Attachment_3_-_Contractor_Production_Report.docx

DOCX document 25 KB Posted

Attached to
Replace the existing HVACs in buildings 1582, 2093 and 2188, and Install two Mini Split systems in buildings 201 and 2806
Solicitation number
N00421-19-Q-0500
Issued by

About this file

Attachment 3 - Contractor Production Report

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

CONTRACTOR PRODUCTION REPORT

ATTACH ADDITIONAL SHEETS IF NECESSARY

Date :

Contract Number

Title and Location
Report Number:

Contractor:

Superintendent:

AM Weather:
PM Weather:
Max Temp:
Min Temp:

Work Performed Today

Schedule Activity No.
Work Location and

Description

Employer Number of Workers

Trade

Hours

JOB

SAFETY

WAS A JOB SAFETY MEETING HELD THIS DATE? |_| Yes |_|No

TOTAL WORK HOURS ON JOB SITE THIS DATE

WERE THERE ANY LOST TIME ACCIDENTS THIS DATE? |_| Yes |_|No IF YES, attach a copy of the completed OSHA report

HOURS FROM PREVIOUS REPORT

Total HOURS FROM PREVIOUS REPORT

WAS CRANE/MANLIFT/TRENCHING/SCAFFOLD/HV ELECTRICAL/HIGH WORK DONE? |_| Yes |X|No IF YES, attach statement of checklist showing inspection performed Total work hours FROM START OF CONST.

WAS HAZARDOUS MATERIAL/WASTE RELEASED INTO THE ENVIRONMENT? |_| Yes |X| No IF YES, attach a description of incident and proposed action |X| Safety Requirements have been met

List safety actions taken today / Safety inspections conducted
|X| Safety Requirements have been met

Equipment / Material received today to be incorporated into job:

Construction and plant equipment on job site today. Include number of hours used today:

Remarks:

Outstanding Submittals:

Outstanding RFI’S:

Attachment No. 1 -