7.06_Award_N0038325FBT00.pdf

PDF 313 KB Posted

Attached to
ALRE Award
Solicitation number
N0038325FBT00
Issued by

About this file

This is a DD Form 1155 Order for Supplies or Services, specifically a delivery order issued on April 25, 2025, for the repair and evaluation of Half Bridge Units under contract N00383-24-F-BT01.

The order, issued by NAVSUP Weapon Systems Support in Philadelphia, Pennsylvania, is directed to General Atomics Co (CAGE Code 4V360) located at 3550 General Atomics Court, San Diego, CA 92121-1122. The delivery order requires the contractor to evaluate, repair, and/or modify NSN 7RH 1680-01-686-8394 Half Bridge Units in accordance with applicable repair manuals, technical specifications, engineering orders, and drawings. Three contract line items (CLINs) specify quantities of 3, 21, and 31 units respectively, each priced at $103,025.00 per unit, with delivery required by August 24, 2026. All units are to be manufactured in "A" condition stock with a repair turnaround time (RTAT) of 120 days and an induction expiration date of 365 days. The total contract ceiling amount is $5,666,375.00, with $2,776,523.75 obligated (49% UCA obligation). Payment will be made by DFAS Columbus Center through electronic funds transfer, and inspection and final acceptance will occur at the contractor's manufacturing site (4US81) by DCMA. The order is to be shipped to DLA Distribution Norfolk VA. The Statement of Work establishes repair and testing requirements including disassembly, cleaning, inspection, component replacement, reassembly, and testing to return units to Ready for Issue (RFI) condition, with configuration management and quality system requirements per ISO 9001/SAE AS9100.

View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PAGE 1 OF Form Approved ORDER FOR SUPPLIES OR SERVICES OMB No. 0704-0187

Expires Aug 31, 1992 5. CERTIFIED FOR NA- TIONAL DEFENSE UNDER 2. DELIVERY ORDER NO. 4. REQUISITION/PURCH REQUEST NO. 1. CONTRACT/PURCH ORDER NO. 3. DATE OF ORDER DPAS 15 CRF 700

DO

6. ISSUED BY 7. ADMINISTERED BY (If other than 6) CODE CODE 8. DELIVERY FOB

DEST

OTHER

(See Schedule if other)

11.MARK IF BUSINESS IS FACILITY CODE CODE 10. DELIVER TO FOB POINT BY (Date) 9. CONTRACTOR

SMALL

Q Q 12. DISCOUNT TERMS SMALL DISADVANTAGED NAME AND ADDRESS WOMEN-OWNED

13. MAIL INVOICES TO

Q Q

14. SHIP TO 15. PAYMENT WILL BE MADE BY CODE CODE

MARK ALL PACKAGES AND PAPERS WITH CONTRACT OR

ORDER NUMBER

16. T O DELIVERY This delivery order is issued on another Government agency or in accordance with and subject to terms and conditions of above numbered contract. Y R P D Reference your furnish the following on terms specified herein. E E R PURCHASE O THE CONTRACTOR HEREBY ACCEPTS THE OFFER REPRESENTED BY THE NUMBERED PURCHASE ORDER AS IT MAY PREVIOUSLY HAVE BEEN OR IS NOW ACCEPTANCE. F MODIFIED, SUBJECT TO ALL OF THE TERMS AND CONDITIONS SET FORTH, AND AGREES TO PERFORM THE SAME.

NAME OF CONTRACTOR SIGNATURE TYPED NAME AND TITLE DATE SIGNED

If this box is marked, supplier must sign Acceptance and return the following number of copies:

17. ACCOUNTING AND APPROPRIATION DATA/LOCAL USE

22. 23. 18. 19. 20. 21. QUANTITY ORDERED/ SCHEDULE OF SUPPLIES/SERVICES UNIT AMOUNT ITEM NO. UNIT PRICE ACCEPTED*

Public reporting burden for this collection of information is estimated to average 1 hour per response, including the time for reviewing instructions, searching existing data sources, gatheringand maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of this collection ofinformation, including suggestions for reducing this burden, to Washington Headquarters Services, Directorate for Information Operations and Reports, 1215 Jefferson Davis Highway, Suite1204, Arlington, VA 22202-4302 and to the Office of Management and Budget, Paperwork Reduction Project (0704-0187), Washington, DC 20503. Please DO NOT RETURN your form toeither of these addresses. Send your completed form to the procurement official identified in Item 6.

24. UNITED STATES OF AMERICA 25. TOTAL * If quantity accepted by the Government is same as quantity ordered indicate by X. If different, enter 29. actual quantity accepted below quantity ordered and encircle. DIFFERENCES

BY: CONTRACTING/ORDERING OFFICER

27. SHIP. NO. 26. QUANTITY IN COLUMN 20 HAS BEEN 28. D.O. VOUCHER NO. 30. INITIALS RECEIVED ACCEPTED, AND CONFORMS TO THE INSPECTED CONTRACT EXCEPT AS NOTED PARTIAL 33. AMOUNT VERIFIED CORRECT FOR 32. PAID BY

FINAL

31. PAYMENT 34. CHECK NUMBER DATE SIGNATURE OF AUTHORIZED GOVERNMENT REPRESENTATIVE

COMPLETE 36. I certify this account is correct and proper for payment

PARTIAL 35. BILL OF LADING NO.

FINAL SIGNATURE AND TITLE OF CERTIFYING OFFICER DATE

38. RECEIVED BY 40. TOTAL CONTAINERS 41. S/R ACCOUNT NUMBER 42. S/R VOUCHER NO. 37. RECEIVED AT 39. DATE RECEIVED

CONTRACTOR MUST SUBMIT FOUR COPIES OF INVOICE PREVIOUS EDITIONS ARE OBSOLETE EDADD Form 1155, MAY 90

N0038324GBT01 N00383-25-F-BT00 2025 APR 25 24255-0085

DO-A1

N00383 S0512A

NAVSUP WEAPON SYSTEMS SUPPORT DCMA SOUTHERN CALIFORNIA

PHILADELPHIA 18901 SOUTH WILMINGTON AVENUE

700 ROBBINS AVENUE BUILDING DH2 X

PHILADELPHIA,PA 19111-5098 CARSON,CA 90746-2856

BUYER: M. DICKENS/N792.12 SCD: A

PHONE: (215) 697-4516

4V360 4US81

SEE SCHEDULE

GENERAL ATOMICS CO

ATTN: DOAN LA NET 30 DAYS

3550 GENERAL ATOMICS COURT

SAN DIEGO,CA 92121-1122

POC: (858) 455-3688 SEE BLOCK 15

HQ0339

SEE SCHEDULE DFAS - COLUMBUS CENTER

WEST ENTITLEMENT OPERATIONS

P O BOX 182381

COLUMBUS,OH 43218-2381

EFT:T

X

GACP 20021948NTE

SEE SECTION G

SEE SCHEDULE

CRITICAL APPLICATION ITEM

CEILING PRICE

$5,666,375.00

KLMNOPQRSTM. DICKENS

PAGES

OFPAGEREFERENCE NO. OF DOCUMENT BEING CONTINUED

NAME OF OFFEROR OR CONTRACTOR

CONTINUATION SHEET

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

N00383-25-F-BT00 2 12

GENERAL ATOMICS CO

EVALUATE, REPAIR AND/OR MODIFY

0001 NSN 7RH 1680-01-686-8394 EY

HALF BRIDGE UNIT SHELF LIFE 0-00

SEE TECHNICAL REQUIREMENTS IN SECTIONS C, D, E, AND ATTACHMENTS

PACKAGING REQUIREMENTS SAME AS ESTABLISHED IN BASIC

INSPECT AT SOURCE

ACCEPT AT SOURCE

SHIP TO

0001AA DEL BY: 2026 AUG 24 ACRN: AA TP: 1 SW3117 3 EA $103,025.00

PR N00383-24-U-4820 DO-A1 (NTE) $309,075.00

M/F: "A" CONDITION STOCK (NTE)

INDUCTION NIIN IS 7R 1680 016495098 EY NRP,HALF BRIDGE ASS

3890AS003987-01

NOTE:

RTAT=0120

Throughput Constraint=0000/month Induction Expiration Date=365 (NTE 365 days)

0001AB DEL BY: 2026 AUG 24 ACRN: AA TP: 1 SW3117 21 EA $103,025.00

PR N00383-24-U-4821 DO-A1 (NTE) $2,163,525.00

M/F: "A" CONDITION STOCK (NTE)

INDUCTION NIIN IS 7R 1680 016822590 EY HALF BRIDGE

3890AS003987-02

NOTE:

RTAT=0120

Throughput Constraint=0000/month Induction Expiration Date=365 (NTE 365 days)

0001AC DEL BY: 2026 AUG 24 ACRN: AA TP: 3 SW3117 31 EA $103,025.00

PR N00383-24-U-4852 DO-A1 (NTE) $3,193,775.00

M/F: "A" CONDITION STOCK (NTE)

NOTE:

RTAT=0120

Throughput Constraint=0000/month Induction Expiration Date=365 (NTE 365 days)

CONTINUED ON NEXT PAGE

NAME OF OFFEROR OR CONTRACTOR

CONTINUATION SHEET

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

N00383-25-F-BT00 3 12

GENERAL ATOMICS CO

CLIN 0001, NIIN 01-686-8394 CONT.

AWARD NOTES:

RTAT, Throughput Constraint, and Induction Expiration Date included in CLIN remarks below are defined as follows:

Repair Turnaround Time (RTAT): the contractual delivery requirement is measured from asset Return to the date of asset acceptance under the terms of the contract (days). For purposes of this section, Return is defined as physical receipt of the F-condition asset at the contractor's facility as reflected in the Action Date entry in the Commercial Asset Visibility (CAV) system. In accordance with the CAV Statement of Work, the contractor is required to accurately report all transactions by the end of the fifth regular business day after receipt and the Action Date entered in CAV must be dated to reflect the actual date of physical receipt.

Throughput Constraint: Total assets to be repaired monthly after initial delivery commences. A throughput of 0000/month reflects no throughput constraint.

Induction Expiration Date: Any asset received after this date in days is not authorized to be repaired without bi-lateral agreement between the Vendor and Contracting Officer.

The Contractor must obtain final inspection and acceptance by the Government for all assets within the RTATs established in this contract.

Any units that meet the RTAT requirement within the SubCLIN remarks shall be priced at the unit price established in this contract.

Receipt and acceptance of authorization with mutually acceptable terms and conditions consistent with N00383-24-F-BT01 shall apply and will take precedence over all other terms and conditions of the order.

The order is being placed as a UCA, obligating 49% of the total Not-to-Exceed (NTE) price. This is an unpriced order that will be definitized by the PCO.

Thecontractor shall teardown, test, evaluate, and repair the units.Consequently,a firm fixed price proposal shall be submitted to the

NAVSUP WSS PCO.

The induction period for this award is 365 days from the date of award.

Early and incremental deliveries are accptable and desirable.

The RTAT under each SubClin is estimated only. GA shall provide a firm RTAT with their proposal.

Per REI 24-22146, authorization is granted for use of half bridges to complete these repairs.

This contract/delivery order/purchase order/modification is issued by the Government when deposited in the mail, transmitted by facsimile or sent by any electronic commerce method, including email. The Government's acceptance ofthe contractor's proposal constitutes bilateral agreement to issue this

CONTINUED ON NEXT PAGE

NAME OF OFFEROR OR CONTRACTOR

CONTINUATION SHEET

ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT

N00383-25-F-BT00 4 12

GENERAL ATOMICS CO

AWARD NOTES:

contract/delivery order/purchase order/modification.

The Ceiling Amount for this contractual action is $5,666,375.00.

The amount obligated is $2,776,523.75.

The obligation amount is based on a 49% UCA obligation where applicable.

POC EMAIL: MICHAEL.J.DICKENS5.CIV@US.NAVY.MIL

N00383-25-F-BT00

PART I - THE SCHEDULE

SECTION C

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

CLIN: 0001

NIIN: 016868394 ACTIVITY USE ONLY: TDP VERSION NO.: 003

ITEM NAME: HALF BRIDGE UNIT

1. SCOPE

1.1 Articles to be furnished hereunder shall be repaired, tested and inspected in accordance with the terms and conditions specified in the Requirements Section of this document.

1.1.1 Any item contracted for repair SHALL have a Statement of Work to ensure compliance with all repair procedures and requirements.

Repair of:

HALF BRIDGE UNIT <1680-01-686-8394> NSN , <3890AS003987-03> Part Number, Shall be performed IAW: HALF BRIDGE UNIT <REPAIR/OVERHAUL/INSPECT IAW APPLICABLE REPAIR MANUALS, TECHNICAL SPECIFICATIONS, ENGINEERING ORDERS AND DRAWINGS.> Publication (s).

1.1.2 There will be no repair deviation from the approved written procedures without review and acceptance by the Basic Design Engineer. All requests for Waiver/Deviation shall be via Form 1694 routed throught the Local DCMA/ACO office for review and recommendations via form 1998.

2. APPLICABLE DOCUMENTS - NOT APPLICABLE

3. REQUIREMENTS

3.1 1.0 GENERAL

3.1.1 This Statement of Work (SOW) establishes the criteria for repair and testing /inspection of the subject item.

It includes inspection, component repair and replacement,reassembly and testing procedures required to return units back into a servicable condition.

3.2 2.0 DEFINITIONS.

3.2.1 CONTRACTOR: Is defined as the successful offeror awarded a contract, orderor issued a project work order. The term "contract" encompasses a contract, an order, or a project work order.

3.2.2 OVERHAUL: An overhauled part is one which has been disassembled, cleaned, inspected, repaired as necessary (by replacing or repairing all components which have been found to exceed limits established by the repair/overhaul manual) reassembled and tested in accordance with the approved repair/overhaul manual listed in this SOW and returned to a Ready for Issue (RFI) condition (Refer to contract schedule for items to be overhauled).

3.2.3 REPAIR: A repaired part is one which has been restored to a Ready for Issue(RFI) condition (by replacing or repairing those components found to be defective, broken, damaged or inoperative during the initial evaluation and troubleshooting phase) and tested in accordance with the approved repair/overhaul manual listed in this SOW (Refer to contract schedule for items to be repaired).

3.3 3.0 SCOPE

3.3.1 GENERAL. The items to be furnished hereunder shall be overhauled, upgraded,repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this contract. Unless expressly provided Government Furnished Property, including equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s) will not be provided by the Government and shall be the responsibility of the contractor. The foregoing applies notwithstanding any reference to such equipment or the furnishing thereof that may be contained in any drawing, manual, or specification for the contract items.

3.3.2 REPAIR UPGRADE REQUIREMENTS:The contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to to return the following items to a Ready For Issue (RFI) condition:

HALF BRIDGE UNIT <3890AS003987-03> P/N, <1680-01-686-8394> NSN, <REPAIR/OVERHAUL/INSPECT IAW APPLICABLE REPAIR

MANUALS, TECHNICAL SPECIFICATIONS, ENGINEERING ORDERS AND DRAWINGS.> Tech Publications

3.3.3 RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate.The contractor must perform all repairs/upgrades at the facility identified within this SOW. Repairs performed by the contractor or subcontractor shall be performed in accordance with the specified drawings and repair manual(s).

3.4 Changes to such manuals used for repairs under this contract, or changes to drawings or specifications used in the manufacture of parts utilized in these repairs, require Procuring Contracting Officer (PCO) approval in accordance with the Configuration Management provisions of this Statement of Work or contract. Under no circumstances should the repair, test, and inspection extend beyond the requirements of this paragraph unless authorized by the Government QAR.In addition, requests for approval of changes to a repair source or repair facility shall be submitted in writing to the PCO prior to making any such change.

3.4.1 Any repairs performed using unapproved changes to such manuals, drawings, specifications, or changes to repair source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved manuals,drawing, specification, repair source or repair facility change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility.

3.4.2 References on Drawings and Specifications:For repair and overhaul purposes only. All references to the "prime contractor" or the "actual manufacturer" appearing on the drawings and / or specifications or technical data furnished by the Government shall be read as the "Government Designated Agency"

3.4.3 Process Control Documentation: The contractor shall prepare and maintain repair procedures, and test / inspection information / procedures which shall be made available to the Government for review and approval. The procedures shall include sequential diagrams of processes, as well as the performance specifications to perform the testing / inspection procedures. Those processes shall be frozen after approval of the inspection / Test.

3.4.4 Beyond Economical Repair (BER). An item is BER if the cost of the repair exceeds 75% of the production quantity price to replace the item, current at time of award. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this contract. Items determined BER are not included in the contract price. The contractor shall obtain written concurrence from DCMA for all units determined by the contractor to be BER. All such determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence shall be provided by the contractor to the PCO, with a copy to the inventory manager. After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. The contractor is not authorized to proceed with the repair until notification to proceed is received from the PCO. Any disposal ordered shall be performed by the contractor in accordance with all applicable regulations and in accordance with all DCMA disposal procedures and requirements.

3.4.5 Missing on Induction (MOI). A Weapons Repairable Assembly (WRA) is subject to this MOI provision if the item received by the contractor for repair is missing one or more Shop Replaceable Assemblies (SRAs). Contractor replacement of MOI SRAs is not included in the contract price. The contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The contractor shall provide all such determinations, including identification of the missing SRA(s), and the DCMA written verification, to the Inventory Manager with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The contractor shall not induct and/or repair WRAs with MOI SRAs until instructions on how to proceed are provided to the contractor by the Inventory Manager (where no adjustment price to the contract is required) or by the PCO. Items received by the contractor missing consumable parts are not MOI items. Rather, repair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the contractor under this contract.

3.4.6 Replacing Failed or Missing Shop Replaceable Assembly (SRA) when repairinga Weapons Replaceable Assembly (WRA).

3.4.7 A. When the contractor believes one or more SRA(s) within a WRA are either:

3.4.8 Beyond Economic Repair (BER) or Beyond Repair (BR) i. e. the unit is not capable of being repaired because of the extent of physical damage), or Missing on Induction (MOI), the contractor shall obtain written verification from DCMA and advice from the Inventory Manager whether a SRA may be replaced by one or more of the following options:

Ship in place from an existing spares or repair contract, if any, MILSTRIP the SRA(s), otherwise be provided direction for obtaining the SRA(s) at no cost to the contractor.The detailed procedures are set forth in Section 6.0 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK.

3.4.9 B.When not otherwise provided for (or precluded) by other terms of this contract, the contractor may seek written authorization to replace failed SRA(s) with Ready For Issue SRA(s). When authorized, the procedures set forth in paragraph 3.0 of Section 6.2 of the WEB-BASED COMMERCIAL ASSET VISIBILITY (CAV) STATEMENT OF WORK shall be followed.

3.4.10 Over and Above Repair (OAR). An item sent to the contractor shall be considered to require over and above (OAR) repair effort if the repair required is not the type of repair that would be anticipated as a result of normal Navy operation of the item and is not included in the contract pricing due to the nature or scope of the repair needed for that particular item. Therefore, repair of OAR items may be subject to equitable adjustment. The Contractor shall obtain written concurrence from DCMA for all units determined by the contractor to require OAR effort. All such OAR determinations, including the basis for the determination, the repair required, the proposed price to repair and the DCMA written concurrence, shall be provided by the contractor to the PCO prior to undertaking repair of the item.

After receipt of the required documentation, the PCO shall provide the contractor disposition instructions or contractual authority for repair of the item. Any ordered disposal shall be performed by the contractor in accordance with all applicable regulations and DCMA disposal procedures and requirements.

3.5 4.0 PARTS AND MATERIALS

3.5.1 General. The contractor is responsible for supplying all parts and material necessary to perform the required repairs under this contract unless parts or material are specifically identified as Government Furnished Material (GFM). All parts and material used in performance of this contract shall be in accordance with the latest approved revision of applicable drawings and specifications and shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein. Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization must be approved by the PCO.

Cannibalization of units that have not been inducted is not typically authorized and requires specific approval by the PCO.

3.5.2 The contractor shall ensure it has access for the duration of this contract to updated drawings and specifications for parts and material required for repairs performed under this contract. Any change to such parts/material drawings or specifications requires Government approval in accordance with the Configuration Management provisions of this Statement of Work. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval, unless the contractor is the Design Control Agent (DCA) (i.e. the entity responsible for maintaining the latest configuration data) for the the contract item. If the contractor is the DCA, the contractor may approve approve changes to manufacturing source or manufacturing facility for all parts, including those which require source approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are done at the contractor's own risk. If the Government disapproves the requested change, the contractor shall replace any delivered items repaired using such unapproved change. The contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government's disapproval of a requested change to the drawings, specifications or manufacturing source or facility.

3.5.3 Purchased Material Control and Parts Control. The contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, assure that the parts and and material purchased are in compliance with the requirements of this contract.

3.5.4 Receiving Inspection of Purchased Parts and Material. (1)Purchased items shall be inspected upon receipt at the contractor's facility to assure conformance with all requirements of the applicable drawings and specifications or (2)the contractor shall provide prior to the contract award evidence for Government review and approval of a purchased parts and material system which provides for the inspections to assure conformance with all requirements of the applicable drawings and specifications. Evidence of such inspections of such inspections shall be maintained by the contractor or subcontractor for Government review.The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and process with appropriate pass/fail criteria such as certifications and actual dimensonal readings.

3.5.5 ***NOTE***PART CANNIBALIZATION IS NOT AUTHORIZED UNLESS SPECIFICALLY APPROVED BY NAVSUP WSS AND THE BDE.

3.5.6

3.6 SOURCE AND LOCATION OF REPAIR SOURCE:

3.6.1 The contractor shall specify the name of the Source/Division performing the work and the actual location where work will be performed.

HALF BRIDGE UNIT <GENERAL ATOMICS> Company Name , <3550 GENERAL ATOMICS CT. SAN DIEGO, CA 92121-1122> Address , <4V360> Cage Code inspection will be accomplished on the contractor's equipment

3.7 5.0 CONTRACTOR QUALITY REQUIREMENTS:

3.7.1 Quality Program. The Contractor shall establish, implement, document and maintain a quality system that ensures conformance to all applicable requirements of ISO 9001/ SAE AS9100. The Contractor's quality management system/program shall be designed to promptly detect, correct and prevent conditions that adversely affect quality.

3.7.2 Calibration System Requirements. Contractor shall maintain a calibration system that meets the requirements of ANSI/NCSL Z540.3, ISO-10012-1 or an equivalent calibration program acceptable to the Government.

3.8 6.0 CONFIGURATION MANAGEMENT (CM):

3.8.1 The contractor shall maintain a configuration management plan in accordance with the provisions of NAVSUP WSS configuration management clause NAVICPIA18. (Refer to contract).

3.9 7.0 MARKINGS.

3.9.1 Marking shall be as indicated in the contract when applicable.

3.10 8.0 STORAGE;

3.10.1 The contractor shall provide a proper enclosed warehouse environment for both material items awaiting repair and assets which have been repaired and are awaiting shipment to ensure the items are not damaged while being stored.

PART I - THE SCHEDULE

SECTION D

PACKAGING AND MARKING

CLIN: 0001

NIIN: 016868394 ACTIVITY USE ONLY: TDP VERSION NO.: 003

ITEM NAME: HALF BRIDGE UNIT

5. PACKAGING- MIL-STD 2073 PACKAGING APPLIES AS FOUND ELSEWHERE IN THE SCHEDULE

PART I - THE SCHEDULE

SECTION E

INSPECTION AND ACCEPTANCE

CLIN: 0001

NIIN: 016868394 ACTIVITY USE ONLY: TDP VERSION NO.: 003

ITEM NAME: HALF BRIDGE UNIT

4. QUALITY ASSURANCE PROVISIONS - NOT APPLICABLE.

WSSTERMEZ05

INSPECTION AND ACCEPTANCE OF SUPPLIES

< > 1. Inspection of Supplies shall be performed at the contractor location shown on Page One by the Contract Administration Office (CAO) also shown on Page One, unless otherwise specified below:

<x> Manufacturing Site at <4US81> by the Manufacturing Site CAO <S0107A> < > Subcontractor's Sites at < > by the Subcontractor Site CAO < > .

< > Packaging Site at < > by the Packaging Site CAO < > .

< > DCMA Naval Special Emphasis Operations < >

< > 2. Final Acceptance of Supplies and Packaging shall be performed at the contractor's location on Page One by the Contract Administration Office (CAO) also shown on Page One, unless otherwise specified below:

<x> Manufacturing Site at <4US81> by the Manufacturing Site CAO <S0107A> .

< > Subcontractor's Site at < > by the Subcontractor Site CAO < > ). < > Packaging Site at < > by the Packaging Site CAO < > .

< > DCMA Naval Special Emphasis Operations < > < > Destination.

< > 3. Inspection and Acceptance of Supplies will be performed by the consignee at Destination. (04-15)

PART I - THE SCHEDULE

SECTION G

CONTRACT ADMINISTRATION DATA

ACRN GN/GRNT BGN/END SYMBL SBHD OBJ BCN SA AAA TT PAA COST-CODE AMOUNT TAC

AA 97 00 XX XX 4930 NC1A 000 85004 0 050120 7T 000000 7RPT00000000 $2,776,523.75 NNW6

252.232-7006

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) Definitions. As used in this clause--

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document Type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow

(WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall--

(1) Have a designated electronic business point of contact in the Systemfor Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the Web Based Training link on the WAWF home page at https://w /wawf.eb.mil/

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items--

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

252.232-7006 (CONT)

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

( <Invoice and receiving report (Combo)> )(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

( < > )(Contracting Officer: Insert either Invoice 2in1 or the applicable invoioice and receiving report document type(s) for fixed price line items for services.)

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

(f) (Note: The Contractor may use a WAWF combo document type to create some combinations of invoice and receiving report in one step.)

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC ( <HQ0339> ) Issue By DoDAAC ( <N00383> ) Admin DoDAAC ( <S0512A> ) Inspect BY DoDAAC ( <S0107A> ) Ship To Code ( <SW3117 > ) Ship From Code ( <4US81> ) Mark For Code ( < > ) Service Approver (DoDAAC) ( < > ) Service Acceptor (DoDAAC) ( < > ) Accept at Other DoDAAC ( < > ) LPO DoDAAC ( < > ) DCAA Auditor DoDAAC ( < > ) Other DoDAAC(s) ( < > )

(Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")

(Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

252.232-7006 (CONT)

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activitys WAWF point of contact.

( < > )(Contracting Officer: Insert applicable information or "Not applicable.")

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

PART III - LIST OF DOCUMENTS, EXHIBITS, AND OTHER ATTACHMENTS

SECTION J

LIST OF ATTACHMENTS

CLIN: 0001

NIIN: 016868394 ACTIVITY USE ONLY: TDP VERSION NO.: 003

ITEM NAME: HALF BRIDGE UNIT

DOCUMENT NAME EXHBT/ATTCHMNT

NOTES ATTACHMENT 1

CONSIGNMENT INSTRUCTIONS

NOTE: The activity codes listed below are used to identify the Activities which are to receive material. The activity code and the quantities to be shipped to each activity under this contract appear in the Schedule. DO NOT SHIP TO A WATER PORT OR AIR TERMINAL WITHOUT COMPLYING WITH THE

CLEARANCE/MILSTAMP REQUIREMENTS OF CLAUSE FAR 52.247-52.

SW3117 Receiving Officer, DLA DISTRIBUTION NORFOLK VA, RECEIVING/SHIPPING DDNV P, 1968 GILBERT ST BLDG W143 DWY 17

NORFOLK, VA 23511-0001

ATTACHMENT 1 PAGE: 1

CLIN: 0001

NIIN: 016868394 ACTIVITY USE ONLY: TDP VERSION NO.: 003

ITEM NAME: HALF BRIDGE UNIT

6. NOTES - NOT APPLICABLE

DISTRIBUTION

EXTERNAL:

(S0512A) (HQ0339)

(E) DCMA SOUTHERN CALIFORNIA (E) DFAS - COLUMBUS CENTER

(S0107A) (SW3117)

(E) DCMA SOUTH (M) DLA DISTRIBUTION NORFOLK VA

MILSTRIP

1 (4V360) 1 (4V360)

(P) GENERAL ATOMICS CO (P) GENERAL ATOMICS CO

ATTN: DOAN LA N00383

ATTN: DOAN LA

INTERNAL:

1 FILE COPY

File details come from the government source that posted it. Updated .