JA P00006 Enclosure Redacted.pdf
PDF 62 KB Posted
- Solicitation number
- N3220526C1204P00006
About this file
This is a Justification and Analysis (J&A) enclosure document detailing ship maintenance and repair work items for federal contracting purposes.
The document identifies six work items (CCOs 033, 036, 066 REV 1, 067 REV 1, 068, and 090) required for ship operations and regulatory compliance. CCO 033 covers firemain repairs to ensure a leak-free system as required by the American Bureau of Shipping (ABS). CCO 036 addresses installation of a Bridge Wing RPM indicator for ship safety and navigation. CCOs 066 and 067 (both Revision 1) involve ABS and U.S. Coast Guard (USCG) electrical and mechanical repairs, respectively. CCO 068 covers ABS testing also mandated by regulatory authorities. CCO 090 addresses inspection and repair of a hole discovered in the No. 2 Port ballast tank, which requires both USCG and ABS authorization. All work items are justified as necessary for regulatory compliance, ship safety, and mission-essential operations.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| JA P00006 New Work.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Enclosure to J&A No. N10426C1204P00006 CCO WI Description/Justification
033 599-Firemain Repairs Firemain Repairs-ABS requires the firemain to be leak free.
402-Bridge Wing RPM Indicator
Bridge Wing RPM Indicator- This work is regulatory, mission essential and for Ship safety and navagation.
066 REV 1 599-ABS Repairs Electrical Required by ABS/USCG
067 REV 1
599-ABS Repairs Mechanical Required by ABS/USCG
068 599-ABS Testing Required by ABS/USCG
115-No. 2 Port Ballast Tank Inspection
A hole was found in No. 2 Port ballast tank. This will be a USCG and ABS required repair.
Sheet1
File details come from the government source that posted it. Updated .