18Q4025_JA_Redacted.pdf

PDF 44 KB Posted

Attached to
Lohmann & Stolterfoht Spiroflex KJZ 282 W Coupling Parts
Solicitation number
N3220518Q4025
Issued by

About this file

J/A

View the file

Other files

File Type Posted
18Q4025CSS.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N104-18-Q-4025

JUSTIFICATION AND APPROVAL (J&A)

FOR USE OF OTHER THAN FULL AND OPEN COMPETITION

1. Contracting Activity: Department of the Navy, Military Sealift Command (MSC).

2. Description of the Action Being Approved: Award of a firm-fixed price contract on a brand name basis for Lohmann Stolterfoht Original Equipment Manufacturer (OEM) PTO Coupling parts in support of the USNS HENRY J. KAISER (T-AO 187).

3. Description of Supplies/Services: MSC has a requirement to procure Lohmann Stolterfoht brand parts for the USNS HENRY J. KAISER (T-AO 187), specifically Power Take Off (PTO) Coupling Parts. MSC normally acquires these as long lead time repair components and provides them as Government Furnished Material (GFM) for installation during regularly scheduled ship repair availabilities. The action executed under this J&A has an estimated value of approximately using fiscal year (FY) 2018 United States Navy Working Capital Funds (NWCF).

4. Statutory Authority Permitting Other Than Full and Open Competition: The statutory authority permitting other than full and open competition for FAR subpart 13.5 requirements is 41 U.S.C. 1901.

5. Rationale Supporting Use of Authority Cited Above: Use of the authority cited in FAR Subpart 13.5, specifically FAR 13.501(a), is appropriate for this acquisition as this subpart authorizes use of Simplified Acquisition Procedures (SAP) for acquisition of parts or services greater than the Simplified Acquisition Threshold (SAT) and not exceeding $7.0 million.

The US Navy's Combat Logistics Force (CLF) T-AO Class Replenishment Oilers provide direct support to US and Allied Forces at sea and support combat conflicts and disaster relief around the globe. Their primary mission is to shuttle fuel oil to support ship and aviation operations and to provide sustainment such as fresh fruits and vegetables, vital repair parts and personnel to Carrier Strike Groups and allied forces. Fifteen T-AO Class Replenishment Oilers are dispersed across the five Operational Areas of Responsibility (AOR). With limited resupply ports around the world along with limited port access for US Navy vessels, T-AO Class Replenishment Oilers are vital to Department of Defense military operations.

In accordance with the MSC Safety Management Systems procedure 10.6-002-ALL, the PTO Couplings, which connect the reduction gear to the PTO generator, on the Replenishment Oilers are categorized as Critical Ship Equipment. Critical Ship Equipment is defined as equipment and systems that are necessary to sustain the proper operation and mission capability of the ship. Failure of either of the hull’s two (2) PTO Couplings will reduce the vessel’s power producing capability by 25% which puts a vessel in a C-3 status, a major degradation in mission. Failure of both the PTO Couplings will reduce the vessel’s power producing capability by 50% which puts the vessel in a C-4 status, becoming unable to perform its primary mission of providing underway replenishment services to the fleet. The reduction of power producing capability poses a hazard to the crew and environment due to limiting the operation of critical and auxiliary equipment. Proper refurbishment and maintenance of the PTO Couplings are critical to the safe operation of Kaiser (T-AO) Class vessels. Failure of these equipment items and systems would pose a hazard to the ship, its crew, or the environment.

N104-18-Q-4025

Lohmann Stolterfoht is the OEM for the PTO Coupling systems on board the USNS HENRY J. KAISER (T-AO 187). Proper refurbishment and maintenance of the PTO Coupling is critical to the safe operation of the T-AO Class Vessels. The OEM parts and technical data/drawings from the OEM are required by USCG and ABS regulations. This maintains all OEM warranties, ensures power producing reliability and crew safety, therefore precluding consideration of the product manufactured by another company. The engineering, construction drawings, and technical characteristics for the manufactured parts are proprietary to Lohmann Stolterfoht.

The US Government did not acquire rights to this data. MSC does not have the manufacturing and technical information to evaluate and determine whether non-OEM components and replacement parts offered are equivalent to the OEM components and replacement parts. T-AO Class PTO Couplings require special tools, specialized parts and technical experience unique to the PTO Coupling; only approved OEM parts are authorized to be installed for this highly sophisticated equipment. The OEM representative has access to provide parts and technical data/drawings for the original manufacture, as required to properly repair and maintain the equipment. All OEM parts are in compliance with USCG and ABS IMO regulatory requirements.

6. Description of Efforts Made to Solicit Offers from as Many Potential Sources as Practicable: In accordance with FAR 5.201(b)(1)(i), the Government intends to issue a synopsis and solicitation on FEDBIZOPPS for this contract, with the intent of awarding a firm fixed price contract.

7. Determination of Fair and Reasonable Cost: The Contracting Officer will determine that the price for the supplies/services is fair and reasonable pursuant to FAR Part 13.106-3.

8. Market Research: Market research was performed by reviewing historical acquisitions for similar requirements for Lohmann Stolterfoht Couplings. These requirements for Lohmann Stolterfoht were historically solicited on a brand names basis. Market research revealed that Lohmann Stolterfoht has distributors that sell to the Government.

9. A Listing of the Sources, if any, that Expressed, in writing, an Interest in the Acquisition: To date, no additional sources have expressed an interest in writing.

However, this requirement will be synopsized and solicited via the Government Point of Entry, the FedBizOpps (FBO) website.

10. Actions to Remove Barriers to Future Competition: For the reasons set forth in Paragraph 5, parts provided by Lohmann Stolterfoht are required. Should MSC determine that Lohmann Stolterfoht compatible parts are no longer required; this J&A will become null and void.