PERFORMANCE WORK STATEMENT DETAILS
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N102-18-Q-7078-FEDBIZOPPS.pdf | ||
| COMBINED_SYNOPSIS_SOLICITATION-N29792-7354-4101.pdf | ||
| WAGE_DETERMINATION_WD_15-4561_REV.4.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
USNS CITY OF BISMARCK
(T-EPF 9)
Machinery, Auxiliary Systems Service Order 18-009 12 December 2017 Category “A” MSC/MJD
HEF DEMO SET/UP ASSIST AND CLEAN-UP FOR BOTH E/R AND MB
SO-18-001 - 1
1.0 ABSTRACT
1.1 This item describes the general requirements for labor
support of the Engine Rooms and Mission Bay High Expansion Foam (HEF) preparation prior to testing, during testing, and post testing clean-up.
2.0 REFERENCES/ENCLOSURES
2.1 Drawing 8445369: General Arrangements
2.2 Drawing 8444975: Structural Fire Protection 60 Minute
Fire Rated Panel System, Mission Bay
2.3 HEFSQT Inspection Handbook.
3.0 ITEM LOCATION/QUANTITY/DESCRIPTION
3.1 Location/Description:
3.1.1 High Expansion Foam System (HEF), Hiller
MFG.
3.1.1.1 Protected Spaces; Mission Bay
3.1.1.2 Protected Spaces; Engine Rooms
3.1.1.3 High Expansion Foam Curtain Mod. 28963
3.1.1.4 HEF Skid Equipment, ANSUL 6” IBD Skid
DWG. S-472640, 1-62-1, 1-62-2
4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIALS/SERVICES: None
5.0 NOTES:
5.1 Point of Contact (POC): is
Port Engineer: Michael Dunn
Cell: 757-754-6270 E-mail: michael.dunn2@navy.mil
Potable water, 100 PSI will be available. Contractor shall furnish hoses and connections to vessel fittings.
Electrical power 440V and 110V will be available. Contractor shall furnish extension cords and plug connectors.
Flow Meters and Sensors will be available.
mailto:michael.dunn2@navy.mil
SO-18-001 - 2
5.2 Contractor is required to submit personnel on the EPIC
spreadsheet. To gain access to MSC vessel's on the East Coast, contractors must submit an EPIC request to MSFSC(underscore)EPIC(underscore)EAST(at)navy(dot)mil MSFSC_EPIC_EAST@navy.mil.
5.3 EPIC will take up to 48 hrs to process, the request
must be approved by EPIC before access can be sent to the facility for approval, access will not be guaranteed without approval from EPIC. KTR should consider only utilizing employees holding current Rapid Gate pass authorization.
5.4 Once contract is awarded, KTR is required to gain
access to Naval Air Station Pensacola, FL to perform work. To gain access, contractors must submit OPCON and ODP request forms. Contact POC for request forms and instructions.
5.5 Performance Period:
5.5.1 Start to completion: 24 Jan – 9 Feb 2018.
5.5.1.1 24 January – 4 February 2018, Preparation by Contractor. Apply protective wrap to Mission Bay and Engine Rooms. Frac Tank shall be available at the pierside NLT 2 February to be ready for ER testing
5.5.1.2 5 February, Engine Rooms testing & Crew Verification.
5.5.1.3 6 February 2018, Underway Preparation and Crew Maintenance Review.
5.5.1.4 7 February 2018, Underway, At Sea Mission Bay testing.
5.5.1.5 8 February 2018, At sea Mission Bay Testing Weather Make Up Day
5.5.1.6 9 February 2018, Clean, Repairs and Restore Systems and Equipment back to a fully operational status. The
SO-18-001 - 3
contractor shall complete NLT than COB on 9 February 2018.
5.6 Performance Location:
5.6.1 Naval Air Station Pensacola, Pensacola, Florida, 32508, Pier: TBD.
6.0 QUALITY ASSURANCE REQUIREMENTS: N/A
7.0 PEFORMANCE WORK STATEMENT:
7.1 KTR shall prepare and meet all test prerequisites and
requirements as described in the Ref 2.3 HEFSQT Inspection Handbook.
7.2 KTR shall provide the services of authorized reps who
have HEF expertise for 2 days (ER Testing and At Sea Mission Bay Testing) to provide technical support in executing the HEF SQT alignment and Operational Plan to include data collection and troubleshooting.
7.3 KTR shall provide (4) laborers and (2) marine
electricians for the dates and times in Section 5.5.
KTR shall provide the same (4) laborers and (2) electricians for the entire period of performance.
Workers will be required to work independently on tasks ranging from wrapping electrical outlets, lighting, switches, motor operators, cleaning, mopping, using fire hoses, wiping up left over HEF (High Expansion Foam) residue and any other tasks deemed necessary in supporting the prepping, testing and clean-up. KTR should not send workers with physical disabilities as the nature of this work will require physical dexterity.
7.4 Temporarily install KTR furnished plastic sheeting, drop cloths, masking, division shields, seals, blanks and filtering materials to prevent HEF and foreign substances from entering lights, CBG bulkhead panels, power panels, speakers, cameras, fire detectors, sirens, machinery, fork lifts, piping, hatches, ventilation systems, fire and smoke detectors, ISO containers, tank vents, motor shafts, seals and temporary openings during the HEF System mission bay
SO-18-001 - 4
testing. Apply tape and plastic to entire interior Mission Bay surfaces from deck bulkhead and including individual overhead components prior to test to prevent damage to sensitive equipment, components and panels. Refer to reference 2.1 and 2.2 for dimensions of space and panels.
7.5 Wrap all machinery and equipment located in the P&S
engine rooms with plastic sheeting. This shall include all electrical panels, switchboards, motors and fixtures to the height of six feet above the Main Engines in accordance with the guidelines provided in Appendix D of reference 2.3 prior to commencing test.
Protective coverings shall be inspected and approved by the Chief Engineer prior to commencing test.
7.6 Contractor shall provide a 500 barrel Frac Tank for
the collection of HEF testing slops for the duration of the performance period as described in paragraph 3, Part I of References/Enclosures 2.3. Frac Tank shall include delivery and disposal fees for one tank load.
7.7 Electricians will be expected to help laborers and
provide oversight and guidance to ensuring electrical equipment is protected for testing. At the completion of foam testing electricians will be expected to contribute to all clean-up efforts and other duties as directed by the MSCREP.
7.8 Remove and stow all plastic tie-down cover inserts in
Mission Bay prior to testing and replace when directed.
7.9 Furnish all equipment / material for wrapping the
entire mission bay including individual components on the ceiling and all the way around mission bay perimeter.
7.10 Install a minimum of two (2) flow meters with four (4)
sensors provided on main headers. Observe and record flow during testing. Submit a report to the Chief Engineer and MSCREP of recordings.
SO-18-001 - 5
7.11 KTR shall provide an all-terrain JLG with fuel and
operator (operator shall be included as one of the (6) laborers). JLG shall have the capability of reaching up to 24 feet. JLG shall be left on pier while underway and made available on the dates and times noted in Section 5.5.
7.12 Ship’s stern ramp will be deployed. JLG can access
ship via ramp.
7.13 Immediately following HEF testing in Engine Rooms, KTR
shall work under the direction of ship’s force to pump out foam from containment boundaries using KTR furnished portable pumps into the pier side frac tank and rinsing with freshwater with contractor furnished garden hoses, wiping and removing protective wrappings. KTR shall bag all waste for removal to KTR furnished pier side waste containers and/or trucks.
7.14 Immediately following underway HEF testing in Mission
Bay (while at sea) KTR shall work under the direction of ship’s force washing foam into the sea with fire hoses and rinsing with freshwater with contractor furnished garden hoses, wiping and removing protective wrappings. KTR shall bag all waste for removal to KTR furnished pier side waste containers and/or trucks.
KTR shall remove all waste once ship has returned to port and at the direction of ship’s force.
7.15 Upon completion of the HEF demonstrations, flush HEF
skid piping and equipment and return system to normal configuration. This shall include removal of flow meters/sensors and return to the MSCREP.
7.16 Vacuum all HEF from Mission Bay tie downs with wet
shop vacuum.
7.17 When directed remove all tape and plastic from Mission
Bay. JLG and operator will be required for removal of all overhead protected areas.
7.18 KTR shall assist ship’s force in performing final
operational test of all electrical equipment in mission bay.
SO-18-001 - 6
7.19 Re-install tie down cover inserts in Mission Bay.
7.20 KTR shall provide removal and disposal of all rags, plastic and used tapping material.
7.21 Bag and remove all testing debris, i.e. tape, plastic
and used rags from ship and dispose of IAW local rules, do not use base dumpsters for disposal. High Expansion Foam (HEF) is not considered HAZMAT – MSDS can be provided by the Port Engineer if requested.
7.22 Contractor shall furnish all equipment, materials and
tools for wrap up and cleaning (Refer to paragraph 7.1 for details).
7.22.1 Examples of material the KTR will be
required to provide under this service order:
7.22.1.1 Rolled plastic sheathing, sufficient
quantity to cover all bulkheads from deck to overhead where bulkhead meets ceiling.
7.22.1.2 Garden hoses, length as needed
7.22.1.3 500 barrel Frac tank
7.22.1.4 Rags / Drop cloths, quantity as needed
7.22.1.5 Tape / masking / duct, quantity as
needed
7.22.1.6 Plastic 30-gal and 50-gal garbage bags, quantity as needed
7.22.1.7 Air duct filtering material, quantity
as needed
7.22.1.8 1 each, JLG with fuel, operator, and operation manuals and certifications - all days except at sea
7.22.1.9 Wet Shop Vacuums, quantity as needed
7.22.1.10 Portable pumps, quantity as needed
7.22.2 Other examples:
7.22.2.1 Mission bay bulkheads shall be
protected with plastic sheathing from deck to ceiling joint.
SO-18-001 - 7
7.23 KTR should bring tools and multi-meters required to
perform work.
7.24 Dispose of all waste generated by this testing in
accordance with Local, State and Federal rules and regulations.
7.25 KTR shall provide the ship 12EA 55-gallon drums of
ANSUL JETX 2.75% HEF concentrate.
7.26 Assist Ship Force in refilling Port and Stbd HEF tanks
using CFE foam concentrate. Dispose of empty containers.
8.0 GENERAL REQUIREMENTS:
8.1 NONE