Solicitation_N32205-15-T-5001-0001_-_Amendment.doc
DOC document 57 KB Posted
- Attached to
- USNS MERCY #1 ADG Overhaul 15K Hours
- Solicitation number
- N32205-15-T-5001
About this file
Amendment to Solicitation N32205-15-T-5001
View the file
Other files
| File | Type | Posted |
|---|---|---|
| N32205-15-T-5001.doc | DOC document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
SOLICITATION/CONTRACT FORM
The required response date/time has changed from 27-Jul-2015 02:00 PM to 29-Oct-2015 02:00 PM.
SUPPLIES OR SERVICES AND PRICES
CLIN 0001
The CLIN description has changed from USNS MERCY to USNS MERCY (T-AH 19).
The CLIN extended description has changed from 15K HOUR DSL ENG MAINTENANCE to 15K HOUR DSL ENG MAINTENANCEPOP: 17 November 2015 - 16 January 2016..
The following have been modified:
STATEMENT OF WORK
STATEMENT OF WORK
1.0
ABSTRACT
1.1 This item describes the requirements for the contractor to overhaul the No.1 ADG Engine.
2.0
REFERENCES/ENCLOSURES:
2.1 Reference:
2.1.1 MAN Operating and Repair Manual for Diesel
Engines V Type 25/30; D365615-E (available upon request)
2.2 Enclosure:
2.2.1 Auxiliary Diesel Maintenance Plan (See Below)
3.0
ITEM LOCATION/DESCRIPTION
3.1 Location/Quantity:
3.1.1 Auxiliary Machinery Room, 5-84-0
3.1.2 One (1) each ADG Engine
3.1.3 MAN Diesel (formerly known MAN B&W)
Model: 12ASV 25/30
S/Ns: 1045-137
Rated Power: 2021 EkW @ 900 rpm.
MAN NR 26/98 Twin Turbocharger with
Charge Air Cooler
Fuel: DFM/MGO
3.2 Description:
NO.1 Auxiliary Diesel Generator
4.0
GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES:
4.1 Government Furnished Equipment/Material: None
4.2 Government Furnished Services:
4.2.1 Crane support between pier and ship’s exterior deck
4.2.2 Drain and refill all engine liquid systems
4.2.3 Lock out/tag support
5.0
NOTES:
5.1 Period of Performance: 17 November 2015 – 16 January 2016
5.2 Location: Vigor Marine, Portland, OR
5.3 Contractor is responsible for all labor, rigging, parts/material, shipping, etc to complete scope of work unless specifically addressed in this work item.
6.0 QUALITY ASSURANCE REQUIREMENTS: None additional 7.0
STATEMENT OF WORK REQUIRED
7.1 Conduct 15,000 hour maintenance requirements as specified in enclosure 2.2.1 on the number 1 Auxiliary Diesel Engine. Note: where “replace/service” is specified the contractor may select either replacement, or servicing to return parts/equipment to OEM specifications.
7.2 Clean and degrease as applicable the engine interior, exterior, and parts including but not limited to engine lube oil sump, crankcase, connecting rods, oil galleries, etc.
7.3 Operationally test engine in accordance with OEM break in and testing procedures.
7.4 Repair and/or replace all disturbed and damaged insulation as per original.
7.5 Inspect no. 1 ADG as well as nos. 2 and 3 ADGs for outstanding OEM Service Bulletins.
7.6 Submit a detailed service report including all as found conditions and readings with digital pictures, as released conditions, readings with digital pictures and spare parts used. Report shall be submitted to both the MSCREP and CHENG.
8.0 GENERAL REQUIREMENTS: None additional
REFERENCE 2.2:
| ITEM NO |
| MAINTENANCE DESCRIPTION |
| MAINTENANCE INTERVAL (hours) |
| 1 |
| Top End Inspection, Vlv Clearence |
| 3000 |
| 2 |
| Injector Pop Test |
| 3000 |
| 3 |
| Deflection Readings |
| 7500 |
| 4 |
| Crank Case Inspection |
| 7500 |
| 5 |
| Crankshaft Thrust Play Reading |
| 7500 |
| 6 |
| Main Brg Inspection (2 ea) |
| 7500 |
| 7 |
| Piston Inspection (2 ea- same V) |
| 7500 |
| 8 |
| Big & Small End Brg Inspections (same number as # 7) |
| 7500 |
| 9 |
| Liner Inspection (sam number as # 7) |
| 7500 |
| 10 |
| Cylinder Head Inspection (same number as # 7) |
| 7500 |
| 11 |
| LO, JW and FO Booster Pump Inspections |
| 7500 |
| 12 |
| T/C Cartridge Inspections |
| 7500 |
| 13 |
| Alternator and Rear Brg Inspection |
| 7500 |
| 14 |
| Alternator Air Cooler and Winding Cleaning |
| 15000 |
| 15 |
| Complete Overhaul. Replace following: All Injectors, Fuel Injection Valves, All Liners, All Cylinder Heads, All Main and Thrust Brgs, All Big & Small End Brgs, Replace All Cam Shaft Brgs, Replace All Piston Rings, Replace/Service FO Booster and JW Pumps, Replace T/C Cartridges, Replace Charge Air Cooler, Replace / Service LO and JW Coolers |
| 15000 |
| 16 |
| Torsional Vibration Damper Inspection |
| 15000 |
| 17 |
| Timing and Drive Gear Inspections |
| 15000 |
| 18 |
| Flexible Coupling Inspections |
| 15000 |
| 19 |
| Resilient Mount and Foundation Bolt Inspections |
| 15000 |
| 20 |
| LO and JW Thermostatic Valve Inspections |
| 15000 |
(End of Summary of Changes)