SSJ and UnC COMBO DOCUMENT_Lenthall Crane and Hoist Repair.(REDACTED).pdf

PDF 381 KB Posted

Attached to
USNS LENTHALL (HOISTS AND CRANES)
Solicitation number
N3220525Q2182
Issued by

About this file

This is a Justification for Other Than Full and Open Competition (JOFOC) memorandum for an acquisition under the simplified acquisition threshold for crane and hoist repairs on the USNS LENTHALL. The document justifies sole-sourcing to Crane Tech Solutions based on unusual and compelling urgency.

The requirement is for repairs to cranes and hoists that must be completed between January 30 and March 18, 2025, prior to shipyard work. Crane Tech Solutions, located in Portsmouth, VA, has already performed base work inspections and identified necessary repairs. The justification notes that seeking competition would require new base inspections, causing additional costs and delays that would impact shipyard repairs. The requirement was identified on January 3, with a 45-day lead time from purchase order. The work applies to TAO 187 Class Vessels. The document cites both "Other Reasons" and "Unusual and Compelling Urgency" as justification bases, emphasizing that delays would significantly impact the ability to conduct shipyard repairs.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1 Ver 2.0 (01 July 2018)

Date: 07Jan25

MEMORANDUM

Subj: USE OF OTHER THAN FULL AND OPEN COMPETITION FOR AN ACQUISITION UNDER

THE SIMPLIFIED ACQUISITION THRESHOLD

Ref: (a) PR Number(s): _ _________________________________

I. BACKGROUND:

1. In considering the references, FAR 13.106-1(b)(1)(i) states for purchases not exceeding the simplified acquisition threshold, Contacting Officers may solicit from one source if the

Contracting Officer determines that, under the circumstances of the contract action, only one source is reasonably available (e.g., urgency, exclusive licensing, brand-name, or industrial mobilization).

2. As required by FAR 13.106-3(b)(3)(i), this memorandum explains the absence of competition for this acquisition because only one source will be solicited for this requirement (or for a portion of the requirement) and the requirement is not expected to exceed the simplified acquisition threshold.

II. DESCRIPTION OF ITEM OR SERVICE:

1. Provide a description of the item or service required, to include

a) the name of the required source or brand name

Crane Tech Solutions

b) the required delivery date/period of performance and

POP: 30 JAN – 18 MAR 25

c) its intended use.

To repair the cranes and hoists on the vessel prior to the shipyard to allow for removal and servicing of equipment

2. List the source(s) or known vendor(s) who are able to provide the above described item or service.

Crane Tech Solutions

Mobile 918-852-7786 Office

757-405-0311 www.cranetechsolutions.com jsmittle@cranetechsolutions.com

2030 Ponderosa Street, Portsmouth, VA 23701 USA

III. THE DETERMINATION FOR USE OF OTHER THAN FULL AND OPEN COMPETITION IS BASED

ON THE FOLLOWING (select all that apply):

A. ___ Only one responsible source (select all that apply):

2 Ver 2.0 (01 July 2018)

1. __ RESTRICTIVE RIGHTS: the source has established proprietary rights, limited rights in data, patent rights, copyrights, or secret processes in the item or service.

a. Explain what is subject to the restrictive rights.

b. If drawings are included, who is identified as “owning” the drawings.

2. _____ EXCLUSIVE LICENSING AGREEMENTS: The item or service is only available from the Original Equipment Manufacturer (OEM), or there is ONLY ONE authorized distributor or technical representative for the OEM.

a. Identify the OEM and explain the circumstances surrounding why the item or service is only available from the OEM.

b. Identify the distributor / authorized technical representative for the item or service. Provide evidence of the exclusive licensing agreement as an attachment to this document.

(NOTE: If there is more than one distributor / authorized technical representative, then use Part

B – Brand Name.)

3. _x__ OTHER REASON:

a. ___ CRITICAL SHIP EQUIPMENT: The required item is critical ship equipment, the failure of which poses a hazard to the ship, the crew or the environment.

i. SMS Procedure Number:

b. _____ STANDARDIZATION / BRAND NAME: Per MSCs standardization initiative, only the specified make/model of the equipment/parts will satisfy the Government’s needs for additional units or replacement items.

i. Identify Make / Model Number(s):

ii. Identify other vessels with this Make / Model:

All TAO 187 Class Vessels

c. _____ FORM, FIT, AND FUNCTION: Item is direct replacement parts / components for existing equipment and must be compatible in terms of form, fit, and function with existing equipment / configurations.

i. Identify Make / Model of existing equipment:

ii. Describe how the equipment must be compatible with the existing configuration.

d. __x___ OTHER:

3 Ver 2.0 (01 July 2018)

Crane tech Solutions has done the base work inspections and have identified the parts and repairs needed. An open solicitation would require a new base inspection requiring additional fund and time that would not be conducive to getting the work done during the POP. A delay in completion of this repairs will significantly impact our ability to carry out repairs in the ship yard.

4. X__ UNUSUAL AND COMPELLING URGENCY: The supplies or services are of such unusual and compelling urgency that the Government would be seriously injured unless the agency is permitted to limit the number of sources from which it solicits. Urgent requirements are supplies or services that will result in work stoppage, or are mission critical and the routine processing time would injure the Government. The determination that the procurement for the above is an urgent and compelling requirement is based on the following:

a. Date on which the requirement was identified: __03 JAN_________________________

b. Required delivery date / Period of Performance: _30 Jan = 18 March 2025

c. If the difference between a. and b. is more than one week, explain the delay in submitting the requirement.

Researching all options was time consuming___

d. Estimated production lead time: _45 day lead time from PO

e. Explanation of why delivery / commencement of services by the date required is needed: (explain the impact to the mission, any special circumstances or conditions, etc.)

Repairs are needed to be complete before the ship yard in order not to cause delays

f. CASREP Number:

IV. ANTICIPATED DOLLAR VALUE OF PROCURMENT:

V. CERTIFICATIONS AND APPROVALS:

Technical / Requirement Certification: I certify that the facts and representation under my cognizance which are included in this justification are complete and accurate to the best of my knowledge and belief.