Work Item Index Report.docx

DOCX document 87 KB Posted

Attached to
USNS TIPPECANOE (T-AO 199) Mid-Term Availability
Solicitation number
N3220526R6070
Issued by

About this file

This is a Work Item Index Report for the USNS TIPPECANOE (T-AO 199) Mid-Term Availability scheduled for March 25, 2027 through June 8, 2027. The document serves as a comprehensive catalog of maintenance and repair work items organized by functional category, with each item assigned a specific work code and classification status (NSP for non-scope items or A for active scope items). The report lists approximately 160+ individual work items spanning nine major sections: General Services and Requirements, Hull and Structural, Propulsion Machinery, Electrical, Communication and Navigation, Auxiliary Machinery, Habitability Outfitting and Furnishings, HVAC, Drydocking, and Underway Replenishment Equipment.

General Services work items include requirements for project planning, office furnishings, safety procedures, information technology services, and vessel delivery/redelivery. Structural work encompasses hull preservation, deck repairs, non-destructive testing, cargo tank maintenance, and corrosion prevention across multiple vessel sections. Machinery and system work includes maintenance of the main engine, reduction gear, air compressors, generators, and auxiliary boilers, with many items including inspection and certification intervals ranging from annual to 10-year cycles. Electrical, communications, navigation, and safety systems work covers switchboard cleaning, battery replacement, radar and ECDIS service, fire detection and suppression systems, lifeboat and life raft certification, and personnel elevator inspections. The contractor's place of performance shall be their own facility located on the West Coast, and the contract is open to all responsible sources.

View the file

Other files

File Type Posted
J-14-TechnicalNDA.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Print Date:

03/20/2026

MSC Corrective Maintenance

Engineering Report

USNS TIPPECANOE

(TAO 199)

2027 MTA

2027-03-25 - MTA

WORK ITEM INDEX REPORT

Item Number
Title
Category
SECTION 0000
GENERAL SERVICES AND REQUIREMENTS
0001
TAO187-SWI-SCOPE GENERAL REQUIREMENTS AND
NSP
0002
TAO187-SWI-TECHNICAL AND MANUFACTURERS
NSP
0003
TAO187-SWI-APPROACH BERTHING AND MOORING
NSP
0004
TAO187-SWI-TESTING AND QUALITY ASSURANCE
NSP
0005
TAO187-SWI-ELECTRICAL SAFETY PROCEDURE
NSP
0006
TAO187-SWI-HEAVY WEATHER PLAN
NSP
0007
TAO187-SWI-COLD WEATHER PLAN
NSP
0010
TAO187-SWI-FURNISH OFFICE FOR OVERHAUL
A
0011
TAO187-SWI-GENERAL SERVICES FOR SHIP
A
0012
TAO187-SWI-INFORMATION TECHNOLOGY SERVICES
A
0013
TAO187-SWI-INTEGRATED PROJECT PLANNING AND
A
0014
TAO187-SWI-WEIGHT AND MOMENT REPORT
A
0015
TAO187-SWI-ILS-GFM
A
0016
TAO187-SWI-FIRE PROTECTION AND SHIPS SAFETY
A
0017
TAO187-SWI-HANDLING SHIPS STORES
A
0018
TAO187-SWI-DELIVERY AND REDELIVERY OF THE VESSEL
A
0019
TAO187-SWI-SHIPBOARD ACCESS AND SECURITY
A
0020
TAO187-SWI-GAS FREE CERTIFICATES
A
0021A
TAO187-SWI-CLEAN AND GAS FREE TANKS VOIDS
A
0022
TAO187-SWI-MACHINERY SPACE TURN-OVER DOCK
A
0023
TAO187-SWI-HAZARDOUS WASTE DISPOSAL AT A
A
0030
TAO187-SWI-CONTINUATION OF SERVICES
B
SECTION 0100
HULL AND STRUCTURAL
0101
TAO199-CSI-KINGPOST NON-DESTRUCTIVE TESTING (1 YR)
A
0102A
TAO187-CSI-CLOSE-UP SURVEY AND THICKNESS GAUGING
A
0104
TAO199 CSI DECK PRESERVATION
A
0105
TAO199_OVERBOARD HAND RAILING SEGMENT
A
0106
TAO199_DECK EXPANSION JOINT PRESERVATION AND
A
0107
TAO199_ABS TYPICAL PUNCH LIST STANDARD REPAIRS
A
0108
TAO199_AFFF AFT 1-120-1 & FWD 01-60-1 ROOMS DECKING
A
Page 1 of
5
Print Date:
03/20/2026

MSC Corrective Maintenance

Engineering Report

0109
TAO199 CSI CARGO TIE DOWNS REPLACEMENT
A
0110
TAO199_CARGO TANK ULLAGE COVER GASKETS
A
0111
TAO187-CSI-NAVAIR FLIGHT DECK CERTIFICATION (3 YR)
A
0112
TAO199_01 DECK UNDERDECK STIFFENER RENEWAL
A
0113
TAO199_VARIOUS EXPOSED DECK STEEL & PIPE RENEWAL
A
0114
TAO199_DECK PRESERVATION & DRAIN PIPE RENEWAL
A
0115
TAO199_MAST AND BRIDGE WING PRESERVATION
A
0116
TAO199_FORWARD, AFT, PORT, STBD HOUSE & WINDOW
A
0117
TAO199_HOUSE WINDOW & DOOR PRESERVATION
A
0118
TAO199_STEERING GEAR ROOM SIDE SHELL ROOMS DECK
A
0119
TAO199_TANK DECK NON-SLIP (ASA) RENEWAL
A
0120
TAO199_BULWARK STIFFENER - STRINGER RENEWAL
A
0121
TAO199_FAIRLEADS AND CAPSTANS OVERHAUL
A
0122
TAO199_AFT TRUCK TUNNEL OVERHEAD & BULKHEADS
A
0124
TAO199_IMO EXPOSED DECK SIGNAGE RENEWAL
A
0126
TAO199_06 FAN ROOM STEEL RENEWAL
A
0127
TAO199_LADDER CLIMBER SAFETY RAILS
A
0155A
TAO187-CCSI-TANK VENT INSPECTION (5 YR)
A
0156
TAO187-CCSI-FLIGHT DECK PRESERVATION (3 YR)
A
0162
TAO187-CCSI-WATERTIGHT CLOSURE INSPECTION (5 YR)
A
0165
TAO187-CCSI-BILGE PRESERVATION (10 YR)
A
0169D
TAO187-CCSI-LOW PROFILE NON-SLIP WEATHERDECK
A
0169E
TAO187-CCSI-LOW PROFILE NON-SLIP WEATHERDECK
A
0169F
TAO187-CCSI-LOW PROFILE NON-SLIP WEATHERDECK
A
0169G
TAO187-CCSI-LOW PROFILE NON-SLIP WEATHERDECK
A
0171A
TAO187-CCSI-WASTE WATER SLUDGE TANK
A
0171B
TAO187-CCSI-WASTE WATER SLUDGE TANK
A
0171C
TAO187-CCSI-WASTE WATER SLUDGE TANK
A
0171D
TAO187-CCSI-WASTE WATER SLUDGE TANK
A
0171E
TAO187-CCSI-WASTE WATER SLUDGE TANK
A
0171F
TAO187-CCSI-WASTE WATER SLUDGE TANK
A
0171G
TAO187-CCSI-WASTE WATER SLUDGE TANK
A
0171H
TAO187-CCSI-WASTE WATER SLUDGE TANK
A
0171I
TAO187-CCSI-WASTE WATER SLUDGE TANK
A
0173A
TAO187-CCSI-PRESERVE AND PAINT 2K SQFT TOPSIDE (1
A
0173B
TAO187-CCSI-PRESERVE AND PAINT 2K SQFT MACHINERY
A
0174B
TAO187-CCSI-CARGO PETROLEUM TANK PRESERVATION
A
0174F
TAO187-CCSI-CARGO PETROLEUM TANK PRESERVATION
A
0174H
TAO187-CCSI-CARGO PETROLEUM TANK PRESERVATION
A
0174O
TAO187-CCSI-CARGO PETROLEUM TANK PRESERVATION
A
0174R
TAO187-CCSI-CARGO PETROLEUM TANK PRESERVATION
A
Page 2 of
5
Print Date:
03/20/2026

MSC Corrective Maintenance

Engineering Report

0180
TAO199_STEEL REPAIR - Pipe Containement - Halon Cylinder
A
SECTION 0200
PROPULSION MACHINERY
0207
TAO187-CSI-MAIN ENGINE CLUTCH AND COUPLING
A
0208
TAO187-CSI-MAIN ENGINE SHAFT BRAKE (5 YR) (SCSI)
A
0209
TAO187-CSI-OIL MIST DETECTOR CALIBRATION AND
A
0213B
TAO187-CSI-MAIN REDUCTION GEAR INSPECTION - FALK
A
0214
TAO187-CSI-MAIN ENGINE AIR COOLERS, WATER SIDE -
A
0215
TAO187-CSI-MAIN ENGINE LOCAL CONTROL PANEL
A
0218
TAO187-CSI-ANNUAL CONTROL PANEL AND CONSOLE
A
0254B
TAO187-CCSI-BEARING INSPECTION (5 YR) (SCSI)
A
SECTION 0300
ELECTRICAL
0305
TAO187-CSI-PTO SERVICE- SIEMENS (1 YR)
A
0309A
TAO187-CSI-GYRO UPS BATTERIES - REPLACE (3 YR)
A
0312
TAO187-CSI-REPLACE GAI.C BATTERIES (5 YR)
A
0351
TAO187-CCSI-SWITCHBOARD CLEANING (2.5 YR)
A
0352
TAO187-CCSI-LOAD CENTER CLEANING (2.5 YR)
A
0353
TAO187-CCSI-THERMOGRAPHIC SURVEY (1 YR)
A
0354
TAO187-CCSI-GENERATOR CLEANING AND INSPECTION (5
A
SECTION 0400
COMMUNICATION AND NAVIGATION
0401
TAO187-CSI-HERO ASSESSMENT CERTIFICATION (5 YR)
A
0403
TAO187-CSI-OE-82 UHF SATCOM ANTENNA OVERHAUL (3
A
0404
TAO187-CSI-DOPPLER SPEED LOG MAINTENANCE (2.5 YR)
A
0405
TAO187-CSI-TV DTS SERVICE (1 YR)
A
0408
TAO187-CSI-WIND SPEED INDICATING AND MEASURING
A
0451
TAO187-CCSI-ANNUAL RADAR SERVICE
A
0452
TAO187-CCSI-ANNUAL ECDIS SERVICE (SCSI)
A
0453
TAO187-CCSI-ANNUAL GYRO SYSTEM PM
A
0454
TAO187-CCSI-ANNUAL VDR RECERTIFICATION
A
0455
TAO187-CCSI-ANNUAL RADIO COMMUNICATION
A
0456
TAO187-CCSI-MAGNETIC COMPASS SERVICE (2 YR)
A
0459
TAO187-CCSI-ECHO SOUNDER SERVICE (2.5 YR)
A
0460
TAO187-CCSI-ANNUAL INSPECTION OF MANUALLY
A
SECTION 0500
AUXILIARY MACHINERY
0504
0504_A_Replace AFFF Piping
A
0512B
TAO187-CSI-AUXILIARY BOILER SURVEY AND HYDRO -
A
0518A
TAO187-CSI-FUEL OILLUBE OIL PURIFIER SERVICE -
A
Page 3 of
5
Print Date:
03/20/2026

MSC Corrective Maintenance

Engineering Report

0520
TAO187-CSI-SHIPS SERVICE AIR COMPRESSOR SERVICE (1
A
0522
TAO187-CSI-START AIR COMPRESSOR OVERHAUL (4 YR)
A
0524A
TAO187-CSI-AIR COMPRESSOR, HIGH PRESSURE - SERVICE
A
0526
TAO187-CSI-EMERGENCY DIESEL GENERATOR - SERVICE (3
A
0530
TAO187-CSI-ENGINE ROOM OWS SERVICE AND OCM
A
0540
TAO187-CSI-INCINERATOR SERVICE (5 YR)
A
0544
TAO199_CONEX BOX SERVICE AND UNDER DECK
A
0552
TAO187-CCSI-HOSE REPLACEMENT (5 YR)
A
0554
TAO187-CCSI-INSPECT TEST AND CERTIFY MACHINERY
A
0560
TAO187-CCSI-PERSONNEL ELEVATOR INSPECTION AND
A
0561B
TAO187-CCSI-GAUGE CALIBRATION (2.5 YR)
A
0562
TAO187-CCSI-SCBA ANNUAL INSPECTION (INTERSPIRO)
A
0563B
TAO187-CCSI-SCBA COMPRESSOR AND FILLING STATION
A
0565C
TAO187-CCSI-FIXED GAS FIREFIGHTING SYSTEM
A
0569A
TAO187-CCSI-FIRE AND SMOKE DETECTION AND ALARM
A
0570
TAO187-CCSI-PORTABLE FIRE EXTINGUISHER SERVICE (1
A
0571
TAO187-CCSI-FIRE AND SMOKE DAMPER SERVICE (1 YR)
A
0572
TAO187-CCSI-DEEP FAT FRYER AND RANGE HOOD FIRE
A
0573
TAO187-CCSI-FIRE STATIONS AND HOSES (1 YR)
A
0574A
TAO187-CCSI-FIRE DOORS AND SHUTTERS- SLIDING
A
0574B
TAO187-CCSI-FIRE DOORS AND SHUTTERS- JOINER DOORS
A
0574C
TAO187-CCSI-FIRE DOORS AND SHUTTERS- ROLLER
A
0578
TAO187-CCSI-BOLL AND KIRCH AUTO FLUSH LO FILTER
A
0579
TAO187-CCSI-BOLL AND KIRCH AUTO FLUSH FO FILTER
A
0580
TAO187-CCSI-AUXILIARY BOILER COIL REPLACEMENT (10
A
0581
TAO187-CCSI-OXYGEN BOTTLE INSPECTION AND HYDRO (5
A
SECTION 0600
HABITABILITY OUTFITTING AND FURNISHINGS
0601
TAO187-CSI-GALLEY EQUIPMENT SERVICE (2.5 YR)
A
0602
TAO187-CSI-LAUNDRY EQUIPMENT SERVICE (5 YR)
A
0604
TAO199_JOINER BULKHEAD AND SHOWER REPAIRS
A
0610
TAO187-CSI-SPIDERMAN BASKETS OVERHAUL (1 YR)
A
0648
TAO199_PRESERVATION OF RHIB AND LIFE BOAT DAVITS
A
0651A
TAO187-CCSI-ANNUAL LIFEBOAT INSPECTION
A
0651B
TAO187-CCSI-ANNUAL LIFEBOAT DAVIT INSPECTION
A
0653A
TAO187-CCSI-ANNUAL RESCUE BOAT INSPECTION
A
0653B
TAO187-CCSI-ANNUAL RESCUE BOAT DAVIT INSPECTION
A
0655
TAO187-CCSI-IMMERSION SUIT SERVICE (3 YR)
A
0656
TAO187-CCSI-ANNUAL LIFE RAFT CERTIFICATION
A
0657
TAO187-CCSI-ACCOMMODATION LADDER INSPECTION (1
A
0659
TAO187-CCSI-PILOT BOARDING EQUIPMENT AND
A
Page 4 of
5
Print Date:
03/20/2026

MSC Corrective Maintenance

Engineering Report

0660
TAO199 CCSI DECK TILE REPLACEMENT
A
0662
TAO187-CCSI-DEEP FAT FRYER INSPECTION (1 YR)
A
0668
TAO187-CCSI-INSPECT, TEST AND CERTIFY MATERIAL
A
0669
TAO187-CCSI-BATTERY REPLACEMENT MATERIAL
A
0674
TAO187-CCSI-LIFEBOAT AND DAVIT SERVICE AND
A
SECTION 0800
HVAC
0851
TAO187-CCSI-GALLEY VENTILATION SYSTEM AND
A
0852
TAO187-CCSI-LAUNDRY VENT CLEANING (2.5 YR)
A
SECTION 0900
DRYDOCKING
0958
TAO187-CCSI-PROPELLER CLEAN AND POLISH AND HULL
A
SECTION 1000
UNDERWAY REPLENISHMENT EQUIPMENT
1054
TAO187-CSI-HIGHLINE SPANWIRE ASD FAN SHROUD AND
A
1062
TAO187-CSI-HIGHLINE SPANWIRE WINCH BAND BRAKE
A
1064
TAO187-CSI-SLIDING BLOCK ELECTRIC BRAKE
A
1068
TAO187-CSI-SPANWIRE ASD REFURBISHMENT (10 YR)
A
1078
TAO187-CSI-PRESERVE DOUBLE PROBE RECEIVER BASE
A
Page 5 of
5

image1.jpeg

File details come from the government source that posted it. Updated .