This document provides an amendment to a solicitation for the repair, overhaul, and upgrade of V-22 windshields for the Department of the Navy Naval Supply Systems Command. The procurement will result in multiple fixed price delivery order contracts awarded to up to two approved sources for the repair of these items. The non-price evaluation factors include technical acceptability based on the offeror's status as an approved source for repair in the Joint Engineering Data Management Information and Control System, past performance under previous long term contracts, and production capacity and potential throughput. The price factor involves each offeror submitting a repair price per unit to determine fair and reasonable pricing.

View the file

Other files

File Type Posted
N00383_21_R_0999.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Amendment 0005 to solicitation N0038321R0999

1. This procurement will be awarded as a multi-award contract, SECTION L

SUBMISSION OF PROPOSAL (BEST VALUE/TRADE OFF)

3.1 GENERAL

Correction to L03 - FAR 52.216-1 - TYPE OF CONTRACT (APR 1984) The Government contemplates award of a Multi Award contract with firm fixed price Delivery Orders resulting from this solicitation. The Government anticipates awarding contracts to up to two approved sources.

In addition to instructions to Offerors contained elsewhere in this Request for Proposals (RFP), the following instructions are provided.

The procuring contracting officer contact is below:

John.R.Visconto.Civ@US.NAVY.MIL

Note: Paragraph (e) Multiple Awards listed in Clause L02-52-212-1 Instruction to Offerors Commercial Items is applicable to this procurement.

SECTION M- Explanation of evaluation factors

Non-Price Evaluation Factor

I. Technical Rating Subfactor: Source Approval

The Government will review the Joint Engineering Data Management Information and Control System (JEDMICS) to confirm whether or not a contractor is an approved source of repair for these items.

Table I. Technical Acceptable/Unacceptable Rating Method

Adjectival Rating Description Acceptable Offeror is an approved source of repair Unacceptable Offeror is not an approved source of repair

II. Past Performance mailto:John.R.Visconto.Civ@US.NAVY.MIL

The Government will limit their review of past performance to the contractors performances under the previous Long Term Contracts for these items.

III Capacity

The Government will take the contractors capacity and potential throughput into consideration when deciding which contractor to award delivery orders to.

1. Proposed Price

Each offeror will submit a repair price per unit. The purpose of the price factor is to determine if the proposed price is fair and reasonable. The price proposal shall support the technical proposal. The price proposal should include all elements of price information as considered appropriate and an understanding of how the overall price was developed in support of the performance of the offeror's proposal. In no event will the Government make an award against an offer that the Government does not find to be fair and reasonably priced. The Government anticipates that adequate price competition will establish a fair and reasonable price.