0201_A_PHASE_II_AUTOMATION_UPGRADE_AND_GROOM_(TALT_912)_.docx

DOCX document 29 KB Posted

Attached to
USNS TIPPECANOE L3 PHASE II AND GROOM
Solicitation number
N3220519Q9015
Issued by

View the file

Other files

File Type Posted
0201_A_SSJ_and_UnC_-_TIP_FY20_MTA-_PHASE_II_TALT_912_and_GROOM.docx DOCX document
Solicitation.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

USNS TIPPECANOE

T-AO 199

MACHINERY, PROPULSION

April, 2019

ITEM NO. 201 MSC/REC/N751

L-3 PHASE II INSTALL AND AUTOMATION GROOM

1.0 ABSTRACT

1.1 Provide all labor, equipment, and services to replace the existing alarm windows, analog circuits, software and infrastructure and install the T-AO 187 Class automation upgrade known as ‘Phase II’.

1.2 Provide all labor, equipment and services of a Service Engineer to test all the Main Engine automation and control system operations for the Port and Stbd Main Engines, support annual inspection requirements for ABS, and make adjustments to control parameters for optimal engine performance and power distribution.

2.0 REFERENCES/ENCLOSURES:

2.1 REFERENCES

2.1.1 Engine Room Centralized Control System TM No. 0965-LP-110-9010_0_0 (On Board Vessel)

2.1.2 550WI027 TAO ABS Automated Test Procedure

2.1.3 Excel format ABS Test Procedure

2.1.4 ADDA Box Manual

2.1.5 550PL029 TAO Phase II Obsolescence Mitigation Program Rip-Out And Installation Procedure

2.2 ENCLOSURES: None

3.0 ITEM LOCATION/DESCRIPTION

3.1 Control Consoles System

3.1.1 Propulsion Control and Monitoring Console (ERC)

3.1.2 Ship Control Console (SCC)

3.1.3 Main Engine Local Control Console

3.1.4 Main Engine Pneumatic Control Panels

3.1.5 Remote Sensors throughout the ship

3.1.6 Remote Terminal Units (RTUs) 1-14 throughout the ship

3.1.7 Local Control Panels and pushbuttons throughout the ship

3.1.8 Tank Level Indicator System (TLI) Engine Room

3.1.9 Steering Gear alarms

3.1.10 EDG Alarms

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES:

ITEM DESCRIPTION
P/N
QTY
ASSEMBLY, 16-PT ISO ALOG INPUT, 4-20mA
9011A0511-101
2
ASSY, 16-POINT ISOL ANALOG INP +/-10V
9011A0511-301
4
DISPLAY, 32" 4K UHD NON-TOUCHSCREEN
PS2000102-01
6
COMPUTER, COMPACT INTEL Q87
PS2000034-01
3
TRACKBALL, 50mm CASED, USB
PS2000037-01
3
PANEL, ENGINE ROOM CONSOLE (1A1)
D-4706
1
PANEL, ENGINE ROOM CONSOLE (1A2)
D-4707
1
PANEL, ENGINE ROOM CONSOLE (1A4)
D-4708
1
PANEL, ENGINE ROOM CONSOLE (1A5)
D-4709
1
PANEL, ENGINE ROOM CONSOLE (1B5)
D-4710
1
CABLE ASSY, USB TYPE A M/F EXT, 3 MTRS
ECUSBAX-3M
2
MINI DISPLAY PORT, 6 FT BLK
PS2000036-01
5
CRIMP TERMINAL, 24-18 AWG, COPPER/BRASS
39-00-0039
60
CABLE, 6 x 18 AWG SECURITY AUDIO, GREY
PS2000035-01
1
6 PIN FEMALE CONNECTOR TANONET
39-01-2060
10
1454-9F DB-9 Female to 5 Pos Screw Terminal Adapter
1454-9F Rev 5
2
10 ft. 24/7-Gauge 8-Wire CAT6 Ethernet Cable, Black
342397-10
3
7 ft. 24/7-Gauge 8-Wire CAT6 Ethernet Cable, Black
342367-7
4
25 ft. 24/7-Gauge 8-Wire CAT6 Ethernet Cable, Black
584440-25C
2
DIN RAIL, 35MMX7.5MM, SLOTTED, ALUMINUM, 2M
0814681
6
Multiconductor Shielded Cable, 8 Conductor, 18 AWG, 0.81 mm², Slate, 100 ft, 30.5 m
8671808CY SL005
100
Black on White Nylon Cloth Label Printer Cartridge
M21-750-499
1
Spade Vinyl 22-18 AWG Stud 8-10 100/Clam
EB0304-000
100
10 ft. x 1 in. Black Industrial Strength Extreme Tape
91843
1
14 in. Cable Tie - Natural
GT-370ST
100
11 in. Cable Tie - Natural
GT-280STC
100
0.250 Series 16-14 AWG 10/Clam Female Disconnect Fully Insulated Nylon
EB0280-000
40
250 Series 16-14 AWG 10/Clam Male Disconnect Fully Insulated Nylon
EB0277-000
40
DuraSeal Butt Splices 22-18 10/Clam Heat-Shrink
EB0313-000
40
20 Position Interface Module Terminal Blocks - Screw Connection To Rectangular, Male 12-24 AWG
2315049
4

5.0 NOTES:

5.1 Period of Performance:

A) Phase II 11 Nov - 20 Nov, 2019 Ten - (10) Days B) Groom 21 Nov - 9 Dec 2019 Eighteen (18) Days

5.2 Performance Location: Location TBD, assume Sembcorp Marine Repairs & Upgrades Pte, Ltd, Admiralty Road, Singapore, 759956

5.2.1 Sea trails expected to be executed 8 December from contractor yard back to contractor yard. In all cases, transporation arrangements are considered to be in same local area.

5.0 QUALITY ASSURENESS:

5.1 The L-3 Representatives shall preform all work in accordance with all OEM Technical Requirements. The L-3 Representatives shall work with the ABS Attending Surveyor, Chief Engineer, and Port Engineer to determine required testing for commissioning of the system. All testing to be documented and included in the final report.

7.0STATEMENT OF WORK REQUIRED:

7.1 Software Engineer and Service Engineers shall accomplish installation of phase II in accordance with Ref. 2.5. This shall include the removal of the existing alarm panels, analog circuits and associated equipment, installation of new flat panel displays, and associated equipment.

7.2 Provide the services of an Field Service Engineer to accomplish the following:

7.2.1 Accomplish requirements in accordance with reference 2.1.3 Automated Test Procedure using reference 2.1.2 and 2.1.4 as guidance.

7.2.1.1 Accomplish TAO ABS Automated Test Procedure during plant operation.

7.2.1.2 Coordinate testing with Ship’s Force, MSCREP and ABS Surveyor.

7.2.1.3 Record and correct discrepancies

7.3 Provide the services of an L-3 field service technical representative to perform troubleshoot, repair, adjust and test the propulsion control and monitoring systems throughout the ship.

7.3.1 Verify/calibrate main engine and turbocharger rpm indicators and propulsion shaft rpm indicators

7.3.2 Test and demonstrate all propulsion, ship’s service generators, and emergency diesel generator safety shutdowns in the presence of the ABS surveyor.

7.3.3 Demonstrate all safety interlocks: main engine start A type and B type, main engine clutch interlocks A type and B type, Shaft brake, PTO Mode 2 and Mode 3

7.3.4 Demonstrate main engine slowdown controls with overrides.

7.3.5 Demonstrate auto de-clutch and shaft brake on reduction gear lube oil head tank low-low level.

7.3.6 Demonstrate all vital pumps standby auto start.

7.3.7 Verify/calibrate all main engine fuel rack fuel rack position indicators and set main engine cam switches to appropriate fuel rack set point.

7.3.8 Verify/calibrate all propeller pitch indicators.

7.3.9 Verify/test communication between computers and RTUs.

7.3.10 Demonstrate bilge level alarms in the engine room, pump room and motor rooms

7.3.11 Demonstrate steering gear control and alarms.

7.3.12 Attend Dock Trials to demonstrate Load Balance to satisfaction of Chief Engineer.

7.3.13 Attend one (1) day Sea Trial.

7.3.14 Provide final report of repairs accomplished for groom and completed TAO ABS Acceptance Test Procedure (Ref 2.1.4)

8.0 GENERAL REQUIREMENTS: None additional