View the file

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

INFORMATION TO OFFERORS OR QUOTERS

SECTION A – COVER SHEET

Form Approved OMB No. 9000-0002 Expires Sep 30, 2000

The public reporting burden for his collection of information is estimated to average 35 minutes per response, including the time for reviewing instructions, searching existing data sources, gathering and maintaining the data needed, and completing and reviewing the collection of information. Send comments regarding this burden estimate or any other aspect of the collection of information, including suggestions for reducing the burden, to Department of Defense, Washington Headquarters Services, Directorate for Information Operations and Reports (9000-0002), 1215 Jefferson Davis Highway, Suite 1204, Arlington, VA 22202-4302.

Respondents should be aware that notwithstanding any other provision of law, no person shall be subject to any penalty for failing to comply with a collection of information if it does not display a currently valid OMB control number.

PLEASE DO NOT RETURN YOUR FORM TO THE ABOVE ADDRESS. RETURN COMPLETED FORM TO THE ADDRESS IN BLOCK 4 BELOW.

1. SOLICITATION NUMBER 2 (X one) 3. DATE/TIME RESPONSE DUE

N00383-19-Q-075H

N00383-19-PR0R-329

a. INVITATION FOR BID (IFB) 23 September 2019 / 2:00pm (Local)

b. REQUEST FOR PROPOSAL (RFP) X c. REQUEST FOR QUOTATION (RFQ)

INSTRUCTIONS

NOTE: The provision entitled “Required Central Contractor Registration” is applicable to most solicitations.

1. If you are not submitting a response, complete the information in Blocks 9 through 11 and return to the issuing office in Block 4 unless a different return address is indicated in Block 7.

2. Offerors or quoters must include full, accurate, and complete information in their responses as required by this solicitation (including attachments). “Fill-ins” are provided on Standard Form 18, Standard Form 33, and other solicitation documents. Examine the entire solicitation carefully. The penalty for making false statements is prescribed in 18 U.S. C. 1001.

3. Offerors or quoters must plainly mark their responses with the Solicitation Number and the date and local time for bid opening or receipt of proposals that is in the solicitation document.

4. Information regarding the timeliness of response is addressed in the provision of this solicitation entitled either “Late Submission, Modification and Withdrawal of Bid” or “Instructions to Offerors – Competitive Acquisition”.

4. ISSUING OFFICE (Complete mailing address, including ZIP Code)

5. ITEMS TO BE PURCHASED (Brief description)

NAVSUP WEAPON SYSTEM SUPPORT

PHILADELPHIA PA 19111-5098

SEE SCHEDULE

6. PROCUREMENT INFORMATION (X and complete as applicable)

X

a. THIS PROCUREMENT IN UNRESTRICTED

b. THIS PROCUREMENT IS % SET-ASIDE FOR SMALL BUSINESS. THE APPLICABLE SIC CODE IS:

c. THIS PROCUREMENT IS % SET-ASIDE FOR HUB ZONE CONCERNS. THE APPLICABLE SIC CODE IS:

d. THIS PROCUREMENT IS RESTRICTED TO FIRMS ELIGIBLE UNDER SECTION 8(a) OF THE SMALL BUSINESS ACT.

7. ADDITIONAL INFORMATION

NOTE - IT IS POLICY OF THE DOD TO MAXIMIZE THE NUMBER OF SMALL AND SMALL DISADVANTAGED BUSINESS (SDB) CONCERNS PARTICIPATING IN DEFENSE PRIME AND SUBCONTRACTS. IT IS REQUIRED THAT PRIME CONTRACTORS' SUBCONTRACT PLANS, WHEN REQUIRED BY THE SOLICITATION, REFLECT A SDB GOAL OF 5%, OR GREATER.

NOTE - THE CLAUSE 52.232-25 ENTITLED "PROMPT PAYMENT" IN THE SOLICITATION.

8. POINT OF CONTACT FOR INFORMATION

a. NAME (Last, First, Middle Initial) b. ADDRESS (Include Zip Code) Montes, Jose F. N722.18 NAVSUP WEAPON SYSTEM SUPPORT

PHILADELPHIA PA 19111-5098

c. TELEPHONE NUMBER (include Area Code and Extension)

d. E-MAIL ADDRESS

JOSE.F.MONTES@NAVY.MIL

215-697-2558

9. REASONS FOR NO RESPONSE (X all that apply)

a. CANNOT COMPLY WITH SPECIFICATIONS d. DO NOT REGULARLY MANUFACTURE OR SELL THE TYPE OF ITEMS INVOLVED

b. UNABLE TO IDENTIFY THE ITEM(S) e. OTHER (Specify)

c. CANNOT MEET DELIVERY REQUIREMENT

10. MAILING LIST INFORMATION (X one) WE DO DO NOT DESIRE TO BE RETAINED ON THE MAILING LIST FOR FUTURE PROCUREMENT OF THE TYPE OF INVOLVED 11a. COMPANY NAME b. ADDRESS (Include Zip Code)

c. ACTION OFFICER

(1) TYPED OR PRINTED NAME (Last, First, Middle Initial) (2) TITLE

(3) SIGNATURE (4) DATE SIGNED

(YYYYMMDD)

DD FORM 1707, FEB 2002 (EG) PREVIOUS EDITION IS OBSOLETE

WHS/DIOR, Feb 99

DD FORM 1707 (BACK), FEB 2002

FOLD

FOLD

FROM AFFIX

STAMP

HERE

SOLICITATION NUMBER

N00383-19-Q-075H

DATE(YYYYMMDD) LOCAL TIME

20190923 02:00 P.M.

SOLICITATION, OFFER AND AWARD 1. THIS CONTRACT IS A RATED ORDER RATING PAGE OF PAGES

UNDER DPAS (15 CFR 700) DO 1 41

2.CONTRACT NUMBER 3.SOLICITATION NUMBER 4.TYPE OF SOLICITATION 5.DATE ISSUED 6.REQUISITION/PURCHASE NUMBER

N00383-19-Q-075H SEALED BID (IFB)

NEGOTIATED (RFP)

06 SEPT 2019

N00383-19-PR0R-329

7. ISSUED BY CODE N00383 8. ADDRESS OFFER TO (If other than Item 7)

NAVSUP WEAPON SYSTEMS SUPPORT-PHILADELPHIA

700 Robbins Avenue Philadelphia, PA 19111-5098

NOTE: In sealed bid solicitations “offer” and “offeror” mean “bid” and “bidder”

SOLICITATION

9. Sealed offers in original and 1 copies for furnishing the supplies or services in the Schedule will be received at the place specified in Item 8, or if hand carried, to Building 1, Room 2223 until 2:00 p. m. local time 23 Sept. 19 (Hour) (Date) CAUTION – LATE Submissions, Modifications, and Withdrawals: See Section L, Provision No. 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR

INFORMATION

CALL ►

A. NAME B. TELEPHONE (NO COLLECT CALLS) C. E-MAIL ADDRESS

AREA CODE NUMBER EXT

J. F. Montes 215 697 2558 jose.f.montes@navy.mil

11. TABLE OF CONTENTS

(X) SEC. DESCRIPTION PAGE(S) (X) SEC. DESCRIPTION PAGE(S)

PART I – THE SCHEDULE PART II – CONTRACT CLAUSES

A SOLICITATION/CONTRACT FORM 1 I CONTRACT CLAUSES

B SUPPLIES OR SERVICES AND PRICES/COSTS 2 PART III – LIST OF DOCUMENTS, EXHIBITS ANOTHER ATTACH.

C DESCRIPTION/SPECS./WORK STATEMENT J LIST OF ATTACHMENTS

D PACKAGING AND MARKING PART IV – REPRESENTATIONS AND INSTRUCTIONS

E INSPECTION AND ACCEPTANCE

K

REPRESENTATIONS, CERTIFICATIONS AND OTHER

STATEMENTS OF OFFERORS

F DELIVERIES OR PERFORMANCE

G CONTRACT ADMINISTRATION DATA L INSTRS.,CONDS., AND NOTICES TO OFFERORS

H SPECIAL CONTRACT REQUIREMENTS M EVALUATION FACTORS FOR AWARD

OFFER (Must be fully completed by offeror) NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the price set opposite each item, delivered at the designated point(s) within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT 10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS(%) CALENDAR DAYS(%) (See Section I, Clause No.

14. ACKNOWLEDGEMENT OF AMEND-

MENTS (The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

AMENDMENT NO. DATE AMENDMENT NO. DATE

15A. NAME AND

ADDRESS

OF OFFEROR

CODE FACILITY 16. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER

(Type or Print)

15B. TELEPHONE NUMBER 15C. CHECK IF REMITTANCE ADDRESS

IS DIFFERENT FROM ABOVE – ENTER SUCH

ADDRESS IN SCHEDULE.

17. SIGNATURE 18.OFFER DATE

AREA CODE NUMBER EXT

AWARD (To be completed by Government)

19.ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL AND OPEN COMPETITION: 23. SUBMIT INVOICES TO ADDRESS SHOWN

IN(4 copies unless otherwise specified)

ITEM

10 U.S.C. 2304(c)( ) 41 U.S.C. 253(c)( )

24. ADMINISTERED BY (If other than Item 7) CODE 25. PAYMENT WILL BE MADE BY CODE

26. NAME OF CONTRACTING OFFICER (Type or print) 27. UNITED STATES OF AMERICA 28.AWARD DATE

(Signature of Contracting Officer) IMPORTANT – Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION STANDARD FORM 33 (REV 9-97)

Previous edition is unusable Prescribed by GSA – FAR (48 CFR) 53.214(c)

CONTINUATION SHEET

REFERENCE NO. DOCUMENT BEING CONTINUED

N00383-19-Q-075H

PAGE 2 OF 41 PAGE

ITEM NO.

(a)

SUPPLIES/SERVICES

(b)

QUANTITY

(c)

UNIT

(d)

UNIT PRICE

(e)

AMOUNT

(f)

PROVIDE LABOR, MATERIALS AND PARTS AS MAY BE

REQUIRED TO RESTORE THE FOLLOWING GOVERNMENT

OWNED ARTICLES TO OPERATIONAL CONDITION.

0001 Nomen: Turret Sensor-Sight

NSN: 7RH 1270 016071330

P/N: 4981950-4

0001AA M/F: PSRME490728003; SER NR: MY200003 1 EA

SHIP TO: PSR00F

MARK FOR: PSR00F

SUPADD: PAFSBU

FMS CASE: SR-P-P-SBU

PLATFORM:H-60

NO FAST PAY.

DO NOT INDUCT TO CAV.

THE CONTRACTOR IS REQUIRED TO SHIP BY

TRACEABLE MEANS. TWO COPIES OF THE DD250

SHOULD ACCOMPANY THE EQUIPMENT. ONE PROPERLY

AFFIXED TO THE SHIPPING CONTAINER THE OTHER

INSIDE THE CONTAINER.

PLEASE SEND A COMPLETED COPY OF THE DD 250 TO

NAVSUP WSS CODE N52213.26

GOVERNMENT SOURCE INSPECTION IS REQUIRED.

CONTACT DCMC TRANSPORTATION OFFICER FOR

SHIPPING INSTRUCTIONS.

IF AN ITEM IS FOUND TO BE EITHER BEYOND

ECONOMICAL REPAIR (BER) OR BEYOND REPAIR

(BR), THE CONTRACTOR SHALL NOTIFY THE DEFENSE

CONTRACT MANAGEMENT AGENCY (DCMA) QUALITY

ASSURANCE REPRESENTATIVE (QAR) FOR

VERIFICATION OF THE ITEM'S CONDITION. THE QAR

WILL PROVIDE THEIR ASSESSMENT OF THE ITEM'S

CONDITION ALONG WITH ANY OTHER PERTINENT

INFORMATION TO THE DCMA ADMINISTRATIVE

CONTRACTING OFFICER (ACO). THE ACO WILL ROUTE

THE INFORMATION TO THE NAVSUP WSS PROCUREMENT

CONTRACTING OFFICER (PCO). THE CONTRACTOR

SHALL NOT SCRAP OR CANNIBALIZE THE ITEM UNTIL

WRITTEN AUTHORIZATION IS PROVIDED BY THE

NAVSUP WSS PCO.

PACKAGING AND MARKING SHALL BE IN ACCORDANCE

WITH BEST STANDARD COMMERCIAL PACKAGING FOR

OVERSEAS SHIPMENT.

Articles that have been service shall be shipped via a Collect Commercial Bill of Lading to the Freight Forwarder listed on the item page. No transportation charges should be incurred against this order. Based on the criticality of the item, NAVSUP Weapon Systems Support may authorize alternate or priory air shipment for completed repairs.

This authorization must be made in writing:

No verbal instructions will be horned.

Please note: We are only providing you with the MAPAC SHIP TO and MARK FOR codes and not the full addresses. Prior to the shipment of the material, please consult the MAPAC website (https://www.transactionservices.dla.mil/daas inq/captcha_form.asp) to obtain the complete SHIP TO and MARK FOR addresses. Please click on the MAPAC link on the left hand side of the page and enter the appropriate MAPAC code.

ALL REPAIR ISSUES SHOULD BE DIRECTED TO:

MATTHEW DUTY, CODE N52213.26

Tel: 215-697-3007 Email: matthew.duty@navy.mil

ITEM REPLACEMENT COST

CLIN0001 $1,706,413.00

mailto:matthew.duty@navy.mil

The text of all FAR, DFARS, and NMCARS provisions and clauses may be accessed electronically at the following links:

http://www.acquisition.gov http://www.acq.osd.mil/dpap/dars/dfarspgi/current/ https://acquisition.navy.mil/rda/home/policy_and_guidance/

The text of DoD Class Deviations may be accessed electronically at the following link:

http://www.acq.osd.mil/dpap/dars/class_deviations.html

PART I – THE SCHEDULE

SECTION A

SOLICITATION/CONTRACT FORM

SECTION B

SUPPLIES/SERVICES AND PRICES

WSSTERMBA00 CONTACT INFORMATION

When a DCMA office is shown on a Contract/Purchase Order, the Administrative Contracting Officer (ACO) is the primary point of contact and all inquiries shall initially be directed to that office for necessary action.

Inquiries and correspondence directed to the Post Award PCO should be addressed as follows:

Code N722.18 Weapon System LRC B4P Telephone 215-697-2558 E-Mail: JOSE.F.MONTES@NAVY.MIL

In the event that the listed PCO contact information is no longer valid and a follow-on PCO cannot be identified, contact (itimp.wss.fct@navy.mil).

(01-18)

WSSTERMBZ01 ***IMPORTANT NOTICE REGARDING INVENTORY TRANSACTION REPORTING***

Inventory transaction reporting requirements have changed for NAVSUP Weapon System Support (NAVSUPWSS) contracts. These requirements are detailed in NAVSUPWSSFA24, and the contractor should read this section carefully to ensure compliance. Additional information regarding reporting via Commercial Asset Visibility (CAV) is available at https://www.navsup.navy.mil/public/navsup/wss/pi_cd/ . Questions can be addressed to NAVSUPWSSCAVSOW@navy.mil for NAVSUP WSS Philadelphia solicitations and contracts (document numbers beginning with N00383) and to NAVSUPWSSM.CAVSOW@navy.mil for NAVSUP WSS Mechanicsburg solicitations and contracts (document numbers beginning with N00104). (06-16)

SECTION C

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

SUPTXT216-9401(12-10) PLACING AND PROCESSING OF ORDERS

(a) Order placed under this agreement shall be in accordance with this agreement.

(b) Authorized Ordering Activity. A Contracting Officer of NAVSUP Weapon Systems Support may place orders under this agreement. Only such Contracting Officer has the authority to make changes to the provisions of this agreement.

(c) Ordering Procedures. Orders issued hereunder may be either priced or unpriced. Each order issued hereunder shall constitute a contract. The negotiated ceiling price for an unpriced order issued hereunder is the maximum not-to-exceed price for each order.

Unpriced orders will be definitized within 180 days after the date on which the contractor submits a qualifying proposal to definitize the contractual terms, specifications, and price or the date on which the amount of funds obligated under the order is equal to more than fifty

(50) percent of the overall ceiling price of the order whichever occurs earlier. The contractor agrees to submit a firm fixed price proposal to meet this definitization schedule.

(d) Content of Orders. Orders placed hereunder will be prepared on a DD Form 1155 and will at a minimum include the following if applicable:

(1) The order number, date, and the number of this agreement.

http://www.acquisition.gov/ http://www.acq.osd.mil/dpap/dars/dfarspgi/current/

(2) Citation of the negotiation authority under FAR 6.302.

(3) Appropriation and accounting data and special invoicing instructions.

(4) Special shipping instructions, place of delivery, place of inspection, DoD Priority designator and surveillance criticality designator.

(5) Defense Order Rating certified under the Defense Priorities and Allocations System.

(6) Descriptions and the part numbers of the particular articles to be furnished, the quantity of each, and the stock number, if available.

(7) The model designation of the end unit for which the parts ordered applies, if available.

(8) For priced orders, the agreed upon delivery schedules, firm unit prices, firm extended amounts and a total firm price.

(9) For unpriced orders, a desired delivery schedule and a total ceiling price.

(10) Orders for change pages/revisions to existing Technical Manuals (TM), or for new TMs, will include Technical Manual Contract Requirements (TMCRs) citing the equipment and changes to be covered by the publications ordered, the manuals involved, description and specifications, delivery and packing, instructions for transmittal of negatives and retention of reproducible copies and negatives.

(11) A DD form 1423 setting forth the data ordered.

PRICED ORDERS

(a) Priced orders under this agreement shall be those in which the contractor submits a firm-fixed price quote, offer, or proposal, and delivery schedule in response to a Request for Quotation (RFQ) or Request for Proposal (RFP), and all terms and conditions have been agreed upon prior to issuance of the order, including pricing for Teardown and Evaluation (TD&E) and repair of government furnished property, and delivery.

UNPRICED ORDERS

(a) Unpriced orders under this agreement shall be those which, in response to an RFQ or RFP, the contractor is unable to submit a firm-fixed price quote, offer, or proposal, and/or delivery schedule relative to one or more of the items to be repaired.

(b) Unpriced Orders(also known as “Monetary Limitation Orders”) shall be issued pursuant to the requirements of FAR Part 13 and Undefinitized Contractual Action Orders (also known as “Ceiling Priced Orders”) shall be issued purusant to the requirements of DFARS 217.74

(c) Unpriced Orders shall contain a Monetary Limitation price at the time of issuance. An Undefinitized Contractual Action Order shall contain a Not-To-Exceed price at the time of issuance.

(d) Failure to reach agreement on price for any order issued before its price is established is a dispute under the Disputes clause, FAR 52.233-1.

(e) Monetary Limitation Orders. When an RFQ is issued under Simplified Acquisition Procedures (FAR Part 13) and the estimated contract price is under the Simplified Acquisition Threshold, a realistic monetary limitation shall be established for the order and the order shall be funded in the amount of the monetary limitation.

(1) All monetary limitation orders shall include the clause at FAR 52.216-24 with the fill-ins completed. Any modification of an order to adjust the monetary limitation shall make corresponding adjustments to FAR 52.216-24.

(f) Ceiling Priced Orders. When an RFQ or RFP is issued and the estimated contract price is at or above the Simplified Acquisition Threshold, a Not-To-Exceed price shall be established for the order and the order shall initially be funded at not more than forty-nine percent (49%) of the Not-To-Exceed price. Prior to defnitization and in the Government’s discretion, a modification may be issued to increase the obligated amount to not more than seventy-five percent (75%) of the Not-To-Exceed price after receipt by the Government of the contractor’s qualifying proposal for a firm-fixed-price order.

(1) All Ceiling Priced Orders shall include the clause at DFARS 252.217-7027 with all fill-ins completed.

(2) All Ceiling Priced Orders shall include the clause at FAR 52.216-24 with the fill-ins completed. Any modification to the obligated amount prior to definitization shall make corresponding adjustments to FAR 52.216-24.

(3) For any Ceiling Priced Order, the submission by the contractor of a qualifying proposal in accordance with the definitization schedule is a material element of the contract. The contractor shall submit its firm-fixed-price proposal for definitization to the PCO within thirty

(30) days of its receipt of Government Property to be repaired under the Order, unless otherwise established in clause 252.217-7027, Contract Definitization in the Order. The contractor’s proposal submission shall be in the form of a “qualifying proposal” as defined by DFARS 217.7401; and contractor shall include in its proposal a firm delivery schedule, if not already established, as well as cost or pricing data, as may be required in accordance with FAR subpart 15.4 and DFARS subpart 215.4.

ADDITIONAL MATTERS RELATIVE TO THE ISSUANCE OF ORDERS

(a)The induction period for repairs under each order shall be 365 days from the date of the order unless otherwise specified in the order.

(b)The contractor shall provide appropriate and adequate storage for all items received in accordance with an order under this agreement.

(c)All Ceiling Priced Orders and Monetary Limitation Orders are effective and binding upon issuance by the contracting officer, unless the Order specifically provides the Contractor an opportunity to reject the Order.

(d)Contractor shall not perform any work under this agreement that is not associated with a funded and executed Order.

(e)All contractor proposals and orders issued under this agreement shall include a reference to the Procurement Instrument Identifier (Block 2 of the Standard Form 26/Block 3 of the Standard Form 33/ Block 1&2 of the DD Form 1155).

INPUT OF ARTICLES TO BE REPAIRED AND/OR MODIFIED

(a) Articles to be repaired and/or modified under this agreement, as shown on CLIN 0001, will be shipped at the Government's expense to the plant of the contractor at: TBD The contractor shall receive for each shipment a list (referencing this agreement number) of the articles included in the shipment.

(b) Upon receipt of such articles, the contractor shall:

(1) Verify that the articles received corresponds with the list of the articles furnished for such shipment; and further verify that the articles received are covered by the applicable order;

(2) Segregate those assets that were improperly sent to the contractor, contact PCO for return shipping instructions, and return improperly sent items to the Government; via CAVSOW

(3) Advise the Government PCO/ Supply planner if any portion of the required repair is covered under a warranty; or is a result of the furnishing by the contractor of articles that were defective in material and/or workmanship, or otherwise not in conformance with the requirements of the contract under which such articles were originally furnished;

(4) Further advise the Government PCO of the results of the foregoing preliminary inspection, together with a list of the articles and quantities required to be repaired.

SPECIFICATIONS FOR REPAIR/MODIFICATION/STATEMENT OF WORK

1.0 SCOPE

1.1. The items to be furnished hereunder are Government Furnished Property (GFP) and shall be repaired, tested, inspected, and accepted in accordance with the terms and conditions specified in this document. Equipment such as fixtures, jigs, dies, patterns, mylars, special tooling, special test equipment, or any other manufacturing aid required for the repair, manufacture, and/or testing of the subject item(s), will not be provided by the Government and shall be the responsibility of the Contractor unless expressly provided for on Attachment _____ [FILL IN] This limitation regarding the furnishing of equipment applies notwithstanding any reference to the contrary in any drawing, manual, or specification for the [CONTRACT] items.

1.2. Repair Requirements. The Contractor shall provide the necessary facility, labor, materials, parts, and test and tooling equipment required to return the items (see CLIN 0001 for a list of these items) to a Ready For Issue (RFI) condition. RFI is defined as that condition allowing the items to perform properly and reliably in an operational environment in a manner they were intended to operate. The Contractor shall identify on Attachment _____ [FILL IN] the governing repair manual(s)/documents for each item covered by this [CONTRACT]. On the same attachment, the Contractor must identify the facility for each item where repair, including final test and inspection, is completed.

1.2.1. The contractor shall perform Testing and Evaluation (T&E) of all units submitted for work. T&E shall be conducted in accordance with the repair manual or specifications stated in section 1.1 and 1.2 of this statement of work. Based on the results of the T&E, severity of the failure, and total operational hours accumulated since the last repair/overhaul, the contractor shall make its recommendations to either repair or overhaul the unit to the DCMC (QAR). The contractor shall not begin work before receiving approval from the DCMC (QAR).

1.2.2. For the purpose of the statement of work, "Overhaul" is defined as follows: All items regardless of their condition shall be subjected to all of actions outlined in the documents and specifications listed in 1.1 and 1.2. The contractor shall inspect all components and repair/refurbish/replace those components that fail to meet the limits specified in the documents and specifications listed in paragraph 1 of the requirement's section. Parts exceeding the dimensional limits shall be scrapped or repaired in accordance with documents and specifications listed in 1.1 and 1.2 of this SOW. Parts that cannot be repaired/refurbished shall be scrapped and material review (MRB) will not be granted on these components/parts.

1.2.3. For the purposes of this statement of work, "REPAIR" is defined as follows: Items deemed repairable shall be subjected only to the actions necessary to correct the failed/non-operational condition. All work shall be performed as outlined in the documents and specifications listed in 1.1 and 1.2 of this SOW. The contractor shall inspect only those components/areas identified in the Testing and Evaluation phase as being defective, and repair, replace and or refurbish those failing to meet the limits specified in the documents and specifications listed in 1.1 and 1.2 of this SOW. Parts exceeding the dimensional limits shall be scrapped or repaired in accordance with the documents and specifications listed in 1.1 and 1.2. Parts that cannot be repaired/refurbished shall be scrapped and material review (MRB) will not be granted for these items.

1.2.4. Changes to repair manuals/documents and changes to drawings or specifications for the manufacture of parts utilized in these repairs require Procuring Contracting Officer (PCO) approval. In addition, as provided for in Section 2.3, requests for changes to a repair source or repair facility shall be submitted in writing to the PCO and must be approved prior to making any such change.

1.2.5. Any repairs performed using unapproved changes to manuals, drawings, specifications, or unapproved changes to a repair source or facility are not permitted.

1.2.6. The Contractor is not entitled to any equitable adjustment to the price or [CONTRACT] terms based on the Government’s disapproval of a requested change to manuals, drawings, specifications, or to a repair source or facility.

1.2.7. Services required to accomplish the above objectives shall be in accordance with the contractor's established industrial shop methods and existing special tools and test equipment.

1.2.8. In the event that the contractor requests a waiver, deviation or modification for parts/subassemblies, all Engineering Change Proposals, waivers, and deviations shall be prepared in accordance with MIL-STD-973.

1.2.9. During the performance of this contract, the contractor shall maintain a Quality Assurance System in accordance with

1.3. Beyond Repair (BR)

1.3.1. Scope. An item is BR when the item is not capable of being repaired in accordance with the Statement of Work due to the extent of physical damage.

1.3.2. Procedures. The Contractor shall obtain written concurrence from DCMA for all units determined by the Contractor to be BR. All such determinations, including the basis for the determination and the DCMA written concurrence shall be provided by the Contractor to the PCO, with a copy to the Inventory Manager (IM). After receipt of the required documentation, the PCO shall provide the Contractor disposition instructions. If provided disposition instructions, the contractor shall submit a proposal for BR pricing to the PCO within 30 days of receipt of these instructions. Any disposal ordered shall be performed by the Contractor in accordance with all applicable regulations and the Contractor’s approved Government property disposal procedures.

1.4. Beyond Economical Repair (BER)

1.4.1. Scope. An item is BER if the cost of the repair exceeds 80% of the replacement price for items identified on CLIN

0001:

ITEM REPLACEMENT COST*

CLIN0001 $1,706,413.00

*To be used for identification of Beyond Economical Repair (BER) units only, the replacement cost cited above is the latest replacement cost in NAVSUP WSS files. This figure shall be used for the purposes of this clause unless the contractor notifies the contracting officer in writing and both parties agree in writing to an updated replacement cost based on production run quantities of a new article in a configuration similar to the configuration of the article to be serviced.

1.4.2. This replacement price is for the purposes of BER determinations only, and may not be used or relied on by the offeror in the pricing of the repairs required by this [CONTRACT].

1.4.3. Procedures. The Contractor shall obtain written concurrence from DCMA for all units determined by the Contractor to be BER. All such determinations, including the basis for the determination, the repair required, the Contractor’s proposed BER price to repair, and the DCMA written concurrence, shall be provided by the Contractor to the PCO, with a copy to the IM. After receipt of the required documentation, the PCO shall provide the Contractor disposition instructions or contractual authority for repair of the item. The Contractor is not authorized to proceed with the repair until notification is received from the PCO. If provided disposition disposal instructions, the contractor may submit a proposal for disposal pricing to the PCO within 30 days of receipt of these instructions. Any disposal ordered shall be performed by the Contractor in accordance with all applicable regulations and the Contractor’s approved Government property disposal procedures. Items determined BER will be separately priced.

1.4.4. The following additional procedures may apply, if authorized, for the replacement of a BER SRA (Shop Repairable Assembly) within a WRA (Weapons Repairable Assembly) when the SRA has not been separately inducted. The Contractor may request authorization to:

Ship in place an accepted item from an existing spares or repair [CONTRACT], if any, or MILSTRIP the SRA(s), Authorization to ship in place or MILSTRIP must be provided by the IM in writing to the Contractor and must be appropriately documented in accordance with the WEB-BASED COMMERCIAL ASSET VISIBILITY (WEBCAV) STATEMENT OF WORK. The Contractor must provide written notification of any item shipped in place or MILSTRIPed to the PCO and an equitable adjustment may be required. If authorization to ship in place or MILSTRIP is not provided, the Contractor shall contact the PCO for further instructions.

1.5. Missing on Induction (MOI).

1.5.1. Scope. A WRA is subject to this MOI provision if the item received by the Contractor for repair is missing one or more

SRAs and the SRA is not a separately inducted item. Contractor replacement of MOI SRAs is not included in the contract price. Items received by the Contractor missing consumable parts are not MOI items. Rather, repair of such items and replacement of the missing consumable parts are included in the contract price and the item shall be inducted and repaired by the Contractor under this [CONTRACT].

1.5.2. Procedures. The Contractor shall immediately notify DCMA when an item is received with MOI SRA(s) and shall obtain written verification from DCMA for all WRAs determined to have MOI SRA(s). The Contractor shall provide written notice of all such determinations, including identification of the missing SRA(s), and the DCMA written verification, to the IM with a copy to the PCO and ACO prior to induction and/or repair of the WRA. The Contractor shall not proceed with repair of WRAs with MOI SRAs until instructions on how to proceed are provided to the Contractor.

1.5.3. The following additional procedures may apply, if authorized, for the replacement of a MOI SRA within a WRA. The Contractor may request authorization to:

Ship in place an accepted item from an existing spares or repair [CONTRACT], if any, or MILSTRIP the SRA(s), Authorization to ship in place or MILSTRIP must be provided by the IM in writing to the Contractor and must be appropriately documented in accordance with the WEB-BASED COMMERCIAL ASSET VISIBILITY (WEBCAV) STATEMENT OF WORK. If either of these options is not authorized, the Contractor shall contact the PCO for further instructions.

1.6. Swapping SRAs

1.6.1. Scope. On rare occasions the Contractor may request authority to replace a failed but repairable SRA (within an inducted WRA) that is not BR, BER or MOI.

1.6.2. Procedures. The Contractor may request authorization to replace the failed SRA unit from the Contractor’s production line, by MILSTRIP for an RFI item from Government stock, or with another repairable WRA, i.e. cannibalization.

Permission from the PCO must be obtained and an equitable adjustment may be required. Authorization to ship in place from the Contractor’s production line or MILSTRIP must be appropriately documented in accordance with the WEB- BASED COMMERCIAL ASSET VISIBILITY (WEBCAV) STATEMENT OF WORK. Although permission from the PCO is required if the SRA is obtained from another repairable WRA (cannibalized), that transaction does not have to be input into CAV.

2.0 PARTS AND MATERIAL

2.1. The Contractor is responsible for supplying all parts and material necessary to perform the required repairs under this

[CONTRACT] unless parts or material are specifically identified on Attachment _____ [FILL IN] as Government Furnished Material (GFM). All parts and material used in performance of this [CONTRACT] shall be in accordance with the latest approved revision of applicable drawings and specifications. The Contractor shall ensure it has access for the duration of this [CONTRACT] to updated drawings and specifications for parts and material required for repairs performed under this [CONTRACT]. Any change to such parts/material drawings or specifications requires Government PCO approval.

2.2. All parts and material shall be new in accordance with FAR 52.211-5, Material Requirements, which is incorporated by reference herein. Authorization to use other than new material as defined by FAR 52.211-5 requires written approval from the PCO. In addition, cannibalization of piece parts must be approved by the PCO. Cannibalization of units that have not been inducted is not authorized and requires specific additional approval by the PCO. Cannibalization or swapping, including any actions authorized under paragraphs 1.5 and 1.6, shall not render an item BER or BR.

2.3. Written approval from the PCO must be obtained prior to any change to the manufacturing source or manufacturing facility for all parts which require source approval. However, if the Contractor has been delegated authority in writing by another Navy Command to approve a change in manufacturing source or a manufacturing facility, the Contractor may implement such a change after notifying the PCO, providing a copy of such delegation to the PCO, and receiving acknowledgment of such delegation from the PCO.

2.3.1. Where there has been a change to a manufacturing source, the Contractor shall complete all qualification testing that was required when that item or component was originally qualified. Any changes in such testing shall be submitted to the Contracting Officer for Government review and approval. Any repairs performed using unapproved changes to such drawings, specifications or manufacturing source or facility are not authorized. The Contractor is not authorized to deliver any items until such testing (including revised testing as properly approved) has been completed and the delivered items are repaired/manufactured in accordance with the qualification requirements package.

2.3.2. The Contractor is not entitled to any equitable adjustment to the contract price or terms based on the Government’s disapproval of a requested change to the drawings, specifications or manufacturing source or facility.

2.4. Purchased Material Control and Parts Control. The Contractor shall establish and maintain a system of control over purchased parts and material. Such controls shall, at a minimum, ensure that the parts and material purchased are in compliance with the requirements of this [CONTRACT].

2.5. Receiving Inspection of Purchased Parts and Material. Purchased parts and material shall be inspected by the Contractor upon receipt at the Contractor’s facility to ensure conformance with all requirements of the applicable drawings and specifications.

Alternatively, the Contractor shall submit, prior to contract award, evidence for Government review and approval of a purchased parts and material system which provides for adequate inspection to ensure parts and material conform with all requirements of the applicable drawings and specifications.

2.5.1. Evidence of such inspections shall be maintained by the Contractor or Subcontractor for Government review at least twelve (12) months following the conclusion of the contract. The inspection report shall, at a minimum, include a record of all dimensional data (coordinate/positional), material, finish, and processes with appropriate pass/fail criteria, such as certifications, and actual dimensional readings.

3.0 INSPECTION PROVISIONS

3.1. Government inspection shall be in accordance with FAR 52.246-2, Inspection of Supplies - Fixed-Price incorporated by reference, at source by DCMA unless otherwise specified in the [CONTRACT] or as authorized by the Administrative Contracting Officer (ACO) or PCO. Acceptance testing shall be conducted under the surveillance of the DCMA QAR. These tests shall include all tests necessary to assure that the items repaired conform to the performance required to provide Ready For-Issue material. The DCMA retains the authority to require the Contractor to conduct or reconduct any tests deemed necessary to ensure compliance with the manuals, drawings and specifications applicable to this [CONTRACT].

SUPTXT204-9400(1-17) - CONTRACTOR UNCLASSIFIED ACCESS TO FEDERALLY CONTROLLED FACILITIES, SENSITIVE INFORMATION, INFORMATION TECHNOLOGY (IT) SYSTEMS OR PROTECTED HEALTH

INFORMATION

Homeland Security Presidential Directive (HSPD)-12, requires government agencies to develop and implement Federal security standards for Federal employees and contractors. The Deputy Secretary of Defense Directive-Type Memorandum (DTM) 08-006 – “DoD Implementation of Homeland Security Presidential Directive – 12 (HSPD-12)” dated November 26, 2008 (or its subsequent DoD instruction) directs implementation of HSPD-12. This clause is in accordance with HSPD-12 and its implementing directives.

APPLICABILITY

This clause applies to contractor employees requiring physical access to any area of a federally controlled base, facility or activity and/or requiring access to a DoN or DoD computer/network/system to perform certain unclassified sensitive duties. This clause also applies to contractor employees who access Privacy Act and Protected Health Information, provide support associated with fiduciary duties, or perform duties that have been identified as National Security Position, as advised by the command security manager. It is the responsibility of the responsible security officer of the command/facility where the work is performed to ensure compliance.

Each contractor employee providing services at a Navy Command under this contract is required to obtain a Department of Defense Common Access Card (DoD CAC). Additionally, depending on the level of computer/network access, the contract employee will require a successful investigation as detailed below.

ACCESS TO FEDERAL FACILITIES

Per HSPD-12 and implementing guidance, all contractor employees working at a federally controlled base, facility or activity under this clause will require a DoD CAC. When access to a base, facility or activity is required contractor employees shall in-process with the Command’s Security Manager upon arrival to the Command and shall out-process prior to their departure at the completion of the individual’s performance under the contract.

ACCESS TO DOD IT SYSTEMS

In accordance with SECNAV M-5510.30, contractor employees who require access to DoN or DoD networks are categorized as IT-I, IT- II, or IT-III. The IT-II level, defined in detail in SECNAV M-5510.30, includes positions which require access to information protected under the Privacy Act, to include Protected Health Information (PHI). All contractor employees under this contract who require access to Privacy Act protected information are therefore categorized no lower than IT-II. IT Levels are determined by the requiring activity’s Command Information Assurance Manager.

Contractor employees requiring privileged or IT-I level access, (when specified by the terms of the contract) require a Single Scope Background Investigation (SSBI) or T5 or T5R equivalent investigation , which is a higher level investigation than the National Agency Check with Law and Credit (NACLC)/T3/T3R described below. Due to the privileged system access, an investigation suitable for High Risk national security positions is required. Individuals who have access to system control, monitoring, or administration functions (e.g.

system administrator, database administrator) require training and certification to Information Assurance Technical Level 1, and must be trained and certified on the Operating System or Computing Environment they are required to maintain.

Access to sensitive IT systems is contingent upon a favorably adjudicated background investigation. When access to IT systems is required for performance of the contractor employee’s duties, such employees shall in-process with the Navy Command’s Security Manager and Information Assurance Manager upon arrival to the Navy command and shall out-process prior to their departure at the completion of the individual’s performance under the contract. Completion and approval of a System Authorization Access Request Navy (SAAR-N) form is required for all individuals accessing Navy Information Technology resources. The decision to authorize access to a government IT system/network is inherently governmental. The contractor supervisor is not authorized to sign the SAAR-N; therefore, the government employee with knowledge of the system/network access required or the COR shall sign the SAAR-N as the “supervisor.”

The SAAR-N shall be forwarded to the Command’s Security Manager at least 30 days prior to the individual’s start date. Failure to provide the required documentation at least 30 days prior to the individual’s start date may result in delaying the individual’s start date.

When required to maintain access to required IT systems or networks, the contractor shall ensure that all employees requiring access complete annual Information Assurance (IA) training, and maintain a current requisite background investigation. The Contractor’s Security Representative shall contact the Command Security Manager for guidance when reinvestigations are required.

INTERIM ACCESS

The Command's Security Manager may authorize issuance of a DoD CAC and interim access to a DoN or DoD unclassified computer/network upon a favorable review of the investigative questionnaire and advance favorable fingerprint results. When the results of the investigation are received and a favorable determination is not made, the contractor employee working on the contract under interim access will be denied access to the computer network and this denial will not relieve the contractor of his/her responsibility to perform.

DENIAL OR TERMINATION OF ACCESS

The potential consequences of any requirement under this clause including denial or termination of physical or system access in no way relieves the contractor from the requirement to execute performance under the contract within the timeframes specified in the contract.

Contractors shall plan ahead in processing their employees and subcontractor employees. The contractor shall insert this clause in all subcontracts when the subcontractor is permitted to have unclassified access to a federally controlled facility, federally-controlled information system/network and/or to government information, meaning information not authorized for public release.

CONTRACTOR’S SECURITY REPRESENTATIVE

The contractor shall designate an employee to serve as the Contractor’s Security Representative. Within three work days after contract award, the contractor shall provide to the requiring activity’s Security Manager and the Contracting Officer, in writing, the name, title, address and phone number for the Contractor’s Security Representative. The Contractor’s Security Representative shall be the primary point of contact on any security matter. The Contractor’s Security Representative shall not be replaced or removed without prior notice to the Contracting Officer and Command Security Manager.

BACKGROUND INVESTIGATION REQUIREMENTS AND SECURITY APPROVAL PROCESS FOR CONTRACTORS

ASSIGNED TO NATIONAL SECURITY POSITIONS OR PERFORMING SENSITIVE DUTIES

Navy security policy requires that all positions be given a sensitivity value based on level of risk factors to ensure appropriate protective measures are applied. Contractor employees under this contract are recognized as Non-Critical Sensitive [ADP/IT-II] positions when the contract scope of work require physical access to a federally controlled base, facility or activity and/or requiring access to a DoD computer/network, to perform unclassified sensitive duties. This designation is also applied to contractor employees who access Privacy Act and Protected Health Information (PHI), provide support associated with fiduciary duties, or perform duties that have been identified as National Security Positions. At a minimum, each contractor employee must be a US citizen and have a favorably completed NACLC or T3 or T3R equivalent investigation to obtain a favorable determination for assignment to a non-critical sensitive or IT-II position. The investigation consists of a standard NAC and a FBI fingerprint check plus law enforcement checks and credit check. Each contractor employee filling a non-critical sensitive or IT-II position is required to complete:

• SF-86 Questionnaire for National Security Positions (or equivalent OPM investigative product)

• Two FD-258 Applicant Fingerprint Cards (or an electronic fingerprint submission)

• Original Signed Release Statements

Failure to provide the required documentation at least 30 days prior to the individual’s start date shall result in delaying the individual’s start date. Background investigations shall be reinitiated as required to ensure investigations remain current (not older than 10 years) throughout the contract performance period. The Contractor’s Security Representative shall contact the Command Security Manager for guidance when reinvestigations are required.

Regardless of their duties or IT access requirements ALL contractor employees shall in-process with the Command’s Security Manager upon arrival to the command and shall out-process prior to their departure at the completion of the individual’s performance under the contract. Employees requiring IT access shall also check-in and check-out with the Navy Command’s Information Assurance Manager.

Completion and approval of a System Authorization Access Request Navy (SAAR-N) form is required for all individuals accessing Navy Information Technology resources. The SAAR-N shall be forwarded to the Navy Command’s Security Manager at least 30 days prior to the individual’s start date. Failure to provide the required documentation at least 30 days prior to the individual’s start date shall result in delaying the individual’s start date.

The contractor shall ensure that each contract employee requiring access to IT systems or networks complete annual Information Assurance (IA) training, and maintain a current requisite background investigation. Contractor employees shall accurately complete the required investigative forms prior to submission to the Command Security Manager. The Command’s Security Manager will review the submitted documentation for completeness prior to submitting it to the Office of Personnel Management (OPM); Potential suitability or security issues identified may render the contractor employee ineligible for the assignment. An unfavorable determination is final (subject to SF-86 appeal procedures) and such a determination does not relieve the contractor from meeting any contractual obligation under the contract. The Command’s Security Manager will forward the required forms to OPM for processing. Once the investigation is complete, the results will be forwarded by OPM to the DoD Central Adjudication Facility (CAF) for a determination.

If the contractor employee already possesses a current favorably adjudicated investigation, the contractor shall submit a Visit Authorization Request (VAR) via the Joint Personnel Adjudication System (JPAS) or a hard copy VAR directly from the contractor’s Security Representative. Although the contractor will take JPAS “Owning” role over the contractor employee, the Navy Command will take JPAS "Servicing" role over the contractor employee during the hiring process and for the duration of assignment under that contract.

The contractor shall include the IT Position Category per SECNAV M-5510.30 for each employee designated on a VAR. The VAR requires annual renewal for the duration of the employee’s performance under the contract.

BACKGROUND INVESTIGATION REQUIREMENTS AND SECURITY APPROVAL PROCESS FOR CONTRACTORS

ASSIGNED TO OR PERFORMING NON-SENSITIVE DUTIES

Contractor employee whose work is unclassified and non-sensitive (e.g., performing certain duties such as lawn maintenance, vendor services, etc. ...) and who require physical access to publicly accessible areas to perform those duties shall meet the following minimum requirements:

• Must be either a US citizen or a US permanent resident with a minimum of 3 years legal residency in the United States (as required by The Deputy Secretary of Defense DTM 08-006 or its subsequent DoD instruction) and

• Must have a favorably completed National Agency Check with Written Inquiries (NACI) or T1 investigation equivalent including a FBI fingerprint check prior to installation access.

To be considered for a favorable trustworthiness determination, the Contractor’s Security Representative must submit for all employees each of the following:

• SF-85 Questionnaire for Non-Sensitive Positions

• Two FD-258 Applicant Fingerprint Cards (or an electronic fingerprint submission)

• Original Signed Release Statements

The contractor shall ensure each individual employee has a current favorably completed National Agency Check with Written Inquiries (NACI) or T1 equivalent investigation, or ensure successful FBI fingerprint results have been gained and investigation has been processed with OPM.

Failure to provide the required documentation at least 30 days prior to the individual’s start date may result in delaying the individual’s start date.

* Consult with your Command Security Manager and Information Assurance Manager for local policy when IT-III (non-sensitive) access is…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it.