USNS SPEARHEAD (EPF-1)
N32205-16-R-4502
REQUEST FOR SPECIFICATION CLARIFICATION
NAME OF CONTRACTOR:
SPECIFICATION ITEM NO.: 0011
PARAGRAPH / SECTION NO: 7.1.1.1
TITLE: General Services
QUESTION: Paragraph 7.1.1.1 of the work item requires the Contractor to provide 800 amps of shore power at 450 volts maintained at +/- 5 volts. Until the last availability of the USNS Trenton (EPF-5), the contractor was required to maintain voltage at +/- 5%. Shore power at the Contractor’s facility is 480 volts, and the load of the ship is not large enough to lower the voltage to less than 470 volts. Consequently, contractor would be required to rent a portable generator to maintain voltage at +/- 5 volts at considerable expense. Unless the item is changed to reflect +/- 5% rather than +/- 5 volts, a significant price increase in shore power item will be necessary. Please clarify the tolerance for shore power voltage.
ANSWER:
+/- 5 volts is the correct requirement.