N00421-20-R-0146 Draft Posting.docx
DOCX document 237 KB Posted
- Solicitation number
- N00421-20-R-0146
About this file
This is a draft request for proposal for a contract to provide rapid integration services for C5ISR systems at the Naval Air Warfare Center Aircraft Division's Special Communication Rapid Integration Facility in St. Inigoes, Maryland. The contractor will integrate C5ISR systems onboard various platforms including small and large watercraft, vehicles, transit cases, mobile and fixed communications systems, command centers, and intelligence systems. The work will involve planning, engineering, production, verification, logistics support, training, and program management. The contract type will be cost plus fixed fee with a five year ordering period and potential six month extension. The contractor must have the required security clearances and certifications and will work at government and contractor facilities.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Questions and Answers from Draft Posting.docx | DOCX document |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
N0042120R0146
Section A - Solicitation/Contract Form
GENERAL INFORMATION
1. Under this single award Indefinite Delivery Indefinite Quantity (IDIQ) contract, Level of Effort (LOE) task orders will be issued. NAVAIR clause 5252.211-9503 LEVEL OF EFFORT (COST REIMBURSEMENT)(NAVAIR)(DEC 2012) will be included in applicable task orders.
2. This solicitation is, and the resulting contract will be, subject to the Service Contract Act (SCA) of 1965, as amended, and to FAR clause 52.222.41 SERVICE CONTRACT LABOR STANDARDS (MAY 2014), contained in Section I of this solicitation. The cost/price proposal shall demonstrate compliance with the minimum monetary wages and fringe benefits for service employees as specified in the Wage Determination (provided as an attachment in Section J of this solicitation).
3. The NAICS code for this effort is 541330 – Engineering Services with a size standard of $41.5M. The Product Service Code (PSC) for the procurement is N059 – Installation of Equipment – Electrical and Electronic Components
4. This contract will have a five (5) year ordering period with the possibility of up to six (6) month extension if the 52.217-8 Option is exercised. Task Orders (TOs) will be issued as required and the Period of Performance (PoP) will be determined upon award of each TO.
5. The contractor will be required to have the appropriate facility security clearance as stated on the DD Form 254. An interim Top Secret or Secret clearance will be required for personnel identified in Section C Statement of Work (SOW) within 60 days after contract award. The contractor will not be permitted access to classified information until a final DD254 is incorporated as an attachment in Section J of the contract.
Points of Contact:
Contract Specialist: Krista Hayden E-mail: krista.hayden@navy.mil
Contracting Officer: Matthew Purcell E-mail: matthew.purcell@navy.mil
Procuring Contracting Officer: May Dimitrov E-mail: may.dimitrov@navy.mil
Section B - Supplies or Services and Prices
B-1 ESTIMATED RATES
B.1 Streamlined Ordering Procedures for Cost Plus Fixed Fee LOE orders.
LOE TOs will be issued under this contract using the following streamlined ordering procedures:
(1) For each proposed order, the contracting officer will provide the contractor with a TO and an Independent Government Cost Estimate (IGCE). The IGCE is an estimate of labor hours by labor category utilizing the estimated and negotiated Composite Labor rates table below to calculate the total estimated cost for the proposed TO. The TO fixed fee is calculated using Section H Clause H-2 FIXED FEE and Section G Clause, 5252.232-9510 PAYMENT OF FIXED FEE (NAVAIR).
(2) These Composite rates are estimates, and invoicing will be based upon actual costs incurred. Ceiling for Other Direct Costs (ODC) will be priced in accordance with the Government estimate. TOs crossing multiple years will be estimated by the Government using the composite rates for each year in proportion to the period of performance of the TO. The composite rates below are exclusive of fixed fee.
(3) After receiving the TO and IGCE, the contractor will respond as follows:
(i) If the contractor agrees that it can perform the TO within the parameters of the IGCE, they will sign and return the DD1155 to the contracting officer within three (3) working days. If the requirement remains valid, a priced order will be issued to the contractor.
| (ii) | If the contractor does not agree with the TO and/or IGCE, a proposal will be submitted to the contracting officer within five (5) working days addressing only the specific areas of difference in labor categories and/or hours in the IGCE. Once the differences are resolved between the contracting officer and the contractor, and the requirement remains valid, a priced order will be issued to the contractor. |
| (4) | If the contractor fails to respond to the proposed order within five (5) working days of receipt of the TO, the contracting officer may unilaterally issue the TO or when in the best interest of the Government may extend the deadlines above. |
| Labor Category (* = Labor Category with Key Employee (s)) |
| Composite Fully Burdened Rates, Exclusive of Fee |
| Year 1 |
| Year 2 |
| Year 3 |
| Year 4 |
| Year 5 |
| 12/2/2021 – 12/1/2022** |
| 12/2/2022 – 12/1/2023** |
| 12/2/2023 – 12/1/2024** |
| 12/2/2024 – 12/1/2025** |
| 12/2/2025 – 12/1/2026** |
General and Operations Manager, Senior*
Industrial Production Manager, Senior*
Electrical Engineer, Journeyman*
Mechanical Engineer, Journeyman*
Program Management Specialist
Management Analyst, Journeyman
Management Analyst, Junior*
Logistician, Journeyman
Acquisition Logistics Analyst, Junior*
Team Assembler, Journeyman
Team Assembler, Junior
Electronics Technician Maintenance III (SCA)
Electronics Technician Maintenance III (SCA)
Electronics Technician Maintenance III (SCA) (OT)
Electronics Technician Maintenance II (SCA)
Electronics Technician Maintenance II (SCA) (OT)
Electronics Technician Maintenance I (SCA)
Electronics Technician Maintenance I (SCA)(OT)
Engineering Technician, III (SCA)
Engineering Technician, III (SCA)
Engineering Technician, III (SCA)(OT)
Engineering Technician, II (SCA)
Engineering Technician, II (SCA)
Engineering Technician, II (SCA)(OT)
Engineering Technician, I (SCA)
Engineering Technician, I (SCA)(OT)
Technical Instructor/Course Developer (SCA)
Sheet Metal Worker, Maintenance (SCA)
Shipping/Receiving Clerk (SCA)
Supply Technician (SCA)
Drafter/CAD Operator II (SCA)
Administrative Assistant (SCA)
General Clerk II (SCA)
Technical Writer II (SCA)
Truck Driver (SCA)
Electrical and Electronic Engineering Technologist & Technician
* Denotes Key Personnel **Dates to be adjusted at contract award
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
CPFF Labor Ceiling for CLINs 0002-0007
CPFF
Cost Plus Fixed Fee (CPFF) Labor Ceiling for CLINs 0002-0007 in accordance with the Statement of Work (SOW), Paragraph 3.3 FOB: Destination
PSC CD: N059
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
Labor - Procurement Funding
CPFF Procurement Funding in support of the SOW, Paragraph 3.3. Not Separately Priced from CLIN 0001.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
Labor - WCF Funding
CPFF WCF Funding in support of the SOW, Paragraph 3.3. Not Separately Priced from CLIN 0001.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
Labor - O&M Funding
CPFF Operations & Maintenance (O&M) Funding in support of the SOW, Paragraph 3.3. Not Separately Priced from CLIN 0001.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
Labor - RDT&E Funding
CPFF RDT&E Funding in support of the SOW, Paragraph 3.3. Not Separately Priced from CLIN 0001.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
Labor - Non - DOD Funding
CPFF Non-Department of Defense (DoD) Funding in support of the SOW, Paragraph 3.3. Not Separately Priced from CLIN 0001.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
Labor - FMS Funding
CPFF FMS Funding in support of the SOW, Paragraph 3.3. Not Separately Priced from CLIN 0001.
ESTIMATED COST
FIXED FEE
TOTAL EST COST + FEE
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
Data in support of CLIN 0001
COST
Not Separately Priced
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
ODC Ceiling for CLINs 0010-0016
Other Direct Costs (ODCs) Ceiling in support of CLINs 0001-0007 for CLINs 0010-0015, in accordance with the SOW, Paragraph 3.1.5.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
ODC - Procurement Funding
Procurement ODC Funding in support of the SOW, Paragraph 3.1.5. Not Separately Priced from CLIN 0009.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
ODC - WCF Funding
Working Capital Fund (WCF) ODC Funding in support of the SOW, Paragraph 3.1.5. Not Separately Priced from CLIN 0009.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
ODC - O&M Funding
Operations & Maintenance (O&M) ODC Funding in support of the SOW, Paragraph 3.1.5. Not Separately Priced from CLIN 0009.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
ODC - RDT&E Funding
RDT&E ODC Funding in support of the SOW, Paragraph 3.1.5. Not Separately Priced from CLIN 0009.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
ODC - Non - DOD Funding
Non-Department of Defense (DOD) ODC Funding in support of the SOW, Paragraph 3.1.5. Not Separately Priced from CLIN 0009.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
ODC - FMS Funding
FMS ODC Funding in support of the SOW, Paragraph 3.1.5. Not Separately Priced from CLIN 0009.
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
Contractor Acquired Property - ODC
Contractor Acquired Property in accordance with SOW Paragraph 3.1.5.2. Not Separately Priced from CLIN 0009
ESTIMATED COST
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Lot |
FFP Labor Ceiling for CLINs 0018 - 0023
FFP
Firm Fixed Price (FFP) Labor Ceiling for CLINs 0018 – 0023, in Support of the SOW, Paragraph 3.3.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
FFP Labor - Procurement Funding
Funding in support of the SOW, Paragraph 3.3. Not Separately Priced from CLIN 0017.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
FFP Labor - WCF Funding
Funding in support of the SOW, Paragraph 3.3. Not Separately Priced from CLIN 0017.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
FFP Labor - O&M Funding
Funding in support of the SOW, Paragraph 3.3. Not Separately Priced from CLIN 0017.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
FFP Labor - RDT&E Funding
Funding in support of the SOW, Paragraph 3.3. Not Separately Priced from CLIN 0017.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
FFP Labor - Non - DOD Funding
Funding in support of the SOW, Paragraph 3.3. Not Separately Priced from CLIN 0017.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
FFP Labor - FMS Funding
Funding in support of the SOW, Paragraph 3.3. Not Separately Priced from CLIN 0017.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Lot
Technical Data in support of CLIN 0017
Not Separately Priced
NET AMT
CLAUSES INCORPORATED BY FULL TEXT
| 5252.211-9503 | LEVEL OF EFFORT (COST REIMBURSEMENT) (NAVAIR)(DEC 2012) |
| (a) The level of effort estimated to be ordered during the term of this contract is 1,866,900 man-hours of direct labor including authorized subcontract labor, if any. The contractor shall not, under any circumstances, exceed one hundred (100%) percent of the total level of effort specified in this basic contract. The estimated composition of the total man-hours of direct labor by classification is as follows: |
| CLIN 0001 |
| Total |
TO BE SPECIFIED ON INDIVIDUAL TASK ORDERS
| (b) FAR Clause 52.232-20, "Limitation of Cost" applies to fully funded orders and FAR Clause 52.232-22, "Limitation of Funds" applies to incrementally funded orders. Nothing in this clause amends the rights or responsibilities of the parties hereto under either of those two clauses. In addition, the notifications required by this clause are separate and distinct from any specified in either FAR Clause 52.232-20 or FAR Clause 52.232-22. | |
| (c) In the event that less than one hundred (100%) percent of the established level of effort of the contract/order is actually expended by the end of the performance period, the Government shall have the option of: | |
| (1) Requiring the Contractor to continue performance, subject to the provisions of the FAR Clause 52.232-20 or 52.232-22, as applicable, until the effort expended equals 100% of the established Level of Effort; or | |
| (2) Effecting a reduction in the fixed fee by the percentage by which the total expended man-hours is less than one hundred (100%) percent of the established Level of Effort. | |
| (d) The contractor agrees that effort performed in fulfillment of level of effort obligations under this contract shall include only verifiable effort in direct support of the work specified. It shall not include efforts such as work performed in transit to or from an employee's usual workplace, work during lunchtime activities, or effort performed at other non-work locations. | |
| (e) In performing the contract/order, the contractor may use any reasonable combination of hours for the labor categories in support of section C of this contract/order. |
Section C - Descriptions and Specifications
STATEMENT OF WORK
STATEMENT OF WORK
SPECIAL COMMUNICATION RAPID INTEGRATION FACILITY
1.0 Scope.
The Naval Air Warfare Center Aircraft Division (NAWCAD) Webster Outlying Field (WOLF) Special Communications Mission Solutions (SCMS) Division integrates and delivers products for Command, Control, Communications, Computers, Combat Systems, Intelligence, Surveillance, and Reconnaissance (C5ISR) systems. SCMS leverages the government owned Special Communication Rapid Integration Facility (SCRIF) to provide rapid integration for C5ISR systems on board small and large craft, commercial and militarized vehicles, transit cases, mobile communications, fixed base stations, command centers, and intelligence systems. SCMS Division must quickly respond to urgent mission-essential user requirements to ensure that forward-deployed units are combat ready. These C5ISR products are funded by a broad range of customers including the U. S Navy, Naval Air Systems Command (NAVAIR), United States Special Operations Command (USSOCOM), National Guard Bureau, Marine Corps System Command, Defense Threat Reduction Agency (DTRA), Consequence Management Communication Systems, and other Department of Defense (DoD) and non-DoD agencies. The SCMS Division will utilize this Contract to obtain the specific technical and production expertise required at the SCRIF to meet requirements needed to complete each assigned project.
This Statement of Work (SOW) scope includes SCRIF integration and installation support for the production engineering, assimilation/kitting, verification, logistics support, in-service support, and program planning of C5ISR systems, subsystems, and equipment. Examples of widely-varied C5ISR platforms that the Contractor will be required to support include, but are not limited to:
· Navy Aircrafts (e.g. E-6, P-3, P-8, T-45, F-18);
· Family of Special Operations Vehicles (FOSOV);
· Mobile Command Centers;
· Transit Cases-Radio Integration Systems (RIS).
2.0 Applicable Documents.
The following documents and document sources are provided for reference. The SCMS Division requirements to provide C5ISR interoperability among U.S military, U.S civilian, and foreign users may dictate an adherence to a wide variety of specifications and standards. DoD systems shall adhere to the Joint Technical Architecture (JTA) 2.0 Standards. Non-DoD systems may be governed by numerous commercial, national, or international standards. The documents listed below are presented only as representative sources of the technological interface details that may be required during contract performance. Likewise, the documentation listed is not all-inclusive but is representative of the types of information that may be necessary to perform the work. Each Task Order (TO) will provide additional details, if necessary. The document version applicable to tasking will be the most current published document at the time of TO award.
2.1 DoD specifications.
2.1.1 DoD 5220.22-M, National Industrial Security Program Operating Manual, (NISPOM).
2.1.2 SECNAV M-5510.36, Information Security Program, 1 Jun 2006.
2.1.3 DoDM 5200.01, DoD Information Security Program: Controlled Unclassified Information (CUI) Vol. 4, 9 Sept 2018.
2.1.4 DoDM 5400.07, Freedom of Information Act (FOIA) Program, 25 Jan 2017.
2.1.5 DoDI 5230.24, Distribution Statements on Technical Documents, Change 3, 15 Oct 2018.
SECNAV M-5510.30, Personnel Security Program, 1 Jun 2006.
2.1.6 OPNAVINST 3440.17A, Navy Installation Emergency Management Program, 1 Aug 2014.
2.2 DoD standards.
2.2.1 MIL-STD-810, Department of Defense Test Method Standard: Environmental Engineering Considerations and Laboratory Tests.
2.2.2 MIL-STD-1472, Department of Defense, Design Criteria Standard: Human Engineering.
2.2.3 MIL-STD-31000, Department of Defense Standard Practice: Technical Data Packages.
2.2.4 MIL-STD-882, Department of Defense Standard Practice: System Safety.
2.2.5 MIL-STD-400521-2A, Department of Defense Standard Practice: Technical Manual Preparation.
2.2.6 DoD-STD-2106, Development of Shipboard Industrial Test Procedures.
2.2.7 DoD and/or Military (e.g., DoD-STD and MIL-STD) Electronic Series.
2.3 DoD handbooks.
2.3.1 MIL-HDBK-502A, Department of Defense Handbook: Product Support Analysis.
2.3.2 MIL-HDBK-61, Military Handbook: Configuration Management Guidance.
2.3.3 MIL-HDBK-237, Electromagnetic Environmental Effects and Spectrum Supportability Guidance for the Acquisition Process.
2.4 Other Government documents.
2.4.1 NASPAXRIVERINST 5100.35, Occupational Safety and Health Program.
2.4.2 SECNAVINST 5000.2, Implementation of Defense Acquisition Management Policies, Procedures, Documentation, and Reports.
2.4.3 OPNAVINST 3432.1, Operational Security Plan (OPSEC).
2.4.4 Occupational Safety and Health Administration (OSHA) Regulations.
2.4.5 Naval Air Training and Operating Procedures Standardization (NATOPS).
2.4.6 SCRIF Quality Manual.
2.4.7 SCMS Division Research, Development, Test, & Evaluation Network (RDT&E) Standard Operating Procedures (SOP).
3.0 Requirements.
3.1 General requirements.
3.1.1 Compatibility. The Contractor shall maintain the capability to prepare documents compatible with the Government Information Technology (IT) environment through the security classification of Top Secret. The current operating environment required for this Contract is identified in the SCMS Division Research, Development, Test & Evaluation Network (RDT&E) Standard Operating Procedures (SOP) for both Contractor site and Government site staff (Attachment 14). Additionally, the latest version of the software AutoCAD is required for deliverables that require drafting and production of drawing packages.
The Contractor shall maintain the ability to interface with and transfer data to and from requiring office software applications and their upgraded versions. The Contractor shall ensure that all media are virus free when delivered. The Contractor shall be capable of Internet and Local Area Network (LAN) communications with the SCMS Division. Contractor personnel shall be capable of maintaining real-time communications (both voice and data transfer capabilities) with the SCMS Division during working hours whether at Contractor work site or on travel.
3.1.2 Work location, telework, and facilities.
3.1.2.1 Work location. Approximately 38% of the work will be performed at the Government site located at the SCRIF, WOLF, St. Inigoes, Maryland. Approximately 44% of work will be performed at the contractor-furnished integration facility’s required location in Jacksonville, Florida. Approximately 18% of work will be performed at the Contractor’s site located within fifty (50) drivable miles to WOLF, St. Inigoes, Maryland.
| WORK LOCATION |
| APPROXIMATE NUMBER OF FULL TIME EQUIVALENT (FTE) EMPLOYEES |
Contractor Site - within fifty (50) drivable miles to WOLF, St. Inigoes, Maryland Thirty-four (34)
Government Site - WOLF, St.
Inigoes, Maryland Seventy-two (72)
| Contractor Site, Jacksonville, Florida |
| Eighty-two (82) |
3.1.2.1.1 Government site requirements. Contractors performing support at the SCRIF will be working in a building with 9,300 square feet of integration bay, 3,500 square feet for labs, and 1,200 square feet for training classrooms. Contractors will be provided access to workspaces, telephones, printers, facsimile machines, copy machines, shredders, and network access including web servers and applicable databases or other applications necessary to carry out assigned tasks. If the Contractor chooses to alter the work area in any manner, the Contractor shall obtain prior approval from the Contracting Officer’s Representative (COR) and shall be responsible for the cost of any modifications approved.
3.1.2.1.2 Contractor site requirements. The Contractor shall provide, maintain, and manage a rapid integration facility (estimated requirement is 10,000 interior square feet) in the Jacksonville, Florida (FL) area. The facility location shall satisfy the daily technical and management operations of the Contract and shall be located within fifty (50) drivable miles of the Fleet Readiness Center (FRC) South East at Naval Air Station (NAS) Jacksonville, FL. This facility will be used to liaise with the FRC to conduct all SOW requirements. The FRC end-user is focused particularly on the requirement to rapidly manufacture customized systems, subsystems, and equipment, and related integration components, such as equipment mounts, cable harnesses, brackets, racks, and other smaller miscellaneous items. The Contractor provided facility shall hold an AS9100D certification. The Government will not assume responsibility of retaining the facility or of taking control of the title after the Contract is completed. All equipment, tooling, test equipment, office/facility furnishings and equipment, and transportation vehicles to support the SOW requirements for contractor site requirements shall be provided by the contractor.
3.1.2.1.3 The Contractor shall provide its own liaison facilities to perform the tasking of this Contract within fifty (50) drivable miles of WOLF, St. Inigoes, Maryland in order to satisfy the daily technical and management operations of this Contract.
3.1.2.1.4 Telework. Telework may be authorized under this contract; however the Contractor must provide their Telework policy detailing the roles, responsibilities, security, safety, and requirements, for the Contractor’s adherence, in coordination with the TPOC and COR. The Contractor shall notify the TPOC and COR for any position for which the Contractor proposes a teleworking situation. The Contractor, upon notification to, and concurrence from, the Contracting Officer's Representative (COR) that the employees' work tasking is eligible for telework, may utilize alternate worksites/locations and telework to support continued performance of its contract in accordance with company policy. Contractor discretion is required when making alternate worksite and telework decisions based upon the nature of support provided by the employees. In the event telework is utilized, the Contractor remains responsible for performance, and compliance with any applicable cost accounting standards and contract cost principles/procedures.
3.1.3 Contract Status Reporting. The Contractor shall provide the following documentation.
3.1.3.1 Contracting Officer’s Management Report (Segregation of Cost and Invoice Requirements Report). The Contractor shall provide a contracting officer’s management report IAW the Contracts Data Requirements Lists (CDRLs). The report shall include work accomplished since submittal of the last report (both monthly and cumulative work hour labor costs expended by labor category) and material and travel costs. (CDRL A001)
3.1.3.2 Financial Progress Report. (CDRL A002)
3.1.3.3 Contractor’s Personnel Roster - Workforce Report. (CDRL A003)
3.1.4 Work schedule to include Compressed Work Schedule (CWS), overtime, holidays, and installation closure.
3.1.4.1 Work schedule. The Contractor shall provide the required services and staffing coverage during normal working hours. Normal working hours are usually eight and a half (8.5) hours (including a thirty-minute lunch break), from 0730 to 1600 each Monday through Friday (except on the Federal holidays specified in paragraph 3.1.4.1.2) with the flexibility to start as early as 0600 and end as late as 1800, Monday through Friday.
3.1.4.1.1 CWS is an alternative work schedule to the traditional five (5) eight and a half (8.5) hour workdays (which includes a thirty-minute lunch break) worked per week. Under a CWS schedule, an employee completes the following schedule within a two (2) week period of time: eight (8) weekdays are worked at nine and a half (9.5) hours each (which includes a thirty-minute lunch break), one weekday is alternately worked as eight and a half (8.5) hours (which includes a thirty-minute lunch break) and one (1) weekday is not worked by the employee. The result is eighty (80) hours worked every two (2) weeks, with forty-four (44) work hours one (1) week and thirty-six (36) work hours the other.
The Contractor may allow its employees to work a CWS schedule provided the requirements of the SOW are met. If the Contractor chooses to allow its employees to work a CWS schedule in support of this Contract, any additional costs associated with the implementation of the CWS schedule vice the standard schedule are unallowable costs under this Contract and will not be reimbursed by the Government. Additionally, the CWS schedule shall not prevent Contractor employees from providing necessary staffing and services coverage when required by the Government to the COR/Alternate COR (ACOR). The overall schedule must be provided to the COR as an informal deliverable.
3.1.4.1.2 Holidays. The Government observes the following holidays: New Year’s Day (January 1); Martin Luther King Jr. Day (the third Monday in January); Presidents Day (the third Monday in February); Memorial Day (the last Monday in May); Independence Day (July 4); Labor Day (the first Monday in September); Columbus Day (the second Monday in October); Veterans Day (November 11); Thanksgiving Day (the fourth Thursday in November); and Christmas Day (December 25).
3.1.4.1.3 Installation closure. When federal facilities are closed by the Government, or when federal employees are officially excused from work due to a holiday or a special event, severe weather, a security threat, or any other Government facility related problem that prevents federal personnel from working at the Government facility, Contractor personnel assigned to work at that facility performing non-mission essential work in support of such federal employees shall follow their parent company’s policies.
While generally Contractor personnel may not perform work on-site at a Government facility without oversight from federal personnel, in very limited circumstances, work being performed by contractor personnel may be deemed mission essential and performance of such mission essential work may be authorized to continue at the Government facility despite the facility being otherwise closed for normal operations. The circumstances permitting work being performed by Contractor personnel to be deemed mission essential are extremely limited and generally only apply to performance of efforts related to public health, safety, or matters related to national security. The cognizant COR/Procuring Contracting Officer (PCO) must concur with any determination that work being performed by Contractor personnel is mission essential.
3.1.5 Other Direct Costs (ODCs) (Procurement (PROC), Working Capital Fund (WCF) Operations and Maintenance (O&M), RDT&E, Non-DoD, Foreign Military Sales (FMS)).
3.1.5.1 Travel. Travel may include general and administrative expenses, but shall not include profit. Temporary travel to other locations in support of this Contract is required. Temporary travel locations are expected to include Continental United States (CONUS), and the District of Columbia (D.C.). Outside the Continental United States (OCONUS) locations include Afghanistan, Iraq, United Arab Emirates, Germany, Italy, United Kingdom, Korea, Japan, Philippines, Guam, Puerto Rico, Virgin Islands, Samoa, Alaska, Canada, and Hawaii. This list is not all inclusive as locations may change over the life of the Contract. Possible travel locations include those that are within the United Stated Central Command (USCENTCOM) Area of Responsibility (AOR). Specific travel locations will be identified at the TO level.
3.1.5.1.1 The COR/ACOR shall approve all travel performed in support of this Contract prior to the commencement of the travel and result in a trip report. (CDRL A004)
3.1.5.1.2 OCONUS travel may be required in potentially dangerous environments. Contractors may be eligible for Danger Pay as a percent of their basic compensation per Department of State guidelines for Danger Pay.
3.1.5.1.3 Synchronized Pre-Deployment and Operational Tracker (SPOT). The Contractor may travel in USCENTCOMAOR locations. IAW Clauses 252.225-7040 and 5152.225-5908, SPOT enables the validation of Contractors Authorized to Accompany the Force (CAAF), their authorization and eligibility for access to specific DoD facilities, and their eligibility for specific Government-Furnished Support (GFS). The Contractor shall initiate a Letter of Authorization (LOA) for each prospective traveler. The Contractor shall use the SPOT link (https://spot.dmdc.mil/privacy.aspx) to enter and maintain data with respect to traveling/deployed personnel and to generate LOA.
3.1.5.1.4 LOA. The Contracting Officer will provide LOA for official travel OCONUS, when applicable, supporting the Contract. The LOA will identify local authorizations, privileges, etc. as specified by DoD requirements. All defense contractors working under this Contract shall carry the LOA, when applicable, with them at all times while deployed OCONUS.
3.1.5.2 Material. Material may include general and administrative expenses but shall not include profit/fee. Incidental material will be required in the performance of this Contract and shall be IAW the H-1 Restriction of the Direct Charging of Material clause. All materials not depleted during performance of this contract shall become Government property upon completion of this Contract. The Contractor shall transfer all materials not depleted to the COR by way of the Material Inspection and Receiving Report (DD Form 250). (CDRL A005)
3.1.6 Subcontractors. Provisions stated herein shall be clearly and effectively communicated to all subcontractors providing support under this Contract. All provisions of this SOW shall flow down to subcontractors providing support under this Contract and any TOs issued hereunder.
3.1.7 Management of Contractor personnel. The Government shall neither supervise Contractor employees nor control the method by which the Contractor performs the required tasks. Under no circumstance shall the Government assign tasks to, or prepare work schedules for, individual Contractor employees. The Contractor shall manage its employees and guard against any actions that are of a personal services nature or give the perception of personal services.
3.1.8 Transition out strategy. The Contractor’s overall transition out strategy shall be built around maintaining the mission of the SCMS Division with minimal impact, not only in terms of timeliness of performance but also to ensure that critical data and knowledge transfer occurs. Prior to termination or expiration of the Contract, the Contractor shall ensure an orderly transition of responsibilities, while minimizing impact to the operation. The Contractor shall submit a Phase-Out Transition Plan, to include the minimum elements listed below. (CDRL A006)
3.1.8.1 Work turnover. The Contractor shall provide a plan of action to effectively transfer tasked work that is in process at the expiration or termination of the Contract to the successor company. The Contractor shall establish and maintain effective communication with the incoming contractor or Government personnel for the period of transition via weekly status meetings.
3.1.8.2 Quality Assurance (QA). The Contractor shall provide a plan of action to ensure continuation of quality review processes during the transition period to the successor company.
3.1.8.3 Risk mitigation strategies. The Contractor shall provide a plan of action to mitigate contract performance risks (quality and schedule) encountered during the transition period.
3.1.8.4 Data/information transfer. The Contractor shall provide a plan of action for the efficient inventory and transfer of program data to the successor company.
3.1.9 Vehicles. The Contractor shall be required to transport Government-owned systems/subsystems on a daily basis. Contractor personnel may also be required to operate Government owned and/or Government leased vehicles in the performance of this Contract.
3.1.9.1 Contractor provided vehicles. The Contractor shall be responsible for transportation of equipment in support of this Contract. The cost of material transport vehicles supporting SOW requirements for the Contractor will not be considered as an allowable direct cost in the performance of the Contract.
3.1.9.2 Government-provided vehicles. The Contractor shall be required, as defined at the TO level, to operate Government-owned or leased vehicles in performance of the Contract. Government-owned or leased vehicles that the Contractor may use includes, but is not limited to, general purpose passenger carrying vehicles, special-purpose (tactical) vehicles, and SCMS Division authorized vehicles. All vehicles shall be operated IAW NAVAIR and site-specific processes and requirements. In general, there is no need for specialized licenses; however, if a requirement is identified in a specific TO, there will be time allotted for individuals to obtain the necessary licensing. The Contractor shall report any damage observed on the vehicle/equipment, and shall notify the Government Project Lead (GPL) and COR of any need for service or repair of the Government-owned or leased vehicles. When operating these vehicles, the Contractor shall ensure: possession of a current and valid operator’s license for all vehicles; compliance with all state, federal, and host nation laws pertaining to operating motor vehicles; compliance with NAVAIR policies when operating a vehicle (e.g., no cell phone use, stopping at runway crossings, etc.); use of the most cost-effective means to fuel vehicles; and operation of the vehicles in a safe manner and IAW the vehicle/equipment user/operator manual.
3.1.9.3 If the Contractor is involved in an accident while operating a Government-owned or leased vehicle, they shall notify the GPL, the PCO, and the COR with a verbal report within twenty-four (24) hours and shall provide an accident report within forty-eight (48) hours. (CDRL A007)
3.1.9.4 When operating the vehicle, the Contractor shall be responsible for any costs associated with violations such as speeding tickets, parking tickets, reckless driving, and any damage caused to the vehicle as a result of vehicle code violations.
3.1.10 Technical Direction Letters (TDLs). When necessary, technical direction or clarification concerning the details of specific tasks set forth in the Contract and the T.O.s will be given through issuance of written TDLs. TDLs will not, in any manner, alter the scope of the Contract for T.O. For further direction see NAVAIR Clause 5252.242-9502 Technical Direction (Variation) in Section H of the contract The Contractor shall prepare and deliver a Contracting Officer’s Representative (COR) Management Report for TDLs in accordance with CDRLA001.
3.2 Security.
3.2.1 Citizenship requirements. Only U.S. citizens may perform under this Contract, unless waived by the Government. If the Contractor cannot find qualified U.S. citizens to perform the work, the Contractor shall submit a citizenship waiver request with justification to the Government Security Office. The waiver request should include: the individual's name, date and place of birth, position title, and current citizenship; a statement that a qualified U.S. citizen cannot be hired in sufficient time to meet the contractual requirements; a statement of the unusual expertise possessed by the applicant; a statement that access will be limited to a specific Government contract (TBD); and a statement that the Contractor has obtained an export license for the information required to perform the Contract.
3.2.2 Investigative requirements.
Unclassified. All Contractor personnel must be eligible to perform Non-Critical Sensitive work as defined by SECNAV M-5510.30, Department of the Navy, Personnel Security Program. All contractor personnel are required to have a favorably adjudicated Tier-3 investigation from the Office of Personnel Management (OPM). The Contractor shall submit a request for personnel security investigation to the Government Security Office. The Government Security Office shall initiate the Contractor’s Electronic Questionnaire for Investigations Processing (eQIP) and shall perform a preliminary screening of the Contractor’s eQIP for suitability and derogatory information. The Contractor employee shall provide all requested information pursuant to the Privacy Act of 1974. The Government Security Office may deny the Contractor access to Government facilities and information and may prohibit the Contractor from performance of sensitive duties for failure to provide requested information or when derogatory or adverse information is present on the Contractor’s eQIP. In such cases, the Contractor employee may not perform on the Contract.
The Contractor shall implement and maintain security procedures and controls to prevent unauthorized disclosure of Controlled Unclassified Information (CUI) and to control distribution of CUI IAW with DoD 5220.22-M, National Industrial Security Program Operating Manual (NISPOM) and SECNAV M-5510.36, Department of the Navy, Information Security Program. All Contractor facilities shall provide an appropriate means of storage for CUI and materials. All CUI shall be appropriately identified and marked as For Official Use Only (FOUO) IAW DoDI 5200.48, Controlled Unclassified Information (CUI).
CUI including FOUO and Covered Defense Information (meeting the definition of 48 CFR 252.204–7012(a)) generated and/or provided under this Contract shall be marked and safeguarded as specified in DoDI 5200.48, Controlled Unclassified Information (CUI) available at https://www.esd.whs.mil/Portals/54/Documents/DD/issuances/dodi/520048p.pdf. Any product containing Covered Defense Information shall be assigned a distribution statement (distribution statements B through F) using the criteria set forth in DoDI 5230.24, Distribution Statements on Technical Documents and have this statement displayed per DoDI 5230.24, Distribution Statements on Technical Documents, Enclosure 3.
All controlled unclassified technical information shall be appropriately identified and marked with the following distribution statement(s):
Distribution Statement B-F (as appropriate): Distribution authorized to the Department of Defense and U.S. DoD contractors only (Critical Technology) (Date). Other requests shall be referred to: Commander, Naval Air Systems Command, Attn: SCMS Division, St. Inigoes, B8185 Unit 11, 17100 Webster Field Road, St. Inigoes MD 20684-4009.
PUBLIC RELEASE: Any CUI pertaining to this Contract shall not be released for public dissemination, including posting to any social media sites such as Facebook or Twitter, unless it has been approved for public release by appropriate U.S. government authority. Proposed public releases shall be submitted for approval prior to release through: Naval Air Warfare Center Aircraft Division 17100 Webster Field Road, B8185, St. Inigoes, MD 20684-4009, Attn: COR, Johnny Trifone.
OPERATIONS SECURITY (OPSEC): The Contractor shall develop, implement, and maintain an OPSEC program to protect controlled unclassified and classified activities, information, equipment, and material used or developed by the Contractor and any subcontractor during performance of the Contract. The Contractor shall be responsible for the subcontractor implementation of the OPSEC requirements. This program may include Information Assurance (IA) and Communications Security (COMSEC). The OPSEC program shall be IAW National Security Decision Directive (NSDD) 298, and at a minimum shall include:
1) Assignment of responsibility for OPSEC direction and implementation.
2) Issuance of procedures and planning guidance for the use of OPSEC techniques to identify vulnerabilities and apply applicable countermeasures.
3) Establishment of OPSEC education and awareness training.
4) Provisions for management, annual review, and evaluation of OPSEC programs.
5) Flow down of OPSEC requirements to subcontractors when applicable.
While performing aboard Government sites, the Contractor shall comply with facility OPSEC program instructions and contribute to organization-level OPSEC efforts; include OPSEC as part of its ongoing security awareness program and take all required Agency training; be responsive to the Supporting OPSEC Manager on a non-interference basis; protect sensitive unclassified information and activities that could compromise classified information or operations, or degrade the planning and execution of operations performed by the Requiring Office (RO) and Contractor in support of the mission. (CDRL A008) Classified. All contractor personnel shall maintain security clearance eligibility commensurate with the level of classification of the work performed as annotated in the Contract’s DD-254, Contract Security Specification Form.
Contractor personnel shall require access to classified information in performance of this Contract up to and including Top Secret facility level, with a safeguarding level of Top Secret. The Contractor is responsible for ensuring that all personnel receive the requisite investigation and are favorably adjudicated IAW DoD 5220.22-M, NISPOM. Contractor employees who fail to meet security clearance requirements may not access classified information or perform sensitive duties. In such cases, the Contractor employee may not perform on the Contract.
The Contractor shall comply with security requirements specified in the DD-254 attached to this Contract. Information or data that the Contractor accesses shall be handled at the appropriate classification level. Unclassified information shall be handled IAW the appropriate designation (CUI; FOUO; Covered Defense Information CDI). Distribution is authorized to the Requiring Office's Organization and supported Activity only. Other requests for deliverables under this Contract shall be referred to the Technical Point of Contact (TPOC)/COR of this Contract for approval.
CUI including FOUO and CDI (meeting the definition of 48 CFR 252.204–7012(a)) generated and/or provided under this Contract shall be marked and safeguarded as specified in DoD Instruction 5200.48, Controlled Unclassified Information (CUI) available at https://www.esd.whs.mil/Portals/54/Documents/DD/issuances/dodi/520048p.PDF. Any product containing CDI shall be assigned a distribution statement (distribution statements B through F) using the criteria set forth in DoDI 5230.24 Distribution Statements on Technical Documents and have this statement displayed per DoDI 5230.24, Enclosure 3.
INFORMATION SECURITY: If the work is performed at the Contractor's facility, the Contractor shall implement and maintain security procedures and controls to prevent unauthorized disclosure of classified information and CUI and to control distribution of CUI IAW DoD 5220.22-M, NISPOM and SECNAV M-5510.36, Department of the Navy, Information Security Program. If the work is performed at the Government's facility, the Contractor shall comply with comply with that facility’s security procedures and controls.
3.2.2.1 Contractor personnel Labor Category (LCAT) security requirements. For the LCATs indicated below, the Contractor shall obtain interim Secret or Top Secret clearances sixty (60) days after Contract award.
| LABOR CATEGORY |
| LEVEL |
| SECURITY CLEARANCE |
LEVEL REQUIRED
FULL TIME
EQUIVALENTS
| General and Operations Manager (One (1) FTE key) |
| Senior |
| Top Secret |
| One (1) |
| Industrial Production Manager (One (1) FTE key) |
| Senior |
| Top Secret |
| One (1) |
| Electrical Engineer (One (1) FTE key) |
| Journeyman |
| Secret |
| One (1) |
| Mechanical Engineer (One (1) FTE key) |
| Journeyman |
| Secret |
| One (1) |
| Management Analyst |
| Journeyman |
| Secret |
| One (1) |
| Management Analyst (One (1) FTE key) |
| Junior |
| Secret |
| One (1) |
| Logistician |
| Journeyman |
| Secret |
| One (1) |
| Acquisition Logistics Analyst (One (1) FTE key) |
| Junior |
| Secret |
| One (1) |
| Team Assembler |
| Journeyman |
| Secret |
| One (1) |
| Team Assembler |
| Junior |
| Secret |
| One (1) |
| Electronics Technician Maintenance, III |
| N/A |
| Secret |
| One (1) |
| Electronics Technician Maintenance, II |
| N/A |
| Secret |
| One (1) |
| Electronics Technician Maintenance, I |
| N/A |
| Secret |
| One (1) |
| Engineering Technician, III |
| N/A |
| Secret |
| One (1) |
| Engineering Technician, II |
| N/A |
| Secret |
| One (1) |
| Engineering Technician, I |
| N/A |
| Secret |
| One (1) |
| Technical Instructor/Course Developer |
| N/A |
| Secret |
| One (1) |
| Sheet Metal Worker, Maintenance |
| N/A |
| Secret |
| One (1) |
| Shipping/Receiving Clerk |
| N/A |
| Secret |
| One (1) |
| Supply Technician |
| N/A |
| Secret |
| One (1) |
| Drafter/CAD Operator, II |
| N/A |
| Secret |
| One (1) |
| Administrative Assistant |
| N/A |
| Secret |
| One (1) |
| General Clerk, II |
| N/A |
| Secret |
| One (1) |
| Technical Writer, II |
| N/A |
| Secret |
| One (1) |
3.2.3 Common Access Card (CAC)/Public Key Infrastructure (PKI), System Authorization Access Request (SAAR-N).
3.2.3.1 SAAR-N. All contractor personnel requiring access to Government IT systems shall have an approved SAAR-N Form Office of the Chief of Naval Operations (OPNAV) 5239/14 Rev Sep 2011 on file and complete required Annual Information Awareness Training. New employees must submit their SAAR-N forms within thirty (30) days of their first day of work. Instructions for processing the SAAR-N forms are available at: https://www.navsea.navy.mil/Portals/103/Documents/NSWC_Carderock/OPNAV-5239-14-SAAR-N.pdf.SAAR-N forms shall be submitted to the COR, TPOC, or to the assigned Government Trusted Associate Sponsorship System (TASS) Trusted Associate (TA).
3.2.3.2 CAC/Local Badges. Contractor CACs and facility specific identification badges will be issued by the Government to on-site Contractor personnel and shall be visible at all times while personnel are at the Government site. The Contractor shall furnish all requested information required to facilitate issuance of identification badges. All CACs and identification badges issued to Contractor employees shall be returned to the TA following completion of the Contract, relocation or termination of an employee, or upon request from the COR/PCO. The Government will provide the Contractor access to Government facilities, as required, for performance of tasks under this Contract.
3.2.3.3 DD Form 254. The Contractor shall comply with security requirements specified in the DD-254 attached to this Contract. Information or data that the Contractor accesses shall be handled at the appropriate classification level. Unclassified information shall be handled as FOUO. Distribution is authorized to the RO’s Organization and supported Activities only. Other requests for deliverables under this Contract shall be referred to the COR of this Contract for approval. The Contractor shall obtain facility clearance at Top Secret per the Contract DD-254 within sixty (60) days after contract award. The contractor will require access to:
3.2.3.3.1 Communications Security (COMSEC) Information, Non-Sensitive Compartmented Information (SCI), North Atlantic Treaty Organization (NATO information, CUI, SIPRNET, STE, Secure Fax Access.
In performing this contract, the Contractor will:
3.2.3.3.2 Receive, store, and generate classified information or material; fabricate, modify, or store classified hardware; have access to U. S. Classified Information outside the U.S., Puerto Rico, U.S. Possessions and trust territories; be authorized to use the services of Defense Technical Information Center (DTIC) or other secondary distribution center; require a COMSEC account; have a Tempest requirement; have OPSEC requirements; be authorized to use Defense Courier Service; receive, store, or generate CUI.
3.2.4 Marking. All information generated by the Contractor shall be properly marked. CUI information generated and/or provided under this Contract shall be marked IAW DoDM 5200.01. Technical information shall also be marked with appropriate Distribution Statements and Export Control warnings IAW DoDD 5230.24 and program Security Classification Guidance.
3.2.5 Loss, compromise, and/or electronic spillage of classified information or CUI. The Contractor shall report all instances of loss, compromise, and electronic spillage of classified information or CUI shall be reported to the COR, TPOC, and Government Security Office within twenty-four (24) hours of the incident occurring.
3.2.6 Anti-Terrorism Force Protection and Emergency Management. The work performed on this Contract is not Emergency Essential IAW OPNAVINST 3440.17A and Government Emergency Management, Antiterrorism and/or Continuity of Operations Plans. Contractor personnel shall comply with all Government Emergency Management, Antiterrorism and/or Continuity of Operations Plans and directives. Contractor personnel shall not report for work at Government facilities upon declaration of Force Protection Condition CHARLIE or in any event or emergency where Government officials’ direct curtailment of operations to “Mission Essential Only.” All Contractor personnel assigned to a Government facility shall complete annual Antiterrorism (Level One) and Active Shooter training.
3.2.7 IT access. All Contractor personnel with access to unclassified information systems, including e-mail, shall have, at a minimum, a favorable National Agency Check (NAC). The Contractor shall coordinate with the COR all IT network or website access requirements after award of the Contract and shall be IAW the latest DoD policies and the SCMS Division RDT&E Network SOP. (Attachment 14)
3.2.7.1 Contractor facility IT access. Employees requiring access to various DoD IT network or network resources from a Contractor facility are mandated by DoD policy to use Government-approved PKIs along with an appropriate hard key (i.e., Smart Card). Defense Information Systems Agency (DISA) will be the primary source for these certificates.
3.2.7.2 Government facility IT access.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .