About this file

This is a Standard Form 30 Amendment of Solicitation/Modification of Contract (Amendment 0002) issued by the Naval Supply Fleet Logistics Center Puget Sound on July 20, 2026. The amendment modifies solicitation N0040626Q0328, dated July 14, 2026, and provides further clarification on Material Handling Equipment (MHE) to be sandblasted. The contracting officer is Kristen Lorena, and the document is issued by NAVSUP FLT LOG CTR PUGET SOUND in Bremerton, Washington.

The Performance Work Statement specifies a non-personal services procurement requiring the contractor to sandblast eight Shipboard Electric Pallet Jack Assemblies with upright housings (BP-RICO Model PWH-EE-60) at an off-site facility. Each assembly consists of three pieces: a housing body (440 lbs), leg assembly (531 lbs), and cover (39 lbs), with maximum dimensions of 51" L × 41.5" W × 34.5" T. The contractor must remove existing 2-part polyurethane coating (13538 GLOSS DOR Highway Yellow) and complete all work within two weeks of acceptance. The contractor is responsible for furnishing all labor, materials, tools, equipment, personal protective equipment, and supplies. The Government will provide transportation to and from the sandblasting site if within 15 miles of Naval Base Kitsap Bremerton. The contractor must implement a quality control program, maintain a five-year workmanship warranty from final acceptance, designate a project manager in writing five working days before project start, shield all cavities and fittings during sandblasting, and remove all residue before releasing equipment to the MHE Shop. Work shall be performed during normal hours, Monday through Friday, excluding ten federal holidays.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

Section C - Description/Specifications/Statement of Work

Miscellaneous text in this section has been modified to:

PERFORMANCE WORK STATEMENT (PWS)

Sandblasting of 8 Electric Pallet Jack fork assemblies

1. General. This is a non-personal supply procurement to provide all personnel, equipment, tools, materials, supervision, transportation, safety equipment, and other items and services necessary to sandblast 8 Shipboard Electric Pallet Jack Assemblies w/upright housings as defined in this Performance Work Statement. The Government shall not exercise any supervision or control over the contract service providers performing the services herein. Such contract service providers shall be accountable solely to the Contractor who, in turn is responsible to the Government.

1.1 Description of Supply/Introduction. This is a non-personal services procurement. The Contractor shall provide all personnel, materials, equipment, tools, transportation, supervision, safety equipment, and any other resources necessary to sandblast 8 Shipboard Electric Pallet Jack Assemblies w/upright housings as detailed in this Performance Work Statement. The Government will not supervise or control contractor personnel. These individuals are accountable solely to the Contractor, who is responsible to the Government.

1.2 Background. Fleet Logistics Center Puget Sound is a U.S. Navy logistics installation located in Bremerton, WA. The MHE Shop at Bldg 1030 Bremerton WA does not have a sandblaster large enough to remove paint and debris from the large components on shipboard electric pallet jacks which is required as part of the Fleet Sustainment Program process.

1.3 Objectives. The contractor shall provide all labor, materials, tools, equipment, and supervision necessary to complete the replacement work specified below. All work shall be conducted during normal working hours, Monday through Friday, unless otherwise authorized by the Surveillance Officer.

1.4 Scope. This project includes the sandblasting of 8 Shipboard Electric Pallet Jack Assemblies w/upright housings. There will be 24 pieces total, three of each of the attached images.

1.4.1 FLCPS MHE Shop will deliver the assets as required if within local area, limited to 15 miles.

1.4.2 The Contractor shall sandblast 8 Shipboard Electric Pallet Jack Assemblies w/upright housings.

Manufacturer and model number: BP-RICO Model # PWH-EE-60

Maximum dimensions (L W H): 51" L, 41.5" W, 34.5" T Is the biggest piece the other two are smaller.

Weight of each assembly: Housing Body: 440lbs, Leg Assy: 531lbs, Cover: 39lbs.

Whether all eight assemblies are identical: YES, all eight assemblies will have the same 3 pieces to sandblast per set.

Approximate existing coating/paint system: 2-part, 13538 GLOSS DOR Highway Yellow, Polyurethane Coating

1.4.3 The contractor shall accept Electric Pallet trucks as available

1.4.4 The Contractor shall replace any lost items.

1.4.5 The Contractor shall complete each unit within two weeks of acceptance.

1.4.6 After completion, the contractor will contact the FLCPS MHE Shop by email or phone to pick up withing 1 week of completion.

2. CLEANING AND PROTECTION.

2.1 The contractor shall Use appropriate coverings (plastic sheeting, tarps, etc.) to shield all cavities, fittings, threads from damage.

2.2 Remove all residue created by the sandblasting process from the electric pallet jacks prior to release to MHE Shop.

3. CONTRACTOR FURNISHED ITEMS AND SERVICES.

N0040626Q03280002

3.1 The Contractor shall furnish all necessary materials, tools, supplies, PPE, and other items required to complete the job. The Contractor shall not rely on any Government-furnished supplies unless specified.

3.2 The contractor shall not rely on Government-furnished materials unless otherwise specified.

4. COMPLETION TIME.

4.1 The contractor shall provide period of performance with quote.

5. GOVERNMENT SERVICES.

5.1 The government will provide transportation to and from sandblasting site if facility is within a driving distance of 15 miles from Naval Base Kitsap Bremerton, WA.

6. QUALITY CONTROL.

6.1 The Contractor shall implement and maintain a quality control program to ensure compliance with all contract requirements and professional standards. All workmanship shall be warranted for five (5) years from the date of final acceptance.

7. HOURS OF OPERATION.

7.1 The contractor shall perform the off-site services required under this contract.

7.1.1 The Federal Government is not required to provide service on the following days:

New Year's Day

Martin Luther King, Jr. Birthday

President's Day

Memorial Day

Independence Day

Labor Day

Columbus Day

Veteran's Day

Thanksgiving Day

Christmas Day

8. SECURITY REQUIREMENTS.

8.1 The contractor shall comply with applicable government published safety requirements and regulations, which will be available upon request by the contractor.

9. CONTRACTOR PERSONNEL REQUIREMENTS.

9.1 The contractor shall provide a project manager who shall be responsible for the performance of the work. The name of this person, and an alternate(s), who shall act for the contractor when the contract manager is absent, shall be designated in writing to the Customer PO five

(5) working days prior to start of projects. The contract manager or alternate shall have full authority to act for the contractor on all contract matter relating to the daily operation of this contract. The contract manager or alternate shall be available during normal duty hours

10. CONTRACTOR FURNISHED ITEMS AND RESPONSIBILITIES.

10.1 The Contractor shall furnish all supplies, equipment, facilities and services required to perform work under this contract that are not listed under Section 3 of this PWS.

N0040626Q03280002

IDCode: J
Page: 1
Pages: 3
AmendNo: 0002
EffDate: 20 Jul 2026
ReqNo: See Continuation Sheet
ProjNo:
IssCode: N00406
AdmCode:
IssuedBy: NAVSUP FLT LOG CTR PUGET SOUND

PUGET SOUND (FISCPS), 467 W STREET

BREMERTON, WA 98314-5100

UNITED STATES

Kristen Lorena, Email: kristen.g.lorena.civ@us.navy.mil Telephone: 564-230-2886 AdminBy:

SCD: PAS:

ContractorNameAdd:
Code:
FacCode:
SolChg: 1
SolNo: N0040626Q0328
SolDate: 14 Jul 2026
AwardChg: Off
AwardNo:
AwardDate:
Amended: 1
OffrExt: Off
OffrNoEx: 1
NoCopies: 1
ApprData: See Section G - Contract Administration Data
ChgeOrd: Off
ChgeOrder:
Modify: Off
SuppAgre: Off
SuppAuth:
ModOthr: Off
OthrSpec:
NoReq: Off
Require: Off
Copies:
Descript: THIS SOLICITATION AMENDMENT IS ISSUED TO PROVIDE FURTHER CLARIFICATION ON MHE EQUIPMENT TO BE SANDBLASTED. PLEASE SEE PWS FOR FURTHER DETAILS.
ContNameTitle:
CoNameTitle: KRISTEN LORENA
ContDate:
CODate: 20 Jul 2026

File details come from the government source that posted it. Updated .