This document is a solicitation amendment that includes a question and answer (Q&A) compilation from vendor inquiries related to a carpet installation contract opportunity.

The key details are:

  • This is Amendment 0002 to Solicitation N0040624Q0618.
  • The government is seeking carpet installation services.
  • The Q&A addresses various administrative and logistical details, such as badges/parking, post-award conference, existing furniture, hallway carpeting, asbestos testing, noise mitigation, material storage, work area access, use of elevators, door stop replacement, work hours, transition strip replacement, and removal/disposal procedures.
  • The contract is administered by the Department of the Navy's Naval Supply Systems Command.
  • No specific information is provided on the contract value, period of performance, set-asides, or incumbent contractor.

View the file

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1301158821

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This amendment is issued to include a Q&A compiled from a list of vendors emails, phone calls, and in-person inquiries.

Administrative POC: Mark W. Witte, 360.476.1121, mark.w .w itte.civ@us.navy.mil

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 16-Jul-2024

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N0040624Q0618

X 9B. DATED (SEE ITEM 11)

08-Jul-2024

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

16-Jul-2024

CODE

NAVSUP FLC PUGET SOUND

467 W STREET, 2ND FLR

ATTN: MARK WITTE

BREMERTON WA 98314-5100

N00406 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N0040624Q0618

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been added by full text:

QUESTIONS AND ANSWERS

CARPET FLCPS

N0040624Q0516 Amendment 02 Frequently asked Questions & Answers

1. Q: Will badges and parking passes be provided?

A: Additional requirements for badges and parking passes will be specified after contract award.

2 Q: Will there be a post-award conference available?

A: Yes. A post-award conference will be scheduled one week after award (see 9.2.1 in the statement of work.

3 Q: What is the status of existing furniture?

: Most furniture will be removed from the rooms by a team prior to start of work. Any residual furniture in the rooms will be moved prior to and replaced after installation by the contractor

4 Q: Is the expectation of the hallway to be one piece of carpet?

A: Carpet tiles unless a better alternative is identified.

5. Q: Has an asbestos test been completed?

A: Yes. If asbestos is found during the performance of this contract, the contractor SHALL cease and desist work and notify the Contracting officer and GSO IMMEDIATELY.

6. Q: Some equipment will cause noise during the replacement process, who will be responsible to inform downstairs neighbors?

A: The Government will provide notices to tenants accordingly.

7. Q: Can equipment and parts be stored onsite?

A: The Government will designate a storage space onsite after award.

8. Q: During work, will the work spaces be blocked off?

A: Yes, the work spaces will be off limits to casual access and foot traffic. Security and Safety teams will still have access to the work spaces as a precaution.

9. Q: Will contractors need to use the stairs or will a cargo elevator be accessible?

A: Arrangements for access to the cargo elevator will be after award.

0. Q: Will the door stops need replacement?

A: Yes.

11. Q: Are the working hours exactly 0700-1530?

A: If a contractor needs access outside the normal hours of operation, a request needs to be made in writing to the Technical Team at least 24 hours before access is needed. See 7.1 of the statement of work.

12. Q: Will transitions need to be replaced?

A: Yes. See 1.4.9 of the statement of work.

N0040624Q0618

13. Q: How is removal/disposal handled?

A: Removal and disposal will be in accordance with industry standards for this requirement.