N0040622Q0882 0001 SOLICITATION AMENDMENT.pdf

PDF 628 KB Posted

Attached to
PAINTING SERVICES
Solicitation number
N0040622P0882
Issued by

View the file

Other files

File Type Posted
N0040622Q0882 DRAWING REVISED 9.23.2022.pdf PDF
N0040622Q0882 SOLICITATION.pdf PDF
N0040622Q0882 DRAWING.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

1301036164-0001

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print)

30-105-04EXCEPTION TO SF 30

APPROVED BY OIRM 11-84

STANDARD FORM 30 (Rev. 10-83) Prescribed by GSA

FAR (48 CFR) 53.243

This amendment is issued after the solicitation w as closed to change Performance Work Statement for additional requirements. The closing of this solicitation is extended to 26 September 2022 at 12:00 Pacific Standard Time.

1. CONTRACT ID CODE PAGE OF PAGES

J 1 3

16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

16C. DATE SIGNED

BY 23-Sep-2022

16B. UNITED STATES OF AMERICA15C. DATE SIGNED15B. CONTRACTOR/OFFEROR

(Signature of Contracting Officer)(Signature of person authorized to sign)

8. NAME AND ADDRESS OF CONTRACTOR (No., Street , County, State and Zip Code) X N0040622Q0882

X 9B. DATED (SEE ITEM 11)

20-Sep-2022

10B. DATED (SEE ITEM 13)

9A. AMENDMENT OF SOLICITATION NO.

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

X The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offer X is extended, is not extended.

Offer must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended by one of the following methods:

(a) By completing Items 8 and 15, and returning 1 copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or telegram which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN

REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by telegram or letter, provided each telegram or letter makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NO. AS DESCRIBED IN ITEM 14.

A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE

CONTRACT ORDER NO. IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation date, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(B).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not, is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

10A. MOD. OF CONTRACT/ORDER NO.

2. AMENDMENT/MODIFICATION NO. 5. PROJECT NO.(If applicable)

6. ISSUED BY

3. EFFECTIVE DATE

23-Sep-2022

CODE

NAVSUP FLC PUGET SOUND

467 W STREET, 2ND FL

ATTN: LCDR CALVIN CHU

BREMERTON WA 98314

N00406 7. ADMINISTERED BY (If other than item 6)

4. REQUISITION/PURCHASE REQ. NO.

CODE

See Item 6

FACILITY CODECODE

EMAIL:TEL:

N0040622Q0882

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

SECTION SF 30 - BLOCK 14 CONTINUATION PAGE

The following have been modified:

PERFORMANCE WORK STATEMENT

I. Statement of Work

The Contractor shall provide labor, materials, and equipment, as required, to accomplish the following work in accordance with the basic contract requirements, incorporated clauses, included drawings, enclosures (if any), references and statements herein:

This contract is to paint the offices describe below. Ceiling shall be painted including duct work. Uniform light gray LVOC or NVOC paint is required. Contractor is required to protect furniture and carpet from any paint spills. May move remaining furniture to the center of the room and tarp. Government will move all personal and IT items and small furniture out of the offices. Contractor will need to protect and move large furniture (wardrobes, closets) and glass white boards in the office. Patch walls prior to painting. Paint interior and exterior of the doors in light gray tone.

All work must be coordinated with on-going operations in the immediate area, in and around Building 467. The contractor shall coordinate all laydown areas and access with the government representative.

The contractor will contact the government representative within 10 days after award to schedule a post-award meeting for review and approval of proposed materials and to answer any questions by either party.

The Period of Performance shall commence at date of award and be complete by December 31st.

Standards and Codes A. All structural work shall be in accordance with International Building Code (IBC), National Electric Code

(NEC), National Fire Protection Association (NFPA) standards, Uniform Plumbing Code, Uniform Mechanical Code, Unified Facilities Criteria (UFC), and Unified Facilities Guide Specifications (UFGS).

B. All work shall be performed by a licensed contractor for the specific trade.

II. Drawings, Attachments and Enclosures See drawing attached-

III. Product Specifications A. Paint, Latex, low VOC or No VOC in a light gray. Final approval of color will be 15 days after award.

IV. Proposals

A. Proposals will include the following:

1. Proposed costs assuming a firm-fixed-price contract.

2. Proposed materials.

3. Tentative Schedule, with time lines, identifying;

a) Planned start date and duration of project

b) Material delivery dates

c) Planned completion date

d) Final inspection date

4. Universal Outage Request:

a) Outage requests (Minimum of 20 working days required)

5. Vehicle Permits (Minimum 7 calendar days required, after outage request has been approved)

6. Badging requests (Minimum 14 working days required)

N0040622Q0882

V. Scope A. The contractor shall coordinate with the government representative.

B. The Contractor is responsible for verifying all existing site conditions, dimensions, and materials prior to start of work.

C. The contractor is responsible for all necessary utility and service connections.

1. Patch, sand, texture and otherwise prep walls for paint.

2. Prime and paint walls and interior window trim. Walls are approximately 11’ in height.

D. Painting in six offices using LVOC paint in light grey color. Walls are approximately 11’ in height. Required to protect furniture and carpet from any paint spills. Government will move the tables and items to the center of the room. Contractor to tarp these items and will need to be taped off and protected during painting. Patch walls, paint interior and exterior of the doors in a medium gray.

1. Room 2-23- 11’x11’ with 11’ ceiling

2. Room 2-24- 11’x11’ with 11’ ceiling and single side of door and jam only

3. Room 2-25- 20’x20’ no ceiling paint required, ceiling is at 9’, both sides of door and jams.’

4. Room 2-26- 15’x15’ with 11’ ceiling

5. Room 2-27- 16.5’x15’ with 12’ 11’ ceiling, single side of door and jams. Okay to spray interior windows

6. Room 2-28- single interior side of door and Jam only

If proposed cost exceed available funds, the government reserves the right to remove either, some or all three rooms (#23, and room #24 or #25).

E. Painting of Lunchroom with an approximate size of 25’ by 21’ which includes a kitchen nook. Wall height is at 11’color is a light gray LVOC or no-VOC paint. Government will move the tables and items to the center of the room. Contractor to tarp these items and will need to be taped off and protected during painting. No ceilings to be painted. Patch walls, paint interior and exterior of the door in a medium gray.

F. Women’s Restroom. Approximate dimensions are 20’ x 13.5’ with an entry way of 9’ x 6.5’. Wall height is approximately 11’.The bathroom has 6 stalls and various towel dispensers, sinks, and mirrors on the walls.

These items will need to be taped off and protected during painting. No ceilings to be painted. Patch walls, paint interior and exterior of the door in a medium gray.

G. Men’s Restroom, Approximate dimensions are 20’ x 12’ with wall height approximately 11’ . The bathroom has 1- ADA and 3 regular stalls along with seat cover and toilet paper dispensers, and 1-grab bar. These items will need to be taped off and protected during painting. No ceilings to be painted. Patch walls, paint interior and exterior of the door in a medium gray.

VI. Additional Administrative Items A. An approved laydown area will be required. All vehicles must park with-in the confines of the approved laydown area and have an approved hanging pass displayed.

B. The contractor is responsible for protecting the building contents in the vicinity of the work during performance.