USNS_Arctic_SCBA_MOR_Supplement_SOW.docx
DOCX document 18 KB Posted
- Solicitation number
- N32205-17-Q-7186
About this file
REQUEST FOR PARTS WITH GUIDELINES
View the file
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HULL STRUCTURE Material Procurement Supplement
Category “A” PM6/N756/JEB
1.0 ABSTRACT
1.1. This specification is for procurement of new Self Contained Breathing Apparatus’s (SCBA’s) and spare SCBA Cylinders for the USNS ARCTIC, T-AOE 8
2.0 REFERENCES/ENCLOSURES:
2.1. References:
2.1.1. National Fire Protection Association (NFPA) 1981 Version 2007 or Later (Contractor Provide).
2.1.2. National Institute for Occupational Safety and Health (NIOSH) 42 CFR Part 84 (Contractor Provide).
3.0 ITEM LOCATION/DESCRIPTION:
3.1. Quantity: 42 SCBA Packs (no cylinders attached) Part No 804861-2810.
3.2. Quantity: 114 (one-hundred and fourteen), 4500 psi 60 minute carbon fiber cylinders and valve assemblies with 15 year life cycle Part No.804723-01 or equal.
4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES: None
5.0 NOTES: None
6.0 QUALITY ASSURANCE REQUIREMENTS: None
7.0 STATEMENT OF WORK REQUIRED:
7.1. Contractor shall provide Self Contained Breathing Apparatus’s that comply with references 2.1 and 2.2 except that the units shall NOT have a Personal Alert Safety System (PASS). The SCBA shall be NFPA compliant to NFPA 1981-2007 edition or later. Each SCBA shall have at a minimum; a regulator(s), hoses, heads up display (HUD), waist belt, pads, shoulder straps, stainless steel back frame, harness, tank pressure indicators, rapid intervention crew/universal air connection (RIC/UAC), and end-of-service time indicator required to make a complete SCBA Pack compliant with NFPA 1981-2007 or later. All SCBAs shall have a voice amp meeting the requirements of NFPA 1981-2007 or later. SCBAs shall have a wired HUD. SCBA shall be CBRN compliant per 42 CFR Part 84.
7.1.1. Offeror shall provide documentation that the manufacturer is self-certifying that all OEM parts and supplies in order to maintain the SCBAs compliant with the particular version of NFPA 1981 will be available for a minimum of the 15 year life cycle of the cylinders.
7.1.2. Offeror shall provide documentation that equipment being supplied meets requirements of reference 2.1 and 2.2 with the offer.
7.2. SCBA Cylinders shall be high pressure (4500 psi), 60 minute capacity, lightweight composite carbon fiber, have a minimum 15 year service life, and be manufactured within two (2) month’s of delivery.
7.3. Offeror shall provide documentation of the warrantees applicable to the SCBA and all associated equipment with the offer.
7.4. Offeror shall provide documentation how warranty service is obtained. Specific directions shall be provided with the offer.
7.5. Contractor shall include as part of the SCBA CLIN manufacturer operational training and familiarization on board the vessel. Included operational training shall be four(4) hours. A minimum thirty (30) days notice shall be given by the government to the contractor to establish the training date.
**Delivery is required 45 days After Date of Award/Contract or earlier.
| ITEM |
| PART NUMBER |
| DESCRIPTION |
| UNIT OF ISSUE |
| QTY |
| 1 |
| 804723-01 |
| CYLINDER & VALVE ASSY, CARBON, 4500 PSI, 60 MIN |
| EACH |
| 38 |
| 2 |
| 804861-2810 |
| NAVSEA, CBRN, 4.5 AIR-PAK |
| EACH |
| 38 |
Estimated Delivery Date if Different than Requested Date: __________________________
File details come from the government source that posted it. Updated .