USNS JOSHUA HUMPHREYS (T-AO 188) Regular Overhaul/Dry-docking (ROH/DD)
Solicitation number
N3220518R4013
Issued by

About this file

Amendment 0005

View the file

Other files

File Type Posted
J-2_Category_A_Items_Rev_C.xlsx XLSX spreadsheet

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N3220518R4013

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION B - SUPPLIES OR SERVICES AND PRICES

The following have been modified:

TOTAL PROPOSED PRICE

TOTAL PROPOSED PRICE FOR CLINS 0001 THROUGH 0010 $______________

The contractor shall enter the total proposed price of all CLINs.

CLAUSES INCORPORATED BY FULL TEXT

PART I - THE SCHEDULE

Section B, Price Schedule, detailed information

CLIN 0001 –Attachment J-2 – Category “A” WIs provides a WI breakdown of CLIN 0001 pricing.

CLIN 0002: This CLIN contains the FBLR (e.g., G&A, overhead, profit, supervision, consumables, and/or support functions, etc.) and the ODC profit and G&A rate. These rates are used for pricing changes negotiated under the H-3 Clause - AGR and H-4 Clause ODC, for the duration of the contract. Changes are inherent to vessel repair contracts and should be expected by the Contractors. Additionally, this CLIN includes G&A and profit rates for ODC to be used for negotiating changes. These rates shall prevail even when the contract is extended/modified. The number of AGR man-hours and the ODC base amount are estimates that were generated for evaluation purposes. The actual amounts of man-hours and ODC may be used interchangeably under the contract which could result in a distribution and amount of man-hours and ODC that is either higher or lower than that stated in CLIN 0002. Any additional AGR or ODC required beyond the CLIN 0002 estimated amount shall be added through contract modification using the same AGR and ODC rates agreed upon at contract award. Any unused AGR or ODC will be de-obligated from the contract at the same AGR and ODC rates agreed upon at contract award. The contractor agrees that the number of man-hours included in its proposed price for such AGR shall include only direct production man-hours. For these purposes, direct production man-hours are for skilled labor at the Journeyman level expended in direct production as exemplified by the following functions:

Abrasive cleaning/blastingTank cleaning
WeldingMachinists (inside and outside)
BurningBrazing
CarpentryElectrical work
Electronic workShipfitting
LaggingPainting
BoilermakingPipefitting
Sheetmetal workEngineering
RiggingStaging/scaffolding
General laborFire Watch

Direct production man-hours will not include those functions (whether charged directly or indirectly by the contractor’s accounting system) which are defined herein as support for production functions. Necessary support functions shall be considered to be included in the offeror's FBLR for direct production man-hours. Examples of support functions include:

TestingQuality Assurance
PlanningCleaning (except tank cleaning)
Material handling & warehousingSecurity
SurveyingAdministration
TransportationPurchasing staff
LoftingOther indirect support
Supervision

Consumable materials are goods used in the ordinary course of work performance such as office supplies, paper, rags, vehicle or equipment fuel costs, cleaning chemicals, disposable tools, welding rods, paint buckets, paint brushes, protective clothing, etc. that do not become an integral part of the repaired vessel. Consumable material shall be included in the contractor's fully loaded manhour rate and not separately priced.

The rates for profit and G&A on CLIN 0002 above shall be the same rates used by the contractor in its responses to the Request for CCO Proposals issued under this contract. The KO will apply these rates to the ODCs for each CCO when it is negotiated and settled.

The base cost, stated in this CLIN does not include the profit or G&A rates.

NOTE: This does not include any material cost for Category “A” WIs. The material cost for Category “A” WIs has been included under CLIN 0001.

CLINs 0003 through 0010 –Attachment J-3 – Category “B” WIs provides a WI breakdown of CLIN 0003 through 0010 pricing.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

C – 2 List of Standard WIs included for this solicitation:

GENERAL SERVICES

001
Intent, Scope, General Requirements and Definitions
NSP
002
Technical and Manufacturer's Representatives
NSP
003
Approach, Berth, and Mooring Requirements
NSP
004
Testing and Quality Assurance
NSP
005
Electrical Safety Procedure Requirements
NSP
006
Heavy Weather Plan
NSP
007
Cold Weather Plan
NSP
008
Not Used
009
Not Used
010
Furnish Office For Overhaul Management Team (OMT)
A
011
Furnish General Services (T-AO)
A
012
Information Technology Services
A
013
Project Planning and Production Status Monitoring Reports
A
014
Preparation of Weight and Moment Report
A
015
Integrated Logistics and GFM Support Requirements
A
016
Fire Protection and Ship's Safety Program
A
017
Handling Ship's Stores
A
018
Delivery and Redelivery of the Vessel
A
019
Shipboard Access and Security
A
020
Gas Free Certificates
A
021
Clean and Gas Free Tanks, Voids, Cofferdams & Spaces
A
022
Dock Trials and Sea Trials
A
023
Hazardous Waste Disposal at a Contractor's Facility
A

Physical Security at a Private Contractors Facility Physical Security at a Private Contractors Facility in Forced Condition Bravo-Delta Continuation of Services

NSP

B

B

100
STRUCTURE
101
Non-Destructive testing (NDT) Kingpost areas (ABS)
A
102
Inspection of Pressure-Vacuum (PV) Valves (USCG)
A
103
01 Level and Tank Deck Hydro-blast and Recoat.
A
104
Not Used
105
Not Used
106
Structural Steel Repairs
B
107
Tank deck overhead; Power Tool Clean Preservation
A
108
Not Used
109
Not Used
110
Engine Room Tank Top; Preservation
A
111
Unfired Pressure Vessels and Relief Valve; Testing
A
112
Not Used
113
Pump Room Lagging and insulation; Replace
A
114
Flight Deck Preservation and Non-Skid
A
115
Flight Deck Safety Net Weight Test
A
116
Not Used

Pump Room Bilge; Preservation Stability Test A A

200
MACHINERY, MAIN
201
Main Engine Industrial Assistance
A
203
Main engine Turbochargers; Overhaul
A

ELECTRICAL

301
Main and Emergency Switchboards; Clean and Inspect
A
302
Emergency Switchboards and Load Center Cleaning
A
303
Not Used.
A
304
ERC Electrical Safety Matting; Replacement
A
305
Not Used

COMMUNICATIONS AND NAVIGATION

401
Radar/ECDIS Preventive maintenance
A
402
NAVIGAT X Gyro System Preventative Maintenance
A
403
Annual GMDSS; Safety Radio Certification
A
404
SVDR Annual Recertification
A
405
Not Used
406
Magnetic Compass; Annual
A
407
Not Used
408
Not Used
409
Not Used
410
Fathometer Dual Transducer Preventive Maintenance
A
411
Not Used
412
Doppler Speed Log; Preventative Maintenance
A
500
MACHINERY, AUXILIARY
501
Salt Water Circulating Pump 1; Overhaul
A
502
Not Used
503
Jacket Water Cooling Valves; Overhaul
A
504
Ships Service Diesel Engine number 3; Overhaul
A
505
Ships Service Diesel Engine number 4; Overhaul
A
506
Jacket water pump 1 ,2 and 3; Overhaul
A
507
Air Conditioning (A/C) Compressor: Overhaul
A
508
Miscellaneous piping; Replace
B
509
Not Used
510
Not Used
511
Not Used
512
Ship Service Diesel Engine Turbo Charger; Overhaul
A
513
Not Used
514
Ships service generator Flexible coupling ; Replace
A
515
Pima 14” Globe Stop Check Valves; Repair
A
516
Fresh Water Tank Piping; Repairs
A
517
NO. 1 and 2 Central Fresh Water Cooling Pumps; Overhaul
A
518
Not Used
519
Expansion Joints; Replace
A
520
Flexible hose; Replacement
A
600
OUTFITTING AND HABITABILITY
601
Inflatable Life raft Annual Servicing (USCG)
A
602
SCBA Compressor/Refill Station; Annual Servicing
A
603
Terrazzo in Heads; Remove and replace with tile
A
604
Life Boat Davit Block and Fairlead Sheaves; Overhaul
A
606
Annual USCG Fire Fighting Recertification Services
A
607
Annual Recertify Rescue Boat Winch and Davit
A
608
Stateroom Carpet; Replace.
A
609
Rescue Boats; Recertify
A
610
Inspection of Ships Immersion Suits
A
611
SCBA Equipment; Annual Servicing
A
612
Life boats; Replacement and certification
A
613
Recertify Lifeboats winches and davits
A
614
Annual Elevator; Recertification
A
615
Not Used
616
Fire and Smoke Damper Service
A
617
Shunt Trip for Deep Fat Fryer
A
801
Galley Range Exhaust System Cleaning
A
802
Not Used
803
Cleaning Laundry Ventilation Systems
A
804
Pump-room Heating Coil; Replace
A

DRYDOCKING AND UNDOCKING

901
Dry-docking and Undocking the Vessel
A
902
Marine Growth inhibitor Anodes; Replace
A
903
Rudder and Stern Frame Exam
A
904
Inspection of Bilge Keels
A
905
Propeller System Maintenance
A
906
Overhauling Sea Valves
A
907
Underwater Hull Cleaning and Painting
A
908
Dry-docking and Undocking the Ship; Additional Days
B
909
Ground Tackle; Inspection and Preservation
A
910
Not Used
911
Zinc Anodes; Replace
B
912
Inspect and Repair Hull Cathodic Protection System
A
913
Propeller Shaft line and Net Cutter Inspection
A
914
Simplex Stern Tube Seals; Maintenance
A
915
Propeller Shaft Wear down Readings
A
916
Cargo Ballast System Valves; Overhaul
A
917
Tail shaft; Inspection
B
1000
UNREP SYSTEMS AND EQUIPMENT
1001
Sliding Block Chain Replacement.
A
1002
Ram Tensioner, Wire Rope Slack Cable, and 1st Fairlead Sheave. Preservation and Metal Repair.
A
1003
Transmission Replenishment Pump Electric Motor Bearing Refurbishment.
A
1004
Overhaul ASD Fan Motors and Manufacture New Fan Cans.
A
1005
Repair and Preservation of Saddle Winch and Saddle Foundation Stations 1 and 2.
A
1006
Winch Booth Windows Refurbishment, Metal Repair and Window Stops.
A
1007
Unrep Hauling Winch Clutch Cooling Fan Refurbishment.
A
1008
Span wire Winch Band Brake Drum Refurbishment.
A
1009
Manufacture and Install Winch Booth Jump Seat Hinge Assembly.
A
1010
Disassembly Gullwing From Stream Trolley Manufacture and Install New Gullwing Bolts.
A