2019.02.12.HEEWJCapPreSolConfBrief_FINAL_PAO2019_206.pdf
PDF 4 MB Posted
- Attached to
- HEEWJ Pre-Solicitation Conference
- Solicitation number
- N0042118R0009
About this file
This announcement provides details for a pre-solicitation conference for contracted air services to support electronic warfare training. The Naval Air Systems Command will seek proposals for aircraft and aircrew to simulate electronic attack and standoff jamming threats. Services will include electronic warfare operations, target banner towing, and obtaining necessary flight clearances.
The conference will be held on February 12-13, 2019 at the Fleet Area Control and Surveillance Facility Virginia Capes in Virginia Beach, Virginia. A general session on February 12th will provide an overview of draft requirements and evaluation factors. One-on-one meetings with offerors will be scheduled for February 13th by request. The final RFP is expected in late March 2019, with an anticipated one year contract award period from FY2020 to FY2025. Pricing will include firm fixed prices for setup, flight services, and a not-to-exceed amount for monthly sustainment. All responsible sources may submit proposals in response to the forthcoming solicitation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 2019.03.15.Q&A_final.pdf | ||
| PMA_226_HEEWJ_Industry_Presolicitation_Conference_Attendees.pdf | ||
| Attachment_4_-_GFP.xlsx | XLSX spreadsheet | |
| Section_L_Attachments.zip | ZIP file | |
| Attachment_2_-_IRD.docx | DOCX document | |
| Attachment_1_-_DD254_DRAFT.pdf | ||
| Exhibit_A_-_CDRLs.zip | ZIP file | |
| HEEWJ_PC_Registration_Form.pdf | ||
| Attachment_5_-_QA_Form.docx | DOCX document | |
| HEEWJ_Draft_RFP.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AIR-4.0E
Contracted Air Services (CAS)
High Endurance Electronic Warfare Jet (HEEWJ) Capabilities
Pre-Solicitation Conference
N00421-18-R-0009
DISTRIBUTION A. Approved for public release: distribution unlimited [NAVAIR Public Release 2019-206]
File: 2019.02.12.HEEWJ/Cap/PreSol/Conf/Brief
Conference Agenda
12 February: 1300-1500 – All Parties
• Pre-Solicitation Brief
• Airworthiness Requirements Brief
13 February: 0800-Completion
• One-on-ones as scheduled
Pre-Solicitation Briefing Agenda
• Welcome, Disclaimers, Admin
• Program Overview & Requirements
• Contract Overview
• Source Selection Overview
• Draft Sections L&M
• Summary & Path Forward
Welcome / Ground Rules
• All attendees must sign in
• No electronic recording of presentation or discussion
• Please silence your cell phones
• Conference Classification: UNCLASSIFIED
• This pre-solicitation conference constitutes an informal exchange of information
– Provides insight into Government plans
– The information shared today represents the Government’s current intentions with regard to the subject acquisition; however, the Government’s intentions may change based on today’s discussions and any follow-up comments / questions
– The remarks made by Government officials during this exchange should in no way be construed as a guarantee of the Government’s final course of action
• The formal solicitation, when issued, is the ONLY document that should be relied upon in determining the Government’s requirement
• Attendance list and briefings approved for release to the public will be posted on FedBizOpps
Introductions / Government Attendees
• PMA-226 CAS IPT Lead
• IPT Lead CAS HEEWJ
• FACSFAC VACAPES N9
• CAS Class Desk
• Military CAS Class Desk
• PCO, Contracts, AD-2.5.1.13
• Contracts 2.5.1.13.7
• Office of Counsel, AD-11.7
• NAVAIR Source Selection Office, AIR-4.0E
• NAVAIR Source Selection Office, AIR-4.0E
Specialized and Proven Aircraft
Program Office
PMA-226 manages and supports specialized and proven platforms & systems
Assigned responsibilities:
Adversary Aircraft
USN and USMC Adversary F-5 Squadrons
Naval Aviation Warfighting Development Center’s (NAWDC’s) F-16s
Contracted Air Services (CAS) Contracting, PAO Declaration and Airworthiness
US Naval Test Pilot School / Naval Postgraduate School (USNTPS / NPS)
Out of Production Sustainment Support (FMS)
Over (18) aircraft types in over (13) Countries (F-5, F-16, T-38, H-72, X-26, U-6, O-2, T-39, Sentry UAVs, UV-18, NU-1B, T-2, H-2, H-3, A-4, S-2T, CN235…) and over (11) platforms on
NAVAIR contracts… http://www.airliners.net/photo/USA---Navy/Cessna-O-2A-Pelican/1611364/L/ //upload.wikimedia.org/wikipedia/commons/6/6f/Egyptian_Westland_Commando_Mark_2_helicopter.JPEG
Contracted Air Services IPT
Contracted Air Services (CAS) provides cost effective:
• Fleet Training and Exercise Support – Readiness
• Acquisition Program Test and Evaluation Support
By providing:
• OPFOR (Air to Air, Air to Surface, EW…)
• Air to Air Refueling
• Close Air Support for Training
• Airborne Range Support Services (ARSS)
Effectively replacing aircraft that have been divested from the inventory, augmenting limited adversary resources, and preserving combat aircraft life for the Warfighter.
Fleet Demand for CAS Growing
• CNAF realizes CAS capacity and efficiencies
• New Efforts
• Near Peer Threat Emulation
• 4th Generation Fighter OPFOR support
• JSF Squadrons fielding plan requires additional CAS OPFOR support
• CAS contract for JTAC Generation
• UAS Threat Emulation
NAVAIR Commander’s Intent
CAS supports AIR-00’s two Strategic Imperatives:
1. Align resources to better support Today’s
Readiness.
By providing cost effective Fleet Training and Exercise
Support
2. Reduce Cost and Increase Speed of Products to Fleet.
By providing cost effective Acquisition Program Test and
Evaluation Support
Goal
Our goal is to execute a cost-effective, mission focused acquisition to provide critical capability to the Fleet and T&E communities
• The Government appreciates your feedback on the following:
– DRAFT CLIN structure
– Timeline of Deliverables
– Critical issues impacting industry
Purpose
• Primary Purpose – Common understanding the content of the DRAFT RFP, with focus on Sections L and M
• Final opportunity for open industry feedback prior to final
RFP release
• All information released to date and during this conference is to be considered DRAFT and for informational purposes only
• Internal source selection plans and procedures will not be discussed
Purpose of One-on-One
Communications
• One-on-Ones provide an opportunity for Industry to present meaningful information to the Government regarding its potential solution based on requirements of the Performance Work Statement (PWS) and evaluation criteria
• The Government is not interested in a “sales pitch”;
rather, Industry will have an opportunity to provide feedback on the Government's intentions
• Industry will have an opportunity to engage in a public discussion and to attend one-on-one meetings with the Government
• Questions and answers (Q&As) approved for public release will be posted on FedBizOpps
Discussion Disclaimer
The Government’s potential requirements and capabilities presented for discussion represent the government’s current intent, but may change prior to the formal solicitation.
Questions and Answers
• Please reserve questions until the end of the presentation and submit on the index cards provided. The Government may answer questions at the end of the presentation. However, all questions may not be answered today due to time constraints
• After today, questions should be submitted in accordance with the
RFP, using the form in the RFP
• All draft RFP questions should be submitted to the Government by
12:00 PM EST on 27 February 2019. It is not the Government’s intention to release answers to every draft RFP question. If necessary, changes will be made via the final RFP release
Agenda
• Welcome, Disclaimers, Admin
• Program Overview & Requirements
• Contract Overview
• Source Selection Overview
HEEWJ Purpose
Provide Contractor Owned and Contractor
Operated (COCO) aircraft and personnel to support training for shipboard and aircraft squadron weapon systems operators and aircrew to defeat tomorrows Electronic Warfare threats
Draft Performance Requirements
Para 3.0 Reference Documents
• Adhere to FAR, DCMA, FAA, DoD, etc., Applicable
Documents in accordance with (IAW) para 3.0
Para 4.0 Requirements
• Provide Certified Aircraft and Personnel to Deliver the
Following Services:
– Electronic Attack (EA) para 4.1.1
– Stand Off Jamming (SOJ) para 4.1.2
– Target Banner Tow (TBT) para 4.1.3
• Meet Aircraft Mission Profiles IAW para 4.1.4, Appendix D and the Interface Reference Document
(IRD)
Draft Performance Requirements
Para 4.0 Requirements (cont.)
• Contractor Aircraft may be configurable for any mission (EA, SOJ or TBT)
• Simultaneous Presentations Para 4.1.5:
– East Coast: Minimum of Seven (7)
• Must always include one (1) SOJ
– West Coast: Minimum of Five (5)
• Must always include one (1) SOJ
– Simultaneous presentations are at the Government’s discretion to meet mission requirements para 4.1.5.1, 4.1.5.2
Draft Performance Requirements
Para 4.0 Requirement (cont.)
Contract Administration and Data Requirements
• Additionally IAW DCMA INST 8210.1C Change 1
– Mishap Response Plan is required to be maintained as part of the
GOP/FOP requirement para 4.2.7
– Waiver Requests shall be coordinated with the PCO, COR and approved by the GFR para 4.2.8
CDRL Title Required Data
A001 Contractors Progress, Status and
Management Report
Data as outlined in DI-MGMT-81904 to include all required content and/or as tailored in the DD1423 Block 16.
A002 Program Management Reviews, Report, Record of Meeting / Minutes
Data as outlined in DI-ADMIN-81505 to include all required content and/or as tailored in the DD1423 Block 16.
A003 Contractor Management Plan Data as outlined in DI-MGMT-80004A to include all required content and/or as tailored in the DD1423 Block 16.
A004 Fuel Chits Data as outlined in DI-MISC-81461 to include all required content and/or as tailored in the DD1423 Block 16.
A005 Airworthiness Data as outlined in DI-SAFT-81905A to include all required content and/or as tailored in the DD1423 Block 16.
A006 Government Property Inventory Report Data as outlined in DI-MGMT-80411C to include all required content and/or as tailored in the DD1423 Block 16.
A007 OPSEC Plan Data as outlined in DI-MGMT-81999 to include all required content and/or as tailored in the DD1423 Block 16.
Draft Performance Requirements
Para 4.0 Requirements (cont.)
• Aircraft Certification, Maintenance and Operating
Procedures Para 4.3, 5.3.5
– Shall be IAW 14 CFR and its NAVAIR / DoD or other Agency
IFC
– Aircraft shall have and maintain current FAA Airworthiness
(AW) Certifications
– Aircraft shall have the ability to fly in Icing Conditions
– Contractor shall provide accurate, usable and timely AW data
IAW CDRL A005
Draft Performance Requirements
Para 5.0 Operational Requirements
• Mission Planning para 5.1
– Via Scheduling Officers
– All Flights require authorization
• Permanent Basing para 5.2
– Requires home base on East Coast and West Coast
– No basing facilities will be provided under this contract
Draft Performance Requirements
Para 5.0 Operational Requirements (cont.)
Personnel Requirements
• Provide Certified Aircrew and Maintenance Personnel
IAW DCMA INST 8210.1C Change 1 and 14 CFR
• Provide a Mission Commander (MC) and Special
Mission Operator (SMO) for EA/SOJ missions per the
PBWS.
– The MC shall be familiar with air defense operations and communications, and operate EW systems as outlined in the
PBWS para 4.1.2 (iii), (V) and 5.5.2.3, Appendix D and the IRD
Draft Performance Requirements
Para 6.0 Government Oversight
• Government will conduct inspections of Contractor ground and aircraft operations
Para 7.0 Training
• Government will provide designated Pilots, MCs and
SMOs with initial training on the operation of all
Government Furnished Property (GFP) / Mission
Equipment
• Any follow-on training is the responsibility of the contractor
Draft Performance Requirements
Para 8.0 Government Furnished Property (GFP)
• Contractor shall track and report GFP to include
Contractor Acquired Property (CAP)
• Contractor shall document receipt and return of all
Government Furnished Mission Equipment via DD
Form 1149
• Contractor is responsible for all Technical Assistance
Agreements (TAAs) and International Traffic in Arms
Regulations (ITAR) compliance
Draft Performance Requirements
Para 9.0 Security
• Contractor shall adhere to the Contract’s DD-254, Contract Security Classification Specification
• OPSEC plan to safeguard, identify and protect Critical
Information
Draft Performance Requirements
• Appendix A: Definitions and Glossary
• Appendix B: Acronym List
• Appendix C: Potential Bases of Operation/
Deployments
• Appendix D: Aircraft Requirements
– Detailed Requirements moved to Appendix D
– Integration Requirements moved to Attachment 2 – Interface
Reference Document (IRD)
Appendix D
Electronic Attack Requirements Communications Suite FAA communication requirements IAW 14CFR
Two Ultra High Frequency (UHF) radio in the cockpit
One Very High Frequency (VHF) radio in the cockpit
Provisioning for the GFP provided APX-123 IFF Transponder and IFF control head
Provisioning for the Government provided two URC-200 or two PRC-158 encrypted UHF communications relay radios including top and bottom mounted UHF antennas
Electronic Warfare Operator aircraft Intercommunication System (ICS) Capability
Navigation Suite FAA navigation requirements IAW 14CFR
FAA approved Global Positioning System (GPS)
Tactical Air Navigation (TACAN) including Air-to-Air capability
Permanently mounted Traffic Alert and Collision Avoidance System (TCAS) II
Weather Radar One forward hemisphere scanning I-band Weather Radar that can also detect victim surface ships (approximately 1000 m^2
Radar Cross Section (RCS) at 25 NM in clear weather). (Weather Antenna may be removed when tasked to provide two
DRFM jamming bands)
Range Over water operations up to 250 NM from nearest land, in mission configuration with two AST-9 pods. At least two West
Coast aircraft must be capable of traveling to Hawaii
Minimum Take-off to
Landing Time Five hours in slick configuration (without EW pods) from take-off to landing
Day Altitude 100 ft. up to and including 35,000 ft. MSL in mission configuration with two AST-9 pods
Night Altitude 1,000 ft. up to and including 35,000 ft. MSL with two AST-9 pods
Airspeed 300 KIAS in mission configuration with two AST-9 pods up to and including 20,000 ft. MSL
Turn 2.7G sustained turn in in mission configuration with two AST-9 pods up to and including 14,000 ft. MSL
DRFM Operations Aircraft shall be reconfigurable for “Nose on” B, C/D, E/F/G, I-band jamming IAW the IRD.
Aircraft shall be capable of simultaneously supporting two different bands of DRFM Jamming (Except simultaneous B and C band operations). The weather radar may be removed to support the second band transmit antenna requirements.
Additionally, at least two Hardpoints will include RF cabling support for GFP antennas mounted in ALQ-167 pods and GFP skin mount antennas on top and bottom of the aircraft
B-band Jamming Aircraft shall be reconfigurable for B-band noise and “Nose on” B-band DRFM jamming; to include 1000W cross dipole transmitting antenna
D band Antenna Two sets of D-band IFF antenna and cables (100 W average power, 4kW peak power), on the centerline top and bottom of the aircraft. The antenna cables must terminate at N(f) bulkhead connectors mounted on an RF panel accessible to the aircraft cabin such that cable length required to reach electronic equipment racks is minimized
Appendix D
Electronic Attack Requirements Cont.
Safe One internally mounted GSA approved single-drawer security container (12.5” x 16” x 17”)
Internal Racks Provisioning to internally mount two GFP electronic racks for the equipment (22 inches wide by 24 inches deep by 43 inches high) with seating for at least one operator per rack. The layout configuration must meet FAA Human Factors, Structural and aircraft Electrical Wiring requirements per FAA 8300.16 CHG 1
Cooling 5000 watts (W) of power to dissipate heat for GFP provided equipment.
Mission Power 28 VDC 35 amps and 9 kVA 115 VAC (400 Hz, 3 phase). Each wing capable of at least 3.5 kVA and internally capable of at least 3.5 kVA (Not to exceed 9 kVA). Military Standard (MIL-STD)-704F compliant
Dual Control Boxes Provisioning to install, at a minimum, two GFP provided Dual Control Boxes (DCB) (CD-300/ALQ part number (P/N) 1611AS9600-4). The aircraft must be configured to use either control box interchangeably
EW Wiring IAW provided GFI
External Pod Mounts External pod mounts must conform to MIL-STD 8591 1000 lb. store with 14” lug spacing.
Aircraft must be capable of a combination of any two of the following external pods simultaneously:
a. AN/ALQ-188,
b. AN/ALQ-167,
c. AN/ALE-43 shell compatible pod,
d. AN/AST-6,
e. AN/AST-9,
f. Tactical Combat Training System (TCTS), and/or
g. P5 Combat Training System (P5CTS). (Note: TCTS and P5CTS are mounted with
Government provided mission equipment LAU-7 and or ADU-299 adapters.)
Large Area Tracking
Range (LATR)
Provisioning to support a GFP internally mounted LATR System
Appendix D
Stand Off Jamming Requirements
Communications Suite FAA communication requirements IAW 14CFR
Two Ultra High Frequency (UHF) radios in the cockpit
One Very High Frequency (VHF) radio in the cockpit
One HF radio with the ability to control the radio from either the cockpit or the cabin
One additional HF radio controlled in the cabin with an integrated recording system to support communications jamming operations
One additional UHF/VHF radio controlled from the cabin to support SMO and/or USQ-113
Provisioning for the GFP provided APX-123 IFF Transponder and IFF control head
Cabin ICS Capability
Navigation Suite FAA navigation requirements IAW 14 CFR
FAA approved Global Positioning System (GPS)
Tactical Air Navigation (TACAN) including Air-to-Air capability
Permanently mounted Traffic Alert and Collision Avoidance System (TCAS) II
Weather Radar One forward hemisphere scanning I-band Weather Radar that can also detect victim surface ships
(approximately 1000 m^2 RCS at 25 nm in clear weather)
Range Over water operations up to 250 NM from nearest land, in mission configuration with two AST-9 pods in mission configuration
Minimum Take-off to
Landing Time:
Five hours in slick (without EW pods) configuration from take-off to landing
Day Altitude 500 ft. up to and including 35,000 ft. MSL in mission configuration with two AST-9 pods
Night Altitude 1,000 ft. up to and including 35,000 ft. MSL with two AST-9 pods
Airspeed 300 KIAS in mission configuration with two AST-9 pods between 10,000 and 20,000 ft. MSL
Turn 2.0G sustained turn in mission configuration with two AST-9 pods up to and including 14,000 ft. MSL
SOJ Mission Computer The Contractor shall provide a mission computer that supports ES Geolocation and internal network support for GFP DRFM systems. Mission Computer must meet requirements of References (m) through (y)
Appendix D
Stand Off Jamming Requirements
DRFM Operations Aircraft shall be capable of simultaneously supporting four different bands of DRFM Jamming IAW
Attachment (2), IRD:
a. 1 B-band, 1 C/D-band, 1 E/F/G-band, and 1 I-band DRFM;
b. 1 B-band and 3 E/F/G-band;
c. 1 B-band, 1 C/D-band and 2 I-band)
d. 1 B-band, 1 C/D-band, and 2 E/F/G-band
The weather radar may be removed to support B-band transmit antenna requirements. Additionally, at least two hardpoints will include RF cabling support for GFP antennas mounted in ALQ-167 pods and GFP skin mount antennas on top and bottom of the aircraft.
B-band Noise Jamming Aircraft shall be reconfigurable to support a “Nose on” and “Tail on” B-band noise jamming system; to include 1000W cross dipole transmitting antenna. This hardware may be used for D-band DRFM
Mission Power 28 VDC 250 amps and 11 kVA 115 VAC (400 Hz, 3 phase). Each wing capable of at least 3.5 kVA and internally capable of at least 3.5 kVA. Military Standard (MIL-STD)-704F compliant
Cooling power Cooling up to 17,000W
Safe Internally mount one GSA approved single-drawer security container (12.5” x 16” x 17”)
LATR Provisioning to support a GFP internally mounted LATR System
USQ-113 Provisioning to support GFP USQ-113 operations, or CFE Equivalent
External Pod Mounts External pod mounts must conform to MIL-STD 8591 1000 lb. store with 14” lug spacing.
Aircraft must be capable of a combination of any two of the following external pods simultaneously:
a. AN/ALQ-188,
b. AN/ALQ-167,
c. AN/ALE-43 shell compatible pod,
d. AN/AST-6,
e. AN/AST-9,
f. TCTS, and/or -
g. P5CTS. (Note: TCTS and P5CTS are mounted with GFP provided LAU-7 and or ADU-299 adapters)
Appendix D
Stand Off Jamming Requirements
ES Geolocation (Own
Force Monitoring)
Geolocating Spectrum Analyzer that meets the following:
1. At a 160 NM standoff, system shall be capable of detecting and providing a line of bearing to a signal between Radar bands 400 MHz and 18,000 MHz and Communication bands 100 MHz and 3000 MHz, in a continuous field of view of no less than 270 degrees, for transmitters operating at 20W or greater transmitted power and given 5 seconds of signal persistence
2. System shall be capable of providing Pulse Repetition Interval (PRI) Pulse Repetition Frequency (PRF) and frequency for detected radar signals in the C to J bands (500 MHz to 18,000 MHz)
3. System shall be capable of geolocating detected signals in the C to J bands to within 5 NM from a 160
NM standoff, assuming 10 minutes of signal persistence.
4. System shall have a Radar Signal Receiver Sensitivity of – 70dBm at receive antenna input
5. System shall provide situational awareness software application that is capable of displaying and managing a wide variety of digital map images in its main window. It shall also have an extensive library of airport, navigational aids and air space boundary data which can be overlaid on the map display. It shall be capable of displaying and updating aircraft and target position information
19 inch Rack Space for
GFP
Provisioning for at least two GFP 19” racks, each at least 43” tall, in addition to racks for CFE equipment.
The layout configuration must meet FAA Human Factors, Structural and aircraft Electrical Wiring requirements per FAA 8300.16 CHG 1
Appendix D
Target Banner Tow Requirements
Communications Suite FAA communication requirements IAW 14 CFR
Two Ultra High Frequency (UHF) radio in the cockpit
One Very High Frequency (VHF) radio in the cockpit
Provisioning for the GFP provided APX-123 IFF Transponder and IFF control head
Navigation Suite FAA navigation requirements IAW 14CFR
FAA approved Global Positioning System (GPS)
Tactical Air Navigation (TACAN) including Air-to-Air capability
Permanently mounted Traffic Alert and Collision Avoidance System (TCAS) II at 25 NM in clear weather
Weather Radar One forward hemisphere scanning I-band Weather Radar that can also detect victim surface ships
(approximately 1000 m^2 RCS at 25 nm in clear weather)
Range Departing over water operations up to 250 NM from nearest land
At least two West Coast aircraft must be capable of traveling to Hawaii
Minimum Take-off to
Landing Time:
Five hours in slick configuration from take-off to landing. If target/banner deployed upon takeoff, the aircraft must be capable of a minimum of two hours flight time
Time on Station Two hours
Day Altitude 100 ft. up to and including 25,000 ft. MSL in mission configuration with tow reel mounted
Night Altitude N/A
Airspeed 250 KIAS when in mission configuration (target deployed) up to and including 20,000 ft. MSL
Turn 2.0G up to 14,000 ft. MSL with tow reel
Tow Reels RM-30A/A1 or MTR-101 or equivalent, at least two aircraft *
Mission Power 1.5 kVA 115 VAC (400 Hz, 3 phase) MIL-STD-704F compliant
D-band Antenna Two sets of D-band IFF antenna and cables (100 W average power, 4kW peak power), on the centerline top and bottom of the aircraft. The antenna cables must terminate at N(f) bulkhead connectors mounted on an
RF panel accessible to the aircraft cabin such that cable length required to reach electronic equipment racks is minimized
Note: Tow reel targets are listed in Appendix D
Attachment -2
Interface Reference Document
• The IRD includes Government Furnished Information
(GFI) required to integrate and support Government
Furnished Property (GFP) on COCO aircraft.
• Government equipment is identified throughout the IRD as GFP or Government Provided Mission Equipment
(GPME).
• Equipment not identified as GFP or GPME is Contractor
Furnished Equipment (CFE)
Attachment 4 – GFP Matrix
../../../SSAC/DRAFT RFP Release/Attachment 4 - GFP.xlsx
Attachment -2
Interface Reference Document (cont.)
• Para 2 Applicable Documents:
– Reference Documents listed will be available for the
Final RFP
– Enclosures are contained within the IRD
• Para 3 Externally Mounted Equipment
– Including but not limited to electrical, mechanical, environmental and operational requirements or characteristics
Attachment -2
Interface Reference Document (cont.)
• Para 4 Internal Equipment
– Including but not limited to electrical, mechanical, environmental and operational requirements.
– Provides USQ-113(v)4 functional diagrams
– DRFM Configurations and RF handling capabilities for
EA and SOJ
– DRFM Block Diagrams and antenna mount diagrams
Agenda
• Welcome, Disclaimers, Admin
• Program Overview & Requirements
• Contract Overview
• Source Selection Overview
AIR-4.0EContract Overview
• Single Award ID/IQ Services Contract
• Firm Fixed Price (FFP)
• Federal Acquisition Regulation (FAR) PART 15 Source
Selection
• 4 year, 364 Day Ordering Period (FY20 – FY25) In
Compliance with 10 USC 2401
• No Ordering Period Extension Options
Draft Section B
CLIN Title Type Description Deliverable
0001 Electronic Attack (EA)
Stand Up Capability
FFP Performing aircraft modifications, completion of NAVAIR Interim Flight
Clearances (IFCs), and operational validation of required EA capabilities IAW the PBWS. Limited to costs that will occur during stand up only to meet the requirement of a mission ready EA aircraft.
(Service)
NTE 12 months of labor
0002 Stand Off Jamming
(SOJ) Stand Up
Capability
FFP Performing aircraft modifications, completion of NAVAIR IFCs, and operational validation of required SOJ capabilities IAW the PBWS. Limited to costs that will occur during stand up only to meet the requirement of a mission ready SOJ aircraft.
(Service)
NTE 12 months of labor
0003 Target Banner Tow
(TBT)Stand Up
Capability
FFP Performing aircraft modifications, completion of NAVAIR IFCs, and platform operational validation of required TBT capabilities IAW the PBWS. Limited to costs that will occur during stand up only to meet the requirement of a mission ready TBT aircraft.
(Service)
NTE 12 months of labor
Draft Section B
CLIN Title Type Description Deliverable
0004 EA Services FFP EA service costs (charged by the flight minute) shall include mission flight time and all flight support costs (including travel) and any other operating costs not outlined in the monthly fixed operating costs CLIN 0007.
(Services)
NTE 936,000
Flight Minutes
0005 SOJ Services FFP SOJ service costs (charged by the flight minute) shall include mission flight time and all flight support costs (including travel) and any other operating costs not outlined in the monthly fixed operating costs CLIN 0007.
(Services)
NTE 196,800
Flight Minutes
0006 TBT Services FFP TBT service costs (charged by the flight minute) shall include mission flight time and all flight support costs (including travel) and any other operating costs not outlined in the monthly fixed operating costs CLIN 0007.
(Services)
NTE 31,920
Flight Minutes
Draft Section B
CLIN Title Type Description Deliverable
0007 Monthly Fixed
Operating Costs
FFP Monthly fixed operating costs for EA, SOJ
& TBT to include labor, meetings with the
Government, Contractor hangar space, insurance, training requirements, material, and any other recurring operating costs not attributable to other CLINs. This CLIN shall commence upon issuance of an
Interim Flight Clearance for all capabilities
( EA, SOJ, and TBT).
(Service)
48 months of labor
0008 Administrative/
Technical Data
NSP The Contractor shall provide technical and administrative data in accordance with
Section C and CDRL Exhibit A.
Data
0009 Modifications to
Incorporate GFP and
Government provided mission equipment not previously defined.
FFP Incorporate additional capabilities with
GFP/Government provided mission equipment kits as required.
(Service)
Labor
NOTE 1: CLIN 0009 – The Offeror shall show its burdens and profit for this CLIN. The burden and profit shall be established in Section B for use on future task orders.
NOTE 2: The Government reserves the right to realign funding across CLINs 0001-0006 and 0009 within the total contract ceiling amount.
Draft RFP: Section E
– CLINs 0001, 0002 and 0003 – The services to be furnished hereunder shall be accepted IAW NAVAIR clause 5252.246-9512
– CLINs 0004 – 0006 – The services to be furnished hereunder shall be inspected and accepted IAW the QASP, Attachment (3), and NAVAIR clause
5252.246-9512, as identified in the individual task order
– CLIN 0007 – The services to be furnished hereunder shall be accepted IAW
NAVAIR clause 5252.246-9512
– CLIN 0008 – The data to be furnished hereunder shall be inspected and accepted IAW the NAVAIR clause 5252.246-9514 and Exhibit A, as identified in the individual task orders
– CLIN 0009 – Inspection and Acceptance are not applicable to this item
Draft RFP: Section E
5252.246-9512 INSPECTION AND ACCEPTANCE (NAVAIR)(OCT 2005)
(a) Inspection and acceptance of the supplies or services to be furnished hereunder shall be performed by the Contracting Officer’s Representative (COR)
(b) Acceptance of all Contract Line Items/Sub Line Items (CLINs/SLINs) shall be made by signature of the accepting authority on a DD 250 submitted through the WAWF system. Acceptance will only occur when the accepting authority is sure that inspections performed demonstrate compliance with contract requirements
Draft RFP: Section F
• Draft Section F:
– The Government intends to issue orders for CLINs 0001 - 0003 (Stand Up
Capability for EA, SOJ and TBT) immediately after contract award
– The Government intends to issue orders for CLINs 0004, 0005 or 0006 after successful demonstration of the corresponding stand-up capability IAW
Section E inspection and acceptance and the issuance of an Interim Flight
Clearance for each capability (EA, SOJ or TBT) no later than 12 months after the date of contract award
– The Government intends to issue orders for CLIN 0007 after successful demonstration of the stand-up capability for CLINs 0004, 0005 and 0006 (EA, SOJ and TBT) IAW Section E inspection and acceptance
Agenda
• Welcome, Disclaimers, Admin
• Program Overview & Requirements
• Contract Overview
• Source Selection Overview
Source Selection Objectives
• Choose the contractors who provide the best value to the
Government, all factors considered
• Obtain the best value using a comprehensive evaluation process
• Use of the evaluation process provides a fair and consistent evaluation of proposals
Source Selection Organization
SSA
SSAC CHAIR
SSEB CHAIR
SSAC Advisors
SSEB Advisors
SSEB
TECHNICAL
SSAC Members
ASSISTANT CHAIR
PRICE
PAST
PERFORMANCE
PCO
CORPORATE
EXPERIENCE
Evaluators
Source Selection Process
Generic
Source Selection Process
Req’ts Developed Plan the Approach
• ISTRAP/AP/Strategy
• SSP
Market Research & Early Exchanges w/Industry
• SOO/SOW
• PBWS
• Draft RFPs • One-on-ones • Industry Days • Tech. Library
Receive
Proposals
Compare
Proposals
Discussions w/ Offerors
(ENs)
Complete
Discussions
Evaluate
Proposals
Competitive
Range (or SSA Selects Source)
Corp Exp
Technical
Past Perf
Evaluate FPRs
Price
Request Final
Proposal Revision (FPRs)
Debrief
Contract
SSAC SSA
SSAC SSA
SSAC SSASSA SSAC
SSAC/L&M
Formal
RFP
Select Source
Award on Initial
Proposals?
Sections L & M
Proposals should use the same paragraph format as provided in Section L
• Understanding and following Sections L&M are the keys to developing a good proposal. A mutually beneficial goal to facilitate a successful evaluation
• Proposal Instructions – Section L of the RFP:
– Tells Offerors what to put in the proposal
• Evaluation Factors and Criteria – Section M of the RFP:
– Identifies what will be evaluated
– Identifies relative order of importance of factors
Draft Section M: General
• Best Value in Accordance with FAR Subpart 15.101-1
Tradeoff Process
• The Government intends to evaluate each proposal and award a contract without discussions to the responsible Offeror whose offer, conforming to the solicitation, provides the greatest overall benefit to the
Government, all factors considered
Discussions…
• The Government intends on awarding without discussions
• The Government may award based on initial proposals if . . .
– the Government receives proposals that conform with the requirements of the solicitation, and
– the proposals provide the greatest overall benefit to the
Government, all factors considered
• Offerors are advised to provide the best proposal possible since discussions may not be conducted
• However, …
• ...the Government Reserves the Right to Conduct
Discussions
• The Government may establish a Competitive
Range with the most highly rated proposals
– Those included in the Competitive Range will enter into
Discussions
• Evaluation Notices (ENs)
– As a minimum, notification of deficiencies and significant weaknesses
– Ask for additional information
• Proposal change pages as a result of ENs and
Discussions
– Conformed electronic version using track changes
– Helps to easily identify changes
– Minimizes work for the Final Proposal Revision (FPR)
Discussions…
Agenda
• Welcome, Disclaimers, Admin
• Program Overview & Requirements
• Contract Overview
• Source Selection Overview
Draft Order of Importance
Price
(FFP)
TECHNICAL
(Technical
Compliance Rating &
Technical Risk Rating)
PAST
PERFORMANCE
(Performance Confidence
Assessment Rating)>
CORPORATE
EXPERIENCE
(Performance Confidence
Assessment Rating)
Proposal Content and Volumes
• Annexes are used to provide supporting data
• Annexes do not count toward the suggested page count for each Volume
Volume Number Volume/Annex Title Suggested Pages
1 EXECUTIVE SUMMARY 15
2 CORPORATE EXPERIENCE 25
3 TECHNICAL 75
4 PAST PERFORMANCE 50
5 PRICE As Needed
Annex A
Final Versions of Previous
SOO/SOW/PWSs/Other Supporting
Documentation for Past Performance and
Corporate Experience
As Needed
Annex B Small Business Subcontracting Plan As Needed
Annex C Technical Data As Needed
Volume 1: Executive Summary
1. Offeror Summary Table (ES-1, Part of Attachment L-1)
2. Relevant Contract Summary Table (ES-2, Part of Attachment L-1)
3. Business System Status (ES-3, Part of Attachment L-1)
4. Small Business Subcontracting Plan – Large Business Offerors only
5. Technical
Offeror’s identification of strengths, risk reducers
6. Contract Documents
a) Original signed SF33 (Solicitation, Offer, and Award) cover page of the solicitation and a signed SF30 cover page of each amendment (as applicable) with all applicable
Blocks completed and acknowledgement of receipt of each amendment (as applicable) to this solicitation
b) Signed Representations, Certifications, and Acknowledgements and System for
Award Management (SAM) reference
c) A complete copy of all FAR, DFARS, NAVAIR, and special clauses and provisions requiring Contractor fill-ins
d) Offeror proposed Section H, Special Contract Requirements or other suggested changes or additions
Volume 1: Executive Summary
• An “Offeror” is defined as the prime Contractor with its CAGE code identified in
Block 15A on Standard Form (SF) 33, Solicitation, Offer, and Award
• A “Joint Venture” (JV) is a partnership or teaming arrangement that is formed for the purpose of responding to this solicitation when the prime Contractor consists of more than one legal entity. “JV Team Members” are the entities that make up a Joint Venture
• The term “entity” is used to mean any or all of the following: prime Contractor, JV, JV team members, any subcontractor, and corporate parent, division, subsidiary, or affiliate (e.g., any Contractor with a different CAGE Code/DUNS than the Offeror)
• The following entities are defined as principal entities and only principal entities will be used in the past performance and corporate experience evaluations:
a) the prime Contractor;
b) JV Team Members;
c) other entities that are proposed to perform at least 20% of the proposed total price for the contract;
and
d) entities that are proposed to perform a critical function* in the performance of the resulting contract
** Critical functions include providing primary EW design services or EW training services
• Offerors are advised that in order to demonstrate work commitment, each principal entity must be identified in Volume 5 Price and associated with a commensurate dollar value
Offeror Summary (Table ES-1)
• This table summarizes the Offeror and its entities’ proposed type and level of work, indicating a commitment to that effort during contract performance
• Offerors are advised that in order to demonstrate work commitment, each entity identified in Table ES-1 (Offeror Summary) must be identified in Volume 5 (Price) and associated with a dollar value commensurate with the Percent of Total Proposed Price identified in
Table ES-1 (Offeror Summary)
• This table must be a reflection of what is proposed in Volume 5 (Price)
Offeror: ABC, Inc.
Entity
Name
Physical Location of Entity
CAGE
Codes/DUNS
Roles and
Responsibilities with
Work Description
Workshare - % Total Proposed Price
Principal
Entity Yes or
No?
ABC, Inc. Nowhere, MD 12345 Prime: EA, TBT 65% YES
XYZ, LLC Somewhere, VA 98765 SOJ 25% YES
LMN Anywhere, CA 45632 EW design services 5% YES
PQR Elsewhere, KS 25486 Admin 5% NO
Total Proposed price (must add up to 100%) 100%
Relevant Contract Summary (Table ES-2)
Offeror: ABC, Inc
Entity Name Contract
Reference
Contract
Number Contract Type Contract Title
*Description of
Changes/Additions from Early
Information
Prime or Joint
Venture Company
ABC, Inc
P1 XXXXXXXX FFP Electronic Warfare aircraft services No changes
P2 XXXXXXXX FFP Target Banner Tow services Added PBWS
P3
JV team member A
(where applicable)
T1
T2
T3
T4
Subcontractor A
XYZ, LLC
S1 XXXXXXXX CPFF Stand off Jamming services No changes
S2 XXXXXXXX FFP Stand off Jamming Services Fixed typo in contract number
Subcontractor B
LMN
S3 XXXXXXX FFP EW design services No changes
S4 XXXXXXX CPFF EW design services No changes
Corporate Experience vs.
Past Performance
• Corporate Experience:
– What your company has done?
• “We repaired 100 leaky boats in the past month”
• Past Performance:
– How well your company has done it?
• “Ninety boats still leaked after your repair”
Volume 2: Corporate Experience
2.0: Applicable Contracts for Each CE Element CE-1 (Part of Attachment
L-2)
2.1: Evaluation Area Summary CE-2 (Part of Attachment L-2)
2.2: Evaluation Elements:
2.2.1 Obtaining Flight Clearances
• NAVAIR Flight Clearances
• Other DoD Flight Clearances
• Other Gov’t Agency Clearances
2.2.2 Experience using Electronic Warfare (EW)
• Electronic Warfare Support (ES)
• DRFM Jamming
Price Information is not included in this Volume
Volume 2: Corporate Experience
2.2.3 Ground Operations Procedures (GOPs)/Flight Operations
Procedures (FOPs)
• Experience in Developing GOPs/FOPs
• Training Required personnel to ensure compliance with GOPs/FOPs
• Maintaining and Updating GOPs to perform air vehicle modifications and installations
2.2.4 Experience using the same FAA Aircraft Type as proposed for
CAS HEEWJ
• Operating and Maintaining the same aircraft type
• FAA Airworthiness Directives and OEM Services Bulletins
• Logistics and maintenance support in remote and non-remote locations
Applicable Contracts for Each Corporate Experience Element (CE-1)
Table CE-1 Applicable Contracts for Each CE Element
1 Offeror Name
2 Entity Name
3 Contract Reference
4 Title of Contract
5 Contract/TO/DO/Subcontract Number
2.2.1 Obtaining Flight Clearances
Applicable SOO/PWS/SOW Section/Paragraph from Contract Reference
Applicable to Obtaining Flight Clearances
2.2.2 Experience using EW
Applicable SOO/PWS/SOW Section/Paragraph from Contract Reference
Applicable to Experience using EW
2.2.3 Ground Operations Procedures
(GOPs)/ Flight Operations Procedures
(FOPs)
Applicable SOO/PWS/SOW Section/Paragraph from Contract Reference
Applicable to Ground Operations Procedures (GOPs)/ Flight Operations
Procedures (FOPs)
2.2.4 Experience using the same FAA
Aircraft Type as proposed for CAS
HEEWJ
Applicable SOO/PWS/SOW Section/Paragraph from Contract Reference
Applicable to Experience using the same FAA Aircraft Type as proposed for
CAS HEEWJ
Applicable Contracts for Each Corporate Experience Element (CE-1)
• The Offeror shall identify the relevant portions (sections and paragraphs) of the contract reference’s SOO/SOW/PWS or other supporting solicitation/contract documentation to clearly identify how Corporate
Experience performing past tasks are similar to evaluation elements 2.2.1 through 2.2.4
• If the Offeror performed as a subcontractor for a contact reference, identify relevant portions (sections and paragraphs) of the subcontractor or supplier SOO/SOW/PWS or other documentation of the agreement between the prime and subcontractor
• Only contract references designated in Table ES-2 (Relevant Contract
Summary) shall be used in completing this Volume and all contract references shall be numbered the same throughout all of the Offeror’s proposal volumes (i.e., the contracts identified as P1, S1, T1, etc.)
• Contract relevancy will be determined in the Past Performance evaluation.
Only contract references identified in the Volume 2 (Corporate
Experience) and determined relevant in the past performance evaluation will be evaluated in Corporate Experience
Corporate Experience Proposal
• The Offeror shall provide a comparative analysis between the principal entities’ roles and responsibilities identified in Table ES-1
(Offeror Summary) and the Corporate Experience requested in subparagraphs 2.2.1 through 2.2.4
• Describe the extent to which previous Corporate Experience performing requirements similar to this solicitation can be leveraged in future performance of work. Similarity is the extent to which the
Offeror’s contract references (or documented work efforts) correspond to the specific tasks required by this solicitation
Evaluation Area Summary (CE-2)
• This table should provide a list of the principle entities’ referenced contracts that provide examples of corporate experience performing tasks similar to those required for evaluation areas 2.2.1 through 2.2.4
• Mark the cells in Table CE-2 with an “X” where the referenced contract included the experience indicated in evaluation areas 2.2.1 through
2.2.4
Offeror:
C o n tr ac t
R ef er en ce N u m b er
C o n tr ac t
N u m b er
2.2.1
Obtaining Flight
Clearances
2.2.2
Experience Using EW 2.2.3
GOPs/FOPs
2.2.4
Experience using same FAA
Aircraft Type
N A
V A
IR
F li g h t
C le ar an ce s
O th er D
O D
F li g h t
C le ar an ce s
O th er G o v er n m en t
A g en cy
C le ar an ce s
E S
D R
F M
J am m in g
E x p er ie n ce i n d ev el o p
G O
P s/
F O
P s
T ra in in g r eq u ir ed p er so n n el t o en su re c o m p li an ce w it h G
O P s
M ai n ta in in g a n d u p d at
G O
P s to p er fo rm a ir v eh ic le m o d if ic at io n a n d i n st al la ti o n s
O p er at in g a n d m ai n ta in sa m e ai rc ra ft t y p e
F A
A A ir w o rt h in es s
D ir ec ti v es an d
O E
M S er v ic e B u ll et in s, L o g is ti cs a n d m ai n te n an c e su p p o rt i n r em o te a n d n o n re m o te l o ca ti o n s
P1
Pn
S1
Sn
O R
O R
A N
D
A N
D
A N
D
A N
D
A N
D
Draft Section M: Corporate Experience
• The Government will evaluate the Offeror’s and its principal entities’ demonstrated corporate experience based on contracts deemed recent and relevant in the past performance evaluation
• A comparative analysis of each of these contracts will be conducted to determine the similarity between the corporate experience and the future effort as proposed
• The breadth and depth of the corporate experience will be assessed for each element to predict how the Offeror may perform on the future effort. The evaluation will include an assessment of the following elements:
– Obtaining Flight Clearances
– Experience using EW
– GOPs/FOPs
– Experience using the same Aircraft Type as proposed for CAS HEEWJ.
Draft Section M: Corporate Experience
• Breadth is the degree to which the principal entities have performed/managed the effort(s) similar to that required by the solicitation as they relate to the element
• Depth is the extent to which each activity/task of the effort was performed to gain a certain level of proficiency
• The experience considered in this evaluation will only relate to
Corporate Experience, which is the experience gained through contracted work, vice the experience of the Offeror's personnel.
Therefore, personnel experience is not part of the Corporate
Experience factor and will not be considered
• A separate Performance Confidence Assessment Rating will be assigned based on an integrated assessment of all elements
Performance Confidence Assessment Definitions
Rating Description
Substantial Confidence
Based on the Offeror’s recent/relevant performance record, the
Government has a high expectation that the Offeror will successfully perform the required effort.
Satisfactory Confidence
Based on the Offeror’s recent/relevant performance record, the
Government has a reasonable expectation that the Offeror will successfully perform the required effort.
Limited Confidence
Based on the Offeror’s recent/relevant performance record, the
Government has a low expectation that the Offeror will successfully perform the required effort.
No Confidence
Based on the Offeror’s recent/relevant performance record, the
Government has no expectation that the Offeror will be able to successfully perform the required effort.
Volume 3: Technical
3.1: Aircraft Performance
3.2: Airworthiness
3.2.1 Parts Life Tracking Process and Status Report
3.2.2 Aircraft Pedigree Report
3.2.3 Maintenance History Report
3.2.4 Fatigue Life Status Report
3.3: Aircraft Support
3.3.1 Aircraft Maintenance Strategy
3.3.2 Aircraft Logistical Strategy
3.3.3 Certified Data
Volume 3: Technical
3.4: Technical Approach
3.4.1 Aircraft Modification Plan
3.4.2 Navy airworthiness certification plan
3.4.3 Stand off Jammer (SOJ) Services System Design (System
Architecture) and Integration
3.4.4 EA Services System Design and Integration
3.4.5 Personnel Resources
3.5: Small Business Utilization Strategy
Volume 3: Technical Cross Reference Matrix
• The CRM is included to help the offeror develop its proposal and to ensure traceability of Section L paragraphs to the requirements
Section L –
Proposal
Instructions
Volume or
Paragraph
Numbers
Section L -
Proposal
Instructions
Volume or
Paragraph Title
RFP Sections
(e.g. Sections F, H, and M)
PBWS
paragraph/
CDRL
CLIN Offeror’s
Proposal
Reference
Volume 3 Technical
3.1 Aircraft
Performance
Section M
Para B.2
Par 4.1, Appendix D
0004 -
3.2 Airworthiness
Section M
Para B.2
Par 4.3, CDRL A003, A005
0001 -
3.3 Aircraft Support
Section M
Para B.2
Par 4.1, 6.0
CDRL A003
0004 -
3.4 Technical
Approach
Section M
Para B.2
Par 4.1, CDRL A003
0001 -
3.5
Small Business
Utilization
Strategy
Section M
Para B.2
Draft Section M: Technical
• The Government will evaluate the proposal to determine the
Offeror's understanding of, approach to and ability to meet the solicitation requirements
• The Government will assess the Offeror’s Technical Proposal with respect to its compliance with the solicitation requirements and the risk associated with the Offeror’s approach
• The evaluation will also include an assessment of the Offeror's
1) Aircraft Performance
2) Airworthiness
3) Aircraft Support
4) Technical Approach
5) Small Business (SB) Utilization Strategy
Draft Section M: Technical
• A Technical Rating and Technical Risk Rating will be assigned
• The Technical Rating is an assessment of compliance with the solicitation requirements and merit which considers the benefits and detriments related to program performance and operations
– The degree of benefit to the Government associated with a strength(s) will be considered in determining whether the Offeror’s approach and understanding of requirements rises to a level of being thorough or exceptional
– Appreciably exceeding requirements can potentially produce performance or operational benefits. Beyond the point where there is no additional performance or operational benefit, risk reduction may be assessed
– Additionally, a proposal that provides the Government with a capability, service, or resource that is not specifically required, but benefits the Government can have merit if it appreciably enhances performance and/or operations to benefit the Government
Draft Section M: Technical
• The Technical Risk Rating considers the risk associated with the technical approach in meeting the requirement
– Assessment of technical risk considers potential for disruption of schedule, degradation of performance, the need to increase Government oversight, or the likelihood of unsuccessful contract performance
• “Offerors are advised that during the evaluation process, a Technical
Rating of “Unacceptable” or a Technical Risk Rating of “High” or
“Unacceptable” may result in the entire proposal being found unacceptable and eliminated from the competition”
Technical Compliance Rating Definitions
Blue Outstanding
Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths.
Purple Good
Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength.
Green Acceptable Proposal indicates an adequate approach and understanding of the requirements.
Yellow Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements.
Red Unacceptable
Proposal does not meet requirements of the solicitation and, thus, contains one or more deficiencies and is unawardable.
Technical Risk Definitions
Rating Description
Low
Proposal may contain weakness(es) which have little potential to cause disruption of schedule, increased cost or degradation of performance. Normal Contractor effort and normal Government monitoring will likely be able to overcome any difficulties.
Moderate
Proposal contains a significant weakness or combination of weaknesses, which may potentially cause disruption of schedule, increased cost or degradation of performance. Special Contractor emphasis and close Government monitoring will likely be able to overcome difficulties.
High
Proposal contains a significant weakness or combination of weaknesses, which is likely to cause significant disruption of schedule, increased cost or degradation of performance. Is unlikely to overcome any difficulties, even with special Contractor emphasis and close Government monitoring.
Unacceptable
Proposal contains a material failure or a combination of significant weaknesses that increases the risk of unsuccessful performance to an unacceptable level.
Technical - Risk Reducer
Risk Reducer Definition: An aspect of an offeror’s proposal that reduces risk in a way that will be advantageous to the Government during contract performance
• Affects Technical Risk Rating
– Provides appreciable risk reducing benefits to the Government that may mitigate weaknesses or further reduces the risk to performance
– Each risk reducer may provide different degrees of benefit, thereby affecting the risk rating differently
– Used to assess the risk associated with the proposed approach
Technical - Risk Reducer Examples
• Reduces proposal risk by providing more than sufficient resources in order to respond to unknown conditions/situations
• Reduces proposal risk by providing resources/capabilities that are in-place and ready to be used
• Reduces proposal risk by providing plans that reduce/mitigates risks inherent in the proposed approach and program
• Reduces proposal risk by providing performance margin
Technical - Significant Weakness
Significant Weakness Definition: A “Significant
Weakness” in the proposal is a flaw that appreciably increases the risk of unsuccessful contract performance
• Affects Technical Risk Rating
– Provides appreciable increased risk to the Government
– Used to assess the risk associated with the proposed approach
– Each significant weakness may provide different degrees of impact, thereby affecting the risk rating differently based on the likelihood of…
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .