The file's text, extracted by GovTribe without its formatting.
N3220518R4013
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION B - SUPPLIES OR SERVICES AND PRICES
The following have been modified:
TOTAL PROPOSED PRICE
TOTAL PROPOSED PRICE FOR CLINS 0001 THROUGH 0010 $______________
The contractor shall enter the total proposed price of all CLINs.
CLAUSES INCORPORATED BY FULL TEXT
PART I - THE SCHEDULE
Section B, Price Schedule, detailed information
CLIN 0001 –Attachment J-2 – Category “A” WIs provides a WI breakdown of CLIN 0001 pricing.
CLIN 0002: This CLIN contains the FBLR (e.g., G&A, overhead, profit, supervision, consumables, and/or support functions, etc.) and the ODC profit and G&A rate. These rates are used for pricing changes negotiated under the H-3 Clause - AGR and H-4 Clause ODC, for the duration of the contract. Changes are inherent to vessel repair contracts and should be expected by the Contractors. Additionally, this CLIN includes G&A and profit rates for ODC to be used for negotiating changes. These rates shall prevail even when the contract is extended/modified. The number of AGR man-hours and the ODC base amount are estimates that were generated for evaluation purposes. The actual amounts of man-hours and ODC may be used interchangeably under the contract which could result in a distribution and amount of man-hours and ODC that is either higher or lower than that stated in CLIN 0002. Any additional AGR or ODC required beyond the CLIN 0002 estimated amount shall be added through contract modification using the same AGR and ODC rates agreed upon at contract award. Any unused AGR or ODC will be de-obligated from the contract at the same AGR and ODC rates agreed upon at contract award. The contractor agrees that the number of man-hours included in its proposed price for such AGR shall include only direct production man-hours. For these purposes, direct production man-hours are for skilled labor at the Journeyman level expended in direct production as exemplified by the following functions:
| Abrasive cleaning/blasting | Tank cleaning | | |
| Welding | | | Machinists (inside and outside) |
| Burning | | | Brazing |
| Carpentry | | Electrical work | |
| Electronic work | | Shipfitting | |
| Lagging | | | Painting |
| Boilermaking | | Pipefitting | |
| Sheetmetal work | | Engineering | |
| Rigging | | | Staging/scaffolding |
| General labor | | Fire Watch | |
Direct production man-hours will not include those functions (whether charged directly or indirectly by the contractor’s accounting system) which are defined herein as support for production functions. Necessary support functions shall be considered to be included in the offeror's FBLR for direct production man-hours. Examples of support functions include:
| Testing | | | Quality Assurance |
| Planning | | | Cleaning (except tank cleaning) |
| Material handling & warehousing | Security | | |
| Surveying | | Administration | |
| Transportation | | Purchasing staff | |
| Lofting | | | Other indirect support |
| Supervision | | | |
Consumable materials are goods used in the ordinary course of work performance such as office supplies, paper, rags, vehicle or equipment fuel costs, cleaning chemicals, disposable tools, welding rods, paint buckets, paint brushes, protective clothing, etc. that do not become an integral part of the repaired vessel. Consumable material shall be included in the contractor's fully loaded manhour rate and not separately priced.
The rates for profit and G&A on CLIN 0002 above shall be the same rates used by the contractor in its responses to the Request for CCO Proposals issued under this contract. The KO will apply these rates to the ODCs for each CCO when it is negotiated and settled.
The base cost, stated in this CLIN does not include the profit or G&A rates.
NOTE: This does not include any material cost for Category “A” WIs. The material cost for Category “A” WIs has been included under CLIN 0001.
CLINs 0003 through 0010 –Attachment J-3 – Category “B” WIs provides a WI breakdown of CLIN 0003 through 0010 pricing.
SECTION C - DESCRIPTIONS AND SPECIFICATIONS
The following have been modified:
C – 2 List of Standard WIs included for this solicitation:
GENERAL SERVICES
| 001 |
| Intent, Scope, General Requirements and Definitions |
| NSP |
| 002 |
| Technical and Manufacturer's Representatives |
| NSP |
| 003 |
| Approach, Berth, and Mooring Requirements |
| NSP |
| 004 |
| Testing and Quality Assurance |
| NSP |
| 005 |
| Electrical Safety Procedure Requirements |
| NSP |
| 006 |
| Heavy Weather Plan |
| NSP |
| 007 |
| Cold Weather Plan |
| NSP |
| 010 |
| Furnish Office For Overhaul Management Team (OMT) |
| A |
| 011 |
| Furnish General Services (T-AO) |
| A |
| 012 |
| Information Technology Services |
| A |
| 013 |
| Project Planning and Production Status Monitoring Reports |
| A |
| 014 |
| Preparation of Weight and Moment Report |
| A |
| 015 |
| Integrated Logistics and GFM Support Requirements |
| A |
| 016 |
| Fire Protection and Ship's Safety Program |
| A |
| 017 |
| Handling Ship's Stores |
| A |
| 018 |
| Delivery and Redelivery of the Vessel |
| A |
| 019 |
| Shipboard Access and Security |
| A |
| 020 |
| Gas Free Certificates |
| A |
| 021 |
| Clean and Gas Free Tanks, Voids, Cofferdams & Spaces |
| A |
| 022 |
| Dock Trials and Sea Trials |
| A |
| 023 |
| Hazardous Waste Disposal at a Contractor's Facility |
| A |
Physical Security at a Private Contractors Facility Physical Security at a Private Contractors Facility in Forced Condition Bravo-Delta Continuation of Services
NSP
B
B
| 101 |
| Non-Destructive testing (NDT) Kingpost areas (ABS) |
| A |
| 102 |
| Inspection of Pressure-Vacuum (PV) Valves (USCG) |
| A |
| 103 |
| 01 Level and Tank Deck Hydro-blast and Recoat. |
| A |
| 106 |
| Structural Steel Repairs |
| B |
| 107 |
| Tank deck overhead; Power Tool Clean Preservation |
| A |
| 110 |
| Engine Room Tank Top; Preservation |
| A |
| 111 |
| Unfired Pressure Vessels and Relief Valve; Testing |
| A |
| 113 |
| Pump Room Lagging and insulation; Replace |
| A |
| 114 |
| Flight Deck Preservation and Non-Skid |
| A |
| 115 |
| Flight Deck Safety Net Weight Test |
| A |
Pump Room Bilge; Preservation Stability Test A A
| 201 |
| Main Engine Industrial Assistance |
| A |
| 203 |
| Main engine Turbochargers; Overhaul |
| A |
ELECTRICAL
| 301 |
| Main and Emergency Switchboards; Clean and Inspect |
| A |
| 302 |
| Emergency Switchboards and Load Center Cleaning |
| A |
| 304 |
| ERC Electrical Safety Matting; Replacement |
| A |
COMMUNICATIONS AND NAVIGATION
| 401 |
| Radar/ECDIS Preventive maintenance |
| A |
| 402 |
| NAVIGAT X Gyro System Preventative Maintenance |
| A |
| 403 |
| Annual GMDSS; Safety Radio Certification |
| A |
| 404 |
| SVDR Annual Recertification |
| A |
| 406 |
| Magnetic Compass; Annual |
| A |
| 410 |
| Fathometer Dual Transducer Preventive Maintenance |
| A |
| 412 |
| Doppler Speed Log; Preventative Maintenance |
| A |
| 501 |
| Salt Water Circulating Pump 1; Overhaul |
| A |
| 503 |
| Jacket Water Cooling Valves; Overhaul |
| A |
| 504 |
| Ships Service Diesel Engine number 3; Overhaul |
| A |
| 505 |
| Ships Service Diesel Engine number 4; Overhaul |
| A |
| 506 |
| Jacket water pump 1 ,2 and 3; Overhaul |
| A |
| 507 |
| Air Conditioning (A/C) Compressor: Overhaul |
| A |
| 508 |
| Miscellaneous piping; Replace |
| B |
| 512 |
| Ship Service Diesel Engine Turbo Charger; Overhaul |
| A |
| 514 |
| Ships service generator Flexible coupling ; Replace |
| A |
| 515 |
| Pima 14” Globe Stop Check Valves; Repair |
| A |
| 516 |
| Fresh Water Tank Piping; Repairs |
| A |
| 517 |
| NO. 1 and 2 Central Fresh Water Cooling Pumps; Overhaul |
| A |
| 519 |
| Expansion Joints; Replace |
| A |
| 520 |
| Flexible hose; Replacement |
| A |
| 600 |
| OUTFITTING AND HABITABILITY |
| 601 |
| Inflatable Life raft Annual Servicing (USCG) |
| A |
| 602 |
| SCBA Compressor/Refill Station; Annual Servicing |
| A |
| 603 |
| Terrazzo in Heads; Remove and replace with tile |
| A |
| 604 |
| Life Boat Davit Block and Fairlead Sheaves; Overhaul |
| A |
| 606 |
| Annual USCG Fire Fighting Recertification Services |
| A |
| 607 |
| Annual Recertify Rescue Boat Winch and Davit |
| A |
| 608 |
| Stateroom Carpet; Replace. |
| A |
| 609 |
| Rescue Boats; Recertify |
| A |
| 610 |
| Inspection of Ships Immersion Suits |
| A |
| 611 |
| SCBA Equipment; Annual Servicing |
| A |
| 612 |
| Life boats; Replacement and certification |
| A |
| 613 |
| Recertify Lifeboats winches and davits |
| A |
| 614 |
| Annual Elevator; Recertification |
| A |
| 616 |
| Fire and Smoke Damper Service |
| A |
| 617 |
| Shunt Trip for Deep Fat Fryer |
| A |
| 801 |
| Galley Range Exhaust System Cleaning |
| A |
| 803 |
| Cleaning Laundry Ventilation Systems |
| A |
| 804 |
| Pump-room Heating Coil; Replace |
| A |
DRYDOCKING AND UNDOCKING
| 901 |
| Dry-docking and Undocking the Vessel |
| A |
| 902 |
| Marine Growth inhibitor Anodes; Replace |
| A |
| 903 |
| Rudder and Stern Frame Exam |
| A |
| 904 |
| Inspection of Bilge Keels |
| A |
| 905 |
| Propeller System Maintenance |
| A |
| 906 |
| Overhauling Sea Valves |
| A |
| 907 |
| Underwater Hull Cleaning and Painting |
| A |
| 908 |
| Dry-docking and Undocking the Ship; Additional Days |
| B |
| 909 |
| Ground Tackle; Inspection and Preservation |
| A |
| 911 |
| Zinc Anodes; Replace |
| B |
| 912 |
| Inspect and Repair Hull Cathodic Protection System |
| A |
| 913 |
| Propeller Shaft line and Net Cutter Inspection |
| A |
| 914 |
| Simplex Stern Tube Seals; Maintenance |
| A |
| 915 |
| Propeller Shaft Wear down Readings |
| A |
| 916 |
| Cargo Ballast System Valves; Overhaul |
| A |
| 917 |
| Tail shaft; Inspection |
| B |
| 1000 |
| UNREP SYSTEMS AND EQUIPMENT |
| 1001 |
| Sliding Block Chain Replacement. |
| A |
| 1002 |
| Ram Tensioner, Wire Rope Slack Cable, and 1st Fairlead Sheave. Preservation and Metal Repair. |
| A |
| 1003 |
| Transmission Replenishment Pump Electric Motor Bearing Refurbishment. |
| A |
| 1004 |
| Overhaul ASD Fan Motors and Manufacture New Fan Cans. |
| A |
| 1005 |
| Repair and Preservation of Saddle Winch and Saddle Foundation Stations 1 and 2. |
| A |
| 1006 |
| Winch Booth Windows Refurbishment, Metal Repair and Window Stops. |
| A |
| 1007 |
| Unrep Hauling Winch Clutch Cooling Fan Refurbishment. |
| A |
| 1008 |
| Span wire Winch Band Brake Drum Refurbishment. |
| A |
| 1009 |
| Manufacture and Install Winch Booth Jump Seat Hinge Assembly. |
| A |
| 1010 |
| Disassembly Gullwing From Stream Trolley Manufacture and Install New Gullwing Bolts. |
| A |
(End of Summary of Changes) image1.wmf