRET paper destruction, and contractors may submit equipment specifications to NSA for evaluation. All destroyed material by-products must be fully destroyed and unrecoverable, with only residue—not intact media—permitted to leave the installation. The contract includes provisions for up to two pier side events per the performance period (two per base period and two per option year for longer-term contracts), with non-regular shred events requiring 14-day advance notice. Approximately 1,003 devices per month are anticipated but may fluctuate. All collection bins must be 64-gallon capacity, with 10 bins required at Building X-132 for the short-term contract and 28 bins for the long-term contract. The government will provide a Quality Assurance Surveillance Plan (QASP) and a fillable pricing document at the time of formal solicitation, with pricing to be included for scheduled monthly service, platter hard drives, solid state drives, cell phones or tablets, and pier side events.

View the file

Other files

File Type Posted
Questions and Answers - Sources Sought.pdf PDF
SSN Secret Shred PWS 20261026.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

a. Service frequency. PWS 3.1 states services are monthly (second Thursday of each month), while the Performance Requirements Summary lists “Bi-Weekly Shredding Services.” Please confirm the frequency is monthly.

Changed to monthly in the revised PWS.

b. Reference number. The PWS header lists N3220524Q7019, while the notice is N3220527Q7019.

Changed to monthly in the revised PWS.

c. Clearance requirements. PWS 3.3.2 and 4.2.1 require each contractor employee to hold a SECRET clearance and a Courier Card. It would help industry to know whether a DD Form 254 and a SECRET facility clearance will be required, and whether that requirement applies to the prime contractor, the subcontractor that performs the destruction, or both. This will directly affect how many small businesses can compete.

The Security requirements apply to both the prime and sub. The GOV will only deal with the Prime.

d. Paper destruction standard. Please state whether the paper shredding equipment used for classified paper must be listed on the current NSA/CSS Evaluated Products List for paper shredders. Many mobile shredding trucks are NAID AAA certified but are not NSA listed for SECRET paper, so stating the exact standard will help offerors price the correct equipment.

The equipment used must be on the NSA Evaluated Products List. Contractors can submit their equipment specifications to NSA for evaluation.

e. Section 5.1.2 wording. This section refers to the vendor transporting by-products to “its secure facility in Norfolk, Virginia” and to specific certifications (R2V3, ISO 9001, ISO 14001, ISO 45001 and DLA). We recommend wording such as “a secure facility” and “or equivalent” so that qualified small businesses without those exact certifications or a Norfolk facility are not excluded.

All destroyed material by products will be fully destroyed in accordance with the PWS directives. Material shall be unrecoverable once destroyed.

f. On-site destruction. PWS 4.1 and 4.2 require all destruction on site, while 5.1.2 describes removing by-products from the installation. Please confirm that only destroyed residue (not intact media) may leave Naval Station Norfolk.

All material shall be destroyed on-site at the Governments’ locations and disposed of appropriately by the Contractor per the PWS.

g. Section 5.3. The sentence ends with “the contractor shall include the pricing in the contract for the following:” with no list after it. Please confirm the intended pricing lines (for example, per scheduled monthly service, per platter hard drive, per solid state drive, per cell phone or tablet, and per pier side event).

5.3 refers to a fillable document that will be made available at the time of solicitation.

h. Surveillance reference. PWS 4.5 refers to surveillance methods in Section 10.0, but the PWS ends at Section 9.0.

4.5 refers to the Quality Assurance Surveillance Plan (QASP) that will be provided at the time of solicitation.

i. Pier side events. Please confirm whether “not to exceed two events” is per year or per period of performance.

For the short-term contract, there is a potential for two pier side events per the period of performance. For the longer-term contract there is potential for two pier side events for the base period and two pier side events per each option year.

j. Non-regular events. Please provide the expected number of non-regular shred events per year, and confirm whether the annual device quantities in 5.4 and 5.5 are spread across those events.

For the short-term contract, it’s expected to require the shredding listed in 5.4 and 5.5 spread throughout the life of the contract. It is anticipated that there may be 1003 devices per month, however this number may fluctuate. The Contractor shall be notified 14 days in advance of a non-regular event and at that time the actual numbers may be provided.

k. Bins. Please state the required bin size (for example 32, 64 or 96 gallon) and whether the 28 bins at Building X-132 are at one collection point or spread through the building.

All bins shall be 64 gallons for each location. For the short-term contract there is a requirement for 10 bins at X132. For long term contract, there will be 28 bins at X132.

File details come from the government source that posted it. Updated .