COMBINED_SYNOPSIS_SOLICITATION_N32205-14-T-3229.docx

DOCX document 95 KB Posted

Attached to
UPS Survey, PLC Survey, Thermographic Survey
Solicitation number
N32205-14-T-3229
Issued by

View the file

Other files

File Type Posted
COMBINED_SYNOPSIS_SOLICITATION_N32205-14-T-3229.docx DOCX document

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

MILITARY SEALIFT COMMAND

N10 - CONTRACTS AND BUSINESS MANAGEMENT DIRECTORATE

COMBINED SYNOPSIS/SOLICITATION TEMPLATE

Military Sealift Command Combined Synopsis and Solicitation Notice Information

1. This is a combined synopsis/solicitation for commercial items prepared in accordance with FAR 12.6, as supplemented with additional information included in this notice. This announcement constitutes the only solicitation; quotes are being requested and a written solicitation will not be issued.

2. Solicitation number is N32205-14-T-3229 and is being issued as a Request for Quotes (RFQ).

3. The solicitation document and incorporated provisions and clauses are those in effect through Federal Acquisition Circular 2005-70, effective 30 Sep 2013.

4. The associated NAICS code is 238210 and this procurement is being set-aside for small businesses.

5. Military Sealift Command (MSC), Norfolk, VA intends to award a firm fixed price purchase order USNS MATTHEW PERRY for the following services:

The requested period of performance for the below service is 04 -30 November 2013.

1. ABSTRACT

This item describes the work required for the UPS Survey; PLC Survey; Thermographic Survey; Switchboard cleaning and related travel.

1. REFERENCES/ENCLOSURES

1. NAVSEA Drawing No. 475-7489155, NASSCO Drawing No. 471-346-0562 LOC, Rev E, Dry Cargo/Ammunition Ship T-AKE 1 Class, “Degaussing System Block Wiring Diagram-List of Connections”

0. Technical Manual Generator, Synchronous, 6600 V, 60 Hz, Including Generator Excitation Control Panel - T9235-AK-MMC-010

0. Technical Manual T-AKE Propulsion Control System - T9235-AN-MMC-010

0. Technical Manual Transformers, Propulsion, Type THT 12HN 7M2N - T9235-AM-MMC-010

0. NAVSEA T/M T9235-AL-MCC-010, Main Power Switchboard, 6.6 KV, 2500A

0. NAVSEA T/M T9324-BU-MMC-010, Switchboards Ships Service 480V

0. NAVSEA T/M T9324-BT-MMC-010, Emergency Switchboard 480V Dwg 2838 For TAKE

0. Cutler Hammer, I.B. 32-255-1G, Instructions for Installation, Operation and Maintenance of Type VCP-W Vacuum Circuit Breakers

0. Cutler Hammer, I.B. 48002, Instructions for 36" Wide Vacuum-Break Starters Rated 360 Amperes, 7200 Volts, Roll Out Type

0. Technical Manual, Bow Thruster Frequency Drive T9568-AZ-MMC-010

0. Technical Manual, Bow Thruster Transformer T9568-A1-MMC-010

0. Technical Manual,Load Centers T9324-BV-MMC-010

0. Technical Manual, Motor Control Centers T6262-AF-MMC-010

0. Technical Manual, Harmonic Filters T9235-AN-MMC-010

0. MSC HV Safety Management Procedures Manual 2.1-016-AKE-Rev 0.1

0. T-AKE Class Notice #5, 25 Feb 2010

1. ITEM LOCATION/DESCRIPTION

2. Location: USNS Matthew Perry(T-AKE 9) Pattaya Thailand (Contractor, Exact Location TBD)

2. Description

1. Provide services to perform the UPS Survey; PLC Survey; Thermographic Survey; Switchboard Cleaning

1. GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES

3. Government Furnished Equipment (GFE): None

3. Government Furnished Material (GFM)

1. Various PLC Batteries needed for replacement

3. Government Furnished Services (GFS): None

1. NOTES

4. Period of Performance: November 4-30, 2013

4. For vessel access the required personnel information must be sent to the SSU Port Engineer, Anh Ho: Anh.Ho@fe.navy.mil .

1. Full Name; Last 4 SSN; Vessel Attending; Reason for Visit; Dates Requiring Access.

4. This vessel contains High Voltage (HV) electrical systems. The Contractor and all Subcontractors shall obey all posted and verbal instructions regarding safety and exclusion from High Voltage areas. At no time shall a Contractor or Subcontractor approach, work on, or enter a High Voltage area without proper authorization.

4. THE USNS T-AKE ELECTRICAL COLOR CODING DOES NOT FOLLOW CONSISTENT COLOR SCHEME. THE SHIP IS KNOWN TO HAVE CURRENT CARRYING CONDUCTORS COLORED GREEN, BLUE, BLACK AND WHITE. THE CONTRACTOR SHALL ASSUME ALL ELECTRICAL CABLES ARE HOT UNTIL TESTED OTHERWISE. THE CONTRACTOR SHALL TEST ALL ELECTRICAL CABLES TO ENSURE THEY ARE DEAD PRIOR TO WORKING ON THE ITEM.

4. For Switchboard Cleaning the following notes apply:

4. Only Qualified individuals possessing High Voltage certificate of Qualification shall be permitted access and work within the safety perimeter established by S/F.

4. Ensure only Contractor and sub-Contractor personnel designated as "Qualified" work on HV equipment.

4. Prepare a list of all Contractor and sub-Contractor personnel identified as "qualified" to:

2. Work in HV spaces

2. Work on HV equipment.

2. Include on the list the specific type of formal qualification training possessed by each individual.

2. Submit copies of the list to the MSCREP and the ship's Chief Engineer before any individual commences HV permit request.

1. QUALITY ASSURANCE: None Additional

1. STATEMENT OF WORK

6. UPS Survey

0. The Contractor shall perform a UPS Survey of all installed UPS units.

0. The survey shall consist of the following

1. Documenting all installed UPS units, part number, model number, manufacturer, installed load and location.

1. Checking the wiring for each unit to determine that it is properly installed.

1. Checking the operation of each unit.

1. Verifying the installed batteries; determine the part number, age of battery and its condition.

1. A complete report shall be provided at the completion of the survey. Any discrepancies shall be detailed and the necessary recommendations shall be provided. An electronic copy of the report shall be provided to the Chief Engineer and Port Engineer.

6. PLC Survey

1. The Contractor shall perform the following while conducting the PLC Survey.

0. Upload all possible obtainable programs from field devices specified on the “Master List”.

0. Note and attempt to upload any new or additional automation equipment not captured on the “Master List”.

0. Update the ship’s inventory of hardware and software pertaining to automation equipment onboard the vessel.

0. Note any unobtainable items in the report.

0. Ensure all software used to conduct the survey described on “T-AKE Deliverables” document is in the ship’s possession.

0. Conduct a brief training course as directed by “Training Outline” document and obtain a sign off.

0. Replace any PLC batteries needed. Replacement batteries shall be provided by the ship.

0. Ensure all demands and needs of the ship are met and will be captured in the completion report. An electronic report shall be provided to the Chief Engineer and Port Engineer.

6. Thermography Survey

2. Survey and report shall meet the requirements of SMART Inspection requirements.

2. The Contractor shall perform the following while conducting the Thermography Survey.

1. The Contractor shall conduct a survey of all load centers, switchboards, etc.

1. At the completion of all surveys the Contractor shall provide an electronic service report to the Chief Engineer and Port Engineer.

6. The Contractor shall demonstrate proper operation of all equipment worked on under this work statement to the Chief Engineer upon completion of all work.

6. Switchboard Cleaning

0. Provide services of a qualified Marine Electrical Specialist(s), labor personnel(s), and tools. The Rep(s) shall be experienced with the T-AKE Class and its HV switchboards and load centers.

0. All technicians have valid HV Qualification Certifications.

0. Have previously accomplished the same work items on this particular ship class.

0. Knowledge and experience with the T-AKE Class and its equipment, operations and procedures.

0. This work item is a potential critical path item and they have proven that this work can be completed within the time frame needed.

0. Technical Representatives shall perform the following:

0. For all the equipment listed under para.7.2.4, subparts 7.2.4.1 thru 7.2.4.36, clean, inspect,tighten all bus bars, lug connections, terminals, relays, trips and contact points.

0. Identify corroded fasteners and hardware requiring replacement,and other discrepancies found. Use technical manuals for guidance. Test as required. Submit an “As found” condition report with test measurements for all findings to the Chief Engineer and Port Engineer.

0. HV Breaker Maintenance:

2. All HV breaker maintenance shall be performed by qualified marine electricians

2. Refer to reference 2.1.1 and 2.1.4 for detailed procedures.

2. Rack out and remove for inspection and maintenance all the switchboard breakers and contactors.

2. Visually inspect drive insulator, barriers and stand-off insulators for dirt and cracking. Clean with lint free cloth or replace cracked piece.

2. Check the insulation integrity of the Main Circuit to Ground, between Main circuit Terminals and Control circuit to ground with a hip potential (Hipot) tester as follows:

Note: The test voltage depends upon the maximum rated voltage of the breaker. For breaker elements rated at 8.25 KV, the test voltage is 27 KVAC.

4. Remove circuit breaker form the switchboard in accordance with Reference 2.1.1. to perform the following tests.

4. Close the breaker. Connect the High Potential lead of the test machine to one of the poles of the breaker. Connect the remaining poles and breaker frame to ground.

4. Start the machine with output potential at zero and increase to the test voltage. Maintain the test voltage for one minute. Repeat for the remaining poles. Successful withstand indicates satisfactory insulation strength of the primary circuit.

2. Visually check the vacuum interrupters by closing the circuit breakers and observing if all the green marks on the moving stems are visible. If a mark is not visible, perform a contact wipe check.

5. The adequacy of the contact wipe can be determined by observing the vacuum interrupter side of the operating rod assembly on a closed circuit breaker. Refer to tech manual for the procedure in determining the contact wipe of blue or red contact springs. If the wipe is not adequate, the vacuum interrupter assembly (pole unit) must be replaced. A field adjustment is not possible.

Note: Failure to replace a pole unit assembly when contact erosion mark is not visible or wipe is unsatisfactory will cause the breaker to fail to interrupt and thereby cause property damage or personal injury.

2. Vacuum Interrupters used in Type VCP-W Vacuum Circuit Breaker Elements Are highly reliable interrupting elements. Satisfactory performance of these devices is dependent upon the integrity of the vacuum in the interrupter and the internal dielectric strength. Both these parameters can be easily checked by a one minute AC High Potential test.

Warning: Applying abnormally high voltage across a pair of contacts in vacuum may produce x-radiation. The radiation increases with the increase in voltage and or decreases in contact spacing. X radiation produced during this test with recommended voltage and normal contact spacing is extremely low and well below maximum permitted by standards. However, as a precautionary measure against possibility of application of higher than recommended voltage and or below normal contact spacing, it is recommended that all operating personnel stand at lest four meters away in front of the breaker element.

Warning: After the high potential is removed, an electrical charge may be retained by the vacuum interrupters. Failure to discharge the residual electrostatic charge could result in an electrical shock. All six primary terminals and the center ring of each vacuum interrupter of the circuit breaker should be grounded to reduce this electrical charge before coming in contact with the primary circuit.

2. Perform vacuum interrupter integrity test as follows:

7. With the breaker element open, connect all top primary studs (bars) together and to the high potential machine lead. Connect all bottom studs together and ground them along with the breaker frame. Start the machine at zero potential, increase to appropriate test voltage and maintain for one minute.

7. Test voltage is 27 KV AC 60hz, per reference 2.1.4 section 6-4.

7. A successful withstand indicates that all interrupters have a satisfactory vacuum level. If there is a breakdown, the defective interrupter or interrupters should be identified by an individual test and replaced before placing the breaker in service.

Note: To avoid any ambiguity in the AC hi potential test due to leakage or displacement (capacitive) current, the test unit should have sufficient volt ampere capacity. It is recommended that the equipment be capable of delivering 25 milliamperes for one minute.

2. Inspect the primary disconnects for evidence of burning or damage. Replace if burned, damaged or eroded,

2. Test the closing and tripping device including disconnects of the circuit breaker twice. Replace any defective device. Identify per troubleshooting chart in reference 2.1.4.

2. Visually check that wiring is securely tied in proper place. Repair or tie as necessary.

2. Visually check that the terminals are tight. Tighten or replace if necessary.

2. Conduct a functional test of the charging motor. Replace brushes if necessary or motor.

2. Make a careful visual inspection of the operating mechanism for any loose or missing parts. Tighten or reinstate if necessary with appropriate tools. Visually check for dust or foreign matter. Clean as necessary.

2. Check for the smooth operation of the operating mechanism. Check for deformation or excessive wear. Submit “as found” condition report when replacement parts are required to the Chief Engineer and Port Engineer.

2. Lubricate operating mechanisms very sparingly with light mineral oil; refer to reference 2.1.4 Figure 6-1 for lubrications points. After lubrication, operate the circuit breaker several times manually and electrically.

2. Check for smooth operation during manual charging, closing and tripping.

2. Conduct a Closure™ Test in accordance with reference 2.1.4 Section 6-9.1

2. After final inspection and upon approval by the ships force authorizing engineer and/or MSCrep and/or competent person reinstall breakers into switchboard.

2. Complete Part 3 of the HV Limitation of Access Permit.

2. Provide a final testreport for each circuit breaker serviced to the Chief Engineer and Port Engineer.

0. HV Contactor Maintenance:

3. All HV Contactor maintenance shall be performed by qualified marine electricians

3. Remove contactor from the switchboard.

3. Visually Inspect contactor for dirt and or grease and clean as needed with lint free cloth.

3. To verify the integrity of the vacuum interrupters a voltage of 16KV-AC should be applied across the open contacts of the interrupters. The voltage should be applied for 60 seconds without breakdown. Breakdown is defined as a current of 5mA or more flowing across the open contacts. Note that approximately 1.3mA of current will flow through each interrupter during the AC test due to the capacitance of the vacuum interrupter. If a DC high potential test unit is used, make certain that the peak voltage does not exceed 23KV, the peak of the corresponding AC RMS test voltage. A megger cannot be used to verify vacuum integrity due to its limited output voltage.

Warning: When a vacuum bottle is tested with voltage over 5000 volts across its open gap there is some possibility of generating X-rays. Test should be minimized and personnel should be not closer than 10 feet this is a precaution until such time as the possible hazard is better understood and standards are published.

Note: Periodic dielectric tests across open contacts should not be omitted on the basis of satisfactory contactor performance since under certain operating conditions, the contactor may perform satisfactorily even though one vacuum interrupter has become defective.

3. Contact material vaporizes from the contact faces during every interruption and condenses elsewhere inside the bottle. This is normal, and is provided for by overtravel or wear allowance. When the contactor is fully closed, there is a gap between the lower bottle nut and a pivot plate. As the contacts wear, this gap decreases. When the gap goes below 0.020 inches on any pole, all the bottle subassemblies should be replaced. Use the 0.020 inch thick fork shaped overtravel feeler gauge supplied for this measurement, part no 5259C11. DO NOT RE-ADJUST THE BOTTLE NUTS TO RESET OVER TRAVEL AS THE CONTACTS WEAR. Once the contactor is place in service, overtravel should be checked but not adjusted.

3. Inspect the primary disconnects for evidence of burning or damage. Replace if burned, damaged or eroded.

3. Test the closing and tripping device including disconnects of the contactor twice. Replace any defective devices.

3. Visually check that wiring is securely tied in proper place. Repair or tie as necessary.

3. Visually check that the terminals are tight. Tighten or replace if necessary.

3. Make a careful visual inspection of the operating mechanism for any loose or missing parts. Tighten or reinstate if necessary with appropriate tools. Visually check for dust or foreign matter.

3. Check for the smooth operation of the operating mechanism. Check for deformation or excessive wear. Submit “As Found” condition report when replacement parts are required.

3. Reinstall all contactors into the switchboard.

3. Complete Part 3 of the HV Limitation of Access Permit.

3. Submit a test report for each HV contactor serviced to the Chief Engineer and Port Engineer.

0. HV Contactor Jumper Cables:

4. Remove and replace the Jumper Cables in the HV Load Center Contactor Cubicles LC1 thru LC12 iaw the guidelines in reference 2.1.15

4. All HV tagouts to be iaw ref 2.1.16

0. Listed Equipment:

5. Ship Service Switchboard No.1

5. Ship Service Switchboard No.2

5. Main HV No.1 XFMR Only

5. Main HV No.2 XFMR Only

5. Emergency Switchboard & XFMR

5. HV Load Center “LC01”

5. HV Load Center “LC02”

5. HV Load Center “LC03”

5. HV Load Center “LC04”

5. HV Load Center “LC05”

5. HV Load Center “LC06”

5. HV Load Center “LC07”

5. HV Load Center “LC08”

5. HV Load Center “LC09”

5. HV Load Center “LC10”

5. HV Load Center “LC11”

5. HV Load Center “LC12”

5. Motor Control Center “A01”

5. Motor Control Center “A02”

5. Motor Control Center “M01”

5. Motor Control Center “M02”

5. Motor Control Center “M03”

5. Motor Control Center “M04”

5. Motor Control Center “M08”

5. Motor Control Center “M09”

5. Motor Control Center “M09”

5. Motor Control Center “M10”

5. Motor Control Center “M11”

5. Motor Control Center “M12”

5. Motor Control Center “M13”

5. Motor Control Center “MV01”

5. Motor Control Center “MV02”

5. Ship Service #1 120V Load Center & XFMR

5. Ship Service #2 120V Load Center & XFMR

5. HV Bow Thruster Converter

5. HV Bow Thruster Transformer Clean and Inspect the Ship Service and Emergency Switchboards including the 120V distribution centers and main 480/120 transformers. Refer to references 2.1.5 & 2.1.6.

0. SS Switchboard #1 and #2: 480V, 6500A, 3Ø, 3W 60Hz, 100 KA RMS System, Point Eight Power, Dwg 2835. Consisting of 2 each buses, with 9 sections per bus and a bus transition section.

6. Four (4) each, Cutler Hammer Model Magnum IEC breaker 6300 AF , 100 KA , 3 Pole ABCABC Draw out, 6300 Amp Sensor/plug 520 LSI Trip unit with 110/120 VAC/VDC Shunt Trip 110/125 5 sec motor operator 110/127VAC/VDC spring release, 110/120 VAC undervoltage Release, 6a/6b Auxiliary Contacts

6. Four (4) each, Cutler Hammer Model Magnum DS breaker 4000AF, 100KA, 3 Pole ABCABC, Draw out, 400 A sensor/Plug 520 LIS trip with 110/127 VAC/VDC Shunt trip, 110/125VAC 5 sec motor operator, 110/127 VAC/VDC spring release.

0. Emergency Switchboard: 480V, 4000A, 3Ø, 3W 60Hz, 85 KA RMS System, Point Eight Power, Dwg 2838. Consisting of 1 each bus with 11 sections

7. Three (3) each, Whipp and Bourne, ACB 4000hr, 4000AF, 3 pole, 500VAC 85000AIC, 80KA Max fixed inst, trip, 480VAC control Power 115/120VAC Close and shunt trip Voltage, 480VAC UVR, 4a/5b Aux Contacts

0. Open all switchboard sections for cleaning access

8. Clean and torque the switchboards in accordance with references 2.5, and 2.6.

8. Document and report all discrepancies found. Prepare and submit “As Found” report to the Chief Engineer and Port Engineer.

0. The Chief Engineer or designee and/or MSCREP shall perform all final close out inspections.

0. Clean and Inspect the 4 Diesel Generators.

Note: Refer to Manufacturer’s tech manual reference 2.1.2 (T9235-AK-MMC-010) for detailed procedures.

10. All work to be accomplished by “HV Qualified” marine electricians.

10. Ensure all holding-down bolts are torqued to manufacturers recommended settings.

10. Check all visible fittings and bolts, including those holding the cooler to the cover.

10. Visually inspect bearings:

3. Inspect for oil leakage and note findings.

3. Clean cooling coil fins on bearing pedestal and bearing insulation.

3. Ensure all debris (dirt, dust, etc.) are removed from insulation.

3. Visually inspect for water leakage.

3. Visually inspect inside emergency panel.

0. The Polarization Index (PI) of a generator's windings.

11. Prior to measuring the insulation resistance, remove all external connections to the machine and completely discharge the windings to the grounded machine frame.

11. Apply a constant 500 volts DC between the winding and the ground using a direct-indicating megohmeter, for 10 minutes.

11. The PI is a calculated ratio of the 10-minute to the 1-minute value of the insulation resistance, measured consecutively. Record resistance values after 1-minute and after 10-minutes. The calculation is as follows:

Polarization Index (PI) = Resistance after 10 minutes/Resistance after 1 minute.

11. Tested values should be compared against previous readings to track changes. If history is not available, the recommended minimum values of PI for all machine components insulation classes per IEC 60085-01:1984 are:

Thermal Class Rating --- Minimum PI Class A --- 1.5 Class B --- 2.0 Class F --- 2.0 Class H --- 2.0 Note: These are the lowest values at which a winding is recommended for an over-voltage test or for operation. The PI test is not applicable to non-insulated field windings. Very high PI (greater than 8) for varnished cambric, shellac mica-folium, or asphaltic stator windings may indicate that the insulation has been thermally aged and may be at risk of failure. Physical inspection can be used to confirm if the insulation is dry and brittle.

11. Check brushes for any damage, excessive wear or excessive deterioration.

11. Check for proper spring tension.

11. Inspect brushes for freedom of movement in holder (Brush length, replace if required)

11. Inspect brushes for contact to commutator.

11. Inspect brush holders and rigging for alignment. Brush holders should have a radial clearance from collector rings as specified by manufacturer specs. Inspect smoothness.

11. Document and report all discrepancies found. Prepare and submit “As Found” report to the Chief Engineer and Port Engineer.

0. The Chief Engineer or designee and/or MSCREP shall perform all final close out inspections.

0. Clean/Inspect 4 Propulsion Transformers:

13. Inspect the interior for any signs of moisture or corrosion:

13. Visually examine the molded case circuit breaker mountings and windings for excessive dirt and dust build up. Ensure that the insulation material has not been cracked or broken.

13. Visually examine the bus bars, stabs, studs, etc. for discoloration caused by excessive heat.

13. Inspect as much of the panel wiring as possible for chaffing or cracked insulation. Ensure that all cable clamps are secure.

13. Observe all indicating lights and meters to insure that they are functioning properly. If indicating lights are not functioning, check bulbs to insure that they are not burned out. If a bulb is burned out always replace with a bulb of equal wattage and voltage.

13. Thoroughly clean all surfaces, especially the conducting parts, by means of lint free cloth and vacuum cleaner. It is not recommended to use a high-pressure air line to blow the dust away. Do not use solvents or any kind of liquid (especially on the coils).

13. Clean all ventilation grills, louvers, or openings.

13. Check and if necessary, re-tighten all hardware and wire connections.

13. Check the condition of all painted surfaces. This applies to the core, the enclosure and other structural metallic parts. Remove traces of rust, if any, by means of wire brush. When necessary, apply locally two coats of new paint. Only a temperature resistant (155 °C) and insulating paint should be used.

13. Check the operating settings and correct function of the thermal protection device.

13. Check the operating setting and correct function of cooling fans (if fitted) for forced ventilation.

0. Clean/Inspect 4 Propulsion Freq. Converters:

Note: Refer to manufacturer’s Technical Manual (T9235-AN-MMC-10) for detailed procedures.

14. All work to be accomplished by ‘HV Qualified’ marine electricians.

14. Visually inspect converter components for general/overall clean condition of the interior and exterior cabinets.

14. Inspect frame paint for signs of corrosion

14. Inspect bars for possible signs overheating

14. Inspect cabinet for signs of water leakage.

14. Inspect semi-conductor-heat sink sets.

14. Inspect capacitors for signs of overheating, and swelling.

14. Inspect resistors for signs of overheating.

14. Inspect terminal blocks for overheating, or corrosion.

14. Inspect wiring for damage, overheating, or corrosion

14. Inspect associated electronic boards for overheating, or corrosion.

14. Check the water pressure. Pressure should be set at 1.5 bar (21.8 PSI)

14. Bleed de-ionized water system via VD090. Close tap as soon as water appears.

14. Check the condition of air filters. Clean air filters if it can be done or replace if necessary. (Have enough air filters on hand to replace if needed. Any air filters not used will be turned over to Ship’s force.)

0. Clean/Inspect 2ea Harmonic Filters:

Note:Refer to manufacturer’s tech manual (T9235-AN-MMC-010) for detailed procedures.

15. All work to be accomplished by “HV Qualified” marine electricians.

15. Remove or open access covers/doors.

15. Visually inspect resistor elements and insulation components for signs of wear, corrosion, erosion, defects, or deterioration.

15. Using low pressure compressed air, dry cloth or brush, remove dust/debris accumulation from the insulating components. Note, do not force any cleaning equipment into the resistor bank assembly.

15. Test the leakage detector, PT100 Sensor, Thermal Relay, and unbalanced relay. Compare values with tables/ acceptance criteria found in Tech Manual.

15. Visually inspect unit and fans for abnormal noise and/or imbalance.

15. Inspect heat exchanger connections, unions, and joints for leaks.

15. Inspect capacitors (externally) for any signs of leakage, or signs of overheating at terminals.

15. Ensure all connections are tight.

15. Using a megger with a range of 500-1000VDC Perform insulation test of the 115VAC supply.

a.Jumper XT1 01/02/03/04 together.
b.115VAC acceptance criteria: Resistance > 1MOhm.

15. Using a megger with a range of 500-1000VDC Perform insulation test of the 460VAC supply.

a.Jumper ABC for M191 and ABC for M194 together.
b.460VAC acceptance criteria: Resistance > 1MOhm.

15. Using a megger with a range of 500-1000VDC Perform insulation test of the 6.6KV supply.

a.Jumper ABC.
b.6.6KV acceptance criteria: Resistance > 7.6MOhm.
c.Remove all jumpers.

15. Check power supply (voltage verification) of the heater, 115VUPS, and fan. Compare readings to acceptance criteria found in Technical Manual.

15. Clean heat exchanger air side using a vacuum cleaner or compressed air.

a.Using compressed air, blow clean in the opposite direction of normal air flow.
b.Clean filter and heat exchanger housing, removing debris from unit.

15. Inspect and clean the inductor/reactors.

0. Document and report discrepancies found. Submit “As Found” condition report to the Chief Engineer and Port Engineer.

0. The Chief Engineer or designee and/or MSCREP shall perform all final close out inspections.

0. Provide Technical services to perform a UPS survey on the USNS Matthew Perry.

1. Perform survey of all fixed UPS units installed throughout the ship.

0. Document all UPS Units for part numbers, model numbers, manufacturer, Battery age, load, location, system the UPS supports and over condition.

0. Provide all labor, material, rigging and staging required to perform the survey.

0. Perform electrical checks to ensure the UPS units are installed and operate satisfactory

0. Notify the Chief Engineer and Port Engineer in writing of all discrepancies found during the UPS Unit survey.

1. GENERAL REQUIREMENTS:

7. Enterprise-Wide Contractor Manpower Reporting Application (ECMRA)

The contractor shall report ALL contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Military Sealift Command via a secure data collection site. Contracted services excluded from reporting are based on Product Service codes (PSCs). The excluded PSCs are:

(1) W, Lease/Rental of Equipment

(2) X, Lease/Rental of Facilities

(3) Y, Construction of Structures and Faciulities

(4) S, Utilities ONLY and

(5) V, Freight and Shipping Only.

The contractor is required to completely fill in all required data fields using the following web address: https://doncmra.nmci.navy.mil.

Reporting inputs will be for the labor executed during the period of performance during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year. Contractors may direct questions to the help desk, linked at https://doncmra.nmci.navy.mil

6. The provision at FAR 52.212-1, Instructions to Offerors – Commercial applies to this acquisition and is amended as follows:

52.212-1 (ADDENDUM) ADDITIONAL INSTRUCTIONS TO OFFERORS--COMMERCIAL ITEMS

a. After receipt of quotes the Government may, with or without notice, negotiate with and, if desired, seek quote revisions from as many or as few quoters as it, in its discretion, deems appropriate.

b. The term “offeror” or “offer” as used in FAR 52.212-1 shall be understood to mean “quoter” and “quote,” respectively. Further, the term “award” shall be understood to describe the Government’s issuance of an order.

c. The following paragraphs in FAR 52.212-1 shall not apply to this RFQ: a, b, c, f (except f(4)), and l.

d. The Government will consider all quotes that are timely received and may consider late quotes. Failure of a quote to address any items required in the submission package may make a quote unacceptable.

e. SUBMISSION PACKAGE

1. The quote shall contain the following:

a. price quote which identifies the requested item(s), unit price, and extended price.

b. Firm Fixed - Price Total

c. Remittance address, Tax identification Number, DUNS number and Cage Code

d. FAR 52.212-3—Offeror Representations and Certifications—Commercial Items. An offeror shan complete only paragraphs (b) of this provision if the offer has completed the annual representations and certificates electronically via http://www.acquisition.gov/ if an offer has not completed the annual representations and certifications electronically at the System for Award Management (SAM) website, the offer shall complete only paragraph (c) through (o) of this provision.echnica, and other information needed for evaluation. See FAR Provision at 52.212-3

All quoters must include a completed copy of FAR 52.212-3, Offeror Representations and Certifications – Commercial Items with its offer.

2. Responses to this solicitation are due 25 October 2013 at 0800 local time, Norfolk, VA. Quotes may be emailed to tommy.a.hale@navy.mil or faxed via 757-443-5982 Attn: Tommy Hale. Please reference the solicitation number on your quote.

3. Offers/quotes submitted in response to this solicitation shall not contain nor be subject to the offeror's/vendor's standard commercial terms and conditions. Any offer/quote submitted in response to this solicitation which includes the offeror's/vendor's standard commercial terms and conditions may be considered a material defect and may be rejected as being non-responsive to the solicitation.

4. LABOR:

Contractor must provide a copy of published hourly/daily rates for documentation.

Labor Rates: $________ straight time X (number of hours) _______; $_______ overtime X (number of hours) __________; $__________ double or holiday X (number of hours) ________.

Specify the number of hours per person for any applicable labor rates.

MATERIALS:

Estimated materials: Provide a detailed list of all estimated materials, the cost for each and the part numbers (if applicable).

List any other cost, which does not fall with the above categories (i.e. travel, per diem, rental car, hotel, administrative fees, etc..):

Provide any contract numbers for purchase orders in which you have previously performed this work: ______________________________________________.

Firm Fixed Price Total (includes all charges): $__________________________.

Company Name: _______________________

CAGE Code: ____________________

DUNS Number: ____________________

Tax Identification Number: _____________________

7. The clause at FAR 52.212-4, Contract Terms and Conditions – Commercial Items applies to this acquisition.

8. The clause at FAR 52.212-5, Contract Terms and Conditions Required To Implement Statutes Or Executive Orders – Commercial Items applies to this acquisition. The following additional FAR clauses contained within FAR 52.212-5 are applicable to this acquisition:

52.204-7System for Award Management
52.212-1Instructions to Offerors-Commercial Items;
52.212-3Offeror Representations and Certifications – Commercial Items
(Offerors are advised to include a completed copy of this provision with their quote or a statement stating that it is available via the SAM website, https://www.acquisition.gov.)
52.212-3ALT I Offeror Representations and Certifications -- Commercial Items.
52.212-4Contract Terms and Conditions-Commercial Items;
52.212-5Contract Terms and Conditions Required to Implement Statutes or Executive Orders – Commercial Items
52.233-4Applicable Law for Breach of Contract Claim
52.204-10Reporting Executive Compensation and First-Tier Subcontract Awards
52.209-6Protecting the Government’ Interest When Subcontracting with Contractors Debarred, Suspended, or Proposed for Debarment
52.222-3Convict Labor,
52.222-19Child Labor - Cooperation with Authorities and Remedies,
52.222-21Prohibition of Segregated Facilities,
52.222-26Equal Opportunity,
52.222-36Affirmative Action for Workers with Disabilities
52.222-41Service Contract Act
52.222-42Statement of Equivalent Rates for Federal Hires
52.223-18Contractor Policy to Ban Text Messaging While Driving
52.225-13Restrictions on Certain Foreign Purchases, and
52.232-33Payment by Electronic Funds Transfer --Central Contractor Registration
52.222-50Combating Trafficking in Persons
52.215-5Facsimile Proposals: (757) 443-5982
52.225-25Prohibition on Contracting with Entities Engaging in Sanctioned Activities Relating to Iran—Representation and Certification
52.232-18Availability of Funds (only used with an unapproved budget, not standard)
52.247-64Preference for Privately Owned U.S.-Flag Commercial Vessels
252.203-7000Requirements Relating to Compensation of Former DoD Officials
252.203-7002Requirement to Inform Employees of Whistleblower Rights
252.203-7005Representation Relating to Compensation of Former DoD Officials
252.204-7000Disclosure if Information
252.204-7003Control of Government Personnel Work Product
252.211-7003Item Identification and Valuation;
252.225-7000Buy American Act and Balance of Payment Program Certificate
252.225-7001Buy American and Balance of Payments Program
252.225-7048Export-Controlled Items
252.232-7003Electronic Submission of Payment Requests and Receiving Reports
252.246-7003Notification of Potential Safety Issues
252.247-7023Transportation of Supplies by Sea
252.247-7023Transportation of Supplies by Sea Alternate III

52.204-13 SYSTEM FOR AWARD MANAGEMENT MAINTENANCE (JULY 2013)

(a) Definitions. As used in this clause--

Data Universal Numbering System (DUNS) number means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities, which is used as the identification number for Federal Contractors.

Data Universal Numbering System+4 (DUNS+4) number means the DUNS number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the business concern to establish additional SAM records for identifying alternative Electronic Funds Transfer (EFT) accounts (see the FAR at subpart 32.11) for the same concern.

Registered in the System for Award Management (SAM) database means that—

(1) The Contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, the Contractor and Government Entity (CAGE) code, as well as data required by the Federal Funding Accountability and Transparency Act of 2006 (see subpart 4.14), into the SAM database;

(2) The Contractor has completed the Core, Assertions, Representations and Certifications, and Points of Contact sections of the registration in the SAM database;

(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS). The Contractor will be required to provide consent for TIN validation to the Government as a part of the SAM registration process; and

(4) The Government has marked the record ``Active''.

System for Award Management (SAM) means the primary Government repository for prospective Federal awardee and Federal awardee information and the centralized Government system for certain contracting, grants, and other assistance-related processes. It includes—

(1) Data collected from prospective Federal awardees required for the conduct of business with the Government;

(2) Prospective contractor-submitted annual representations and certifications in accordance with FAR subpart 4.12; and

(3) Identification of those parties excluded from receiving Federal contracts, certain subcontracts, and certain types of Federal financial and non-financial assistance and benefits.

(b) The Contractor is responsible for the accuracy and completeness of the data within the SAM database, and for any liability resulting from the Government's reliance on inaccurate or incomplete data. To remain registered in the SAM database after the initial registration, the Contractor is required to review and update on an annual basis, from the date of initial registration or subsequent updates, its information in the SAM database to ensure it is current, accurate and complete. Updating information in the SAM does not alter the terms and conditions of this contract and is not a substitute for a properly executed contractual document.

(c)(1)(i) If a Contractor has legally changed its business name, doing business as name, or division name (whichever is shown on the contract), or has transferred the assets used in performing the contract, but has not completed the necessary requirements regarding novation and change-of-name agreements in subpart 42.12, the Contractor shall provide the responsible Contracting Officer a minimum of one business day's written notification of its intention to—

(A) Change the name in the SAM database;

(B) Comply with the requirements of subpart 42.12 of the FAR; and

(C) Agree in writing to the timeline and procedures specified by the responsible Contracting Officer. The Contractor shall provide with the notification sufficient documentation to support the legally changed name.

(ii) If the Contractor fails to comply with the requirements of paragraph (c)(1)(i) of this clause, or fails to perform the agreement at paragraph (c)(1)(i)(C) of this clause, and, in the absence of a properly executed novation or change-of-name agreement, the SAM information that shows the Contractor to be other than the Contractor indicated in the contract will be considered to be incorrect information within the meaning of the ``Suspension of Payment'' paragraph of the electronic funds transfer (EFT) clause of this contract.

(2) The Contractor shall not change the name or address for EFT payments or manual payments, as appropriate, in the SAM record to reflect an assignee for the purpose of assignment of claims (see FAR subpart 32.8, Assignment of Claims). Assignees shall be separately registered in the SAM. Information provided to the Contractor's SAM record that indicates payments, including those made by EFT, to an ultimate recipient other than that Contractor will be considered to be incorrect information within the meaning of the ``Suspension of Payment'' paragraph of the EFT clause of this contract.

(3) The Contractor shall ensure that the DUNS number is maintained with Dun & Bradstreet throughout the life of the contract. The Contractor shall communicate any change to the DUNS number to the Contracting Officer within 30 days after the change, so an appropriate modification can be issued to update the data on the contract. A change in the DUNS number does not necessarily require a novation be accomplished. Dun & Bradstreet may be contacted—

(i) Via the internet at http://fedgov.dnb.com/webform or if the Contractor does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if located within the United States; or

(ii) If located outside the United States, by contacting the local Dun and Bradstreet office.

(d) Contractors may obtain additional information on registration and annual confirmation requirements at https://www.acquisition.gov.

252.204-7004 ALTERNATE A, SYSTEM FOR AWARD MANAGEMENT (MAY 2013)

(a) Definitions. As used in this clause--

``System for Award Management (SAM) database'' means the primary Government repository for contractor information required for the conduct of business with the Government.

``Commercial and Government Entity (CAGE) code'' means—

(1) A code assigned by the Defense Logistics Information Service (DLIS) to identify a commercial or Government entity; or

(2) A code assigned by a member of the North Atlantic Treaty Organization that DLIS records and maintains in the CAGE master file. This type of code is known as an ``NCAGE code.''

``Data Universal Numbering System (DUNS) number'' means the 9-digit number assigned by Dun and Bradstreet, Inc. (D&B) to identify unique business entities.

``Data Universal Numbering System +4 (DUNS+4) number'' means the DUNS number assigned by D&B plus a 4-character suffix that may be assigned by a business concern. (D&B has no affiliation with this 4-character suffix.) This 4-character suffix may be assigned at the discretion of the business concern to establish additional SAM records for identifying alternative Electronic Funds Transfer (EFT) accounts (see FAR 32.11) for the same parent concern.

``Registered in the System for Award Management (SAM) database'' means that—

(1) The contractor has entered all mandatory information, including the DUNS number or the DUNS+4 number, and Contractor and Government Entity (CAGE) code into the SAM database;

(2) The contractor has completed the Core Data, Assertions, Representations and Certifications, and Points of Contact sections of the registration in the SAM database;

(3) The Government has validated all mandatory data fields, to include validation of the Taxpayer Identification Number (TIN) with the Internal Revenue Service (IRS). The Contractor will be required to provide consent for TIN validation to the Government as part of the SAM registration process; and

(4) The Government has marked the record ``Active.''

(b)(1) By submission of an offer, the offeror acknowledges the requirement that a prospective awardee shall be registered in the SAM database prior to award, during performance, and through final payment of any contract, basic agreement, basic ordering agreement, or blanket purchasing agreement resulting from this solicitation.

(2) The offeror shall enter, in the block with its name and address on the cover page of its offer, the annotation “DUNS” or “DUNS +4” followed by the DUNS or DUNS +4 number that identifies the offeror's name and address exactly as stated in the offer. The DUNS number will be used by the Contracting Officer to verify that the offeror is registered in the SAM database.

(c) If the offeror does not have a DUNS number, it should contact Dun and Bradstreet directly to obtain one.

(1) An offeror may obtain a DUNS number--

(i) Via the Internet at http://fedgov.dnb.com/webform or if the offeror does not have internet access, it may call Dun and Bradstreet at 1-866-705-5711 if located within the United States; or

(ii) If located outside the United States, by contacting the local Dun and Bradstreet office. The offeror should indicate that it is an offeror for a U.S. Government contract when contacting the local Dun and Bradstreet office.

(2) The offeror should be prepared to provide the following information:

(i) Company legal business.

(ii) Tradestyle, doing business, or other name by which your entity is commonly recognized.

(iii) Company Physical Street Address, City, State, and Zip Code.

(iv) Company Mailing Address, City, State and Zip Code (if separate from physical).

(v) Company Telephone Number.

(vi) Date the company was started.

(vii) Number of employees at your location.

(viii) Chief executive officer/key manager.

(ix) Line of business (industry).

(x) Company Headquarters name and address (reporting relationship within your entity).

(d) If the Offeror does not become registered in the SAM database in the time prescribed by the Contracting Officer, the Contracting Officer will proceed to award to the next otherwise successful registered Offeror.

(e) Processing time, which normally takes 48 hours, should be taken into consideration when registering. Offerors who are not registered should consider applying for registration immediately upon receipt of this solicitation.

(f) Offerors may obtain information on registration at https://www.acquisition.gov.

252.232-7010 LEVIES ON CONTRACT PAYMENTS (DEC 2006)

(a) 26 U.S.C. 6331(h) authorizes the Internal Revenue Service (IRS) to continuously levy up to 100 percent of contract payments, up to the amount of tax debt.

(b) When a levy is imposed on a payment under this contract and the Contractor believes that the levy may result in an inability to perform the contract, the Contractor shall promptly notify the Procuring Contracting Officer in writing, with a copy to the Administrative Contracting Officer, and shall provide--

(1) The total dollar amount of the levy;

(2) A statement that the Contractor believes that the levy may result in an inability to perform the contract, including rationale and adequate supporting documentation; and

(3) Advice as to whether the inability to perform may adversely affect national security, including rationale and adequate supporting documentation.

(c) DoD shall promptly review the Contractor's assessment, and the Procuring Contracting Officer shall provide a written notification to the Contractor including--

(1) A statement as to whether DoD agrees that the levy may result in an inability to perform the contract; and

(2)(i) If the levy may result in an inability to perform the contract and the lack of performance will adversely affect national security, the total amount of the monies collected that should be returned to the Contractor; or

(ii) If the levy may result in an inability to perform the contract but will not impact national security, a recommendation that the Contractor promptly notify the IRS to attempt to resolve the tax situation.

(d) Any DoD determination under this clause is not subject to appeal under the Contract Disputes Act.

252.232-7998 Obligations in Advance of Fiscal Year 2014 Funding (DEVIATION 2014-O0001 Oct 2013)

The Department of Defense has the authority to enter into this contractual action and to obligate the Government in advance of appropriations; however, appropriated funds are not currently available to make payments under this contract to liquidate this obligation. When appropriated funds become available, the Government will make payment in accordance with the terms of this contract, including the payment of interest where applicable under the Prompt Payment Act. This clause supersedes conflicting terms of any other provision in this contract dealing with contract payment or financing until funds are made available to the Contracting Officer for this contractual action.

52.252-1 Solicitation Provisions Incorporated by Reference

This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these addresses:

http://farsite.hill.af.mil/vffara.htm http://farsite.hill.af.mil/vfdfara.htm

52.252-2 CLAUSES INCORPORATED BY REFERENCE (FEB 1998)

This contract incorporates one or more clauses by reference with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause my be accessed electronically at this/these address(es):

http://farsite.hill.af.mil/vffara.htm http://farsite.hill.af.mil/vfdfara.htm

52.252-5 Authorized Deviations in Provisions

(a) The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) provision with an authorized deviation is indicated by the addition of “(DEVIATION)” after the date of the provision.

(b) The use in this solicitation of any Defense Federal Acquisition Regulation Supplement (48 CFR Chapter 2) provision with an authorized deviation is indicated by…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .