4.0 26Q02270002 Amended SF 30.pdf
PDF 518 KB Posted
- Attached to
- CONCRETE ANCHOR BLOCKS
- Solicitation number
- N0040626Q0227
About this file
This is a Standard Form 30 (SF 30) Amendment of Solicitation/Modification of Contract issued by the Naval Supply Fleet Logistics Center Puget Sound on June 16, 2026, for Solicitation N0040626Q0227, originally dated May 22, 2026. The amendment extends the response deadline from June 15, 2026 at 12:00 PM to June 17, 2026 at 09:00 AM. The contracting officer is Ashley A Rollin, and the document is effective as of June 16, 2026 (Amendment Number 0002, Requisition Code N00406).
The amendment addresses a Questions and Answers section clarifying requirements for the fabrication and delivery of twenty concrete anchor blocks to Naval Station Everett. Key clarifications include: (1) reinforcement/rebar is required for block construction using contractor standard engineering practices acceptable for general commercial grade applications; (2) eyelet "A" connection hardware should be structured using stainless steel SS2343 in accordance with drawings; (3) the contractor must be capable of removing items from the transport vehicle and placing them at the designated destination, with Naval Station Everette providing a laydown area/drop station and assistance with block movement within that area; and (4) the requirement covers fabrication and delivery labor, materials, tools, and equipment to form, reinforce, pour, finish, strip, and deliver the blocks, but installation/offloading equipment will be provided by the Government. Offerors must acknowledge receipt of this amendment prior to the extended deadline or face potential rejection.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 26Q0227 0001 Amended SF 30.pdf | ||
| Solicitation - N0040626Q0227.pdf | ||
| 8T ANCHOR DWG.pdf | ||
| Anchor 12-20T DWG.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
R
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.
Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:
(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.
CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER
NUMBER IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
15B. CONTRACTOR/OFFEROR
(Signature of person authorized to sign)
15C. DATE SIGNED 16B. UNITED STATES OF AMERICA
(Signature of Contracting Officer)
16C. DATE SIGNED
Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES
2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)
6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE
8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER
9B. DATED (SEE ITEM 11)
10A. MODIFICATION OF CONTRACT/ORDER NUMBE
10B. DATED (SEE ITEM 13)
CODE FACILITY CODE
SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
Solicitation/Contract Form Continuation
The following changes have been made:
INFORMATION FROM TO
Response Due Time 12:00 PM 09:00 AM Response Due Date 15 Jun 2026 17 Jun 2026
N0040626Q02270002
List of Contract Documents, Exhibits, or Attachments
Miscellaneous text in this section has been modified to:
Questions and Answers:
The specification section states that:
"All blocks must be constructed using industry-standard concrete, reinforced with rebar..."
However, the submitted anchor drawings for the 8-ton and 12-ton units note:
"The anchor is not reinforced."
1. Can the Government please clarify whether reinforcement/rebar is required for fabrication of the anchor blocks, or if the drawings are intended to govern construction requirements? Requesting that the blocks be reinforced to prevent cracking and structural failure.
2. Additionally, if reinforcement is required, please confirm whether the Government has a preferred reinforcement schedule/design standard or if contractor standard engineering practices are acceptable. Contractor standard practices is acceptable for this general commercial grade application.
3. Can the Government provide manufacturer details associated with these concrete anchor blocks and/or the Integrated Secure Anchor Connector (ISAC) component referenced in the drawings? Due to different manufactures offering different options we cannot offer drawing showing connectors.
Eyelet "A" on the drawing is required but we do not know the exact composition of the connection hardware used. Recommend eyelet "A" be structured using stainless steel SS2343 and in accordance with drawings.
4. The specifications state that the contractor shall provide the labor, materials, tools, and equipment required to form, reinforce, pour, finish, strip, and deliver the twenty concrete anchor blocks to Naval Station Everett.
Could you please confirm whether the Government will provide offloading/unloading equipment at the destination, or whether the contractor is expected to provide crane/offloading services? Our understanding is that this is a supply requirement for fabrication and delivery only, and that installation/offloading is not separately required unless otherwise stated
Vendor should be capable of removing the items from the transport vehicle and placing them at the designated destination. Naval Station Everette will provide a laydown area/drop station for the concrete blocks and can provide assistance with moving of the blocks in the designated laydown area.
N0040626Q02270002
| IDCode: J |
| Page: 1 |
| Pages: 3 |
| AmendNo: 0002 |
| EffDate: 16 Jun 2026 |
| ReqNo: See Continuation Sheet |
| ProjNo: |
| IssCode: N00406 |
| AdmCode: |
| IssuedBy: NAVSUP FLT LOG CTR PUGET SOUND |
PUGET SOUND (FISCPS), 467 W STREET
BREMERTON, WA 98314-5100
UNITED STATES
Ashley Rollin, Email: ashley.a.rollin.civ@us.navy.mil Telephone: 564-230-3001 AdminBy:
SCD: PAS:
| ContractorNameAdd: |
| Code: |
| FacCode: |
| SolChg: 1 |
| SolNo: N0040626Q0227 |
| SolDate: 22 May 2026 |
| AwardChg: Off |
| AwardNo: |
| AwardDate: |
| Amended: 1 |
| OffrExt: 1 |
| OffrNoEx: Off |
| NoCopies: 1 |
| ApprData: See Continuation |
| ChgeOrd: Off |
| ChgeOrder: |
| Modify: Off |
| SuppAgre: Off |
| SuppAuth: |
| ModOthr: Off |
| OthrSpec: |
| NoReq: Off |
| Require: Off |
| Copies: |
| Descript: This amendment has been issued extend and address a follow-on question in response to the solicitation. |