About this file

This is a request for proposal for Naval Air Systems Command Digital Group technology acceleration and integration, information technology, information management, and cybersecurity support services. The services include digital transformation planning and execution, technology exploration and acceleration, data analytics and integration, and cybersecurity support. The solicitation is a full and open competition resulting in a single-award indefinite delivery indefinite quantity contract with cost-plus-fixed-fee labor contract line items and a cost reimbursable other direct cost line item for travel and material. The proposal submission deadline is November 12, 2019. The product service code is D318 and NAICS code is 541512 with a small business size standard of $27.5 million.

RFP N00421-19-R-0101 Amendment 0003

View the file

Other files

File Type Posted
N00421-19-R-0101_Amend_0005.docx DOCX document
N00421-19-R-0101_Amend_0004.docx DOCX document
N00421-19-R-0101_Amend_0002.docx DOCX document
P3-Past_Peformance_Information_Form.docx DOCX document
N0042119R0101_Amend_01.docx DOCX document
Attach_P4_-_Cost_Summary_Spreadsheet.xls XLS spreadsheet
Attach_P4_-_Cost_Summary_Spreadsheet.xls XLS spreadsheet
Attach_P5-_Fully_Burdened_Annual_Salary.xlsx XLSX spreadsheet
Attach_1_-_CSP_SAC.doc DOC document
Attach_P2_-_CPAQ.pdf PDF
Attach_5_-_Data_Item_Form.docx DOCX document
N0042119R0101.docx DOCX document
Attach_4_-_COR_Appointment_Letter.docx DOCX document
Attach_3_-_DD254.pdf PDF
Attach_P6-_Sample_Tasks_Staffing_Plan.xls XLS spreadsheet
Attach_2_-_OCI_List.docx DOCX document
Exhibit_A_-_CDRLs.docx DOCX document
Attach_P3_-_Past_Performance_Information_Form_Mar_2017.pdf PDF
Show all 18

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

N0042119R0101

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION A - SOLICITATION/CONTRACT FORM

The following have been modified:

AMENDMENTS

Amendment 1 Changes and Questions & Answers to the Request for Proposal (RFP) include:

(The revised information has been highlighted within this modification to easily note what has been changed.)

· Section C, Statement of Work, Paragraph 3.1.9.5: Removed the reference of paragraph (e) (1) and replaced with paragraph (e).

· Section J, Attachment P(4), Revised the Cost Summary Spreadsheet Tab as follows:

· Removed: “Maximum Pass Through Allowed by SeaPort-e IDIQ Contract”

· Removed: “Maximum Fixed Fee Allowed by SeaPort-e IDIQ Contract”

· Removed the statement “When analyzing pass through costs, the Government will consider prime offeror fee on subcontractor price as an element of pass through as explained in the Section H Savings Clause of the MACs. In Section B, however, prime offeror fee on subcontractor price is a fee element rather than a cost element. Prime offeror fee on subcontractor price should be included in the fee column (rather than the cost column) of Section B.”

Q1: What is the specific process to receive the copy of the Assess Only Standard Work Package (SWP) that is called out in Sample Task 3?

A1: In reference to Section L-1, Part B, Volume 2.0, Paragraph 2.1, Sample Task 3, the potential offeror shall request the SWP by submitting the CAGE code to the Contract Specialist designated in Section L-1, Part A. The Contract Specialist will then verify that the provided CAGE Code is an Authorized Department of Defense (DoD) Provider via https://sam.gov. Once the CAGE code is verified, the Contract Specialist will provide via an encrypted e-mail through Defense Information Systems Agency (DISA) Department of Defense (DOD) Secure Access File Exchange (SAFE) at https://safe.apps.mil/ as Government Furnished Information (GFI).

Q2: Would the Government consider a Multiple Award Contract (MAC) of 2 to 3 awardees, Hybrid contracts with Firm Fixed Price CLINs for core known work and Cost CLINs for unknown and innovation insertions?

A2: The contract strategy will remain as is. The contract strategy is for a Single Award Indefinite Delivery, Indefinite Quantity (IDIQ) Cost Plus Fixed Price (CPFF) contract.

Amendment 2 Questions & Answers and Changes to the Request for Proposal (RFP) include:

(The revised information has been highlighted to easily note what has been changed.)

· Section H, NAVAIR Clause 5252.209-9510 (e)(1) has been revised to reflect the period of prohibition.

· Section J, Attachment P3, Past Performance Information Form has been revised to include a MS Word Version.

· Section L, Part A, Paragraph 3.0 has been revised.

· Section L, Part A, Paragraph 4.0 has been revised to remove the following language “It is requested that Volume 3 Past Performance information be submitted 14 days prior to the submission date specified in Block 9 of the SF 33 of the RFP.”

· Section M, Part B, Paragraph 5.0 has been revised.

Q3: Will the government consider Contractor Teaming Arrangements (CTA)?

A3: Section L, Part B, Volume 1, Paragraph 1.4 addresses Contractor Team Agreements.

Q4: The RFP does not provide a requirement for an acronym list. Is an acronym list desired? If so, can provisions be made in the instruction such that the acronym list does not count against provided page limitations?

A4: Acronym lists are required and are excluded from the page limitations. Section L, Part A, Paragraph 3.0 has been revised.

Q5: On page 65, Section L (4.0) states “it is requested that Volume 3 Past Performance information be submitted 14 days prior to the submission date specified in Block 9,” presumably to allow time for Contractor Performance Assessment Questionnaires to be routed and processed (if included in proposal submissions). Can the Government clarify whether the remainder of Volume 3 (i.e., PPIFs, work descriptions, and subcontractor consent forms) is also requested to be submitted 14 days prior to the submission date specified in Block 9?

A5: In reference to Section L, Part A, Paragraph 4.0, only the Contractor Performance Assessment Questionnaires (CPAQs), Attachment P2, shall be submitted to the Contract Specialist within 2 weeks of the Program Manager receiving the request to complete the assessment. This allows the Program Manger 2 weeks to complete their assessment while also ensuring the Contract Specialist receives all CPAQs on or before the proposal due date specified in Block 9 of the SF33. The rest of Volume 3 shall be submitted NLT the proposal due date. For clarification purposes, Section L, Part A, Paragraph 4.0 has been revised to remove the sentence requesting that the entire Volume 3 be submitted 14 days in advance.

Q6: On page 70, Section L states “The Offeror shall submit written consent from its principal subcontractor(s) and JV team member(s) that will allow the Government to coordinate any past performance issues directly with the Offeror.” Can provisions be made in the instruction such that the requested consent pages do not count against provided page limitations?

A6: Written consent from subcontractors and JV team members are excluded from the page limit. Section L, Part A, Paragraph 3.0 has been revised.

Q7: In the required Attachment P3, Past Performance Information Form, the Contract Effort Description field allows the user to scroll through the section to review/add text that expands beyond the visible area of the field. However, when this file is printed (as required by the RFP), a large portion of the text entered is not printed. Will the Government allow offerors to submit copies of the text contained in this field in a separate continuation page so printed copies will match electronic copies? If so, can the Government increase the page limit for the Past Performance Volume to 30 pages to account for the additional formatting required for each of the contract references?

A7: A Microsoft Word Version has been attached. The page limit will not be increased.

Q8: In Section L, Volume 2, the Technical Proposal, can provisions be made to provide a 2-page allocation for the “Understanding of the Work” section as a lead into the Sample Tasks?

A8: Proposal instructions will remain unchanged.

Q9: On page 25, Section C, 4.5.1 Labor Qualification, would the government consider adding a Junior level position which allows NQV Level 1 or NQV Level 2 without the additional certification requirements?

A9: This labor category will not be required under this contract.

Q10: Referencing Section C, 4.5 Labor Qualifications on pages 22-24, there are four labor categories listed on these pages that are not listed in the table in Section L, 4.5, pages 74-75: Project/Management Analyst, Junior; Software Developer, Junior; Computer Systems Analyst, Junior; Computer Programmer, Junior. Can the government clarify the discrepancy between the two sections and if hours are to be included in Section L?

A10: The Table in Section L provides a snapshot of the projected requirement and is provided for bidding purposes only. In contract execution it is possible that Junior level labor categories may be executed for these positions.

Q11: Referencing Section L, 3.0, page 71, the language states that the P2 Attachment/CPAQ is to be sent to the “Program Manager who is the Assessing Official”. Can the government confirm that the Contracting Officer Representative should be receiving the CPAQ request?

A11: The Program Manager, who is familiar with contract performance and therefore able to complete the assessment, should receive the CPAQ. This individual may or may not be the Contracting Officer Representative.

Q12: In Section H, page 42, Organizational Conflicts of Interest (Services), box (e) (1) is checked, but there is no period of prohibition provided. Can the government clarify?

A12: The clause has been revised to reflect the period of prohibition.

Q13: On page 82, Section 5.0, there is a statement that “the evaluated cost/price of this six-month period will be calculated by dividing the Proposed Year 5 by (2) two to establish an estimated monthly amount. The monthly amount will then be multiplied by six to establish the estimated cost for the six-month option to extend services.” Can the government clarify that it was intended to say that the Year 5 amount would be divided by (12) to establish a monthly estimated amount?

A13: Section M, 5.0 has been revised.

Amendment 3 Questions & Answers and Changes to the Request for Proposal (RFP) include:

(The revised information has been highlighted to easily note what has been changed.)

· Section C, the chart under Paragraph 4.5, the language “and CISSP or GSLC-Global Security Leadership Certificate or CISSM-Certified Information Security Manager” has been removed under the “Certifications” column for the Information Security Analyst, Journeyman.

· Section C, Paragraph 4.5.1, the “Certification Requirements” under “Information Security Analyst (Journeyman, Senior)” have been revised.

· Section L, Part B, Paragraph 2.1, Sample Tasks 1 and 2 have been revised.

Q14: Please define the term enterprise IT in the context of this Sample Task 1. Does it include new digital age technologies that might not widely be considered enterprise IT (e.g., virtual reality, additive manufacturing)? Does it include IT associated with or resident in airframes and weapons systems (i.e., more operational technology)?

A14: Enterprise IT: IT designed to meet the demands of a large organization. Enterprise IT may include digital age technologies such as virtual reality that can fulfill requirements for availability, compatibility, reliability, scalability, performance and security across the organization. It could include IT associated with or resident in airframes and weapons systems.

Q15: The Sample Task 1 question states the response should “...address applicable technical analysis, cost-benefit, and security concerns”. Are those the only areas of analysis requested/permitted. Is there a standard or minimum list of applicable areas for analysis that NAVAIR uses/can share.

A15: Technical Analysis, Cost-benefit, and Security should be addressed, additional analysis is permitted and suggested.

Q16: Is the 3 month NTE timeline in Sample Task 1 intended to be for all possible technologies/domains?

A16: Request the vendor’s plan for evaluation of Emerging Technologies not exceed 3 months. Technology changes rapidly and a long-term evaluation process could result in selecting an outdated technology.

Q17: Given the page count restriction, does the response to Sample Task 3 need to include any actual evaluation of the three (3) products identified using the proposed alternative approach to the SWP, or just the approach and a description of the resulting reports’ content?

A17: The response should include just the approach.

Q18: RFP Page 23 of 84: The certification requirements for both the Information Security Analyst Senior and Information Security Analyst Journeyman include Security+, Navy Fully Qualified Validator Level 2, and CISSP or GSLC-Global Security Leadership Certificate or CISSM Certified Information Security Manager. Will the government please verify these certification requirements are the same for both the Senior and Journeyman level labor categories?

A18: The certification requirements for the Information Security Analyst (Journeyman) have been updated in the solicitation, Section C, paragraph 4.5 Labor Qualifications

Q19: RFP Pages 22-24 of 84: A number of the BLS codes included in the RFP appear to be outdated or nonexistent. Will the government please provide an updated list of all labor categories and the correct BLS code?

A19: All BLS codes included in the RFP are from 2018 Standard Occupational Classification System. This is most recent Occupational Classification System used by the BLS. Below is a link to the correct BLS page.

https://www.bls.gov/soc/2018/major_groups.htm

Q20: Would the Government consider a T&M contract-type that would require offerors to develop an inclusive list of labor categories that support the entire scope, including transformation, and provide a Time and Materials (T&M) rate card based upon these labor categories?

A20: The contract strategy will remain as is. The contract strategy is for a Single Award Indefinite Delivery, Indefinite Quantity (IDIQ) Cost Plus Fixed Price (CPFF) contract.

Q21: A program of this magnitude will likely have multiple projects with requirements of varying degrees of stability. For the vendor to perform on projects with stable requirements, would the Government consider allowing FFP and T&M task order awards? Executing projects under FFP & T&M incentivizes scope control and management, reduces administrative overhead, and mitigates schedule and cost risk for the Government.

A21: The contract strategy will remain as is. The contract strategy is for a Single Award Indefinite Delivery, Indefinite Quantity (IDIQ) Cost Plus Fixed Price (CPFF) contract.

Q22: Will the Government consider conducting oral presentations as an element of its technical factor evaluation to describe the Digital Transformation approach on sample task 1? Would the Government consider potentially adding an additional evaluation factor or another sub-factor under the Technical Factor (Part B)?

A22: The evaluation factors will remain unchanged.

Q23: Would the Government consider adding evaluation requirements to include user centric service delivery approach?

A23: The government will evaluate the sample task responses in accordance with Section M. This does not preclude offers from offering use of a user centric delivery.

Q24: Will the Government consider including organizational change as a key component of sample task 1 and 2 response? This should include a strong focus on stakeholder & organizational alignment, leadership engagement, communications and user readiness, in addition to traditional training-centric change management assessment.

A24: Section L, Volume 2, Sample Tasks 1 and 2 have been updated to address organizational change.

Q25: Would the Government consider requiring two out of the five past performance submissions come from commercial experience with leading digital transformation?

A25: The proposal instructions for past performance will remain unchanged.

Q26: The vision for digital transformation references changes to business models. Section 3.3.2.9 references “Business process improvement support”. Can the government elaborate on this support need? Is there a need to conduct business process reengineering or is there a preference to overlay existing business processes on top of new digital technologies?

A26: Both scenarios are possible based on individual task order requirements.

Q27: Section M includes “Understanding of the Work” as one of the evaluation factors. The description further includes a reference to “understanding of the requirements. To what extent will the Government value understanding of the functionality supported by the legacy technology? Would the Government consider sharing existing business process architecture or relevant context for existing NAVAIR operations documentation for offerors to consider in their responses?

A27: The Government will evaluate proposals in accordance with Section M, Evaluation Factors For Award. The Government will provide Government Furnished Information, as required, to complete performance under individual Task Orders.

Q28: RFP page 20, paragraph 3.3.2.10; When it says, “Data Architecture, Design, Engineering, and Management Support. The Contractor shall provide data architecture, design, engineering, and management support to include:” Will the government provide updated security classification guides to address data aggregation, or, will it be a function of this effort?

A28: The Government will provide Government Furnished Information as required to complete performance under individual Task Orders.

Q29: RFP page 20, paragraph 3.3.2.11; When it says, “Digital Solutions and Technology Development and Acceleration/Development Security Operations (DevSecOps) Support. The Contractor shall provide digital solutions technology development and acceleration / DevSecOps support to include:” Does the government envision the vendor using the Navy’s Compile to Combat in 24 Hours (C2C24) or similar instance in the prototyping (i.e.. Platform as GFE)? Or, are there specific PaaS or platform technologies the government wants included in the AoA for this effort?

A29: DevSecOps support could include C2C24 or similar DevSecOps platforms. Offerors must be able to support DevSecOps technologies and practices independent of platform.

Q30: RFP page 20, paragraph 3.3.2.12; When it says, “Virtual / Digital Integrated Modeling Environment (IME) and Capability Based Acquisition (CBA) Support. The Contractor shall provide virtual / IME and CBA support to include:” Are there specific industry standards or qualifications the government is looking for adherence to? Any environment limitations we should be aware of?

A30: The Government will provide Government Furnished Information as required to complete performance under individual Task Orders.

Q31: RFP page 66, paragraph 1.0; The referenced section states that the offeror is to list the CAGE code, DCMA, DCAA, and DFAS points of contact and DoDAACs for the Prime and all proposed subcontractors and team members. Can the government please clarify if they are also requesting the “signed representations, certifications and acknowledgements and/or System for Award Management (SAM), signed SF33 for basic solicitation and each amendment, as applicable,” from proposed subcontractors or are these documents strictly to be submitted only by the prime offeror who is submitting? If the government is requesting these documents to be submitted from the proposed subcontractors, can they be submitted under Section 1.2 so as not to impact the Offeror’s 10 page limitation to address the other required information?

A31: Only the Prime is required to submit signed representations, certifications and acknowledgements and/or System for Award Management (SAM), signed SF33 for basic solicitation and each amendment, as applicable.

Q 32: Reference Amendment 0002 – The Microsoft Word version of Attachment P-3 Past Performance Information Form provided in this amendment uses Calibri 11 point font. Please confirm we can follow the format provided in the Attachment P-3 template and use Calibri 11 point font within the P-3 form.

A32: Please follow the Proposal Format instructions in Section L, Part A, paragraph 2.0.

SECTION C - DESCRIPTIONS AND SPECIFICATIONS

The following have been modified:

STATEMENT OF WORK

1. Background and Scope:

The NAVAIR Digital Group leads the digital transformation of NAVAIR and works to accelerate and scale digital/analytic technologies and capabilities across the NAVAIR Enterprise as a means to increase speed in the delivery and sustainment of warfighting capability. The Digital Group delivers and executes command-wide strategies that align activities and provides the workforce with agile self-service infrastructure, data accessibility, visualization and analytic tools, and digital/IT services to rapidly research, create, deploy, integrate, and maintain, applications, enterprise solutions, and other digital capabilities. NAVAIR’s digital transformation will require leveraging advanced digital tools to implement fundamentally different business models across all business, technology development, workforce, and mission operation domains. NAVAIR is committed to a digital culture that empowers the workforce to accelerate, innovate, collaborate, develop, and deliver capabilities to meet mission outcomes.

The contractor shall provide various types of support including: digital transformation planning and execution; enterprise alignment; technology exploration, acceleration, and integration; digital/IT consultation; business intelligence; application portfolio management; system integration; Enterprise Architecture (EA) design and management; web management; Navy Marine Corps Intranet (NMCI)/Next Generation Enterprise Network (NGEN) program management; IT Operations; cybersecurity; Information Assurance (IA); cloud services; maintenance functions; network security; Automated Data Processing (ADP) support services; digital modeling and virtual environment support; talent management; change management; data analytics and integration; business process management and improvement; as well as general IT/digital support. Services may also be required in support of numerous current and planned initiatives (i.e., Cybersecurity related events, Cloud initiatives, emerging and disruptive technologies, IT consolidations initiatives) and infrastructure improvements.

As the NAVAIR Digital Group works collaboratively across the NAVAIR Enterprise and the Department of Defense (DoD) to align efforts and accelerate advances in digital technology, the contractor may be required to provide support across the NAVAIR Enterprise, the Program Executive Offices (PEOs), the supported Commands (including all echelons levels), and other DoD Services, sites, and activities as required.

2. Applicable documents:

The Government will provide the Contractor copies of, or access to, all required directives, publications, and documents, as available. A comprehensive list of Navy regulatory documents can be found at the DON Chief Information Officer (CIO) IT Policy and Guidance website, http://www.doncio.navy.mil/. Throughout the life of this contract, if any policy, instruction, or regulation is replaced or superseded, the replacement or superseding version shall apply. The Contractor is responsible for researching and complying with any additional regulations applicable to the specific task area. Applicable documents are listed below, but are not limited to:

2.1 DoD Specifications / Standards / other Government Documents

· Section 508 Amendment to the Rehabilitation Act of 1973 http//www.section508.gov/

· NASPAXRIVINST 12610.7G Employee Reporting Procedures During Emergency Situations, 02 June 2014

· SECNAVINST 5239.3B DON Information Assurance Policy, 17 JUN 2009

· SECNAV M-5239.1, DON Information Assurance Manual

· System Authorization Access Request -Navy (SAAR-N) form (OPNAV 5239/14 (Rev 9/2011)

· SECNAVINST 5211.5E DON Privacy Act Program, 10 Oct 2008

· SECNAVINST 5510.30B DON Personnel Security Program Instruction, 06 OCT 2006

· DOD-D-5220.22 National Industrial Security Program (NISPOM), 18 MAY 2016

· DoD 8570.01-M, Information Assurance Workforce Improvement Program, 19 Dec 2005 (Incorporating Change 3, 24 Jan 2012)

· DoDD 8570.01 Information Assurance Training, Certification, and Workforce Management, 15 August 2004, Certified Current as of 23 April 2007

· DON letter 5239 NAVAIR 726/2322 of 18 Feb 09, NAVAIR Data at Rest Policy

· DoD 5220.22-M, National Industrial Security Program Operating Manual, (NISPOM) 28 Feb 2006

· SECNAV M-5510.36 Information Security Program, 30 Jun 2006

· DoDM 5200.01 (DoD Information Security Program: Controlled Unclassified Information (CUI)) Vol. 4; 9 Sept 2018 and (enclosure 3 pages 11-18) 24 Feb 2012

· DoDM 5400.7, Freedom of Information Act (FOIA) Program 25 Jan 2017

· DoDD 5230.24 Distribution Statements on Technical Documents, Change 3, Effective 15 Oct 2018

· SECNAV M-5510.30 Personnel Security Program Jun 2006

· OPNAVINST 3440.17A Navy Installation Emergency Management Program, 1 Aug 2014

3. Requirements

3.1 General Requirements

3.1.1 Compatibility - The Contractor shall maintain the capability to prepare documents and software packages compatible with the Government IT environment through the security classification of Top Secret. The current operating environment required for this contract includes:

Microsoft Windows 10 Microsoft Project 2010 Microsoft Office Professional Plus 2010 Adobe Acrobat XI (reader) Internet access

The Contractor shall maintain the ability to interface with and transfer data to and from the requiring office software applications and their upgraded versions. The Contractor shall maintain state-of the-art anti-virus software and ensure that all media are virus free when delivered. The Contractor shall be capable of Internet and LAN communications with the NAVAIR Digital Group. Contractor personnel shall be capable of maintaining real-time communications, both voice and data transfer capabilities, with the NAVAIR Digital Group during working hours whether at Contractor work site or on travel.

3.1.2 Work Location and Facilities

3.1.2.1 Work location: Approximately 30 percent of work will be performed at Government site and 70 percent of work will be performed at Contractor site. The Contractor shall support the NAVAIR enterprise-wide environment within the Continental United States (CONUS), which is comprised of facilities at Patuxent River, Maryland, Patuxent River remote facilities (St. Inigoes, Solomon’s Island Naval Center, Washington Liaison Office in Arlington VA, and leased spaces within the 30 mile range); China Lake, California; San Diego/North Island, California; Point Mugu, California; Jacksonville, Florida; Cherry Point, North Carolina; Lakehurst, New Jersey; and Orlando, Florida. Work in support of this SOW shall be primarily performed at the Contractor’s facility or at Patuxent River, MD; however, the place of performance is not limited to the above locations due to the evolving, integrated and capability-focused enterprise requirements throughout NAVAIR and the DoD. Specific work locations will be included in individual task orders. Contractors performing on-site support will be provided access to workspaces, telephones, printers, facsimile machines, copy machines, shredders, computers, and network access including web servers and applicable databases or other applications necessary to carry out assigned tasks.

3.1.2.2 Meeting support: In support of the tasking outlined in this SOW, the Contractor shall have the capability to host and conduct meetings at the classification levels up to unclassified with the capacity to support a minimum of 30 persons and have contractor furnished telephone and VTC capability as well as sufficient equipment to conduct meetings with presentations including compatible software as required in Paragraph 3.1.1). This support shall be provided at a local facility within a 15 mile radius of Patuxent River, MD location.

3.1.3 Contractor reporting. The Contractor shall provide the following Contract Data Requirements List (CDRL) deliverables as specified in individual task orders.

CDRL
Title
A001
Monthly Progress and Financial Status Report
A002
Standard Operating Procedures and Desk Guides
A003
Transition Out Plan
A004
Technical Report-Study/Services
A005
Software Documentation / Application / Interface Code
A006
OPSEC Plan

3.1.3.1 Monthly Progress and Financial Status Report: The Contractor shall provide a progress and financial status report in accordance with CDRL A001. Throughout contract performance, the Contractor shall maintain an updated and current staffing plan and obtain approval from the Government, prior to incurring additional costs and/or adding personnel to the contract. The report shall include work accomplished since submittal of the last report, both monthly and cumulative man-hour labor costs expended by person and labor category as well as material and travel costs.

a) Cost Plus Fixed Fee (CPFF) CLINS: The Contractor shall provide information by CLINs/SLINs/Appropriations to include, cost details (i.e. Employee Name, Labor Category, Rate, Current and Cumulative Hours & Costs etc.), financial status of cost CLINs (i.e., funding applied, expenses incurred during current reporting period, total expenses to date, amount remaining, etc.) and forecast of funds depletion by CLIN type based on known requirements.

b) Cost Reimbursable CLINs: The Contractor shall provide information, by CLIN/Sub-CLIN/Appropriation, to include, travel details (i.e., Traveler’s Name(s), Dates of Travel, Destination, & Purpose for travel); ODC expense details (Item/Name, Description, Unit Cost, Number of Units, & Extended Costs for ODC’s, etc.); financial status of cost-related CLINs (i.e., funding applied, expenses incurred during current reporting period, total expenses to date, amount remaining, etc.) and forecast of funds depletion by CLIN type based on known requirements.

c) GFP/GFE/CAP Reporting: The Contractor shall maintain a documented property accountability system and procedures whereby all Government Furnished Property/Equipment (GFP/E) and Contractor Acquired Property (CAP) are tracked by documenting all pertinent information about property, including item nomenclature, serial number, and location. Upon termination of the Contract, all GFP/GFE/CAP shall revert to the Government.

All other CDRL details will be included in each CDRL Form DD1423.

3.1.3.2 Other Reporting. The Contractor may be required to provide additional reporting, documentation, products, and schedules, in accordance with deliverable requirements (CDRLs) incorporated in individual task orders. Other reporting requirements may include, but are not limited to: specific technical reports, documentation, multimedia products, training courses and materials, data, evaluations and analysis, digital information, etc.

3.1.4 Work Schedule to include Compressed Work Schedule (CWS), overtime, holidays, and installation closure.

3.1.4.1 Work schedule: The Contractor shall provide the required services and staffing coverage during normal working hours. Normal working hours are usually 8.5 hours (including a 30-minute lunch break), from 0600 to 1800 each Monday through Friday (except on the legal holidays specified in paragraph 3.1.4.1.2).

3.1.4.1.1 Compressed Work Schedule (CWS): CWS is an alternative work schedule to the traditional five 8.5 hour workdays (which includes a 30-minute lunch) worked per week. Under a CWS schedule, an employee completes the following schedule within a two-week period of time: eight weekdays are worked at 9.5 hours each (which includes a 30-minute lunch), one weekday is alternately worked as 8.5 hours (which includes a 30-minute lunch) and one weekday is not worked by the employee. The result is 80 hours worked every two weeks, with 44 work hours one week and 36 work hours the other.

The Contractor may allow its employees to work a CWS schedule provided the requirements of this SOW are met. If the Contractor chooses to allow its employees to work a CWS schedule in support of this contract, any additional costs associated with the implementation of the CWS schedule vice the standard schedule are unallowable costs under this contract and will not be reimbursed by the Government. Additionally, the CWS schedule shall not prevent Contractor employees from providing necessary staffing and services coverage as required by the Government to the ACOR/COR.

3.1.4.1.2 Holidays: The Government observes the following holidays:

New Year’s Day, January 1 Martin Luther King’s Birthday, the third Monday in January President’s Birthday, the third Monday in February Memorial Day, the last Monday in May Independence Day, July 4 Labor Day, the first Monday in September Columbus Day, the second Monday in October Veteran’s Day, November 11 Thanksgiving Day, the fourth Thursday in November Christmas Day, December 25

With the exception of the events in section 3.1.4.1.3 below, the Contractor is permitted to observe the above Holidays in accordance with its corporate policy.

3.1.4.1.3 Installation closure: When Federal facilities are closed by the Government, or when Federal employees are officially excused from work due to a holiday or a special event, severe weather, a security threat, or any other Government facility related problem that prevents Federal personnel from working at the Government facility, contractor personnel assigned to work at that facility in support of such Federal employees shall follow their parent company’s policies

While generally contractor personnel may not perform work on-site at a Government facility without oversight from Federal personnel, in very limited circumstances, work being performed by contractor personnel may be deemed mission essential and performance of such mission essential work may be authorized to continue at the Government facility despite the facility being otherwise closed for normal operations. The circumstances permitting work being performed by contractor personnel to be deemed mission essential are extremely limited and generally only apply to performance of efforts related to public health, safety, or matters related to national security. The cognizant Contracting Officer must concur with any determination that work being performed by contractor personnel is mission essential.

3.1.4.1.4 Overtime: Overtime cannot be charged directly to the contract unless first approved in writing by the Contracting Officer.

3.1.5 Other Direct Costs (ODCs): ODCs are based on a per annum amount. The COR/ACOR approval shall be obtained prior to the purchase of any material or travel expenses.

3.1.5.1 Travel: Travel will be allowable only when it is essential to the performance of the tasks detailed in Section 3.3. Reimbursement for travel performed shall be in accordance with the Department of Defense Joint Travel Regulation (http://www.defensetravel.dod.mil/site/travelreg.cfm). The COR shall approve all travel performed in support of this contract prior to the commencement of the travel. COR approval for local travel expenses is required. Travel may include general and administrative expenses, but shall not include profit. Temporary travel to other locations in support of program tasking is required. If required, temporary travel locations include Cherry Point, NC; Jacksonville, FL; Orlando, FL; San Diego, CA; China Lake, CA; Pt. Mugu, CA; Atsugi, Japan. This list is not all inclusive as locations may change over the life of the contract.

3.1.5.2 Material: The Contractor may be required to purchase material in support of performance under individual Task Orders on an as required basis. Required material may include but is not limited to: various tools, software products, licenses, training delivery and course materials, advanced computers, tablets, iPads, and various digital/information technology equipment, hardware, materials, and products etc. In accordance with NAVAIR Clause 5252.242-9515, the Contractor shall obtain advance written approval for all material purchases. All materials not depleted during the performance of this contract shall become Government property upon completion of this contract. The Contractor shall transfer all materials not depleted to the COR by way of Material Inspection and Receiving Report (DD Form 250). Material costs may include general and administrative expenses but shall not include profit/fee.

The costs of general purpose business expenses required for the conduct of the Contractor’s normal business operations are not an allowable direct cost in the performance of this contract. General purpose business expenses include, but are not limited to, the cost for items such as telephones and telephone charges, reproduction machines, word processing equipment, personal computers and other office equipment and office supplies.

3.1.6 Subcontractors: Provisions stated herein shall be clearly and effectively communicated to all subcontractors providing support under this contract. Provisions of this SOW shall flow down to subcontractors providing support under this contract, as applicable.

3.1.7 Management of Contractor Personnel: The Government will neither supervise contractor employees nor control the method by which the Contractor performs the required tasks. Under no circumstances will the Government assign tasks to, or prepare work schedules for, individual contractor employees. The Contractor shall manage its employees and guard against any actions that are of the nature of personal services, or give the perception of personal services

3.1.8 Transition Out Strategy:

The Contractor’s overall transition out strategy shall be built around maintaining the mission of the program with minimal impact, not only in terms of timeliness of performance but also to ensure that critical data and knowledge transfer occurs. Upon termination or expiration of the contract, the Contractor shall ensure an orderly transition of responsibilities, while minimizing impact to the operation. The Contractor shall submit a Transition Out Plan CDRL A003, to include the minimum elements listed below:

- Work Turnover. The Contractor shall provide a plan of action to effectively transfer tasked work that is in process at the expiration or termination of the contract to the successor company. Establish and maintain effective communication with the incoming contractor or Government personnel for the period of transition via weekly status meetings.

- Quality Assurance. The Contractor shall provide a plan of action to ensure continuation of quality review processes during the transition period to the successor company.

- Risk Mitigation Strategies. The Contractor shall provide a plan of action to mitigate contract performance risks (quality and schedule) encountered during the transition period.

- Data/Information Transfer. The Contractor shall provide a plan of action for the efficient inventory and transfer of program data to the successor company.

3.1.9 Program Unique Requirements:

3.1.9.1 Compliance and Collaboration

The Contractor shall perform all digital/IT services in accordance with the latest applicable guidance and policies. Contractor support activities shall also comply with Command initiatives such as Navy ERP and AIRSpeed and shall be performed in accordance with Federal, DOD, DON, and NAVAIR statutory and regulatory requirements, such as Application Portfolio Management, Defense Business Transformation Guidance, Navy Enterprise Application Developer’s Guide, Clinger Cohen Act (CCA), Federal Information Security Management Act (FISMA), and Web Enablement. Any tools that will be hosted by NMCI or run on NMCI workstations must be certified for NMCI and comply with NMCI policy.

As there are multiple digital/IT projects, initiatives, and activities ongoing throughout the NAVAIR Enterprise and the DoD, the Contractor shall work in close cooperation, collaboratively, and in an integrated manner with other support contractors as required, to maximize organizational alignment and technology acceleration.

3.1.9.2 Rapid Response to Evolving Technologies

It is anticipated that the majority of support under this contract will be required for digital / information technology innovation including complex, emerging, and rapidly evolving technology acceleration and modernization needs. The Contractor may be required to respond rapidly, to meet surge requirements, across a wide portfolio of emerging and disruptive technology areas (e.g. block chain, internet of things, artificial intelligence /machine learning, robotics process automation, container technologies, edge computing, quantum computing, Progressive Web Apps (SOW), 5G, LiFi technologies, etc.). As digital technology rapidly evolves and emerges, the Contractor may be required to support digital technology areas not specifically listed herein.

3.1.9.3 Quality Control:

The Contractor shall maintain an effective quality control program to ensure services are performed in accordance with the SOW and the Contract Surveillance Plan (CSP). The Contractor shall implement procedures to identify, prevent, and ensure non-recurrence of defective services. The Government shall evaluate the Contractor’s performance under this contract in accordance with the CSP which is included as an attachment to the contract in Section J.

3.1.9.4 Task Order Requirements:

Specific requirements will be outlined in individual task orders and may be provided in the form of a Statement of Objectives (SOO), Performance Work Statement (PWS), or Statement of Work (SOW), as appropriate. Further, individual task orders may include Completion or Term type CPFF CLINS as appropriate.

3.1.9.5 Non-Disclosure Agreements (NDAs) and Organizational Conflicts Of Interest (COIs):

In the performance of the contract, the Contractor may have access to non-public information. The Contractor shall provide signed non-disclosure agreements for those employee, as requested by the COR, no later than five (5) business days after task order award.

Consistent with the terms and conditions of paragraph (e) of NAVAIR 5252.209-9510 Organizational Conflicts of Interest (Services), with respect to proprietary data of third parties, and DFARS 252.227-7025, Limitations on the Use Or Disclosure of Government-Furnished Information Marked with Restrictive Legends, with respect to technical data, the Contractor shall not use, modify, reproduce, release, perform, display, and disclose any non-public information provided to or obtained by the Contractor in the course of performing this contract for other than Government purposes, and shall not do so for any commercial or personal purpose.

In the event that the Contractor knows of or identifies that it has a commercial interest in the subject matter of any proposed or on-going agreement with respect to which contract services are to be performed, the Contractor shall consider such interest a potential conflict of interest under NAVAIR 5252.209-9510(g) and promptly disclose it to the Contracting Officer Representative and Contracting Officer.

3.2 Security

3.2.1 Citizenship Requirements: Only U.S. citizens may perform under this contract. If the Contractor cannot find qualified U.S. citizens to perform the work, the Contractor shall submit a citizenship waiver request with justification to the Government Security Office. The waiver request should include:

a. The individual's name, date and place of birth, position title, and current citizenship.

b. A statement that a qualified U.S. citizen cannot be hired in sufficient time to meet the contractual requirements.

c. A statement of the unusual expertise possessed by the applicant.

d. A statement that access will be limited to a specific government contract (specify contract number).

e. A statement that the Contractor has obtained an export license for the information required to perform the contract.

3.2.2 Investigative Requirements:

Unclassified: All Contractor personnel must be eligible to perform Non-Critical Sensitive work as defined by SECNAV M-5510.30. All Contractor personnel are required to have a favorably adjudicated Tier-3 investigation from the Office of Personnel Management. The Contractor shall submit a request for personnel security investigation to the Government Security Office. The Government Security Office shall initiate the Contractor's Electronic Questionnaire for Investigations Processing (eQIP), shall do a preliminary screening of the Contractor's eQIP for suitability and derogatory information. The Contractor employee shall provide all requested information pursuant to the Privacy Act of 1974. The Government Security Office may deny the Contractor access to Government facilities and information and may prohibit the Contractor from performance of sensitive duties for failure to provide requested information or when derogatory or adverse information is present on the Contractor's eQIP, in such cases, the Contractor employee may not perform on the Contract.

The Contractor shall implement and maintain security procedures and controls to prevent unauthorized disclosure of controlled unclassified information and to control distribution of controlled unclassified information in accordance with DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM), and SECNAV M-5510.36. All Contractor facilities shall provide an appropriate means of storage for controlled unclassified information and materials. All controlled unclassified information shall be appropriately identified and marked as For Official Use Only in accordance with DoDM 5200.01, Information Security Program: Controlled Unclassified Information (CUI) Volume 4 (enclosure 3).

Controlled Unclassified Information including For Official Use Only and Covered Defense Information (meeting the definition of 48 CFR 252.204–7012(a)) generated and/or provided under this contract shall be marked and safeguarded as specified in DoDM 5200.01 (DoD Information Security Program: Controlled Unclassified Information (CUI)) Vol. 4 (enclosure 3 pages 11-18) available at http: //www.dtic.mil/whs/directives/corres/pdf/520001_vol4.pdf. Any product containing Covered Defense Information shall be assigned a distribution statement (distribution statements B through F) using the criteria set forth in DoDI 5230.24 (Distribution Statements on Technical Documents); and have this statement displayed per DoDI 5230.24, Enclosure 3.

All controlled unclassified technical information shall be appropriately identified and marked with the following distribution statement(s):

Distribution Statement D: Distribution authorized to the Department of Defense and U.S. DoD contractors only (Critical Technology) (dated - _______). Other requests shall be referred to: Commander, Naval Air Systems Command, Attn: (Program/User Agency mailing address).

Classified: All Contractor personnel shall maintain security clearance eligibility commensurate with the level of classification of the work performed as annotated in the Contract's DD-254, Contract Security Classification Specification Form.

Contractor personnel shall require access to classified information in performance of this contract up to and including Top Secret, with a safeguarding level of Secret. The Contractor is responsible for ensuring that all personnel receive the requisite investigation and are favorably adjudicated in accordance with DoDM 5220.22, National Industrial Security Program Operating Manual. Contractor employees who fail to meet security clearance requirements may not access classified information or perform sensitive duties. In such cases, the Contractor employee may not perform on the contract.

The Contractor shall comply with security requirements specified in the DD-254 attached to this contract. Information or data that the Contractor accesses shall be handled at the appropriate classification level. Unclassified information shall be handled in accordance with the appropriate designation (Controlled Unclassified Information; For Official Use Only; Covered Defense Information). Distribution is authorized to the Requiring Office's Organization and supported Activity only. Other requests for deliverables under this contract shall be referred to the TPOC/COR of this contract for approval.

3.2.3 Common Access Card (CAC)/Public Key Infrastructure (PKI), System Authorization Access Request (SAAR-N).

3.2.3.1 SAAR-N: All contractor personnel requiring access to Government Information Technology (IT) systems shall have an approved System Authorization Access Request (SAAR-N) Form OPNAV 5239/14 (Rev Sep 2011) on file, and complete required Annual Information Awareness Training. New employees must submit their SAAR forms within thirty (30) days of their first day of work. Instructions for processing the SAAR-N forms are available at: http://www.cnrc.navy.mil/publications/Forms/OPNAV_5239_14_SAAR_N.pdf.

SAAR-N forms shall be submitted to the Contracting Officer’s Representative (COR), Government Technical Point of Contact (TPOC), or to the assigned government Trusted Associate Sponsorship System (TASS) Trusted Associate.

3.2.3.2 Command Access Cards (CAC)/Local Badges: Contractor CACs and facility specific identification badges will be issued by the Government to on-site contractor personnel and shall be visible at all times while personnel are at the Government site. The Contractor shall furnish all requested information required to facilitate issuance of identification badges and shall conform to local installation policies and guidance as appropriate. All CACs and identification badges issued to Contractor employees shall be returned to the Government Security Department at the Government site in accordance with local installation policies and guidance as appropriate following completion of the contract, relocation or termination of an employee, or upon request from the Contracting Officer’s Representative. The Government will provide the Contractor access to Government facilities, as required, for performance of tasks under this contract.

3.2.2.3 DD-254: The contractor shall comply with security requirements specified in the DD-254 attached to this contract. DD-254 guidelines may be updated in performance of the contract, as required. Information or data that the Contractor accesses shall be handled at the appropriate classification level, unclassified information shall be handled as “For Official Use Only”. Distribution is authorized to the Requiring Office’s Organization and supported Activity only. Other requests for deliverables under this contract shall be referred to the TPOC/COR/ACOR of this contract for approval.

3.2.4 Information Security. If the work is performed at the Contractor's facility, the Contractor shall implement and maintain security procedures and controls to prevent unauthorized disclosure of classified information and controlled unclassified information (CUI) and to control distribution of CUI in accordance with DoD 5220.22-M (NISPOM), and SECNAV M-5510.36. If the work is performed at the Government's facility, the Contractor shall comply with the applicable Facilities Instructions/Guidance, the latest applicable Program Protection Plan(s) and applicable Security Classification Guide(s).

3.2.4.1 Marking: All information generated by the Contractor shall be properly marked. For Official Use Only information generated and/or provided under this contract shall be marked in accordance with DoDM 5200.01.

This is the start of the file's text. The full file is on GovTribe.