Solicitation_N32205-15-T-5001-0001_-_Amendment.doc

DOC document 57 KB Posted

Attached to
USNS MERCY #1 ADG Overhaul 15K Hours
Solicitation number
N32205-15-T-5001
Issued by

About this file

Amendment to Solicitation N32205-15-T-5001

View the file

Other files

File Type Posted
N32205-15-T-5001.doc DOC document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 1449 - CONTINUATION SHEET

SOLICITATION/CONTRACT FORM

The required response date/time has changed from 27-Jul-2015 02:00 PM to 29-Oct-2015 02:00 PM.

SUPPLIES OR SERVICES AND PRICES

CLIN 0001

The CLIN description has changed from USNS MERCY to USNS MERCY (T-AH 19).

The CLIN extended description has changed from 15K HOUR DSL ENG MAINTENANCE to 15K HOUR DSL ENG MAINTENANCEPOP: 17 November 2015 - 16 January 2016..

The following have been modified:

STATEMENT OF WORK

STATEMENT OF WORK

1.0

ABSTRACT

1.1 This item describes the requirements for the contractor to overhaul the No.1 ADG Engine.

2.0

REFERENCES/ENCLOSURES:

2.1 Reference:

2.1.1 MAN Operating and Repair Manual for Diesel

Engines V Type 25/30; D365615-E (available upon request)

2.2 Enclosure:

2.2.1 Auxiliary Diesel Maintenance Plan (See Below)

3.0

ITEM LOCATION/DESCRIPTION

3.1 Location/Quantity:

3.1.1 Auxiliary Machinery Room, 5-84-0

3.1.2 One (1) each ADG Engine

3.1.3 MAN Diesel (formerly known MAN B&W)

Model: 12ASV 25/30

S/Ns: 1045-137

Rated Power: 2021 EkW @ 900 rpm.

MAN NR 26/98 Twin Turbocharger with

Charge Air Cooler

Fuel: DFM/MGO

3.2 Description:

NO.1 Auxiliary Diesel Generator

4.0

GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES:

4.1 Government Furnished Equipment/Material: None

4.2 Government Furnished Services:

4.2.1 Crane support between pier and ship’s exterior deck

4.2.2 Drain and refill all engine liquid systems

4.2.3 Lock out/tag support

5.0

NOTES:

5.1 Period of Performance: 17 November 2015 – 16 January 2016

5.2 Location: Vigor Marine, Portland, OR

5.3 Contractor is responsible for all labor, rigging, parts/material, shipping, etc to complete scope of work unless specifically addressed in this work item.

6.0 QUALITY ASSURANCE REQUIREMENTS: None additional 7.0

STATEMENT OF WORK REQUIRED

7.1 Conduct 15,000 hour maintenance requirements as specified in enclosure 2.2.1 on the number 1 Auxiliary Diesel Engine. Note: where “replace/service” is specified the contractor may select either replacement, or servicing to return parts/equipment to OEM specifications.

7.2 Clean and degrease as applicable the engine interior, exterior, and parts including but not limited to engine lube oil sump, crankcase, connecting rods, oil galleries, etc.

7.3 Operationally test engine in accordance with OEM break in and testing procedures.

7.4 Repair and/or replace all disturbed and damaged insulation as per original.

7.5 Inspect no. 1 ADG as well as nos. 2 and 3 ADGs for outstanding OEM Service Bulletins.

7.6 Submit a detailed service report including all as found conditions and readings with digital pictures, as released conditions, readings with digital pictures and spare parts used. Report shall be submitted to both the MSCREP and CHENG.

8.0 GENERAL REQUIREMENTS: None additional

REFERENCE 2.2:

ITEM NO
MAINTENANCE DESCRIPTION
MAINTENANCE INTERVAL (hours)
1
Top End Inspection, Vlv Clearence
3000
2
Injector Pop Test
3000
3
Deflection Readings
7500
4
Crank Case Inspection
7500
5
Crankshaft Thrust Play Reading
7500
6
Main Brg Inspection (2 ea)
7500
7
Piston Inspection (2 ea- same V)
7500
8
Big & Small End Brg Inspections (same number as # 7)
7500
9
Liner Inspection (sam number as # 7)
7500
10
Cylinder Head Inspection (same number as # 7)
7500
11
LO, JW and FO Booster Pump Inspections
7500
12
T/C Cartridge Inspections
7500
13
Alternator and Rear Brg Inspection
7500
14
Alternator Air Cooler and Winding Cleaning
15000
15
Complete Overhaul. Replace following: All Injectors, Fuel Injection Valves, All Liners, All Cylinder Heads, All Main and Thrust Brgs, All Big & Small End Brgs, Replace All Cam Shaft Brgs, Replace All Piston Rings, Replace/Service FO Booster and JW Pumps, Replace T/C Cartridges, Replace Charge Air Cooler, Replace / Service LO and JW Coolers
15000
16
Torsional Vibration Damper Inspection
15000
17
Timing and Drive Gear Inspections
15000
18
Flexible Coupling Inspections
15000
19
Resilient Mount and Foundation Bolt Inspections
15000
20
LO and JW Thermostatic Valve Inspections
15000