CODE

(Hour)

PAGE(S)

until 12:00 AM local time 31 May 2023

X

A

X B

X C X D

EX

X

G

F 45 - 53

54 - 68

X H 69 - 74 michael.broomfield@nrl.navy .mil

RATING PAGE OF PAGES

7. ISSUED BY

(Date)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

Previous Edition is Unusable 33-134 STANDARD FORM 33 (REV. 9-97)

Prescribed by GSA

FAR (48 CFR) 53.214(c)

DO-C9 1 74

(If other than Item 7)

15A. NAME 16. NAME AND TITLE OF PERSON AUTHORIZED TO

AND

ADDRESS

SIGN OFFER (Type or print)

OF

OFFEROR

AMENDMENT NO. DATE

15B. TELEPHONE NO (Include area code) 17. SIGNATURE15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

18. OFFER DATE

1. THIS CONTRACT IS A RATED ORDER

UNDER DPAS (15 CFR 700)

2. CONTRACT NO.

N00173 8. ADDRESS OFFER TO

See Item 7

9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if handcarried, in the depository located in

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and

N/A conditions contained in this solicitation.

10. FOR INFORMATION

CALL:

A. NAME (NO COLLECT CALLS)

MICHAEL H BROOMFIELD 202-924-3838

11. TABLE OF CONTENTS

SOLICITATION/ CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/ COSTS

2 - 4

X I CONTRACT CLAUSES

DESCRIPTION/ SPECS./ WORK STATEMENT X

PACKAGING AND MARKING

5 - 10

J LIST OF ATTACHMENTS

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

13 - 14 X K

REPRESENTATIONS, CERTIFICATIONS AND

OTHER STATEMENTS OF OFFERORS

CONTRACT ADMINISTRATION DATA 15 - 24 X

SPECIAL CONTRACT REQUIREMENTS

OFFER (Must be fully completed by offeror) 25 - 30 X M

L INSTRS., CONDS., AND NOTICES TO OFFERORS

EVALUATION FACTORS FOR AWARD

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause No. 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments

AMENDMENT NO. DATE

to the SOLICITATION for offerors and related documents numbered and dated):

FACILITY

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period

SOLICITATION, OFFER AND AWARD

X

(X) SEC. DESCRIPTION (X) SEC. DESCRIPTION PAGE(S)

PART I - THE SCHEDULE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28. AWARD DATE

EMAIL:TEL: (Signature of Contracting Officer)

CODE CODE

B. TELEPHONE (Include area code) C. E-MAIL ADDRESS

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION:

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( ) (4 copies unless otherwise specified)

23. SUBMIT INVOICES TO ADDRESS SHOWN IN ITEM

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

PART IV - REPRESENTATIO NS AND INSTRUCTIO NS

PART III - LIST O F DO CUMENTS, EXHIBITS AND O THER ATTACHMENTS

31 - 43

PART II - CO NTRACT CLAUSES

NAVAL RESEARCH LABORATORY

4555 OVERLOOK AVE SW

WASHINGTON DC 20375

(202) 767-3155

FAX:

TEL:

FAX:

TEL:

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

6. REQUISITION/PURCHASE NO.

1301033095

5. DATE ISSUED

25 Apr 2023

4. TYPE OF SOLICITATION

SEALED BID (IFB)

NEGOTIATED (RFP)

[ X ]

3. SOLICITATION NO.

N0017323RMB12

Section B - Supplies or Services and Prices

ITEM NO SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

LABOR

CPFF

The Contractor shall conduct scientific, engineering, technical, and analytical

Research and Development (R&D) for a wide range of NRL research projects supporting NRL's Electronic and Optoelectronic Research for the Electronics

Science and Technology Division. The Contractor shall furnish all labor required to accomplish task orders issued pursuant to the requirements contained in the Statement of Work (SOW) at Section C.

Contract types for task orders placed under this indefinite delivery/indefinite quantity CLIN can be CPFF - Term or Completion Type as depending on the requirements of the task orders. Each task order will contain its individual SOW and pricing.

Ordering Period: Five (5) years from date of contract award.

FOB: Destination

PURCHASE REQUEST NUMBER: 1301033095

PSC CD: AJ13

ESTIMATED COST

FIXED FEE

TOTAL EST COST + FEE

MATERIAL & SUPPLIES

COST

Material and Supplies in support of NRL's Electronic and Optoelectronic

Research for the Electronics Science and Technology Division. The

Contractor shall furnish all materials, equipment and supplies required to accomplish task orders issued pursuant to the requirements contained in the

Statement of Work (SOW) at Section C. CLIN type for materials, equipment and supplies under this IDIQ contract shall be cost only, no fee.

Ordering Period: Five (5) years from date of contract award.

FOB: Destination

TRAVEL

COST

Travel in support of NRL's Electronic and Optoelectronic Research for the

Electronics Science and Technology Division. The

Contractor shall furnish all travel support required to accomplish task orders issued pursuant to the requirements contained in the Statement of Work (SOW) at

Section C.

CLIN type for travel support under this IDIQ contract shall be cost only, no fee.

Travel will be reimbursed at actual direct cost in accordance with the limitations set forth in FAR 31.205-46 and IAW the Joint Travel Regulations (JTR).

Ordering Period: Five (5) years from date of contract award.

Contract Data Requirements List (CDRL)

The Contractor shall furnish all data as required by the Contract Data

Requirements List (CDRL), DD Form 1423, which is hereby incorporated as

Exhibit A.

NET AMT

CAP Delivery CLIN

Contractor-Acquired Property (CAP) Delivery CLIN

This NSP CLIN is for delivery of CAP Items under Task Order(s). Once delivered and accepted by the Government, the Government assumes title and the items become GFP. All items meeting the IUID criteria of DFARS 211.274-2 shall be marked and reported in the IUID registry upon delivery IAW DFARS

252.211-7003.

Not Separately Priced CLIN

NET AMT

MAXIMUM VALUE

B-1 CONTRACT MINIMUM/MAXIMUM QUANTITY AND CONTRACT VALUE

The minimum quantity and contract value for all orders issued against this contract shall not be less than the minimum quantity and contract value stated in the following table. The maximum quantity and contract value for all orders issued against this contract shall not exceed the maximum quantity and contract value stated in the following table.

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

$2,500.00 $TBD

B-2 CLIN DELIVERY/TASK ORDER MINIMUM/MAXIMUM QUANTITY AND CLIN ORDER VALUE

The minimum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not be less than the minimum quantity and order value stated in the following table. The maximum quantity and order value for the given Delivery/Task Order issued for this CLIN shall not exceed the maximum quantity and order value stated in the following table.

CLIN

MINIMUM

QUANTITY

MINIMUM

AMOUNT

MAXIMUM

QUANTITY

MAXIMUM

AMOUNT

0005 $ $

Section C - Descriptions and Specifications

STATEMENT OF WORK

STATEMENT OF WORK

Electronic and Optoelectronic Research for the Electronics Science and

Technology Division (Unclassified)

Section 1 Background.

1.1. The Electronics Sciences and Technology Division (ESTD), Code 6800, of the U.S.

Naval Research Laboratory is engaged in the development of advanced semiconductor materials, devices, and circuits for use in a variety of applications including optoelectronics, microwave devices, and power electronics. The potential application areas for these new technologies address a broad range of military missions, so the research includes reliability testing, physics of failure analysis, and environmental testing including nuclear and space radiation effects.

1.2. The mission of ESTD is to produce novel electronic devices having advanced properties and capabilities, and to transition these devices to the warfighter. This is achieved through coordinated modeling, simulation, and design efforts to produce new device designs.

These designs are realized in working devices through semiconductor growth and fabrication, and the device performance is measured in the characterization laboratories within ESTD. ESTD researches technologies ranging from basic electronic materials to high-powered electronics, to high-speed microwave devices, to optoelectronics, to quantum technologies for sensing, communications and computing, each with their own critical performance parameters such as efficiency of operation, responsiveness, and power output.

Section 2 Objective/ Scope. The present SOW addresses the ESTD mission by making skilled expertise available to ESTD in key technical areas where there are gaps in the ESTD expertise for specific technical areas.

2.1. The Requirements in section 4 (§4) consist of six subsections that can be broken down into four main areas. The contractor is expected to demonstrate expertise in each of these areas.

2.1.1. Modeling and simulation. Modeling and Simulation is the use of models (e.g., physical, mathematical, or logical representation of a system, entity, phenomenon, or process) as a basis for simulations to develop data utilized for managerial or technical decision making. [refs. 3.1, 3.2].

2.1.2. Fabrication. Fabrication requires the use of NRL facilities. Specifically, optoelectronic materials and/or colloidal nanostructures must be fabricated. The materials must be fabricated into optoelectronic devices, and the devices must be fabricated into functional circuits.

2.1.3. Characterization. Characterization refers to probing the electronic and optoelectronic characteristics of the materials, devices and circuits fabricated using techniques as specified below and in ref. 3.3.

2.1.4. Iteration. The state-of-the-art in optoelectronics technology is dynamic and evolving. As such, this research program must contain iterative stages of development, each stage depending on the results of the previous stage. The contractor must have experience in producing results from modeling, simulation, fabrication, and characterization, experience in analyzing those results, and experience in making appropriate decisions that best continue the advancement of the technology.

Section 3 References and Applicable Documents.

3.1. "Department of Defense INSTRUCTION NUMBER 5000.61: Modeling and

Simulation (M&S) Verification, Validation, and Accreditation" (PDF). Department of

Defense. 2009-12-09. Archived from the original (PDF) on July 14, 2007.

3.2. "Department of Defense DIRECTIVE NUMBER 5000.59: DoD Modeling and

Simulation (M&S) Management" (PDF). Department of Defense. 2007-08-08. Archived from the original (PDF) on July 10, 2007.

3.3. Schroder, Dieter K., Semiconductor Material and Device Characterization, 3rd Ed.

(John Wiley and Sons, Inc. Hoboken, New Jersey) 2006.

3.4. Fenton, Mike (2016). "Restoring executive confidence: Red Team operations", Network

Security 2016 (11) pp. 5–7.

Section 4 Requirements (Performance Work Statement) .

4.1. Modeling and Simulation

4.1.1 The contractor shall be expected to develop and augment NRL software for the design and simulation of the band structure and operation of optoelectronic device structures including barrier, single-junction, and multi-junction heterostructures composed of III-V bulk and superlattice layers.

4.1.2. The contractor shall be expected to use the NRL software to design optoelectronic heterostructure devices composed of III-V bulk and superlattice layers, that meet specified criteria.

4.1.3. The contractor shall be expected to use the NRL software to analyze experimental data extracted by NRL from such optoelectronic heterostructures, to evaluate the design and help identify material and structural parameters consistent with measured electronic and optical properties.

4.1.4. The contractor shall be expected to augment the NRL software with improved models for the simulation of the optical constants for ternary and quaternary III-V alloys and other material systems, and to validate those models.

4.1.5. The contractor shall be expected to augment the NRL software with improvements to the graphical user interface and program functionality, and by extending and refining the built-in material database.

4.1.6. The contractor shall be fully conversant in the programming languages, theoretical physics, algorithms, and numerical methods employed in the NRL software in order to provide timely design and analysis support to NRL, in order to meet deliverable schedules. In particular, the contractor shall have expertise in the

“C-Sharp” programming language used to implement the graphical user interface of the NRL software.

4.1.7. The contractor shall have the theoretical, mathematical, and numerical programming skills for: The simulation of optical and electronic transport in novel optoelectronic devices, including multi-junction heterostructures utilizing bulk, superlattice, and low-dimensional quantum-confined structures; The simulation of optical transport in complex layered medium consisting of semiconductors, dielectrics, and metals, and accounting for bulk absorption and internal reflections from specular and diffuse optical interfaces; The simulation of the optical constants for ternary and quaternary III-V alloys and other material systems.

4.1.8. The contractor shall be skilled in the experimental and analytical methods to determine the optical constants of novel thin film materials, including infrared spectral ellipsometry and infrared transmission spectroscopy.

4.1.9. The contractor shall provide reports on modeling and simulations as per

CDRL A001 in §8 and Appendix A.

4.2. Fabrication

4.2.1. The contractor shall be expected to develop processing protocol using NRL cleanroom facilities for the fabrication of microcells primarily for photovoltaic and light-emitter applications with alignment tolerance within +/- 3 microns.

4.2.1.1. The contractor shall be qualified and certified to work in NRLs

Nanoscience Institute (NSI) cleanroom environment, and be familiar with the operation of NSI cleanroom equipment, including but not limited to: e-beam evaporators, solvent hoods, photoresist spinners, acid/base hoods, contact mask aligner, MLA150 maskless aligner, inductively-coupled plasma reactive ion-etch, plasma-enhanced chemical vapor deposition, rapid thermal annealer, thermal evaporator, profilometer.

4.2.1.2. The contractor shall be expected to develop processing protocol for micro-transfer printing of materials and devices with alignment tolerance within +/- 5 microns.

4.2.1.3. The contractor shall be expected to develop processing protocol for array-level metal interconnection with alignment tolerance within +/- 3 microns.

4.2.1.4. The contractor shall be expected to document best practices and fabrication protocols for the development of various devices, and disseminate this information to NRL during technical meetings. (Cross Reference CDRL

A002 in §8.)

4.3. Design of electronics systems, integrated circuits and their architectures, and IC performance metrics

4.3.1. The Naval Research Laboratory, a participant in the microelectronics security

Red Team [ref. 3.4], requires the contractor to possess expertise concerning the design of electronics systems, integrated circuits and their architectures, and IC performance metrics. There is no CDRL associated with this section.

4.4. Optoelectronic material and device characterization

4.4.1. The contractor will possess skills and expertise in characterizing optoelectronic materials and devices, including novel photovoltaics and infrared sensors using a range of experimental techniques. These skills must include material characterization techniques such as optical and infrared spectroscopy, atomic force microscopy (AFM), and Hall transport.

4.4.2. The contractor must perform optoelectronic device measurements to obtain I-V, C-V, and Noise characteristics, and spectral response and quantum efficiency.

4.4.3 The contractor shall perform these techniques on materials and devices in ambient conditions, cryogenically cooled, or at elevated temperatures as required for a specific test or application.

4.4.4 The contractor shall configure, connect, align, tune, and calibrate optical and electronic test equipment for reliable and accurate measurements, and will be skilled and experienced in the use of instrumentation control software such as LabVIEW and

MATLAB to set up automated measurements.

4.4.5. The contractor shall perform experimental measurements, perform the initial analysis, document their work and disseminate their findings to NRL during data calls and technical meetings. (Cross reference CDRL A003 in §8.)

4.5. Material characterization for quantum science and technology

4.5.1. The contractor will perform optical characterization of novel thin film materials for quantum science and technology, including micro-cavities, defects in SiC epitaxial layers, and 2D materials.

4.5.2. The contractor will be skilled and experienced in quantum optical measurement techniques, such as those used to measure and manipulate electron spin lifetime and coherence, including time-resolved resonance fluorescence and Ramsey interferometry.

4.5.3. The contractor will be highly skilled in performing such measurements on single photon emitters at 4K, and magnetic fields up to 7 Tesla.

4.5.4. The contractor will be skilled and experienced in the preparation of test samples, including the mechanical exfoliation and transfer of 2D semiconductors, and in the application of analytical methods to determine the optical properties of these materials, such as photonic cavity quality factors, transition linewidths, emitter brightness, and emitter lifetimes.

4.5.5. The contractor shall document their work and disseminate his findings to NRL during technical meetings. Cross reference CDRL A004 in §8.

4.6. Synthesis and characterization of colloidal nanostructured materials for optoelectronic devices

4.6.1. The contractor will have the skills and expertise to synthesize colloidal nanostructures in an air-free environment using Schlenk-line and glove box techniques.

4.6.2. The contractor will have the expertise to characterize the composition and optical properties of these nanocrystals using a suite of techniques including transmission electron microscopy (TEM), X-ray diffraction (XRD), inductively coupled plasma atomic emission spectroscopy (ICP-AES), Fourier transform infrared spectroscopy (FTIR), UV-Vis spectroscopy and photoluminescence spectroscopy.

4.6.3. The contractor will also have the ability to deposit these novel nanostructures into thin films for integration into optoelectronic devices using a range of techniques including spin-coating, dip-coating, and blade- coating.

4.6.4. The contractor is expected to document their work and disseminate their findings to NRL during technical meetings. Cross reference CDRL A005 in §8.

4.7. Programmatic Diligence

4.7.1 The contractor shall deliver a monthly labor report no later than fifteen (15) days after the end of the reporting period. The report will show name, contract value, current funding, amount expended in current period, total expended to date, and date submitted. Cross reference CDRL A006 in §8.

4.7.2. In conjunction with CDRL A006 and §4.7.1 the contractor shall supply a report of monthly expenses. Cross reference CDRL A007 in §8.

4.7.3 The contractor shall supply technical data analysis, reports, procedures, and presentation materials including any software developed herein as required. Cross reference CDRL A008 in §8.

Section 5 Problem Reports and Change Requests

Problem Reports and Change Requests, including increments, modifications, and staffing issues shall be addressed to the Contract Specialist, Michael Broomfield.

Michael Broomfield

Contract Specialist, Contracting Division, Code 1340

U.S. Naval Research Laboratory

Cell 202.875.9785

Email: michael.broomfield@nrl.navy.mil

Section 6 Use of Existing Corporate Plans, Policies, and Procedures

Most work will be performed on-site at the Washington, DC NRL base. The contractor shall provide personnel having sufficient security clearance to enter the facility. Note: The research to be performed is Unclassified.

Section 7 GFM/GFP

NO government furnished property will be provided at the basic contract level

Section 8 Deliverables

Contractor's format for Reports is acceptable throughout all CLINs. The frequency of reports is as required (ASREQ).

8.1 CDRL A001. Report on modeling and simulations. Report provides thorough discussion of modeling and simulation results, including plots, schematics, diagrams, and numerical results.

Reference: SOW §4.1.9

8.2 CDRL A002. Report on fabrication. Report provides procedures, flow charts and best practices for necessary fabrication techniques. Reference: SOW §4.2.1.4

8.3 CDRL A003. Report on advances in materials development. Report provides a thorough description of (1) useful new materials developed, (2) advances in the optoelectronic properties of existing materials, and/or (3) improvements in experimental techniques. Reference: SOW §4.4.5

8.4 CDRL A004. Report on advances in quantum science and technology. Report provides a narrative of theoretical and experimental advances achieved in the field of quantum science and technology. Reference: SOW §4.5.5

8.5 CDRL A005. Report on nanostructured optoelectronics. Report provides a thorough description of the techniques, methodologies and best practices for synthesizing colloidal nanostructures. Report also includes experimental results of characterization using techniques as specified in SOW section 4, part 5. Reference: SOW §4.6.4

8.6 CDRL A006. Monthly labor report no later than fifteen (15) days after the end of the reporting period. The report will show name, contract value, current funding, amount expended in current period, total expended to date, and date submitted. Reference SOW §4.7.1.

8.7 CDRL A007. In conjunction with CDRL A006 and §4.7.1 the contractor shall supply a report of monthly expenses. Reference SOW §4.7.2.

8.8 CDRL A008. The contractor shall supply technical data analysis, reports, procedures, and presentation materials including any software developed herein as required. Reference

SOW §4.7.3.

C-5 REQUIREMENTS FOR ON-SITE C

C-1 REQUIREMENTS FOR ON-SITE CONTRACTORS

The Contractor shall adhere to requirements for NRL On-Site Contractor for performance of this contract and task orders under this contract. Requirements is set forth in Section J, Attachment 02.

Section D - Packaging and Marking

PACKAGING AND MARKING

D-1 PRESERVATION, PACKAGING, PACKING, AND MARKING

All unclassified data and deliverable contract line items shall be preserved, packaged, packed and marked and must conform to normal commercial packing standards to assure safe delivery at destination.

D-2 MARKING OF SHIPMENTS AND REPORTS

The Contractor shall mark all shipments under this contract in accordance with the addition of ASTM-D-3951-18

“Standard Practice for Commercial Packaging” in effect on the date of the contract.

The Contractor shall comply with FED STD 313 (Symbols for Packages and Containers for Hazardous Industrial

Chemical and Materials) to the extent applicable.

All reports delivered by the Contractor to the Government under this contract shall prominently show on the cover of the report: *

(1) Name and business address of the Contractor

(2) Contract Number

(3) Task Order Number

*To be completed at the Task Order Award, when applicable.

D-3 UNCLASSIFIED AND CLASSIFIED MARKING

Unclassified data shall be prepared for shipment in accordance with requirements set forth in the Task Order, or if none is specified, pursuant to industry standards.

Classified reports, data, and documentation shall be prepared for shipment in accordance with National Industrial

Security Program Operating Manual (NISPOM), DOD 5220.22-M (dated February 28, 2006) and its Change 2

(dated May 18, 2016), Section E - Inspection and Acceptance

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government

0002 Destination Government Destination Government

0003 Destination Government Destination Government

0004 Destination Government Destination Government

0005 Destination Government Destination Government

INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government

0002 Destination Government Destination Government

0003 Destination Government Destination Government

0004 Destination Government Destination Government

0005 Destination Government Destination Government

CLAUSES INCORPORATED BY REFERENCE

52.246-3 Inspection Of Supplies Cost-Reimbursement MAY 2001

52.246-5 Inspection Of Services Cost-Reimbursement APR 1984

52.246-8 Inspection Of Research And Development Cost

Reimbursement

MAY 2001

252.245-7001 Tagging, Labeling, and Marking of Government-Furnished

Property

APR 2012

Section F - Deliveries or Performance

PERFORMANCE

F-1 ORDERING PERIOD

This is an IDIQ Type Contract with a five year ordering period for each CLIN with the effective date of the contract.

Each task order shall specify the period of performance.

F-2 PLACE OF PERFORMANCE

The principal place of performance of this contract shall be Naval Research Laboratory, 4555 Overlook Ave SW, Washington, D.C. 20375.

F-3 DELIVERABLES

Each DO/TO shall establish any additional required deliverables and a schedule for submission. DO/TO deliverables shall be provided to the Contracting Officer’s Representative appointed under separate letter upon award of that action, or as specified in the individual DO/TOs. All deliverables required by each CLIN under each order shall be shipped FOB Destination to location identified in each Task Order or by Technical Direction.

F-4 SHIP TO INFORMATION

All deliverables required by under each Task Order shall be shipped: FOB Destination, Naval Research Laboratory, Washington DC 20375-5320, All shipments delivered by the Contractor to the Government under this contract shall include the following

“Attention To” on the shipping label: *

Contracting Officer’s Representative*

Naval Research Laboratory

Contract Number:*

Task Order Number:

Building:*

Code:*

4555 Overlook Avenue, SW

Washington DC 23075-5320

(*To be filled in at time of award and with each Task Order award)

F-5 GOVERNMENT FURNISHED PROPERTY

If during the performance of the statement of work of a resulting Task Order, it is determined that providing GFP is necessary, a list of GFP will be incorporated into the applicable Task Order via attachment, along with the following information:

The GFP will be provided by (Insert date).

The Government shall deliver the GFP to the following address: (Insert location)

Upon completion of the award, the GFP will be returned to (Insert location or TBD, if not known upon issuing the award).

(To be completed at the Task Order level when applicable)

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC /

CAGE

0001 POP 30-JUN-2023 TO

29-JUN-2028

N/A NAVAL RESEARCH LABORATORY 31

BRADLEY WEAVER

4555 OVERLOOK AVE SW

WASHINGTON DC 20375

202-767-5456

N00173

0002 POP 30-JUN-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

0003 POP 30-JUN-2023 TO

N/A (SAME AS PREVIOUS LOCATION)

0004 POP 30-JUN-2023 TO

29-MAR-2028

N/A (SAME AS PREVIOUS LOCATION)

0005 POP 30-JUN-2023 TO

29-MAR-2028

N/A (SAME AS PREVIOUS LOCATION)

52.242-15 Stop-Work Order AUG 1989

52.242-15 Alt I Stop-Work Order (Aug 1989) - Alternate I APR 1984

52.242-17 Government Delay Of Work APR 1984

52.247-34 F.O.B. Destination NOV 1991

Section G - Contract Administration Data

CONTRACT ADMINISTRATION

G-1 CONTRACT ADMINISTRATION

(a) In order to expedite administration of this contract, the following delineation of duties is provided, including the names and contact information, for each individual or office specified. Contact the individual/position designated as having responsibility for any questions, clarifications or information regarding the functions assigned herein.

Contract

Specialist

Michael Broomfield, michael.broomfield@nrl.navy.mil, NRL Competition

Advocate

*To be completed at award

Security Matters Contracting Officer Representative for Security, Code

1226, (202) 767-2240, DSN 297-2240, email security-group@nrl.navy.mil.

Safety Matters Head Safety Branch, Code 3540, (202)767-2232, safety@nrl.navy.mil

Patent Matters Associate Counsel (Intellectual Property), Code 1008.2,

(202) 404-1552, DSN 297-1552, email patents@nrl.navy.mil.

Release of Data Public Affairs Officer, Code 1030, (202) 767-2541, DSN

297-2541, email nrl1030@ccs.nrl.navy.mil. For FOIA information, see https://www.nrl.navy.mil/foia/.

(b) The Contract Administration Office (CAO) designated in Block 24 on the Standard Form 33 is responsible for all matters specified in FAR 42.302(a) and DFARS 242.302(a), except in those areas otherwise designated herein.

(c) Contract administration functions withheld, additional contract administration functions assigned, or special instructions are set forth below:

(1) The function at FAR 42.302(a)(51), consent to the placement of subcontracts, is withheld from DCMA

ACO administration.

G-2 CONTRACTING OFFICER’S REPRESENATIVE (COR) — FUNCTIONS AND

LIMITATIONS

(a) *To be updated upon award is hereby designated as the COR. Unless terminated sooner, this appointment is effective for the period of performance of this contract including any options, if exercised.

COR authority may not be re-delegated. No change in COR assignment shall be made without written notice by the Contracting Officer, who will modify the contract to reflect the change of COR assignment.

The Contracting Officer may designate assistant or alternate COR(s) to act for the COR by naming such assistant/alternate(s) in writing and transmitting a copy of such designation to the contractor via contract modification.

(b) The responsibilities and limitations of the COR are as follows:

mailto:security-group@nrl.navy.mil mailto:security-group@nrl.navy.mil mailto:safety@nrl.navy.mil mailto:patents@nrl.navy.mil mailto:nrl1030@ccs.nrl.navy.mil https://www.nrl.navy.mil/foia/

(1) Providing technical direction and guidance as necessary with respect to the performance of work under this contract. Technical direction and guidance may be used to provide technical advice/recommendations/clarifications on the statement of work/specifications. It MAY NOT be used to tell the contractor how to perform the work.

(2) Submitting interim and final Contractor Performance Assessment Reports (CPARS) at www.cpars.csd.disa.mil/cparsmain.htm.

(3) Quality assurance of services performed or deliveries made.

(4) Inspection and acceptance of services or deliverables.

(5) Ensuring that Government-Furnished Property, to include any contractor use of on-site equipment and/or IT resources is adequately monitored and accounted for.

(6) Security requirements on Government installation, such as the request and retrieval of personnel security badges and vehicle passes.

(7) Monitoring contractor's performance and promptly report problems and recommendations for corrective action to the PCO.

(8) Annually, furnish a written report on performance of the contractor to the PCO. And, if deemed necessary, attending a follow-up meeting to discuss.

(9) Attend post award conference, if conducted.

(10) Ensuring a copy of all Government technical correspondence, to include Technical Direction

Memorandums/Guidance, is forwarded to the PCO for placement in the contract file.

(11) Monitoring of funds expended.

(12) Ensuring that the Contractor does not exceed the defined statement of work set forth in the Task

Orders.

(c) Limitations: The COR is not authorized to take any action, either directly or indirectly, that could result in a change in the cost/price, quantity, quality, place of performance, delivery schedule, or any other terms or conditions of the contract. If, as a result of technical discussions, it is desirable to alter contract obligations or the statement of work/specifications, a modification must be issued in writing and signed by the Contracting Officer in order to effect such changes. No such changes shall be made without the express written prior authorization/direction of the Contracting Officer.

G-3 INFORMATIONAL SUBLINE ITEMS

It is anticipated that the research and development services performed under this contract will be paid for from multiple sources of funds. Informational subline items will be established as necessary to identify each accounting citation classification.

G-4 PAYMENT INSTRUCTIONS FOR MULTIPLE ACCOUNTING CLASSIFICATION CITATIONS

In accordance with PGI 204.7108, clauses 252.204-0001 through 0011 are not applicable to this contract; therefore, use PGI 204.7108(d)(12) Other and pay as follows: If there is more than one ACRN within a contract line item, the payment office will make payment using the ACRN(s) cited on the contractor's invoice. The non-standard clause

(d)(12) "Other" provides a significantly better reflection of how funds will be expended in support of contract performance. One sponsor's funds cannot be used to fund another sponsor’s program.

Based on the type of work contracted for on behalf of DOD/Navy customers, payment by CLIN/SLIN/ACRN is significantly important and using any of the payment method specified in the table identified in PGI 204.7108(b)(2) would result in the funding resources of one customer being paid for work received by another customer. The contractor completes the effort in a fluid environment; therefore, in order to accurately track and account for funding expenditures in accordance with the specific tasking associated with each funding line, payment instruction (d)(12)

"Other" applies as expenditures must reflect the actual work performed, in alignment with the type of funding to avoid violations to the Anti-Deficiency Act.

Payment shall be made in accordance with the Contracting Officer/DCAA approved billing whereby the contactor shall include identification of the CLIN, SLIN, and ACRN on each invoice. This will allow for appropriate contractor invoicing based on the unique customer requirement funding and Contracting Officer's instructions. This approach also allows for proper matching of the charge to the activity that have received the service/product with the application of the payment to the corresponding entity.

G-5 TECHNICAL DIRECTION MEMORANDUM (TDM)

(a) For the purposes of this clause, technical direction includes the following:

(1) Direction to the Contractor which shifts work emphasis between work areas or tasks, requires pursuit of certain lines of inquiry, fills in details or otherwise describes work which will accomplish the objectives described in the statement of work;

(2) Guidelines to the Contractor, which assist in interpretation of drawings, specifications or technical portions of, work description.

(b) Technical instructions must be within the scope of work stated in the contract. Technical instructions may not be used to:

(1) Assign additional work under the contract:

(2) Direct a change as defined in the contract clause entitled "Changes";

(3) Increase or decrease the estimated contract cost, the fixed fee, or the time required for contract performance; or

(4) Change any of the terms, conditions or specifications of the contract

(c) The TDM shall be written by the Contracting Officer’s Representative (COR), with the original given to the Contractor and a copy retained in the CORs file. Technical direction may be issued orally only in emergency situations. If technical direction is issued orally, a TDM must follow within two (2) working days from the date of the oral direction. Amendments, corrections, or changes to TDMs shall also be in written format and shall include all the information set forth in paragraph (e) below.

(d) A TDM shall be considered issued when the Government deposits it in the mail, or if transmitted by other means, when it is physically delivered to the contractor.

(e) TDMs shall include, at a minimum, the following information:

(1) Date of TDM,

(2) Contract Number,

(3) Reference to the relevant portion or item in the Statement of Work,

(4) The specific technical direction or clarification,

(5) The type of work to be performed, i.e., (a) SETA support or (b) R&D work,

(6) A reference to the appropriate CLIN or SubCLIN,

(7) The anticipated level of effort, materials and travel expected as a result of the TDM,

(8) The JON, Program Element, and associated dollar amount, and

(9) The signature of the COR

(f) CORs shall provide a copy of each TDM with the necessary increment of funds to the Contracting Officer for retention in the official contract file. CORs shall retain all files containing TDMs for a period of two (2) years after the final contract completion date.

(g) The only individual authorized in any way to amend or modify any of the terms of this contract shall be the Contracting Officer. When, in the opinion of the Contractor, any technical direction calls for effort outside the scope of the contract or inconsistent with this special clause, the Contractor shall notify the

Contracting Officer in writing within ten (10) working days after its receipt.

G-5 TASK ORDER PROCEDURES FOR INDEFINITE QUANTITY CONTRACTS

(a) General

(1) When the Government requires work under the contract, the Government will initiate the Task Order Request for

Proposal (RFP) process. One or more task orders (TOs) may be issued during the performance period of this contract. The Contractor agrees to accept and perform orders issued by the Task Order Contracting Officer within the scope of this agreement. The RFP will normally be transmitted electronically by e-mail, but may be placed via mail, telephone, or other electronic means. The task order RFP package will include at the minimum, a Task Order

SOW, Task Order CDRLs, and DD254 (if required).

(2) After receipt of the task order RFP. Proposals shall be submitted within 10 to 15 calendars from issuance of the

Task Order RFP. Actual date will depend on the estimated dollar value and complexity of the requirements. The

Government will evaluate the technical proposal against the criteria specified in the RFP. The Government will conduct cost analysis to determine fair and reasonableness of the proposed cost.

(3) TOs will be awarded on DD Form 1155 (Order for Supplies or Services). The TOs will normally be transmitted electronically by e-mail, but may be placed via mail, telephone, or other electronic means.

(4) The Government will not be obligated to reimburse the Contractor for work performed, items delivered, or any costs incurred, nor shall the Contractor be obligated to perform, deliver, or otherwise incur costs, except as authorized by duly executed TOs.

(5) Each TO will include as a minimum:

(A) Contract/ TO number;

(B) Award date;

(C) Type of Order (CPFF Term or Completion Type)

(D)Award amount;

(E) Contract item numbers and descriptions of the specified work required;

(F) Delivery or performance schedule;

(G) Place of performance;

(H) Any packaging, packing, and shipping instructions;

(I) Accounting and appropriation data;

(J) Method of payment and payment office;

(K) DD Form 254 (If applicable);

(L) DD Form 1423; (Contract Data Requirements List)

(M) Listing of GFP (If applicable)

(N) Any other pertinent information

(6) The ceiling amount for each Task Order will be the ceiling price stated therein and may not be exceeded except when authorized by a modification to the Task Order.

(7) Modifications to TOs will be issued on Standard Form (SF) 30.

G-6 INFORMATION REQUIRED FOR SUBMISSION OF EACH ORDER

(a) The COR assigned in Section G will provide the Contracting Officer with a SOW and prepare an acquisition package for each order. The Contracting Officer shall request that the Contractor provide a proposal in response to the SOW. The Contracting Officer will require that the COR will prepare a Technical Analysis report on the

Contractors proposal and forward it to the NRL Contracting Division for issuance of the order.

(b) Direct Labor Hours, travel and material costs are subject to negotiation prior to award. In order to fully evaluate each order proposal, the contractor shall provide the following as applicable:

(1) A time phased (hourly) breakdown of direct labor by labor category.

(2) A complete breakdown for travel identifying each cost mode of travel and the reason for the travel proposed.

(3) A complete list of all material including quantity and cost. The contractor shall provide specific documentation to serve as the basis for price verification (i.e., vendor quotations, invoices, published price lists, GSA schedule lists, etc.).

252.201-7000 Contracting Officer's Representative DEC 1991

252.204-7006 Billing Instructions OCT 2005

252.232-7003 Electronic Submission of Payment Requests and Receiving

Reports

DEC 2018

CLAUSES INCORPORATED BY FULL TEXT

52.244-2 SUBCONTRACTS (JUN 2020)

(a) Definitions. As used in this clause--

Approved purchasing system means a Contractor's purchasing system that has been reviewed and approved in accordance with Part 44 of the Federal Acquisition Regulation (FAR).

Consent to subcontract means the Contracting Officer's written consent for the Contractor to enter into a particular subcontract.

Subcontract means any contract, as defined in FAR Subpart 2.1, entered into by a subcontractor to furnish supplies or services for performance of the prime contract or a subcontract. It includes, but is not limited to, purchase orders, and changes and modifications to purchase orders.

(b) When this clause is included in a fixed-price type contract, consent to subcontract is required only on unpriced contract actions (including unpriced modifications or unpriced delivery orders), and only if required in accordance with paragraph (c) or (d) of this clause.

(c) If the Contractor does not have an approved purchasing system, consent to subcontract is required for any subcontract that—

(1) Is of the cost-reimbursement, time-and-materials, or labor-hour type; or

(2) Is fixed-price and exceeds—

(i) For a contract awarded by the Department of Defense, the Coast Guard, or the National Aeronautics and Space

Administration, the greater of the simplified acquisition threshold, as defined in FAR 2.101 on the date of subcontract award, or 5 percent of the total estimated cost of the contract; or

(ii) For a contract awarded by a civilian agency other than the Coast Guard and the National Aeronautics and Space

Administration, either the simplified acquisition threshold, as defined in FAR 2.101 on the date of subcontract award, or 5 percent of the total estimated cost of the contract.

(d) If the Contractor has an approved purchasing system, the Contractor nevertheless shall obtain the Contracting

Officer’s written consent before placing the following subcontracts:

*To be completed at award*

(e)(1) The Contractor shall notify the Contracting Officer reasonably in advance of placing any subcontract or modification thereof for which consent is required under paragraph (b), (c), or (d) of this clause, including the following information:

(i) A description of the supplies or services to be subcontracted.

(ii) Identification of the type of subcontract to be used.

(iii) Identification of the proposed subcontractor.

(iv) The proposed subcontract price.

(v) The subcontractor’s current, complete, and accurate certified cost or pricing data and Certificate of Current Cost or Pricing Data, if required by other contract provisions.

(vi) The subcontractor’s Disclosure Statement or Certificate relating to Cost Accounting Standards when such data are required by other provisions of this contract.

(vii) A negotiation memorandum reflecting—

(A) The principal elements of the subcontract price negotiations;

(B) The most significant considerations controlling establishment of initial or revised prices;

(C) The reason certified cost or pricing data were or were not required;

(D) The extent, if any, to which the Contractor did not rely on the subcontractor’s certified cost or pricing data in determining the price objective and in negotiating the final price;

(E) The extent to which it was recognized in the negotiation that the subcontractor’s certified cost or pricing data were not accurate, complete, or current; the action taken by the Contractor and the subcontractor; and the effect of any such defective data on the total price negotiated;

(F) The reasons for any significant difference between the Contractor’s price objective and the price negotiated; and

(G) A complete explanation of the incentive fee or profit plan when incentives are used. The explanation shall identify each critical performance element, management decisions used to quantify each incentive element, reasons for the incentives, and a summary of all trade-off possibilities considered.

(2) The Contractor is not required to notify the Contracting Officer in advance of entering into any subcontract for which consent is not required under paragraph (c), (d), or (e) of this clause.

(f) Unless the consent or approval specifically provides otherwise, neither consent by the Contracting Officer to any subcontract nor approval of the Contractor’s purchasing system shall constitute a determination—

(1) Of the acceptability of any subcontract terms or conditions;

(2) Of the allowability of any cost under this contract; or

(3) To relieve the Contractor of any responsibility for performing this contract.

(g) No subcontract or modification thereof placed under this contract shall provide for payment on a cost-plus-a-percentage-of-cost basis, and any fee payable under cost-reimbursement type subcontracts shall not exceed the fee limitations in FAR 15.404-4(c)(4)(i).

(h) The Contractor shall give the Contracting Officer immediate written notice of any action or suit filed and prompt notice of any claim made against the Contractor by any subcontractor or vendor that, in the opinion of the

Contractor, may result in litigation related in any way to this contract, with respect to which the Contractor may be entitled to reimbursement from the Government.

(i) The Government reserves the right to review the Contractor’s purchasing system as set forth in FAR Subpart

44.3.

(j) Paragraphs (c) and (e) of this clause do not apply to the following subcontracts, which were evaluated during negotiations:

*To be completed at award*

(End of clause)

252.232-7006 WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (DEC 2018)

(a) Definitions. As used in this clause—

“Department of Defense Activity Address Code (DoDAAC)” is a six position code that uniquely identifies a unit, activity, or organization.

“Document type” means the type of payment request or receiving report available for creation in Wide Area

WorkFlow (WAWF).

“Local processing office (LPO)” is the office responsible for payment certification when payment certification is done external to the entitlement system.

“Payment request” and “receiving report” are defined in the clause at 252.232-7003, Electronic Submission of

Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-

7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall—

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training

Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the “Web Based Training” link on the WAWF home page at https://wawf.eb.mil/.

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data

Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

https://www.sam.gov/ https://wawf.eb.mil/ https://wawf.eb.mil/

(ii) For fixed price line items—

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting

Officer.

Not Applicable

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the

Contracting Officer.

Not Applicable

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial item financing, submit a commercial item financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF “combo” document type to create some combinations of invoice and receiving report in one step.]

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF

Pay Official DoDAAC *

Issue By DoDAAC N00173

Admin DoDAAC** *

Insp…