MSC AFFF Reserve Management Contract – Performance Work Statement
This is a Performance Work Statement (PWS) for the U.S. Navy's Military Sealift Command (MSC) outlining requirements for commercial storage, preservation, and shipping preparation of government-owned fluorinated firefighting foam (AFFF) concentrates. The contractor must provide secure, environmentally controlled warehouse facilities within 50 miles of MSC Headquarters in Norfolk, Virginia, capable of storing up to 350,000 gallons maximum of various foam products including National Foam Universal CG-6% and Gold lines, Ansul Ansulite and Jet-X, Solberg ARCTIC, and MIL-F-24385F AFFF in 3% and 6% concentrations. All materials will be received in 208-liter drums, 19-liter pails, and 1,040-liter totes. The contractor must maintain storage temperatures between 35°F and 120°F, implement static placement protocols to prevent unnecessary material relocation, establish a documented physical warehouse location legend with grid coordinates, and perform weekly container and storage area inspections.
The contractor is responsible for receiving, verifying, staging, and preparing GFM for outbound shipment upon authenticated written government request, with acknowledgment required within 4 hours and readiness within 24 elapsed hours (or 12 hours for urgent material). The contractor must load arriving vehicles within one hour and comply with all hazardous materials handling regulations including CERCLA, Clean Water Act, and RCRA. Key deliverables include Monthly GFM Inventory Reports with Warehouse Location Legends (CDRL A001) due by the 5th business day of each month, a Contract Phase-In/Transition Plan due within 15 days of award, incident reports for damage or spills, and a Final Inventory and Phase-Out Report due at contract conclusion. The contract period runs from March 28, 2027 to March 27, 2028, with four one-year option periods and a six-month option extension. The contractor bears liability for spill cleanup costs, material damage caused by negligence, and disposal costs, while the government arranges and pays for routine transportation of shipped materials.
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
MSC AFFF Reserve Management Contract
PERFORMANCE WORK STATEMENT
1 Scope
1.1 Glossary of Terms used in the Performance Work Statement
1.2 References used in the Performance Work Statement
1.3 General Requirements
2 Packing and Marking
2.1 Packing and Handling for Shipment
3 GFM Storage
3.1 GFM
3.2 Facility Requirements
3.2.1 Single Stacked Pallets
3.2.2 Static Placement
3.2.3 Warehouse Physical Location Legend
3.2.4 Compliance with Hazardous Materials Handling Regulations
3.3 Receipt of GFM
3.4 Reports
3.5 Contract Phase In/Out
3.5.1 Phase-In
3.5.2 Phase-Out
3.6 Disposal
4 Period of Performance 5 Contracting Officer Representative 6 Contract Data Requirements List (CDRLs) 7 Performance Requirements Summary
1. SCOPE
The U.S. Navy’s Military Sealift Command (MSC) requires the lawful commercial storage, preservation, and shipping preparation of government-owned fluorinated firefighting foam to support installed foam systems aboard its vessels in accordance with all statutory and regulatory requirements.
Services include receipt, storage, inventory control, preservation, sampling support, outbound preparation, loading, and transition activities expressly identified herein. Routine outbound transportation is Government-arranged. Product transfer between containers and nonemergency disposal require authorization under the applicable contract procedures.
1.1 Glossary of Terms Used in the Performance Work Statement:
The following definitions apply to the terms used in this Performance Work Statement:
AFFF: Aqueous Film Forming Foam AR-AFFF: Alcohol Resistant Aqueous Film Forming Foam FP: Fluoroprotein foam concentrate Mil-Spec: Military Specification CONUS: Continental United States COR: Contracting Officer’s Representative GFM: Government-Furnished Material HEF: High-Expansion Foam CO: Contracting Officer
1.2 References used in the Performance Work Statement
All work shall be performed in accordance with, but not limited to, MSC qualified and authorized practices and procedures, ASTM-D-3951-18 (2023) "Standard Practice for Commercial Packaging", FED-STD-313F (2018) "Material Safety Data, Transportation Data, and Disposable Data for Hazardous Materials Furnished to Government Activities", Legacy Military Specification MIL-F-24385F (2017) "Fire Extinguishing Agent, Aqueous Film- Forming Foam (AFFF) Liquid Concentrate, Six Percent and Three Percent", Title 49, Code of Federal Regulations (49 CFR) "Transportation", and MSC Technical Publications. The Contractor shall obtain lawful access to required publications through official sources or authorized distributors. Changes to incorporated technical requirements shall be addressed through applicable contract procedures.
1.3 General Requirements:
MSC requires the secure, environmentally controlled CONUS commercial storage of government-owned fluorinated firefighting foam concentrates to maintain fleet readiness and ensure chemical reliability. The contractor shall furnish all necessary commercial warehouse facilities, labor, supervision, materials, and material-handling equipment (MHE) required to receive, verify, store, preserve, stage, and handle GFM in full compliance with the terms herein.
2. Packing and Marking The Contractor shall prepare all GFM requested for removal from the storage facility under this contract in accordance with ASTM-D-3951-18 (October 4th, 2023- as amended) "Standard Practice for Commercial Packaging." Preservation, packaging, packing, and marking of all deliverable contract line items must ensure the material is received in a serviceable, ready for issue condition when received at the ultimate destination.
The Contractor shall prepare GFM containers for anticipated shipping in accordance with the requirements of 49 CFR (Code of Federal Regulations) or the applicable modal transport regulation. In addition, compliance with FED- STD 313 (As amended) is mandatory when applicable.
2.1. Packing and Handling for Shipment
Release inventory only upon an authenticated written request from a Government official identified by the CO. Requests shall identify product, lot/container identifiers, quantity, pickup party, destination, priority, any special shipping requirements, and required pickup time.
Release authority does not confer authority to change contract terms.
The contractor shall acknowledge complete request within 4 hours and complete outbound staging and readiness for government pickup within 24 elapsed hours of notification (or 12 elapsed hours for documented urgently needed material). The contractor shall prepare the GFM specified by the government for shipment and provide the government with details of the prepared shipment, including but not limited to the shipment’s weight and dimensions. The contractor will provide access to the facility and storage area for personnel, hired at the government’s expense, to remove the GFM that has been prepared for shipment. The government will arrange for and pay for the shipment of the GFM.
The contractor’s facility shall be equipped with the equipment necessary to load pallets onto a delivery truck in preparation for shipment and equipped to load shipments onto the government arranged delivery truck.
The contractor will ensure all material is properly packed to avoid damage during shipment and comply with Sections 2 and 3 of this PWS.
Readiness occurs when the specified material is packaged, documented, and available for pickup. Load the arriving vehicle within one (1) hour during the authorized pickup window.
Record carrier arrival, loading completion, and pickup delays
The contractor will accept additional GFM to the storage area as requested by the government, for example if a vessel has excess foam concentrate to be removed from the ship and stored in the contractor’s GFM storage area. Additional receipts within established scope and quantity limits shall be serviced under the applicable priced CLINs. GFM Inventory reports (CDRL-
001) substantiate quantities but do not independently authorize compensation. Requirements exceeding established limits require CO authorization through the applicable contractual instrument.
3. GFM Storage
3.1. GFM:
The Government will provide GFM to the Contractor for storage, defined as the following fluorinated firefighting foam concentrate products:
National Foam Universal CG-6% AR-AFFF National Foam Universal Gold 1%/3% AR-AFFF National Foam AER-O-Foam XL-3 Fluoroprotein Ansul Ansulite 3x3 Low Viscosity AR-AFFF Ansul Jet-X HEF Solberg ARCTIC™ 3x3% ATC™ AR-AFFF MIL-F-24385F AFFF, in 3% and 6% concentrations
Attachment [X] identifies estimated initial inventory, container mix, pallet configurations, required capacity, and estimated annual receipt/release workload. Maximum simultaneous storage is 350,000 gallons. The packaging distribution will be in totes, drums and pails The Schedule establishes the storage billing basis and separately identifies applicable handling and transition charges...
3.2. Storage Facility Requirements:
The contractor shall provide storage of all GFM defined in Section 3.1 for Military Sealift Command, Chemical Division Requirements. The GFM shall be provided to the contractor by the government ,with the initial GFM Inventory Report giving an estimated quantity with the maximum being 350,000 total gallons.GFM will be provided in 208-liter (55 gallon) drums, 19-liter (5 gallon) pails, and 1,040-liters (275 gallon) totes.
The contractor’s facility and logistical operations must be equipped to ensure that GFM can be fully prepared, loaded, and ready for transport within the response window requested by MSC or the personnel, hired at the government’s expense, to remove the GFM. Additionally, The storage facility shall be within 50 miles of MSC Headquarters in Norfolk, VA (471 East C St, Norfolk, VA 23511). This requirement supports MSC Engineering personnel to be able to readily access the foam concentrate for sampling for lab analysis and inspection.
Store and maintain the GFM products indoors, away from direct sunlight, within the storage temperature limits of 35°F to 120°F. Monitor representative storage locations using calibrated devices, retain records for 3 years and report excursions within 24 hours. Identify affected inventory and restrict issue pending Government technical disposition.
Maintain inventory in singular designated storage areas with segregation, containment, and drainage controls appropriate to the products and site. Inspect containers and storage areas at least weekly. Follow requirements in section 3.4 and 3.6. Do not commingle products or transfer contents between containers without authorization.
The contractor shall be responsible for the security of the storage area containing this GFM. Security measures shall prevent unauthorized entry to the storage areas.
The Contractor shall provide access to authorized Government representatives, including technical, environmental, property-administration, and quality-assurance personnel. Routine access shall be provided within 48 hours; urgent access within 24 hours. The contractor shall coordinate emergency access immediately, subject to safety controls. Access does not confer authority to change the contract.
The contractor shall store and handle material in a manner that prevents damage to the material, its packaging, and its labeling. Immediately contain leaks and segregate damaged or suspect containers, while preserving original identification. Any damage to material, packaging, or labeling shall be corrected within 7 business days at the contractor’s expense;
labeling damage is defined as damage that renders the original manufacturer’s label unreadable, as determined by the COR. The contractor shall submit a corrective-action proposal within 2 business days. Repackaging, replacement of manufacturer identification, and return of suspect material to issue status require applicable Government authorization.
Cleanup of GFM spills at the GFM staging storage facility shall be at the contractor’s expense and performed in accordance with Section 3.2.4.
Inventory reporting for storage is outlined in Section 3.5 under Monthly GFM Inventory Report & Warehouse Location Legend (CDRL-A001).
3.2.1. Single Stacked Pallets:
Stacking a loaded pallet directly on another loaded pallet or container is strictly prohibited.
Independently supported rack levels are permitted when rated for the loads and configured to meet access, containment, fire-protection, and product-storage requirements.
3.2.2. Static Placement:
The Contractor shall employ a Static Placement Protocol: upon receipt, verification, and initial placement into the contractor's storage facility, all material shall remain secured in its assigned warehouse location on the legend without unnecessary relocation or handling. When planning the static placement protocol, appropriate spacing shall be maintained between every row of material to ensure proper access for inventory checks and maneuverability when called upon to ship any specific material. Maintaining inventory in a fixed, stable location preserves container integrity, protects packaging and labeling from mechanical wear, minimizes material handling risks, and ensures immediate, predictable retrieval upon government call-out. Static Placement Protocol mandates items remain in one spot unless necessitated by an emergency. Except in an immediate facility emergency, the Contractor shall obtain written approval from the COR prior to relocating any pallets.
3.2.3. Warehouse Physical Location Legend
The Contractor’s facility layout shall establish and maintain a clear, documented Physical Warehouse Location Legend (e.g., Grid identifier: Aisle – Bay – Tier/Row – Pallet Position).
• Each individual line item of inventory, lot number, and container type shall be directly mapped to a specific grid coordinate on this legend.
• The legend and current location mapping shall be formally submitted with the Phase-In
Plan and updated monthly in each Monthly GFM Inventory Report & Warehouse Location Legend (CDRL-A001).
3.2.4. Compliance with Hazardous Materials Handling Regulations:
The Contractor shall comply with the Comprehensive Environmental Response, Compensation, and Liability Act (CERCLA) of 1980, 42 U.S.C. §§ 9601-9675; the Clean Water Act (CWA), 33 U.S.C. §§1251-1387; the Resource Conservation and Recovery Act (RCRA), 42 U.S.C. §6901 et seq. (1976); and all other applicable Federal, state, and local rules and regulations that govern the environmental, handling, transportation, staging, recycling, or disposal of hazardous materials and/or hazardous waste occupational-safety, fire-protection, and transportation requirements governing the activities performed.
As applicable, the Contractor shall also comply with all laws, codes, regulations, and ordinances of foreign states that govern the handling, transportation, storage, recycling, or disposal of hazardous materials and/or hazardous waste.
In the event that the Contractor is charged with, or cited for, violating any of the authorities within this section while performing under this Contract, the Contractor shall notify the MSC CO within two calendar days after receipt of a citation or notice of violation affecting performance, and immediately upon permit suspension or restriction affecting performance.. A copy of the citation shall be included with the notice. The Contractor shall be responsible for any and all violations.
3.3. Receipt of GFM
The contractor shall verify quantity, identity, visible container condition, seals, labels, and documentation of the GFM at the time of receipt. Receipt inspection does not certify chemical performance or shipboard suitability. The contractor shall note, describe, and photograph any physical/visible damage or defects to the equipment/packaging and submit to the COR within 12 hours of receipt and segregate suspect material pending Government disposition.
3.4. Reports
The contractor shall submit the following deliverables to provide evidence of compliance with SDS standards and inventory tracking:
• CDRL A001: Monthly GFM Inventory Report & Warehouse Location Legend
• CDRL A002: Contract Phase-In/Transition Plan
• CDRL A003: Damage, Spill, or Security Incident Report
• CDRL A004: Final Inventory and Phase-Out Report
All reports shall be sent to the COR and/or any government personnel designated by the COR.
The COR will compare the contractor’s report with conditions found onsite, to ensure the requirements of Section 3 are met. The COR, or other designated government representatives, will complete this inspection on an annual basis. If the COR determines the requirements of Section 3 are not being met, any violation(s) found will be documented in pictures and writing, the COR and Contracting Officer will meet with the contractor to rectify the issue.
In the event of any damage to the GFM, while in custody of the contractor, immediately perform required emergency actions and regulatory notifications. Notification of damage to the CO and COR shall be reported no later than 4 hours after discovery. The contractor shall submit a preliminary written report within 24 hours and a substantiated root-cause/corrective-action report within 7 business days, identifying unresolved investigation items prepare a damage report with pictures outlining the damage, and conditions that led to the damage in accordance with CDRL-A003 Incident Damage Report. If the government determines that observed damage or condition of the GFM is a result of contractor negligence, the contractor will be responsible for expenses associated with resolution. This includes expenses associated with properly disposing of the material and compensating the government with the original purchase cost.
3.5. Contract Phase In/Out
3.5.1. Phase-In
The awardee shall be responsible for the initial transfer and receipt of GFM. The contractor shall provide a Contract Phase-in/Transition plan (CDRL-A002) draft within 5 DAC and Final revised report, from any feedback from the government, within 15 DAC. The complete transition from the Current Contractor’s Facility in Norfolk, VA (6969 Tidewater Dr., Norfolk, VA 23509) to the approved facility 30 days after contract award. The awardee shall submit a comprehensive transfer plan encompassing the project timeline, transportation logistics, transport security protocols, compliance with PWS Section 3.2.4 and a formal receipt inventory verification process to establish baseline custody and condition. The contractor shall document origin release and destination receipt (including quantity, condition, carrier identification, and transfer dates). Contractual terms governing financial liability remain in full force and effect throughout all transfer and verification activities. Any offerors shall provide an estimate of up to a maximum amount of 285,000 gallons
3.5.2.Phase-Out Upon CO direction, contractor shall reconcile inventory, furnish current records and location data, coordinate authorized successor access, and prepare and load material within established transition limits. Transportation responsibility shall also be the contractor’s (such that the awardee under this contract shall be responsible both for transfer of receipt of GFM upon contract award (phase-in) AND contract conclusion (phase-out). Services beyond the contract term or established limits require contractual authorization. The contractor shall provide a Final Inventory and Phase-Out Report (CDRL-A004) draft 30 day prior to end of contract period of performance with final report be delivered by the end of the period of performance.
3.6. Disposal
Before nonemergency offsite disposal, submit the waste determination, quantity, proposed method, transporter, receiving facility authorization, and required documentation for CO approval following Government environmental review. Disposal shall comply with applicable law and Government disposal requirements per DoW guidelines (https://www.acq.osd.mil/eie/eer/ecc/pfas/tf/policies.html) and Environmental Protection Agency (EPA) regulations (https://www.epa.gov/pfas/interim-guidance-destruction-and-disposal-pfas-and-materials-containing-pf…). Immediate, legally required protective actions shall not await approval. Provide applicable manifests or shipping records, facility acceptance records, quantity reconciliation, and final treatment/disposal documentation identifying the material, method, facility, and completion date. Submit each record of certificate of destruction/disposal within 2 business days after receipt to MSC Environmental Coordinator (MSC_N732_Environmental@us.navy.mil), COR, and CO.
The contractor shall be liable for disposal costs associated with spills, while in the custody of the contractor. Handling and cleanup of spills of the GFM at the GFM storage facility will be in compliance with Section 3.2.4 and in accordance with CDRL-A003 Incident Damage Report
4. Period of Performance
Base: March 28, 2027 to March 27, 2028 Option year 1: March 28, 2028 to March 27, 2029 Option year 2: March 28, 2029 to March 27, 2030 Option year 3: March 28, 2030 to March 27, 2031 Option year 4: March 28, 2031 to March 27, 2032 6-month Option- 52.217-8 March 28, 2032 to September 27, 2032
Options apply only when exercised by the CO. Any extension under FAR 52.217-8 is discretionary and governed by that clause; listed extension dates do not constitute exercise
5. Contracting Officer Representative:
The COR acts within written delegation and may not change scope, price, quantity limits, delivery requirements, or other contract terms. Only the CO may modify the contract. The Contractor shall refer potential changes to the CO and direct its personnel through its designated manager.
COR contact information, including functional mailboxes (e.g., MSC_N7_Chemicals), will be provided to the contractor following contract award.
6. Contract Data Requirements List (CDRLs)
• CDRL A001 - Monthly GFM Inventory Report and Warehouse Location Legend: Initial baseline due within 10 calendar days of intake; updated monthly by the 5th business day of https://www.acq.osd.mil/eie/eer/ecc/pfas/tf/policies.html) https://www.epa.gov/pfas/interim-guidance-destruction-and-disposal-pfas-and-materials-containing-pfas https://www.epa.gov/pfas/interim-guidance-destruction-and-disposal-pfas-and-materials-containing-pfas mailto:MSC_N732_Environmental@us.navy.mil each month.
• CDRL A002 - Contract Phase-In/Transition Plan: Draft due within five (5) calendar days of contract award; final due fifteen (15) calendar days of contract award.
• CDRL A003 - Damage, Spill, or Security Incident Report: Verbal notice within 4 hours;
preliminary written report photos within 24 hours; Root-cause analysis report due within Seven (7) business days
• CDRL A004 - Final Inventory and Phase-Out Report: Final draft due 30 days prior to contract expiration; final due on the final day of the PoP.
7. Performance Requirements Summary (PRS) The PRS is incorporated as Attachment [X] and identifies critical outcomes, PWS references, measurable standards, and assessment methods. Any service deductions or other remedies shall be expressly established and consistent with applicable contract clauses
| 1.1 Glossary of Terms used in the Performance Work Statement |
| 1.2 References used in the Performance Work Statement |
| 1.3 General Requirements |
| 3.1 GFM |
| 3.2 Facility Requirements |
| 3.2.1 Single Stacked Pallets |
| 3.2.2 Static Placement |
| 3.2.3 Warehouse Physical Location Legend |
| 3.2.4 Compliance with Hazardous Materials Handling Regulations |
| 3.3 Receipt of GFM |
| 3.4 Reports |
| 3.5 Contract Phase In/Out |
| 3.5.1 Phase-In |
| 3.5.2 Phase-Out |
| 3.6 Disposal |