This is a Performance Work Statement for quarterly maintenance and instrumentation calibration services at Fleet Readiness Center Northwest, Naval Air Station Whidbey Island.

The contractor shall provide temperature uniformity surveys and calibration services for seven thermal processing units: five furnaces (Units A, B, C, D, E) and two ovens (Units F, G). Temperature uniformity surveys must be conducted at specified temperature setpoints with defined tolerances ranging from ±10°F to ±15°F, using varying numbers of thermocouples per unit (6 to 10 points) and conforming to ISO/IEC 17025:2017 standards. Services are organized on two separate quarterly cycles requiring eight annual visits: Cycle 1 covers Units A, B, C, D, E plus associated recorders and controllers in December 2026, March 2027, June 2027, and September 2027; Cycle 2 covers Units F, G, Freezer, and associated equipment in February 2027, May 2027, August 2027, and November 2027. The contractor must supply thermocouple wire for each survey (single-use only) and replace all thermocouples annually. The government will provide mounting frames. Additionally, the contractor shall provide emergency repair services for up to 56 hours under separate contract line items (CLINs 0003, 1003, 2003), with replacement/repair parts quoted and paid separately. All work must be accompanied by a Certificate of Compliance stating calibration compliance with ANSI/NCSL Z540-1-1994, including contract number and item identification. The surveillance official is LS1 Moreau, Travis (travis.l.moreau.mil@us.navy.mil; 360-257-8638), and the contractor's representative must contact the government representative upon arrival and departure from the work site.

View the file

Other files

File Type Posted
Solicitation - N0040627Q0033.pdf PDF
WD 15-5547.pdf PDF

On GovTribe

Work with this file

  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Performance Work Statement

Temperature Uniformity Surveys for Fleet Readiness Center Northwest

SCOPE:

Provide quarterly maintenance and instrumentation calibration services on-site at Fleet Readiness Center Northwest (FRCNW), Naval Air Station (NAS) Whidbey Island for the maintenance and proper functioning of 5 furnaces and 2 ovens.

1. Temperature Uniformity Surveys need to be done on all 7 units. The temperatures required for the survey are as follows:

Unit A – GM Furnace: 1600, 1850 F + 15 F Unit B – GM Furnace: 500, 1050, 1600 F + 15 F Unit C – Lindberg Pit Furnace: 300, 900 F + 15 F Unit D – Lindberg Pit Furnace: 300, 900 F + 15 F Unit E – Lindberg Pit Furnace: 300, 900 F + 15 F Unit F – Grieve Oven: 800, 1040 F + 10 F Unit G – Grieve Oven: 250, 850, 1450, 1700 F + 15 F

2. The temperature points to be measured (the number of thermocouples) per survey are as follows:

Unit A: Class IV, 10 points, 1600 & 1850 F w/controller, high limit, carbon control, recorder Unit B: Class III, 10 points, 500 & 1050 & 1600 F w/controller, high limit, recorder Unit C: Class III, 6 points, 300 & 900 F w/controller, high limit recorder Unit D: Class III, 6 points, 300 & 900 F w/controller, high limit recorder Unit E: Class III, 6 points, 300 & 900 F w/controller, high limit recorder Unit F: Class II, 10 points, 800 & 1040 F w/controller, high limit, recorder Unit G: Class III, 10 points, 250, 850, 1450, 1700 F w/controller, high limit, recorder

2.1 The time durations required per survey point are found in the ISO/IEC 17025:2017

2.2 The end user will provide the frames needed for mounting thermocouples

3. Oven calibration and maintenance are on two separate quarterly cycles – this will require eight annual visits. Timing of cycles is during the following months. The specific date is controlled by the PMS controller.

Cycle 1: Units A,B,C,D,E, plus Eurotherm Recorder, Quench Tank Controller, QT High Limit, and QT Recorder: to be surveyed and calibrated in Dec 2026, Mar 2027, Jun 2027 and Sept 2027.

Cycle 2: Units F & G, Freezer, Eurotherm Recorder, Hardness Tester, Gas Generator, Controller, and High Limit: to be surveyed and calibrated in Feb 2027, May 2027, Aug 2027 and Nov 2027.

4. Contractor must supply thermocouple wire for each TUS – wire is used only once.

5. Contractor to replace all thermocouples annually.

Emergency Repairs:

The contractor will provide emergency repairs (CLINs 0003, 1003, and 2003).

Emergency Service Labor Hours for up to 56 hours.

Any replacement/repair parts as required for the ovens and furnaces, are to be quoted and paid for separately from the anticipated contract. Any parts needed for repair outside of the parameters of normal/standard repairs will be addressed on a case-by-case basis.

Performance Period:

SEE SCHEDULE

CALIBRATION CERTIFICATE OF COMPLIANCE

The Contractor shall provide a Certificate of Compliance which states:

"All items furnished under this contract have been calibrated in full compliance with ANSI/NCSL Z540-1-1994."

The Certificate of Compliance (COC) shall include the following identification information: contract or purchase order number and item description (part number, serial number, drawing number, etc.).

This statement shall be signed by an authorized official, of or on behalf of the contractor, designated responsible for calibration services, and shall accompany the material shipped. COC's signed by an authorized official of a subcontractor are acceptable provided the COC contains the above identification information and quoted state

SURVEILLANCE OF SERVICES

SURVEILLANCE OF FIRM FIXED-PRICED SERVICES

1. The Surveillance Official(s) shall be responsible for appropriate surveillance of all services to be performed under this contract.

NAME: LS1 Moreau, Travis EMAIL: travis.l.moreau.mil@us.navy.mil

TELEPHONE: 360-257-8638

2. When performance is at a government site, the contractor’s representative shall contact the government representative named above upon arrival at and departure from the work site. If access to a security area is required, continuous escort service for the contractor’s representative will be provided by the designated government representative.

3. It is emphasized that only the Contracting Officer has authority to modify the terms of this contract;

therefore in no event will any understanding, agreement, modification, change order, or other matter deviating from the terms of the basic contract between the contractor and any other person be effective or binding on the government. When or if, in the opinion of the contractor, an effort outside of the existing scope of the contract is requested, the contractor shall promptly notify the contract administrator and/or the Contracting Officer in writing. No action shall be taken by the contractor under such direction until the contract administrator and/or the Contracting Officer has issued a modification to the contract or has otherwise resolved the issue.

CALIBRATION CERTIFICATE OF COMPLIANCE

File details come from the government source that posted it. Updated .