REVISED STATEMENT OF WORK
View the file
Other files
| File | Type | Posted |
|---|---|---|
| COMBINED_SYNOPSIS_SOLICITATION_REV_APR_1_2019.docx | DOCX document | |
| 19-001_Charts_class_SOW_(T-ALT_7).docx | DOCX document | |
| 8393757_B_Chart_Table_Installation_&_VIDMAR_Relocation.pdf | ||
| 7080803_-.pdf | ||
| COMBINED_SYNOPSIS_SOLICITATION.docx | DOCX document | |
| SOURCES_SOUGHT_NOTICE.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EPF CLASS
(T-EPF 11-14)
| OUTFIT, FURNISHINGS AND HABITABILITY | CONTRACT NO. 19-001 | |
| CHART TABLE INSTALL (T-ALT 7) | 2019-12-04 | |
| ITEM NO. SO 19-001 | MSC – KOZAK | |
| CATEGORY "A" |
1.0 ABSTRACT
This item describes fabrication and installation of two (2)Chart Tables (1-each) in C4I COC Room and Bridge as well as a VIDMAR relocation from the C4I Communications Center to the C4I Transmitter Room During the EPF-11 through 14 Post Delivery Availability (PDA).
2.0 DRAWINGS/REFERENCES
2.1 MSC Drawing No. 601-8393757, Installations and Relocations – Chart Table and VIDMAR
2.2 MSC Drawing No. 803-7080803, Preparation of CAD Drawings for Government Owned Ships
3.0 LOCATION/QUANTITY
3.1 Location
3.1.1 C4I COC Room (03-28-0) – Chart Table
3.1.2 C4I Comms Center (03-37-1) – Remove VIDMAR
3.1.3 C4I Transmitter Room (03-37-2) – Install VIDMAR
3.1.4 Navigation Bridge (04-18-0) – Chart Table
3.2 Quantity
3.2.1 Two (2) Total, One (1) each Chart Table C4I & Bridge
4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICE
4.1 None Additional
5.0 NOTES
5.1 This is a EPF class contract with a separate period of performance for each of the 4 vessels. Specific onsite periods of performance will be provided as each vessel is delivered and enters its respective Post Delivery Availability.
5.2 Performance Periods:
5.2.1 EPF-11: October 01, 2019 – October 31, 2019
5.2.2 EPF-12 (notional): December 10, 2019 - January 10, 2020
5.2.3 EPF-13 (notional): June 10 - July 10, 2021
5.2.4 EPF-14 (notional): December 10, 2021 - January 10, 2022
5.3 Performance Location: Austal USA Shipyard
Vessel Completion Yard Mobile, Alabama
5.4 Port Engineer:
5.4.1 EPF 11: David Kozak
Mobile: (757) 636-4292 Email: david.w.kozak@navy.mil
| 5.4.2 EPF 12: | TBD |
| 5.4.3 EPF 13: | TBD |
| 5.4.4 EPF 14: | TBD |
5.5 For access to the Austal USA Shipyard, Vessel Completion Yard, Mobile, Alabama, the contractor shall make arrangements, furnish all credentials and fulfill requirements for access. The Point of Contact (POC) is lisabower@austalusa.com for Joint Personnel Adjudication System (JPAS) information, security and visitor passes.
5.6 The contractor and all subcontractors, regardless of tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTR’s including but not limited to GTR’s 1 through 7, 22, 23, 26, 28 and 29.
5.7 The contractor shall follow the MSC Lock Out/Tag Out Procedure administered by the vessel’s Chief Engineer.
5.8 If the contractor performs “Hot Work”, the contractor shall furnish the services of a Marine Chemist to provide a Certificate for “Hot Work” and maintain the Certificate throughout the work period.
5.9 The contractor shall be responsible for the removal and replacement of interferences such as, but not limited to, CBG fire panels, bulkhead panels, overhead panels and ventilation duct work.
5.10 The contractor shall be responsible for all requirements for rigging, positioning, and lifting such as but not limited to crane, man-lift and scaffolding.
6.0 QUALITY ASSURANCE REQUIREMENTS
6.1 None Additional
7.0 STATEMENT OF WORK REQUIRED
7.1 Arrangements/Outfitting
7.1.1 Removals
a. Remove deck covering, carpeting and Bulkhead interferences as required to facilitate installations and relocations, using Reference 2.1 as guidance.
7.1.2 Installations
a. Fabricate chart tables using Reference 2.1 as a guide.
i. Chart Tables to be constructed of Aluminum Honeycomb Panel material.
ii. Chart tables rough dimensions of 51” wide x 42” tall x 37 inches deep depending on space available, fit to function. Final dimensions shall be measured to fit installed location on the ship.
iii. Chart Tables shall be constructed of material where the Top and Exterior match surrounding Furniture (Bridge & C4I) with the Top and Body made of Ayrilite, or equal, construction.
iv. The Chart Tables shall be of Special Laminate Bonding to prevent Delamination in Marine Environment.
v. The Chart Tables shall have Rounded Corners and Joiner Fittings for increased Safety and Streamline Finish.
vi. Chart tables shall have at lease 6 drawers sized to fit standard charts.
vii. The Drawers shall be of Ayrilite Construction with Metal Sides/Glides.
viii. The Drawers shall have 100# Duty Rated Ball Bearing Glides.
ix. The Chart Tables shall have Positive Latches (push/pull knobs).
x. The Weight shall not exceed 225lbs each.
xi. The Chart Tables shall meet Marine Furniture Performance Spec. MIL-PRF-32038 and MIL-STD-1623.
b. Install chart table in C4I COC Room (03-28-0), using Reference 2.1 as guidance. One Chart table location is determined in Reference 2.1. The second Chart Table installation location on the Bridge (Port or Starboard) is per Captain’s prerogative.
7.2 Structural
7.2.1 Installations
a. All foundations for new and relocated equipment installed in paragraphs 7.1.2 and 7.1.3 shall be of welded construction and mounted to the deck on a minimum of 8mm thick doubler plate.
7.3 Electrical
7.3.1 No dissimiliar metals are to be installed without proper galvanic isolators provided and installed.
7.4 Preparation of Drawings
7.4.1 Provide final “as-built” drawings to reflect the actual installation configurations for all efforts accomplished in accordance with this work item. All drawings shall be submitted in AutoCAD 2004 format. All submissions will consist of at least three (3) hard copy prints and one (1) electronic copy on CD in AutoCAD 2004 format to the MSCREP (Port Engineer). Drawing numbers will be provided by MSCREP (Port Engineer). Use Reference 2.2 as guidance.
7.4.2 Final “as-built” Drawings to be prepared by the contractor shall include a completed/filled-in “Weight Control Data”, accounting for both the removals and the installations as separate line items. The contractor shall perform calculations necessary to complete/fill-in the data fields on the “Weight Control Data” block.
7.5 Inspection/Test
7.5.1 Completion Test
7.6 Painting
7.6.1 Replace all insulation removed in way of installations with new insulation of the same type. Paint any disturbed areas effected by the installation and removals.
7.7 Marking
7.7.1 Install nameplates, notices, and markings for all new and modified systems in accordance with GTR No. 29.
8.0 GENERAL REQUIREMENTS
8.1 The contractor shall provide all labor, material, special equipment (cranes), tools, make all removals and restorations, remove and replace interferences, rig and unrig, state and unstage, make all disassemblies and subsequesnt reassemblies to accomplish this specification item.
8.2 The contractor shall remove and reinstall all interferences necessary to accomplish this specification item.
8.3 With assistance from the ship’s crew, isolate, tag-out and secure all affected electrical, piping and HVAC systems.
8.4 Provide welder certificates, material certificates and ABS approved weld procedures to the MSCREP and ABS Surveyor prior to commencing work required to accomplish this specification item is applicable.
19-001 - 1