1301039776

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This solicitation amendment is issued to add crate requirement and shipping address for return of compressor unit upon completion of overhaul.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 4

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 25-Oct-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N0040623Q0016

X 9B. DATED (SEE ITEM 11)

20-Oct-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer is extended, X is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

25-Oct-2022

CODE

NAVSUP FLC PUGET SOUND

467 W STREET, 2ND FL

ATTN: LT JACKSON MURPHY

BREMERTON WA 98314

N00406 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N0040623Q0016

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been modified:

SOW

1.0 ABSTRACT

This item describes the requirement to perform the Original Equipment Manufacturer (OEM) AC plant compressor overhaul.

2.0 REFERENCES

2.1 Tech Manual T9516-BQ-MMC-01A, Technical Manual For Refrigeration Plant, Air Conditioning For T-AKE CLASS AND FORWARD - Installation, Operation And Maintenance Instructions

2.2 Section GB90138A, Service Manual Rotary Screw Compressors SGC 1913 through 2824

3.0 ITEM LOCATION/DESCRIPTION

3.1 Location/Quantity

3.1.1 Location: Contractors Facility.

3.1.2 Quantity: ONE (1) AC Plant Compressor

3.2 Item Description/Manufacturer’s Data

3.2.1 Liquid Chiller Unit, York Marine AB Model No. VSM 2817E

3.2.2 Compressor, Frick (Johnson Controls) Rotary Screw Compressor, Model No.

SGC 2817 T-AKE, Weight 3,000 LBS

3.3 Bill of Materials (Contractor Furnished)

Description Part Number Quantity Overhauling Kit for SGC2817 AC Comp 534L0283C20 1 Unloader Spring 534C1360H07 1 Installation Gasket Kit SGC2817 IMI17000213 1

4.0 GOVERNMENT FURNISHED EQUIPMENT/MATERIAL/SERVICES

4.1 Government Furnished Equipment (GFE):

Description Manufacturer Model

Number U/I Quantity

Rotary Screw Compressor

Johnson Controls SGC2817 Assembly 1

4.2 Government Furnished Material (GFM): None

4.3 Government Furnished Services (GFS): None

5.0 NOTES

5.1 The contractor and all subcontractors, regardless of tier must consult the General

Technical Requirements (GTR) to determine applicability to this work item. In performance of this work item, the contractor and all subcontractors regardless of tier must comply with the requirements of all applicable GTR’s.

5.2 ABS shall witness overhaul of the existing Compressors functional and capacity testing.

5.3 Contractor shall be OEM certified to overhaul AC chiller units.

5.4 Removed Shipboard AC Compressor unit shall be overhauled 15 November through 22

December 2022 at Contractors facility.

6.0 QUALITY ASSURANCE REQUIREMENTS: None additional

7.0 STATEMENT OF WORK REQUIRED

7.1 Arrangements/Outfitting: None

7.2 Structural: None.

7.3 Mechanical/Fluid:

7.3.1 Shipboard AC Compressor Unit

a. Compressor will be crated and shipped to OEM certified Contractor facility by

MSC rep.

b. Overhaul of shipboard compressor to be accomplished at Contractors facility.

Note: The Contractor shall request a “Remote Survey” to satisfy the requirement of ABS witnessing any disassembly and / or reassembly and testing.

7.4 Complete 30,000 hour overhaul of the compressor using Reference 2.2 for guidance and the contractor furnished material identified in paragraph 3.3.

7.5 Notify the MSC Representative immediately if the compressor is beyond field service repair via Condition Report.

7.6 Perform and document a satisfactory shop test of overhauled unit to prove compressor meets OEM operational test criteria.

7.7 Upon Completed Overhaul, Contractor shall ship unit back to MSC as part of ships spares. Contractor shall crate the unit for overseas shipment and ship to the MSC Warehouse in San Diego:

7.7.1 Mark For USNS Cesar Chavez

MSC SSU BATS San Diego 9284 Balboa Ave.

San Diego, CA 92123 MSC Action Description N2900322774005

7.8 Reports

7.8.1 When inspection, service and testing reveal any deficiency a condition report is to be submitted to the MSCREP with recommended repairs and parts required.

Submit three (3) typewritten copies and one (1) electronic copy in Portable Document Format (PDF).

7.8.2 Submit a report that includes “as released” condition of the AC plant compressors. Submit three (3) typewritten copies and one (1) electronic copy in Portable Document Format (PDF).

7.8.3 All reports and checklists are to be completed and signed by the person who carried out the inspection and maintenance work and countersigned by the Company’s representative.

7.9 Painting/Lagging: None additional

7.10 Manufacturer's Representative

7.10.1 Provide the services of an authorized OEM representative to inspect, refurbish, and test the A/C plant compressor.

7.11 Preparation of Drawings: None

8.0 GENERAL REQUIREMENTS: None additional

(End of Summary of Changes)