This modification amends a solicitation to overhaul a cargo refrigeration compressor. The amendment adds a statement of work requiring the contractor to arrange shipment of the shipboard compressor to their OEM certified facility for overhaul, in accordance with technical manuals. The contractor must disassemble, inspect, clean, replace worn parts, reassemble, and test the compressor. ABS will witness the testing remotely. The contractor must provide material and clearance documentation, condition reports for any unrepairable parts, and a service report detailing the work within 14 days of completion. The overhauled compressor must then be shipped back to the Navy as part of the vessel's spares.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| 4.0 23Q0684 SOL.pdf | ||
| 1.4 1301086989 BN (Signed)_Redacted.pdf |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
1301086989
AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT
Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.
15A. NAME AND TITLE OF SIGNER (Type or print)
30-105-04EXCEPTION TO SF 30
APPROVED BY OIRM 11-84
STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA
FAR (48 CFR) 53.243
This amendment is issued to add in the Statement of Work.
LTJG Gayle Mayani , gayle.n.mayani.mil@us.navy.mil
1. CONTRACT ID CODE PAGE OF PAGES
J 1 3
16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)
16C. DATE SIGNED
BY 22-Jun-2023
16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR
(Signature of Contracting Officer)(Signature of person authorized to sign)
8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N0040623Q0684
X 9B. DATED (SEE ITEM 11)
22-Jun-2023
10B. DATED (SEE ITEM 13)
9A. AMENDMENT OF SOLICITATION NO.
11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS
X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, is not extended.
Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:
(a) By completing Items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;
or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN
REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.
12. ACCOUNTING AND APPROPRIATION DATA (If required)
13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.
IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.
A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE
CONTRACT ORDER NO. IN ITEM 10A.
B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).
C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:
D. OTHER (Specify type of modification and authority)
E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.
14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)
10A. MOD. OF CONTRACT/ORDER NO.
2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)
6. ISSUED BY
3. EFFECTIVE DATE
22-Jun-2023
CODE
NAVSUP FLC PUGET SOUND
467 W STREET, 2ND FLR
ATTN: GAYLE MAYANI
BREMERTON WA 98314-5100
N00406 7. ADMINISTERED BY (If other than item 6)
4. REQUISITION/PURCHASE REQ. NO.
CODE
See Item 6
FACILITY CODECODE
EMAIL:TEL:
N0040623Q0684
SECTION SF 30 BLOCK 14 CONTINUATION PAGE
SUMMARY OF CHANGES
SECTION SF 1449 - CONTINUATION SHEET
The following have been added by full text:
STATEMENT OF WORK
1.0 ABSTRACT:
1.1 This item describes the requirement to Overhaul the existing Cargo Refrigeration “Chill Unit” Compressor.
2.0 REFERENCES/ENCLOSURES:
2.1 T/M T9516-A8-MMC-010D; Refrigeration Plant, Cargo
2.2 MSC Drawing 516-8387013; Refrigeration & Purge Pump-Out System Diagram
2.3 T/M T9516-BA-MMC-010; Refrigeration, Marine, Control and Management System, STALECTRONIC
3.0 ITEM LOCATION/DESCRIPTION:
3.1 Location/Quantity
3.1.1 Location: Contractors Facility.
3.1.2 Quantity: One (1) Cargo Refrigeration “Chill Unit” Compressor.
3.2 Item Description/Manufacturer’s Data.
3.2.1 Bill of Materials (Contractor Furnished Material);
3.2.1.1 Cargo Refrigeration Compressor Unit overhaul kit; (Applicable to TAKE-Vessel XJF151L Compressor) Description Part Number QTY OEM Required Tools Various Various Special Fittings for pressure test Various Various Shaft seal 543M0602G02 1 Bearings set 543M0602G03 1 O-Ring Gaskets 543M0602G01 1 O-Ring filter cover 980A0012B91 1 Gasket suction line 3921 5201 125 2 Gasket discharge line 959A0057H09 Rod indicator 543B1023H01 1 O-Ring cover 1331.175 2 Over Pressurization Valve POV 40D111 2 Filter Bags 1912 144-5 As required Desiccant 9479 0002 000 5 bags
3.2.2 Quantities are considered estimates. The Contractor shall provide the exact quantities and additional material such as miscellaneous fittings, O-rings, etc, which are not included in the List of Materials, in order to install a fully functional system which meets the requirements of this specification.
4.0 GOVERNMENT-FURNISHED EQUIPMENT/MATERIAL/SERVICES: None.
5.0 NOTES:
5.1 The contractor and all subcontractors, regardless of tier must consult the General Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTR’s.
5.2 The contractor and all subcontractors, regardless of tier are advised to review other work items under this contract to determine their effect on the work required under this work item. Many of the definitions relating to performance of this work item are found in Work Item 001.
5.3 ABS shall witness overhaul of the existing Compressors functional and capacity testing.
5.4 Contractor shall be OEM certified to overhaul Cargo Refrigeration units.
5.5 Removed Shipboard Cargo Refrigeration Freeze Compressor unit shall be overhauled 01 November through 30 November 2023 Contractors facility.
6.0 QUALITY ASSURANCE REQUIREMENTS: None Additional.
N0040623Q0684
7.0 STATEMENT OF WORK REQUIRED:
7.1 Arrangements/Outfitting:
7.2 Structural: None.
7.3 Mechanical/Fluid:
7.3.1 Shipboard Cargo Refrigeration Compressor “Chill Unit”;
7.3.1.1 Compressor will be crated and shipped to OEM certified Contractor facility by MSC rep.
7.3.1.2 Overhaul of shipboard compressor shall be accomplished at Contractors facility.
NOTE: The Contractor shall request a “Remote Survey” to satisfy the requirement of ABS witnessing any disassembly and / or reassembly and testing.
7.3.1.3 Disassemble and perform Compressor overhaul in accordance with reference 2.1. Check internal wear on gear set, rotors, slide valve, housing etc. Document and check the as-found clearances with factory standards; use reference 2.2 Compressor build sheet for required measurements; include measurements deemed necessary by the York Marine Technical Representative. Notify the MSC Representative immediately if the compressor is beyond field service repair via Condition Report.
7.3.1.4 Deep clean all internal parts in accordance with reference 2.1 and as recommended by the York Marine Technical Representative.
7.3.1.5 Assemble the compressor with new bearings, o-rings and gaskets. Perform final adjustments and alignments. Document all clearance readings during re-assembly and verify against factory standards; use reference
2.2 Compressor build sheet and measurements deemed necessary by the York Marine Technical Representative.
7.3.1.6 Contractor shall perform Shop test of overhauled unit to prove overhaul meets OEM Op test criteria. ABS shall be provided a list of material used for overhaul. ABS and MSC Rep shall witness final operational tests via “Remote Survey”.
7.3.1.7 Upon Completed Overhaul, Contractor shall ship unit back to MSC as part of ships spares.
7.4 Electrical: None additional.
7.5 Electronics: None additional.
7.6 Preparation of Drawings/Documents:
7.6.1 Guidance drawings- None Provided.
7.6.2 Working drawings- None.
7.6.3 Redline drawings-None.
7.6.4 As-built drawings-None.
7.6.5 Service Reports:
7.6.5.1 A detailed service report shall be provided no later than 14 days after the period of performance detailing all service performed, compressor clearance readings for as-found and as-installed (Re-built) condition, refrigeration unit operational test performance and set points, and any other pertinent information required for life cycle documentation.
7.7 Painting, labeling and Markings: None additional.
7.8 Marking: None additional.