Attachment_1_Surveillance_Activity_Checklist.pdf
PDF 210 KB Posted
- Attached to
- 0003 - Q&A for RFP N00421-15-R-0043; Engineering and Technical Support Federal contract opportunity
- Solicitation number
- N00421-15-R-0043
About this file
Attachment_1_Surveillance_Activity_Checklist_(SAC)
View the file
Other files for this federal contract opportunity
Show all 19
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Attachment 1
Surveillance Activity Checklist (SAC)
For the Engineering, Management and Technical Support
Services for the Reliability, Maintainability and System Safety
Engineering Departments
1. Purpose
This Surveillance Activity Checklist (SAC) is a Government developed and applied document used to make sure the systematic quality assurance methods are used in the administration of the Statement of Work (SOW). The intent is to ensure that the contractor performs in accordance with the performance metrics and the Government receives the quality of services called for in the contract and task orders.
This contract requirement provides for engineering and technical support for reliability, maintainability, testability, quality assurance, diagnostic, and system safety analyses during the design, development production, and in-service cycles of Naval aircraft and their systems. Specifically, the contractor shall provide program/project management, engineering design and integration analysis, test planning, test support, test reporting.
The resulting vehicle will be a performance-based, Cost Plus Fixed Fee Indefinite-
Delivery, Indefinite-Quantity (IDIQ) contract with a five year period of performance. A properly executed SAC will assist the Government in achieving the objectives of this procurement and provide the contractor with clearly defined performance expectations.
2. Authority
Authority for issuance of this SAC is provided in the task order under Section E, Inspection and Acceptance, which provides for inspection and acceptance of the services and documentation required to be executed by the Contracting Officer or a duly authorized representative.
3. Scope
To fully understand the roles and responsibilities of the parties, it is important to first define the distinction in terminology between quality control and the SAC. The contractor, and not the Government, is responsible for management and quality control actions necessary to meet the quality standards set forth by the contract or task orders.
The SAC, executed to provide Government surveillance oversight of the Contractor’s quality control efforts to ensure that they are timely, effective and are delivering the results specified in the contract or task order.
4. Government Resources
The following definitions for Government resources are applicable to this plan:
Contracting Officer - The person duly appointed with the authority to enter into
(Procuring Contracting Officer (PCO)) or administer (Administrative Contracting Officer
(ACO)) contracts and make related determination and findings on behalf of the
Government. The PCO for this contract is Ms. Melinda K. Stann, AIR-2.5.1.5. The
ACO will be designated in the resulting order. Contracting Officers are designated via a written warrant, which sets forth limitations of authority.
Representative (COR) – An individual appointed in writing by the PCO to act as their authorized representative to assist in administering the contract. The COR will be designated in the resulting contract and individual task orders. The limitations of authority are contained in a written letter of designation.
5. Responsibilities
The following Government resources shall have responsibility for the implementation of this SAC:
Contracting Officer – The Contracting Officer ensures performance of all necessary actions for effective contracting, ensures compliance with the terms of the contract and safeguards the interests of the United States in the contractual relationship. It is the
Contracting Officer that assures the Contractor receives impartial, fair and equitable treatment under the contract. The Contracting Officer is ultimately responsible for the final determination of the adequacy of the Contractor’s performance.
Contracting Officer Representative (COR) – The COR is responsible for technical administration of the contract and assures proper Government surveillance of the contractor’s performance. The COR is not empowered to make any contractual commitments or to authorize any changes on the Government’s behalf. Any changes that the contractor deems may affect contract price, terms or conditions shall be referred to the Contracting Officer for action.
6. Methods of Surveillance
a. Contractor Performance Assessment Report System (CPARS) – The marketplace for contractor support services is very competitive. As such, the successful offeror has a vested interest in the Government-generated CPARS, rating under this contract as a substandard rating could have an adverse impact on future proposal evaluations. An evaluation using the CPARS format will be performed at the midpoint of each contract year. For this procurement, the Government will address the quality of product or service, schedule, cost control, business relations, management of key personnel, and other important areas. As this information may affect future source selections throughout the Department of Defense (DoD) and the continuation of the contract, the annual
Government assessment will be used appropriately as an additional performance oversight and communication tool in addition to the SAC.
b. SAC - The below listed method of surveillance shall be used by the COR in the technical administration of this SAC. In addition to the below instruction, the form to be used for documentation of surveillance is the Surveillance Activity Checklist provided as
Enclosure (2) herein.
7. Identified QA Surveillance Tasks
Enclosures (1), (2), and (3) set forth the performance standards, incentives, and surveillance methods for the contractor and COR while enclosure (4) provides the checklist and means for the COR to document the results of the surveillance. Enclosure
(4) will be provided to the Contracting Officer on a quarterly basis.
8. Documentation
In addition to providing annual reports to the Contracting Officer, the COR shall maintain a complete quality assurance file. The file will contain copies of all reports, evaluations, recommendations, and any actions related to the Government’s performance of the quality assurance function, including the original copies of the SACs. All such records will be maintained for the life of the contract. The COR shall forward these records to the officer at termination or completion of the contract.
9. Enclosures
Enclosure (1) - Reliability, Maintainability and System Safety Support Performance
Standards Enclosure (2) - Data Performance Standards
Enclosure (3) - Incentives
Enclosure (4) - Surveillance Activity Checklist
Enclosure 1
RELIABILITY, MAINTAINABILITY & SYSTEM SAFETY
SUPPORT PERFORMANCE STANDARDS
Description Performance Standard and
Acceptable Quality Level (AQL)
Surveillance
Method/Measure Incentives
Provide engineering design analysis and support
SOW para 4.1.1, 4.1.2, 4.1.7, 4.1.8, 4.2.1, 4.2.2, 4.2.7, 4.2.8, 4.4.1, 4.4.2, 4.4.7, 4.4.8, 4.5.1, 4.5.2, 4.5.7, 4.5.8. 4.6.1, 4.6.6, 4.7.1, 4.7.6, 4.9.1, 4.9.6. 4.10.1, 4.10.6
Support the development of design analysis documents through the coordination of requirements, data collection and review of business processes. Products and services reflect the attention to detail and are in compliance with DOD and Navy policy and are clear and concise and provided on time 100% of the time
100% Reviewed by
Contracting Officer
Representative via customer feedback
See enclosure 3.
Provide engineering testing and design verification support
SOW para. 4.1.3, 4.1.4, 4.1.6, 4.1.7, 4.1.8, 4.2.3, 4.2.4, 4.2.6, 4.2.7, 4.2.8, 4.4.3, 4.4.4, 4.4.6, 4.4.7, 4.4.8, 4.5.3, 4.5.4, 4.5.6, 4.5.7, 4.5.8, 4.6.2, 4.6.5, 4.6.6, 4.6.7, 4.7.2, 4.7.5, 4.7.6, 4.7.7, 4.9.2, 4.9.5, 4.9.6, 4.9.7, 4.10.2, 4.10.5, 4.10.6, 4.10.7
Support the development of testing documents through the coordination of requirements, data collection and review of business processes. Products and services reflect the attention to detail and are in compliance with DOD and Navy policy and are clear and concise and provided on time 100% of the time
100% Reviewed by
Contracting Officer
See enclosure 3
Provide engineering data documentation and reporting
SOW para 4.1.1, 4.1.2, 4.1.3, 4.1.4, 4.1.9, 4.2.1, 4.2.2, 4.2.3, 4.2.4, 4.2.9, 4.4.1, 4.4.2, 4.4.3, 4.4.4, 4.4.9, 4.5.1, 4.5.2, 4.5.3, 4.5.4, 4.5.9, 4.1.6, 4.6.4, 4.6.6, 4.7.1, 4.7.4, 4.7.6, 4.9.1, 4.9.4, 4.9.6, 4.10.1, 4.10.4, 4.10.6
Develop documents through the coordination of requirements, data collection and review of business processes. Products and services reflect the attention to detail and are in compliance with DOD and Navy policy and are clear and concise and provided on time 100% of the time
100% Reviewed by
Contracting Officer
Provide technical support to meetings and design reviews
SOW para 4.1.5, 4.2.5, 4.4.5, 4.5.5, 4.6.3, 4.7.3, 4.8.3, 4.9.3, 4.10.3
Develop documents through the coordination of requirements, data collection and review of business processes. Products and services reflect the attention to detail and are in compliance with DOD and Navy policy and are clear and concise and provided on time 100% of the time
100% Reviewed by
Contracting Officer
Provide In-Service engineering analyses
SOW para 4.3.1, 4.3.2, 4.3.3, 4.3.4, 4.3.5, 4.3.6, 4.3.7, 4.3.8, 4.3.9, 4.8.1, 4.8.2, 4.8.3, 4.8.4, 4.8.5, 4.8.6, 4.8.7
Develop documents through the coordination of requirements, data collection and review of business processes. Products and services reflect the attention to detail and are in compliance with DOD and Navy policy and are clear and concise and provided on time 100% of the time
100% Reviewed by
Contracting Officer
Enclosure 2
DATA PERFORMANCE STANDARDS
Description Standard AQL Surveillance
Measure Incentives
Technical Report
(Status/Services)
Submission is in accordance with the
DID cited in the
CDRL(A001).
90% acceptable on first submission to
Government100% acceptable on subsequent submission to
Government
100% Inspection by Contracting
Officer
Representative
Progress Status and
Management Report
Submission is in accordance with the
DID cited in the
CDRL(A003)
90% acceptable on first submission to
Government100% acceptable on subsequent submission to
Government.
100% Inspection by Contracting
Officer
Status Report COR
Submission is in accordance with the
DID cited in the CDRL
(A004).
90% acceptable on first submission to
Government100% acceptable on subsequent submission to
Government.
100% Inspection by Contracting
Officer
Enclosure 3
INCENTIVES
The following incentives shall apply to performance under this contract.
Assessment Period Acceptable Performance
Definition How Measured Incentives
Evaluation Period 1
All measurement areas rated “Satisfactory”. See below.
Midpoint of the assessment period (6 month) evaluation using the CPARs format covering the previous 6 months.
(+) award of future orders or exercise of options*
(-) Not awarded future exercising of options and orders unless there is remediation with COR.* (+) Positive performance marks which will be reflected in CPARS.
(-) Negative performance marks which will be reflected in CPARS.
Evaluation Period 2
All measurement areas rated
“Satisfactory”. See below.
period (18 month) evaluation using the CPARS format covering the previous 12
(-)Not awarded future exercising of options and orders unless there is remediation with COR
(+) Positive performance marks which will be reflected in CPARS.
(-) Negative performance marks which will be
Evaluation Period 3
All measurement areas rated at least “Satisfactory”. Three or more measurements rated either “Very Good” or
“Exceptional”. See below.
period (30 month) evaluation using the CPARS format
(-)Not awarded future exercising of options and orders unless there is remediation with COR (+) Positive performance marks which will be reflected in CPARS.
(-) Negative performance marks which will be
Evaluation Period 4 more measurements rated period (42 month) evaluation using the CPARS format
Not awarded future exercising of options and orders unless there is remediation with COR
(+) Positive performance marks which will be reflected in CPARS.
(-) Negative performance marks which will be
Evaluation Period 5 more measurements rated period (54 month) evaluation using the CPARS format
(+) Positive performance marks which will be
(-) Negative performance marks which will be
* The Government may not award orders unless all regulatory requirements are met and the contractor meets the acceptable performance definition.
All SOW/CDRL tasks, including SOW/CDRL sub-tasks, will be assessed focusing on the following.
Quality of Product or Service – Assess the contractor’s effort to transform operational needs and requirements into an integrated solution. Areas of focus may include the planning and management of program tasks, the quality of support provided throughout all phases of contract execution, the integration of program management specialties, management of interfaces, and the management of a totally integrated effort of all program management concerns to meet cost, performance, and schedule objectives. Assess how successfully the contractor meets program quality
Enclosure 3
Schedule – Assess the contractor’s adherence to the required delivery schedule by assessing the contractor’s efforts during the assessment period that contribute to or effect the schedule variance. Also address significance of scheduled events (i.e., design reviews), discuss causes, and assess the effectiveness of contractor corrective actions.
Cost Control – Assess the contractor’s effectiveness in forecasting, managing, and controlling contract cost. Is the contractor experiencing cost growth or underrun? If so, discuss the causes and contractor-proposed solutions for the cost overruns. For contracts where task or contract sizing is based upon contractor provided person-hour estimates, the relationship of these estimates to ultimate cost should be assessed. In addition, the extent to which the contractor demonstrates a sense of cost responsibility, through the efficient use of resources in each work effort should be assessed.
Business Relations – Assess the timelines, completeness and quality of problem identification, corrective action plans, proposal submittals, the contractor’s reasonable and cooperative behavior, effective business relations, and customer satisfaction.
Management – Assess the contractor’s success with timely award and management of subcontracts, including whether the contractor met small/small disadvantage and women-owned business participation goals. Discuss the extent to which the contractor discharges its responsibility for integration and coordination of all activity needed to execute the contract; identifies and applies resources required to meet schedule requirements; assigns responsibility for tasks/actions required by contract; communicates appropriate information to affected program elements in a timely manner. Assess the contractor’s risk mitigation plans. If applicable, identify any other management areas that are unique to the contract.
Other areas – Assess additional evaluation areas unique to the contract or that cannot be captured elsewhere.
The evaluation ratings are as follows:
Exceptional – Performance meets contractual requirements and exceeds many to the Government’s benefit. The contractual performance of the task and sub-task being assessed was accomplished with few minor problems for which corrective actions taken by the contractor were highly effective.
Very Good - Performance meets contractual requirements and exceeds some to the Government’s benefit.
The contractual performance of the task and sub-task being assessed was accomplished with some minor problems for which corrective actions taken by the contractor were effective.
Satisfactory - Performance meets contractual requirements. The contractual performance of the task and sub-task contain some minor problems for which corrective actions taken by the contractor appear or were satisfactory.
Marginal - Performance does not meet contractual requirements. The contractual performance of the task and sub-task being assessed reflect a serious problem for which the contractor has not yet identified corrective actions. The contractor’s proposed actions appear only marginally effective or were not fully implemented.
Unsatisfactory – Performance does not meet most contractual requirements and recovery is not likely in a timely manner. The contractual performance of the task or sub-task contains a serious problem(s) for which the contractor’s actions appear or were ineffective.
Enclosure 4
SURVEILLANCE ACTIVITY CHECKLIST
Quarterly Surveillance:
The COR will perform a quarterly assessment of Quality, Schedule, Cost Control, Business Relations, Management, and Other Areas as applicable utilizing the
CPARS evaluation rating definitions listed in enclosure 3.
Description Surveillance Method/
Measure
Date
Planned Date
Completed Quality Schedule
Cost -
Control Mgmt Other
Business
Relations
Provide engineering design analysis and support SOW para 4.1.1, 4.1.2, 4.1.7, 4.1.8, 4.2.1, 4.2.2, 4.2.7, 4.2.8, 4.4.1, 4.4.2, 4.4.7, 4.4.8, 4.5.1, 4.5.2, 4.5.7, 4.5.8. 4.6.1, 4.6.6, 4.7.1, 4.7.6, 4.9.1, 4.9.6. 4.10.1, 4.10.6
Support the development of design analysis documents through the coordination of requirements, data collection and review of business processes. Products and services reflect the attention to detail and are in compliance with DOD and Navy policy and are clear and concise and provided on time 100% of the time
TBD
Provide engineering testing and design verification support
SOW para. 4.1.3, 4.1.4, 4.1.6, 4.1.7, 4.1.8, 4.2.3, 4.2.4, 4.2.6, 4.2.7, 4.2.8, 4.4.3, 4.4.4, 4.4.6, 4.4.7, 4.4.8, 4.5.3, 4.5.4, 4.5.6, 4.5.7, 4.5.8, 4.6.2, 4.6.5, 4.6.6, 4.6.7, 4.7.2, 4.7.5, 4.7.6, 4.7.7, 4.9.2, 4.9.5, 4.9.6, 4.9.7, 4.10.2, 4.10.5, 4.10.6, 4.10.7
Support the development of testing documents through the coordination of requirements, data collection and review of business processes. Products and services reflect the attention to detail and are in compliance with DOD and Navy policy and are clear and concise and provided on time 100% of the time
Provide engineering data documentation and reporting
SOW para 4.1.1, 4.1.2, 4.1.3, 4.1.4, 4.1.9, 4.2.1, 4.2.2, 4.2.3, 4.2.4, 4.2.9, 4.4.1, 4.4.2, 4.4.3, 4.4.4, 4.4.9, 4.5.1, 4.5.2, 4.5.3, 4.5.4, 4.5.9, 4.1.6, 4.6.4, 4.6.6, 4.7.1, 4.7.4, 4.7.6, 4.9.1, 4.9.4, 4.9.6, 4.10.1, 4.10.4, 4.10.6
Develop documents through the coordination of requirements, data collection and review of business processes. Products and services reflect the attention to detail and are in compliance with DOD and Navy policy and are clear and concise and provided on time
100% of the time
Provide technical support to meetings and design reviews
SOW para 4.1.5, 4.2.5, 4.4.5, 4.5.5, 4.6.3, 4.7.3, 4.8.3, 4.9.3, 4.10.3 processes. Products and services reflect the attention to detail and are in compliance with DOD and Navy policy and are clear and concise and provided on time
100% of the time
TBD
Provide In-Service engineering analyses
SOW para 4.3.1, 4.3.2, 4.3.3, 4.3.4, 4.3.5, 4.3.6, 4.3.7, 4.3.8, 4.3.9, 4.8.1, 4.8.2, 4.8.3, 4.8.4, 4.8.5, 4.8.6, 4.8.7 processes. Products and services reflect the attention to detail and are in compliance with DOD and Navy policy and are clear and concise and provided on time
100% of the time
Technology Reviews, Reports and Papers (CDRL
A001)
90% acceptable on first submission to
Government100% acceptable on subsequent submission to Government.
TBD
Progress Status and
Management Report
(CDRL A003)
90% acceptable on first submission to
Government100% acceptable on subsequent submission to Government
TBD
Status Report COR
(CDRL A004)
90% acceptable on first submission to
Government100% acceptable on subsequent submission to Government
Monthly Summary of Ratings:
Quality Schedule
Number of Exceptional _____ Number of Exceptional _____
Number of Very Good _____ Number of Very Good _____
Number of Satisfactory _____ Number of Satisfactory _____
Number of Marginal _____ Number of Marginal _____
Number of Unsatisfactory _____ Number of Unsatisfactory _____
Cost Control Business Relations
Number of Very Good _____ Number of Very Good _____
Number of Satisfactory _____ Number of Satisfactory _____
Management Other Areas
Number of Very Good _____ Number of Very Good _____
Number of Satisfactory _____ Number of Satisfactory _____
Annual Surveillance Summary:
The COR will perform an annual assessment of overall contract performance utilizing the CPARS evaluation rating definitions listed in Enclosure (3) and the monthly summary of ratings. This annual assessment will occur at the midpoint of each period and cover the previous 12 months, except for the base period which will cover only the previously six months.
Description Surveillance Method/
Measure
Date Planned Date
Completed
Summary Rating/ Results
Quality of Service Review of Monthly Ratings TBD
Schedule Review of Monthly Ratings TBD
Cost Control Review of Monthly Ratings TBD
Business Relations Review of Monthly Ratings TBD
Management Review of Monthly Ratings TBD
Other Areas Review of Monthly Ratings TBD